Softwashsystems.Com © Copyright 2010-2018 HRHIC INDUSTRIES INC

Softwashsystems.Com © Copyright 2010-2018 HRHIC INDUSTRIES INC

855.763.8669 SoftWashSystems.com © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. Building The SoftServ™ Wall Systems Building a 12’ rail style tracking wall for sales accountability. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 03 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 04 Building The SoftServ™ Wall Systems 1. What Is It? • The SoftServTM Rail System is a _______________________ tracking system that uti- lizes a single curtain rod to hang various sales tracking devices. • Developed by AC Lockyer during his __________________ in the service industry. • Created to allow easy organization without putting a lot of holes in a wall. • Easy to __________________ as company grows. • Easy to transport or _________________________________ with minimal effort and company down time. 2. Tools You Will Need • Cordless Screw Gun. • Phillips bit for Screw Gun. • Crescent Wrench. • __________________. • Paint Brush. • Rags. • Hole Saw. • Drill Bits. • Socket Set. • ___________________. 3. What You Will Need (Lowe’s) • One (1) piece of 4’x 8’ 5/8 Ply Wood. (sand ply) • Six (6) 1”x 6”x 6’ #1 pine boards. • Box of 1.5” dry wall screws. • Six (6) door stops. • Six (6) robe hooks. • Half gallon of wood stain. (color your choice) • 36’ of small black chain. • One (1) 12’ curtain rod kit. • Four (4) deck post tops. (if drywall is weak or studs wont cooperate) • 25 count 2.5” dry wall screws. 4. What You Will Need (Staples) • Three (3) Clear Lexan Wall Sign Pockets. • Five (5) Clear Lexan Wall File Pockets. • One (1) Pack of binder rings. • 100 medium binder clips. • 100 small binder clips. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 05 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 06 Building The SoftServ™ Wall Systems 5. What You Will Need (Maponics) • www.MaponicsOnlineStore.com/products/zip-code-maps/zip-code-maps.html • Have a radius zip code map made. – __________________. – _____________. – _____________. – _____________. 6. What You Will Need (Sign Shop) • ____________ Sales Tracking Dry Erase Board. • __________ Sales Tracking Dry Erase Board. • Dry erase print of your zip code radius map. • ____________________ vinyl letters for your wall files. 7. Cutting The Wood • Lowe’s is happy to cut this for you and it makes it easier to carry. • Cut the ply wood into three pieces so that you get ______ 4’x3’ panels and ______ 4’x2’. • Depending on how high you mount your rail you may need to trim a bit off of the 1”x 6” boards. 8. Assembling The Panels • Screw the pine boards onto the back of the plywood panels so that the bottom of the boards is __________ with the bottom of the ply wood. • Stain everything to match. • Mount the robe hooks in the top of the pine boards facing rail and upside down. • Mount door stops in bottom of the pine boards facing wall. • Make sure you measure everything so that the robe hooks and door stops are __________ in same place on every panel. 9. The Panels • The 4’x 3’ panels are for mounting your ______________________ to. • The 4’x 2’ panel is for mounting your ________________________ to. • The 4’x 3’ panels can also be created for hanging LCD digital monitors on. 10. Hanging The Rail • The rail is ____ end to end. • Most walls have studs 12” on center. • Get a stud finder and locate your first stud on left. • Now locate your stud that is 12’ to the right. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 07 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 08 Building The SoftServ™ Wall Systems • Make sure your two points are _________. • Now that you have your two widest studs located now move towards center from the left stud and at 4’ locate a stud and _________. • Replicate this from the right side as well. • You should now have four studs located. One at 0’ ____________________ one at 12’. • Now secure your rod hangers into the studs with 2.5” dry wall screws. 11. Header Possibility • If it is difficult to find studs you can add a ___________________________. • 1”x 10” #1 pine board. • Stained. • ________________________________ • Screwed into what studs were found. • Or… secured with anchors. 12. Alternate Rail • If you plan on hanging heavier items on your rail system… • Upgrade to _____________________________. (for hanging rail) • Upgrade to _______________________ and pipe hangers. • Galvanized pipe has Ts, 90s, 45s and flange hangers. Easy to encircle an entire room. 13. Hanging The Rail • You can now hang your rail. • ___________________________ the set screws as of yet because we will be loading systems onto this rail. • Tighten the set screws once you are ____________________ with set up. 14. What Goes On The Rail • Daily & Weekly Sales Boards. • Zip Code Radius Map. • __________________. • Sales Chain Accountability System. • SoftServ Invoice System _________________. 15. Daily & Weekly Sales Boards • Mounted to one of the 4’x 3’ panels. • Hang on one side of rail system opposite of sales chains. • Make sure you have _____________________________________. • Add ____________ for hanging erasers and dry erase markers to. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 09 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 10 Building The SoftServ™ Wall Systems 16. Zip Code Radius Map • Mounted to one of the 4’x 3’ panels. • Hang on one side of rail system opposite of sales chains. • Make sure you have ________________________. • Add Velcro for hanging _______________________________ to. 17. File Folder Panel • Mounted to one of the 4’x 2’ panels. • Hang on one side of rail system near sales chains. • Add ready to apply vinyl letters. – _____________ – ___________ – _____________ – _________________ – ______________________ 18. Sales Chain Accountability System • Use ______________ to join the chains and the sign holders to the rail. • Hang a ___ section of chain from each ring. • Attach ___________ binder clips on the left chain. • Attach _________________ binder clips on the right chain. (See Intro to SoftServTM System module) 19. SoftServTM Invoice System Wall Map • Hangs on rail or can be attached to the wall. • Visual training aid / reminder of the _______________________ of the invoice system. • __________________ with SoftWash Systems and SoftServTM making your office look _____________________________________. 20. Now All You Need… • This SoftServ Rail Systems was created to go hand in hand with the SoftServTM Invoice System. • A starter kit can be purchased online at: www.SoftWashSystems.com/shop/softserv/ Together We Accomplish More SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 11 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us