Softwashsystems.Com © Copyright 2010-2018 HRHIC INDUSTRIES INC

Total Page:16

File Type:pdf, Size:1020Kb

Softwashsystems.Com © Copyright 2010-2018 HRHIC INDUSTRIES INC 855.763.8669 SoftWashSystems.com © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. Building The SoftServ™ Wall Systems Building a 12’ rail style tracking wall for sales accountability. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 03 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 04 Building The SoftServ™ Wall Systems 1. What Is It? • The SoftServTM Rail System is a _______________________ tracking system that uti- lizes a single curtain rod to hang various sales tracking devices. • Developed by AC Lockyer during his __________________ in the service industry. • Created to allow easy organization without putting a lot of holes in a wall. • Easy to __________________ as company grows. • Easy to transport or _________________________________ with minimal effort and company down time. 2. Tools You Will Need • Cordless Screw Gun. • Phillips bit for Screw Gun. • Crescent Wrench. • __________________. • Paint Brush. • Rags. • Hole Saw. • Drill Bits. • Socket Set. • ___________________. 3. What You Will Need (Lowe’s) • One (1) piece of 4’x 8’ 5/8 Ply Wood. (sand ply) • Six (6) 1”x 6”x 6’ #1 pine boards. • Box of 1.5” dry wall screws. • Six (6) door stops. • Six (6) robe hooks. • Half gallon of wood stain. (color your choice) • 36’ of small black chain. • One (1) 12’ curtain rod kit. • Four (4) deck post tops. (if drywall is weak or studs wont cooperate) • 25 count 2.5” dry wall screws. 4. What You Will Need (Staples) • Three (3) Clear Lexan Wall Sign Pockets. • Five (5) Clear Lexan Wall File Pockets. • One (1) Pack of binder rings. • 100 medium binder clips. • 100 small binder clips. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 05 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 06 Building The SoftServ™ Wall Systems 5. What You Will Need (Maponics) • www.MaponicsOnlineStore.com/products/zip-code-maps/zip-code-maps.html • Have a radius zip code map made. – __________________. – _____________. – _____________. – _____________. 6. What You Will Need (Sign Shop) • ____________ Sales Tracking Dry Erase Board. • __________ Sales Tracking Dry Erase Board. • Dry erase print of your zip code radius map. • ____________________ vinyl letters for your wall files. 7. Cutting The Wood • Lowe’s is happy to cut this for you and it makes it easier to carry. • Cut the ply wood into three pieces so that you get ______ 4’x3’ panels and ______ 4’x2’. • Depending on how high you mount your rail you may need to trim a bit off of the 1”x 6” boards. 8. Assembling The Panels • Screw the pine boards onto the back of the plywood panels so that the bottom of the boards is __________ with the bottom of the ply wood. • Stain everything to match. • Mount the robe hooks in the top of the pine boards facing rail and upside down. • Mount door stops in bottom of the pine boards facing wall. • Make sure you measure everything so that the robe hooks and door stops are __________ in same place on every panel. 9. The Panels • The 4’x 3’ panels are for mounting your ______________________ to. • The 4’x 2’ panel is for mounting your ________________________ to. • The 4’x 3’ panels can also be created for hanging LCD digital monitors on. 10. Hanging The Rail • The rail is ____ end to end. • Most walls have studs 12” on center. • Get a stud finder and locate your first stud on left. • Now locate your stud that is 12’ to the right. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 07 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 08 Building The SoftServ™ Wall Systems • Make sure your two points are _________. • Now that you have your two widest studs located now move towards center from the left stud and at 4’ locate a stud and _________. • Replicate this from the right side as well. • You should now have four studs located. One at 0’ ____________________ one at 12’. • Now secure your rod hangers into the studs with 2.5” dry wall screws. 11. Header Possibility • If it is difficult to find studs you can add a ___________________________. • 1”x 10” #1 pine board. • Stained. • ________________________________ • Screwed into what studs were found. • Or… secured with anchors. 12. Alternate Rail • If you plan on hanging heavier items on your rail system… • Upgrade to _____________________________. (for hanging rail) • Upgrade to _______________________ and pipe hangers. • Galvanized pipe has Ts, 90s, 45s and flange hangers. Easy to encircle an entire room. 13. Hanging The Rail • You can now hang your rail. • ___________________________ the set screws as of yet because we will be loading systems onto this rail. • Tighten the set screws once you are ____________________ with set up. 14. What Goes On The Rail • Daily & Weekly Sales Boards. • Zip Code Radius Map. • __________________. • Sales Chain Accountability System. • SoftServ Invoice System _________________. 15. Daily & Weekly Sales Boards • Mounted to one of the 4’x 3’ panels. • Hang on one side of rail system opposite of sales chains. • Make sure you have _____________________________________. • Add ____________ for hanging erasers and dry erase markers to. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 09 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 10 Building The SoftServ™ Wall Systems 16. Zip Code Radius Map • Mounted to one of the 4’x 3’ panels. • Hang on one side of rail system opposite of sales chains. • Make sure you have ________________________. • Add Velcro for hanging _______________________________ to. 17. File Folder Panel • Mounted to one of the 4’x 2’ panels. • Hang on one side of rail system near sales chains. • Add ready to apply vinyl letters. – _____________ – ___________ – _____________ – _________________ – ______________________ 18. Sales Chain Accountability System • Use ______________ to join the chains and the sign holders to the rail. • Hang a ___ section of chain from each ring. • Attach ___________ binder clips on the left chain. • Attach _________________ binder clips on the right chain. (See Intro to SoftServTM System module) 19. SoftServTM Invoice System Wall Map • Hangs on rail or can be attached to the wall. • Visual training aid / reminder of the _______________________ of the invoice system. • __________________ with SoftWash Systems and SoftServTM making your office look _____________________________________. 20. Now All You Need… • This SoftServ Rail Systems was created to go hand in hand with the SoftServTM Invoice System. • A starter kit can be purchased online at: www.SoftWashSystems.com/shop/softserv/ Together We Accomplish More SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 11 .
Recommended publications
  • FEMA P-909 Home & Business Earthquake Safety and Mitigation
    Wiss Janney Elstner Associates www.thetakeaway.org www.wday.com FEMA News Photo FEMA P-909 Home & Business Earthquake Safety and Mitigation A “Train the Trainer” Course July 2013 1 Overall Purpose Teach the general public about earthquake mitigation for homes and businesses. 2 Overall Agenda Part 1: Orientation for Trainers Part 2: Presentation for the Public Part 3: Hands-On Demonstrations 3 PART 1 – FOR TRAINERS Jocelyn Augustino/FEMA 4 Learning Objectives for Trainers . Plan and organize an effective training session . Address common questions from homeowners and business owners . Identify potential earthquake hazards and evaluate potential risks . Recognize costly consequences of failures . Recall strategies that can limit future losses . Teach others how to implement mitigation strategies 5 Planning a training session Rehearse Practice the Recruit an Deliver the Find a venue the hands-on Audience presentation activities presentation 6 Recruit attendees 1. Send an email to a relevant distribution list 2. Contact your chamber of commerce 3. Partner with a building improvement store 4. Advertise at school board meetings, invite school administrators 5. Reach out to first responders 6. Contact city emergency managers 7. Reach out to local citizen groups 7 Effective Training Strategies 1. Create a comfortable environment 2. Know your participants 3. Concentrate on what’s important 4. Keep participants engaged 5. Get feedback 8 Create a comfortable environment Participants will be more engaged if the session is informal, fun, and example oriented . Make it fun! . Ask questions and encourage dialogue . Use clear vocabulary . Walk around the room, don’t be a talking head . Make yourself available before and after Expert Provide email contact Tip information 9 Know your audience At the beginning of the session, ask about: 1.
    [Show full text]
  • SDWS Timber Screw
    Simpson Strong-Tie® Fastening Systems Load Tables, Technical Data and Installation Instructions Strong-Drive ® SDWS TIMBER Screw Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting and traditional lag screws. The Strong-Drive® SDWS Timber screws are ideal for the contractor and do-it-yourselfer alike. Double-barrier coating provides corrosion resistance equivalent to hot-dip galvanization, making it suitable for certain exterior and preservative-treated wood applications, as described in the evaluation report. Codes/Standards: IAPMO-UES ER-192, State of Florida FL13975; U.S. Patents 5,897,280; 7,101,133 0.75" For More Product Information, see p. 69 3" – 10" SDWS Timber Screw – Allowable Shear Loads – Douglas Fir-Larch and Southern Pine Lumber Size Thread DF/SP Allowable Shear Loads (lb.) Model Wood Side Member Thickness (in.) Dia.x L No. Length (in.) (in.) 1.5 2 2.5 3 3.5 4 4.5 6 8 0.22 x 3 SDWS22300DB 1 2 255 — — — — — — — — 0.22 x 4 SDWS22400DB 2 8 405 405 305 — — — — — — 0.22 x 5 SDWS22500DB 2 4 405 405 360 360 325 — — — — 0.22 x 6 SDWS22600DB 2 4 405 405 405 405 365 365 355 — — 0.22 x 8 SDWS22800DB 2 4 405 405 405 405 395 395 395 395 — 0.22 x 10 SDWS221000DB 2 4 405 405 405 405 395 395 395 395 395 See footnotes below. SDWS Timber Screw – Allowable Shear Loads – Spruce-Pine-Fir and Hem-Fir Lumber SPF/HF Allowable Shear Loads (lb.) Size Model Thread Dia.x L No.
    [Show full text]
  • <[email protected]> Kiln Drying
    Claudia Johnson <[email protected]> You're Right to Want a Log or Timber Home 3 messages Josh Beasley <[email protected]> Mon, Jan 9, 2017 at 8:32 AM To: [email protected] Dear Claudia, You're right to want a log or timber home! Over the next few emails, we would like to share the top reasons you are correct. Here are the first three... 1. Trees Grow Back When a home is made from solid logs, you are effectively taking the carbon contained in those logs out of environmental circulation over the entire life of the home. Eastern White Pine, which is used for Honest Abe's log homes, is a major species for reforestation, making it a plentiful and renewable resource. 2. They Last a LONG Time If there's any question about the durability of log and timber structures, some still in use today in Europe and Russia have been standing almost a millennium. 3. They're Not Scared of Mother Nature The log and timber home industry has countless stories of these homes surviving the worst Mother Nature deliver. In recent years a couple of Honest Abe's customers survived tornados with their homes and their lives. Read one of the stories here: Alabama Log Home Survives Tornado. We don't want to overwhelm you or your inbox, so in a couple of weeks we'll send more reasons from our list. The information we have suggests you are doing research right now and do not have plans to build soon. However, if you have questions or if we may help in any way, simply reply to this email or call Honest Abe Independent Dealer at .
    [Show full text]
  • Shared Rail Composition Mount | QMSRC Elevated Water Seal Technology®
    Shared Rail Composition Mount | QMSRC Elevated Water Seal Technology® THIS EDGE TOWARDS ROOF RIDGE ITEM NO. DESCRIPTION QTY. 4.75 1 FLASHING, ROUNDED CORNERS, 9" X 12" X .040", 5052, MILL 1 2 SHARED RAIL BASE, COMP,4-1/2", 6061-T6, MILL 1 2.50 3 WASHER, SEALING, 5/16" ID X 3/4" OD, EPDM BONDED SS 2 4 LAG SCREW, HEX HEAD, 5/16" x 4", 18-8 SS 2 9.00 5 CAP SCREW, SERRATED FLANGE, HEX HEAD, 5/16"-18 X 7/8", UNC-2A, 18-8SS 1 6 L-FOOT, 2" X 3.30" FOR .438" O.D. FASTENER, 2-1/16" SLOT, 6061-T6/6005A-T61, MILL 1 7 NUT, SERRATED FLANGE, HEX, 5/16"-18, UNC-2B, 18-8 SS 1 .25 NOTE: AVAILABLE IN MILL AND BLACK FINISH 3.438 4.50 12.00 2.000 (L-FOOT RANGE) L-FOOT MAY BE POSITIONED .408 UPSLOPE OR DOWNSLOPE, L-FOOT MAY NOT OVERHANG BASE 1.677 3.300 4.070 1.835 .040 4 .770 3.216 3 2 1 2.50 1.750 7 TITLE: 6 QMSRC: SHARED RAIL COMPOSITION MOUNT 5 UNLESS OTHERWISE SPECIFIED: SIZE DRAWN BY: AAP REV DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL 1/8 A DATE: 10/18/2018 1 PROPRIETARY AND CONFIDENTIAL TWO PLACE DECIMAL .19 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE DO NOT SCALE DRAWING THREE PLACE DECIMAL .094 WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED.
    [Show full text]
  • Quick Mount PV Products Are NOT Designed for and Should NOT Be Used to Anchor Fall Protection Equipment
    E-Mount Lag QMSE - LAG ,7(0 '(6&5,37,21 47<%2; 7+,6('*(72:$5'6522)5,'*( 12 )/$6+,1*;;0,// 4%/2&.&/$66,&$&$67$/0,// 3/8*6($/,1*;(3'066 /$*6&5(:+(;+($'[66 :$6+(5)(1'(5,';2'66 5$&.,1*&20321(176 127,1&/8'(' 7,7/( 406(/$*4039(02817 $9$,/$%/(,10,//$1' %521=($12',=('),1,6+(6 :,7+/$*%2/7 81/(6627+(5:,6(63(&,),(' 6,=( '5$:1%< 5$' 5(9 ',0(16,216$5(,1,1&+(6 72/(5$1&(6 )5$&7,21$/ $ '$7( 35235,(7$5<$1'&21),'(17,$/ 7:23/$&('(&,0$/ 7+(,1)250$7,21&217$,1(',17+,6'5$:,1*,67+(62/(3523(57<2)48,&.0281739$1<5(352'8&7,21,13$5725$6 '21276&$/('5$:,1* $:+2/(:,7+2877+(:5,77(13(50,66,212)48,&.0281739,6352+,%,7(' 7+5((3/$&('(&,0$/ 6&$/( :(,*+7 6+((72) Lag pull-out (withdrawal) capacities (lbs) in typical lumber: Lag Bolt Specifications Specific Gravity 5/16" shaft per 3" thread depth 5/16" shaft per 1" thread depth Douglas Fir, Larch .50 798 266 Douglas Fir, South .46 705 235 Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 705 235 Hem, Fir .43 636 212 Hem, Fir (North) .46 705 235 Southern Pine .55 921 307 Spruce, Pine, Fir .42 615 205 Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) .50 798 266 Sources: American Wood Council, NDS 2005, Table 11.2 A, 11.3.2 A Notes: 1) Thread must be embedded in a rafter or other structural roof member.
    [Show full text]
  • Quick Mount PV
    Your Solution in Mounting Products Solar . H2 O . Conduit . HVAC . Custom Composition Mount Specifications - 5/16” - PV - Quick Mount PV ® is an all-in-one waterproof flashing and mount to anchor photovoltaic racking systems, solar thermal panels, air conditioning units, satellite dishes, or anything you may need to secure to a new or existing roof. It is made in the USA of all aluminum and includes stainless steel hardware. It works with all standard racks, installs seamlessly and saves labor by not need- ing to cut away any roofing, will out live galvanized 2 to 1, and is a better low-profile mount. Split Lock Washer SS 5/16” (Not a theft- prevention feature) Fender Washer SS 5/16” x 1” EPDM Rubber Washer 60 Durometer 5/16” Sealing Washer SS 5/16” ESR-2835 Hanger Bolt SS 5/16” x 6” 1 1/4” Machine, 1 3/4” Spacer, 3” Lag (2) Hex Nuts SS 5/16” Mount & Flashing Aluminum Mount 1 1/4” x 1 1/4” x 2 1/4” Beveled Block Flashing .05” thick For standard composition roofs: flashing is 12” x 12” mount is attached 3” off center Lag pull-out (withdrawal) capacities (lbs) in typical lumber: Lag Bolt Specifications Specific 5/16” shaft 5/16” shaft gravity per 3” per 1” thread depth thread depth Douglas Fir, Larch .50 798 266 Douglas Fir, South .46 705 235 Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 705 235 Hem, Fir .43 636 212 Hem, Fir. (North) .46 705 235 Southern Pine .55 921 307 Spruce, Pine, Fir .42 615 205 Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) ..50 798 266 Sources: Uniform Building Code; American Wood Council Notes: 1) Thread must be embedded in a rafter or other structural roof member.
    [Show full text]
  • NIR Spectroscopy for Predicting the Nutritional, Anthelmintic And
    NIR spectroscopy for predicting the nutritional, anthelmintic and environmental effects of sainfoin Irene Mueller-Harvey, Marta Martin Lorenzo, Elisabetta Stringano, R. Barnes, J. Oliver, Aikaterini Theodoridou, Jocelyne Aufrere, B. Hatew Chuko, Wilbert Pellikaan, Foteini Manolaraki, et al. To cite this version: Irene Mueller-Harvey, Marta Martin Lorenzo, Elisabetta Stringano, R. Barnes, J. Oliver, et al.. NIR spectroscopy for predicting the nutritional, anthelmintic and environmental effects of sainfoin. 8. International Symposium on the Nutrition of Herbivores (ISNH8), Sep 2011, Aberystwyth, United Kingdom. Cambridge University Press, Advances in Animal Biosciences, 2 (2), 2011, Proceedings of the 8th International Symposium on the Nutrition of Herbivores (ISNH8). hal-02747141 HAL Id: hal-02747141 https://hal.inrae.fr/hal-02747141 Submitted on 3 Jun 2020 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. 241 The role of sheep in saltbush domestication – what can they tell us? H Norman1,3, P Jessop2,3, M Wilmot1,3 1CSIRO Livestock Industries, Western Australia, Australia, 2Industry & Investment NSW, New South Wales, Australia, 3CRC Future Farm Industries, Western Australia, Australia Email: [email protected] Introduction Climate change, leading to shorter and more variable seasons, represents a major challenge for livestock producers in southern Australia.
    [Show full text]
  • Projected Tool List
    The Vancouver Tool Library - Projected Tool List Tool Category Tool Tool Category Tool Awl Brick and Jointing Tools Chalk line Bull Float draw knife bull float handles, 6 ft flatbar cement finishing tools hammers (various) darby trowels, edgers, groovers, level (various) cement mixer, electric mallet, rubber cement mixing box miter box chisels: brick, cold, bull point nail puller concrete tamper (jitterbug) Concrete and Masonry nail set sledge hammer planes, various saw, tile (wetsaw) plum bob Grinder plybars, various Grout Float, various rasp, wood mortar hoe router table mortar mixing box router rebar cutter / bender Carpentry and saw, hand crosscut rotary hammer Woodworking saw horses x2 rotary hammer bits speed square pipe clamps, 2'-8' screwdriver set spring clamps squares, various c-clamps, various Clamps stud finder hand-screw tape measure, various vice-grips utility knife corner-clamps wood chisels, various Box cable cutter Screw gun circuit tester Electricians drill extension cords, <50' angle grinder, Electrical extension cords, >50' random orbital sander soldering iron saw, circular (skilsaw) wire stripper saw, power miter (chop) Multimeter saw, reciprocating (sawzall) saw, saber (jigsaw) saw, table The Vancouver Tool Library - Projected Tool List Caulking gun Bow saw drywall mud knives, various digging bar, various drywall corner knife posthole digger drywall hand sander garden trowel drywall pole sander hedgeshear, manual drywall T-square hedgetrimmer, electric Floor and Wall floor and roof scraper hoe, planters heat gun
    [Show full text]
  • SIM 2016 Pisa, Palazzo Dei Congressi 25 - 28 Settembre 2016
    44°CONGRESSO NAZIONALE DELLA SOCIETÀ ITALIANA DI MICROBIOLOGIA SIM 2016 Pisa, Palazzo dei Congressi 25 - 28 settembre 2016 Abstract Book CONTENTS INVITED LECTURES DEVELOPMENTS ON ANTIMICROBIAL RESISTANCE SPECIAL SESSIONS _______________________________________________ 7 _______________________________________________ 2 ANTIBIOTIC RESISTANCE AND NEW EMERGENT IMMUNOLOGY OF TUBERCULOSIS RESISTANCE MECHANISMS IN GRAM-POSITIVE F. Dieli BACTERIA S. Stefani EXOSOMES AS INTERCELLULAR PATHOGENESIS, IMMUNITY AND COMMUNICATORS INNOVATIVE THERAPEUTIC APPROACHES IN VIRAL INFECTIONS _______________________________________________ 2 EXOSOMES IN THE DIAGNOSIS OF _______________________________________________ 8 TUBERCULOSIS: ROLE OF SERUM MICRORNAS HOST AND VIRAL GENETIC FACTORS AS A IN THE DIFFERENTIAL DIAGNOSIS BETWEEN RESPONSE TO ANTIVIRAL THERAPY ANTI-HCV: ACTIVE AND LATENT TUBERCULOSIS YESTERDAY AND TODAY COMPARED G. Russo, P. Miotto, A. Ambrosi, D. Goletti, L.R. Codecasa, F. Ceccherini-Silberstein D.M. Cirillo _______________________________________________ 3 _______________________________________________ 8 ROLE OF EXTRACELLULAR VESICLES IN FUNGI INTERFERON AND VIRUSES: A DELICATE AS MEDIATORS OF CELLULAR COMMUNICATION BALANCE BETWEEN YIN AND YANG A. Tavanti C. Scagnolari _______________________________________________ 3 _______________________________________________ 9 microRNA AND EXOSOMES IN HUMAN NEW THERAPEUTIC APPROACHES IN HIV-1 PAPILLOMAVIRUS-INDUCED TUMORIGENESIS INFECTION M.V. Chiantore, G. Fiorucci, G. Mangino, M. Iuliano, I. Bon G.
    [Show full text]
  • Installation and Cabinet Care & Maintenance Guide Thank You for Your Diamond Cabinetry Purchase!
    INSTALLATION AND CABINET CARE & MAINTENANCE GUIDE THANK YOU FOR YOUR DIAMOND CABINETRY PURCHASE! THIS GUIDE WILL HELP YOU INSTALL YOUR KITCHEN CABINETS. PLEASE READ THE GUIDE IN ITS ENTIRETY BEFORE GETTING STARTED. BEFORE YOU BEGIN GATHER YOUR SUPPLIES • #10 2 1/2” phillips pan head screws supplied with cabinets (use in both wall and base cabinets) • #8 2 1/2” phillips flat head screws (recommended but not supplied) • tapered wood shims • patching plaster & putty knife • shims • fine grade sand paper • touch-up kit (markers, wax stick, and putty) Be sure to include a touch-up kit with your cabinet order. • miter adhesive GATHER YOUR TOOLS • steel tape measure (20’) • scribing tool & pencil • carpenter’s 36” level • chalk line or string • variable speed drill (minimum 9.6v) • 3/32”, 1/8”, 7/32” drill bits & screwdriver attachments • stud finder • 3” - 6” bar clamps or “c” clamps • carpenter’s square • small carpenter’s saw or circular saw • claw hammer • step ladder • extension cord STEP ONE: GETTING STARTED COLLECT ALL MATERIALS • cabinets • flooring (if needed) • lighting (if needed) • plumbing materials • electrical materials • countertop • paint & dry wall supplies • optional: miter saw (80 tooth blade) • optional: air compressor & brad nailing gun (1/2”, 3/4”, 1-1/4”, & 1-1/2” brad nails) STEP ONE: GETTING STARTED CHECK ALL CABINETS FIRST • Inspect each cabinet carefully. • All cabinets are subjected to numerous quality inspections and are carefully packaged before leaving the factory. Unfortunately, damage may occasionally occur in handling between the factory and final destination. • If damage is discovered, place the cabinet back in the box and notify your store of purchase.
    [Show full text]
  • Shiplap Installation Instructions 1
    SHIPLAP INSTALLATION INSTRUCTIONS 1. Let the shiplap acclimate for 72 hours before installation. Wood products need to acclimate to their indoor environment before you install them. Stack your shiplap on 2 x 4’s off of the floor in the room where you will eb installing the shiplap. Do not store your shiplap in any environments where drastic or prolonged fluctuation in humidity will occur. Always protect your shiplap from outdoor environments. 2. Shiplap can be installed directly to sheet rock/drywall. Simply mark the stud locations for nailing the shiplap or you can apply a construction adhesive such as liquid nails. If applying directly to the studs, you will need to check local building and fire codes to ensure the proper requirements are met. 3. It is extremely important to properly set the first piece to ensure a uniform application. Start the firstboard in one corner, leaving an 1/8” gap between corner and the first panel, keeping the longer flange to the top. Apply construction adhesive (per adhesive manufacturer’s instructions) and set the board. Use a level to make sure the first board is level. 4. Use a nail gun with 18 gauge 1 3/4”long brad nails. Nail through the top flange which is the longer of the two flanges. On the first board a second nail should be placed approximately 1” from the bottom edge. Face/Finished Edge Short Flange Long Flange Back/Raw Edge 5. Continue fastening the shiplap by leaving a 1/16” gap between all end to end butt joints for expansion and contraction.
    [Show full text]
  • Classic Pool Panel Mount QMPC
    Classic Pool Panel Mount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ag pull-out (withdrawal) capacities (lbs) in typical lumber: Lag Bolt Specifications Specific Gravity 5/16" shaft per 3" thread depth 5/16" shaft per 1" thread depth Douglas Fir, Larch .50 798 266 Douglas Fir, South .46 705 235 Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 705 235 Hem, Fir .43 636 212 Hem, Fir (North) .46 705 235 Southern Pine .55 921 307 Spruce, Pine, Fir .42 615 205 Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) .50 798 266 Sources: American Wood Council, NDS 2005, Table 11.2 A, 11.3.2 A Notes: 1) Thread must be embedded in a rafter or other structural roof member.
    [Show full text]