Classic Pool Panel Mount QMPC

7+,6('*(72:$5'6522)5,'*(





  ,7(0 12 '(6&5,37,21 47<   )/$6+,1*;;0,//   4%/2&.322/$0,//  :$6+(56($/,1*,';2'(3'0  %21'('66    &/,3%877(5)/<322/02817   :$6+(5)(1'(5,';2'66   /$*6&5(:+(;+($'[66  

 7,7/( 403&&/$66,&322/3$1(/  02817

81/(6627+(5:,6(63(&,),(' 6,=( '5$:1%< 03: 5(9  ',0(16,216$5(,1,1&+(6 72/(5$1&(6 )5$&7,21$/  $ '$7(   35235,(7$5<$1'&21),'(17,$/ 7:23/$&('(&,0$/  7+(,1)250$7,21&217$,1(',17+,6'5$:,1*,67+(62/(3523(57<2)48,&.0281739$1<5(352'8&7,21,13$5725$6 '21276&$/('5$:,1* $:+2/(:,7+2877+(:5,77(13(50,66,212)48,&.0281739,6352+,%,7(' 7+5((3/$&('(&,0$/  6&$/( :(,*+7  6+((72)

    

Lag pull-out (withdrawal) capacities (lbs) in typical : Lag Bolt Specifications

Specific Gravity 5/16" shaft per 3" thread depth 5/16" shaft per 1" thread depth

Douglas , .50 798 266

Douglas Fir, South .46 705 235

Engelmann , Lodgepole (MSR 1650 f & higher) .46 705 235

Hem, Fir .43 636 212

Hem, Fir (North) .46 705 235

Southern Pine .55 921 307

Spruce, Pine, Fir .42 615 205

Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) .50 798 266

Sources: American Council, NDS 2005, Table 11.2 A, 11.3.2 A Notes: 1) Thread must be embedded in a rafter or other structural roof member. 2) See IBC for required edge distances. IMPORTANT: To maintain waterproofing it is important that the aluminum flashing (item 1) is properly placed under one full course above the mounting block with at least some of the flash- ing extending up under the course above that as well. See instructions on back.

BI 7.2.3-19 Mar-2013, Rev 1 Classic Pool Panel Mounting Instructions Installation Tools Required: tape measure, roofing bar, chalk line, stud finder, caulking gun, 1 tube of sealant compatible with roofing materials, with 7/32" bit, drill or impact gun with 1/2" deep socket.

WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment. 1 2 3

Locate, choose, and mark centers of rafters to be Carefully lift composition roof shingle with roofing Slide mount into desired position. Remove any mounted. Select the courses of roofing where bar, just above placement of mount. nails that prevent getting the mount flush with mounts will be placed. front edge of shingle course. Mark center for drilling. 4 5 6

Using drill with 7/32" bit, drill pilot hole into roof Clean off any , and fill hole with roof Slide mount (item 1) back into place. Stack hardware and rafter, taking care to drill to the roof. manufacturer's approved sealant. (items 3-6) as shown in the drawing on the reverse Do not use mount as a drill guide. page. Tighten into place using drill with 7/16" socket to a solid, snug fit.

NOTE: It is not necessary or advisable to use nails Follow all the directions of the pool or other fasteners to secure the perimeter of the 7 panel manufacturer. flashing. All roofing manufacturers’ written instructions must also be followed by anyone modifying a roof system. Please consult the roof manufacturer's specs and instructions prior to touching the roof.

Using flat rope (not included), loop rope from mount to mount over panels to secure into place.

925-478-8269 www.quickmountpv.com [email protected] BI 7.2.3-19 2700 Mitchell Dr., Bldg 2 Walnut Creek, CA 94598 Mar-2013, Rev 1