[Net-E.P.U.B PDF] Stud Sensor I65 Manual High School

Total Page:16

File Type:pdf, Size:1020Kb

[Net-E.P.U.B PDF] Stud Sensor I65 Manual High School Stud Sensor I65 Manual High School Download Stud Sensor I65 Manual High School Find all instruction and documentation assets for your StudSensor™ i65 OneStep® here. StudSensor™ i65 OneStep® Instructions. StudSensor™ i65 OneStep® Datasheet. The Zircon StudSensor ™ stud finder locates the edges of wood and metal studs behind drywall. Use the StudSensor ™ to securely hang pictures. Finds the edge of wood or metal studs up to 3-4 in. (19 mm) deep; Red LEDs light up every time a stud edge is approached; An audio alert and green LED signals when the stud edge is reached Edge Finding. When using the i65 to scan for a stud, you will first be notified when the stud's edge is detected. All of the Middle Bars will. 2003 Ford Mustang - Manual! Lot#: 30a. Vintage Park View Jr. High School Flag. Lot#: 254fl. Zircon One Step Stud Sensor I65. Lot#: 387.Revised "Manual" and "Glossary" to reflect new changes to the 2013 TRM. Version 18 (Submitted December 3, 2012 for 2013 Final Order) Revised "Manual" to reflect new changes to the 2013 TRM Version 19 (Submitted August 29, 2013 for 2014 Tentative Order) Zircon StudSensor HD55 quickly and easily locates the edges of wood and metal studs. It features a sleek, high-impact case, with a patented pinch grip design, and a new. View and Download Zircon Studsensor HD35 instruction manual online. Answer: Yes, as with all Zircon stud finders, the StudSensor i65 needs to. We own Nj driver manual test french practice ePub DjVu txt PDF doc formats. Below is the first. Owners manual chinese dirt bike owners manual chevrolet caprice 1988 owners manual craftsman lawn mower 917 owners manual carrier air conditioners owners manual craftsman eager 1 owners manual craftsman 38 inch electronic drill model 31510300 owners.Product Description. The Zircon StudSensor™ i65 OneStep® stud finder quickly and easily locates the center of wood and metal studs and joists behind walls, floors, and ceilings. Patented CenterVision® technology finds the center of studs in a single pass. Its easy-to-read display screen indicates direction, edges and center of studs, while WireWarning® detection indicates the presence of live AC voltage. While meta-analyses for the preva-cells (high-quality vs. Control; p< 0.0001) to morulae (high-quality vs. Control; lences of high NK cells and Th1:Th2 ratio were not possible, there was no dif-p = 0.002). Additionally, linear regression analysis showed that hESCs migration ference in the prevalence of anti- thyroid antibodies. 1321 S 1st St is a multi-family home in Louisville, KY 40203. This 3,371 square foot multi- family home features 6 bedrooms and 4 bathrooms. 1321 S 1st St last sold on October 19, 2011 for $88,300. HIgh-rise battle HQ, ultimate battle. Zircon studsensor i65 - OneStep. Ruger P95PR gun case, instruction manual, lock. Fellowes powershredder - heavy use.Zircon StudSensor i65 OneStep Center Finding Stud Finder. 5 Best Stud Finders - Oct 2020 - BestReviews. Zircon Stud Sensor ONESTEP I65 User's Manual. It features a durable high-impact case and the patented SpotLite® Pointing System. WireWarning® detection automatically detects and alerts the user of live AC. The Zircon StudSensor ™ i65 OneStep ® stud finder quickly and easily locates the center of wood and metal studs and joists behind walls, floors, and ceilings. Patented CenterVision ® technology finds the center of studs in a single pass. Its easy-to-read display screen indicates direction, edges and center of studs, while WireWarning ® detection indicates the presence of live AC voltage. Stud Finder Sensor Wall Scanner - 5 in 1 Electronic Stud Sensor Locator Wood Beam Joist Finders Wall Detector Edge Center Finding with LCD Display for Wood Live AC Wire Metal Studs Detection (Silver) TACKLIFE Stud Finder Upgraded Wall Scanner, 4 in 1 Center Finding Electronic Wall Detector Finders with Warning, Four Scan Modes for Wood Stud.Place StudSensor™ i65 flat against the wall, then press and hold the Power button. The LCD will display all icons until calibration is complete. Upon completion of calibration, the SpotLite® Pointing System and buzzer will momentarily activate and the tool will begin continuous measurements. Note: It is important to wait for calibration to Zircon StudSensor™ i65 OneStep® locates the edges and center of wood and metal studs and joists behind walls, floors, and ceilings. DeepScan® and. Stanley fatmax stud finder instruction manual Stud finders chalk line reels. On operation automatic shut- off longer battery life high- impact - heavy duty abs case. Stanley® fatmax® stud sensor 300™ bought a zircon i65 studer center finder, and. School stud- finding methods, which can come in handy in minor situations. Page 2. Tidbits of Casper - For Advertising call 307-473-8661 • 161 South Fenway, Casper, WY. October 18 - 24, 2012 Zircon studsensor pro manual keyword after analyzing the system lists the list of keywords related and the list of websites with related content, in addition you can see which keywords most interested customers on the this website Hyundai Santa Fe 2000 2005 Repair Manual Dacor Convection Oven Manual Canon Pixma Mx925 User Manual Vauxhall Corsa C Haynes Manual Mercedes Benz C230 Sport Manual 4g33 Forklifts Workshop Manual Elementary Differential Equations Solutions ManualBoyce Omega Watches Instruction Manual Panasonic Hc V100 Manual Arts Plane Wave Basis Set Vasp Manual Manual De Cimentaciones SuperficialesViewer Jvc Mx Kc58 Manual Muscle Darktable Manuale Italiano Naza Eeoc Compliance Manual Cchs Ludhiana Manual Transmission Sirvinskas Manual De Direito AmbientalMusic At-4 Manual.
Recommended publications
  • FEMA P-909 Home & Business Earthquake Safety and Mitigation
    Wiss Janney Elstner Associates www.thetakeaway.org www.wday.com FEMA News Photo FEMA P-909 Home & Business Earthquake Safety and Mitigation A “Train the Trainer” Course July 2013 1 Overall Purpose Teach the general public about earthquake mitigation for homes and businesses. 2 Overall Agenda Part 1: Orientation for Trainers Part 2: Presentation for the Public Part 3: Hands-On Demonstrations 3 PART 1 – FOR TRAINERS Jocelyn Augustino/FEMA 4 Learning Objectives for Trainers . Plan and organize an effective training session . Address common questions from homeowners and business owners . Identify potential earthquake hazards and evaluate potential risks . Recognize costly consequences of failures . Recall strategies that can limit future losses . Teach others how to implement mitigation strategies 5 Planning a training session Rehearse Practice the Recruit an Deliver the Find a venue the hands-on Audience presentation activities presentation 6 Recruit attendees 1. Send an email to a relevant distribution list 2. Contact your chamber of commerce 3. Partner with a building improvement store 4. Advertise at school board meetings, invite school administrators 5. Reach out to first responders 6. Contact city emergency managers 7. Reach out to local citizen groups 7 Effective Training Strategies 1. Create a comfortable environment 2. Know your participants 3. Concentrate on what’s important 4. Keep participants engaged 5. Get feedback 8 Create a comfortable environment Participants will be more engaged if the session is informal, fun, and example oriented . Make it fun! . Ask questions and encourage dialogue . Use clear vocabulary . Walk around the room, don’t be a talking head . Make yourself available before and after Expert Provide email contact Tip information 9 Know your audience At the beginning of the session, ask about: 1.
    [Show full text]
  • SDWS Timber Screw
    Simpson Strong-Tie® Fastening Systems Load Tables, Technical Data and Installation Instructions Strong-Drive ® SDWS TIMBER Screw Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting and traditional lag screws. The Strong-Drive® SDWS Timber screws are ideal for the contractor and do-it-yourselfer alike. Double-barrier coating provides corrosion resistance equivalent to hot-dip galvanization, making it suitable for certain exterior and preservative-treated wood applications, as described in the evaluation report. Codes/Standards: IAPMO-UES ER-192, State of Florida FL13975; U.S. Patents 5,897,280; 7,101,133 0.75" For More Product Information, see p. 69 3" – 10" SDWS Timber Screw – Allowable Shear Loads – Douglas Fir-Larch and Southern Pine Lumber Size Thread DF/SP Allowable Shear Loads (lb.) Model Wood Side Member Thickness (in.) Dia.x L No. Length (in.) (in.) 1.5 2 2.5 3 3.5 4 4.5 6 8 0.22 x 3 SDWS22300DB 1 2 255 — — — — — — — — 0.22 x 4 SDWS22400DB 2 8 405 405 305 — — — — — — 0.22 x 5 SDWS22500DB 2 4 405 405 360 360 325 — — — — 0.22 x 6 SDWS22600DB 2 4 405 405 405 405 365 365 355 — — 0.22 x 8 SDWS22800DB 2 4 405 405 405 405 395 395 395 395 — 0.22 x 10 SDWS221000DB 2 4 405 405 405 405 395 395 395 395 395 See footnotes below. SDWS Timber Screw – Allowable Shear Loads – Spruce-Pine-Fir and Hem-Fir Lumber SPF/HF Allowable Shear Loads (lb.) Size Model Thread Dia.x L No.
    [Show full text]
  • <[email protected]> Kiln Drying
    Claudia Johnson <[email protected]> You're Right to Want a Log or Timber Home 3 messages Josh Beasley <[email protected]> Mon, Jan 9, 2017 at 8:32 AM To: [email protected] Dear Claudia, You're right to want a log or timber home! Over the next few emails, we would like to share the top reasons you are correct. Here are the first three... 1. Trees Grow Back When a home is made from solid logs, you are effectively taking the carbon contained in those logs out of environmental circulation over the entire life of the home. Eastern White Pine, which is used for Honest Abe's log homes, is a major species for reforestation, making it a plentiful and renewable resource. 2. They Last a LONG Time If there's any question about the durability of log and timber structures, some still in use today in Europe and Russia have been standing almost a millennium. 3. They're Not Scared of Mother Nature The log and timber home industry has countless stories of these homes surviving the worst Mother Nature deliver. In recent years a couple of Honest Abe's customers survived tornados with their homes and their lives. Read one of the stories here: Alabama Log Home Survives Tornado. We don't want to overwhelm you or your inbox, so in a couple of weeks we'll send more reasons from our list. The information we have suggests you are doing research right now and do not have plans to build soon. However, if you have questions or if we may help in any way, simply reply to this email or call Honest Abe Independent Dealer at .
    [Show full text]
  • Shared Rail Composition Mount | QMSRC Elevated Water Seal Technology®
    Shared Rail Composition Mount | QMSRC Elevated Water Seal Technology® THIS EDGE TOWARDS ROOF RIDGE ITEM NO. DESCRIPTION QTY. 4.75 1 FLASHING, ROUNDED CORNERS, 9" X 12" X .040", 5052, MILL 1 2 SHARED RAIL BASE, COMP,4-1/2", 6061-T6, MILL 1 2.50 3 WASHER, SEALING, 5/16" ID X 3/4" OD, EPDM BONDED SS 2 4 LAG SCREW, HEX HEAD, 5/16" x 4", 18-8 SS 2 9.00 5 CAP SCREW, SERRATED FLANGE, HEX HEAD, 5/16"-18 X 7/8", UNC-2A, 18-8SS 1 6 L-FOOT, 2" X 3.30" FOR .438" O.D. FASTENER, 2-1/16" SLOT, 6061-T6/6005A-T61, MILL 1 7 NUT, SERRATED FLANGE, HEX, 5/16"-18, UNC-2B, 18-8 SS 1 .25 NOTE: AVAILABLE IN MILL AND BLACK FINISH 3.438 4.50 12.00 2.000 (L-FOOT RANGE) L-FOOT MAY BE POSITIONED .408 UPSLOPE OR DOWNSLOPE, L-FOOT MAY NOT OVERHANG BASE 1.677 3.300 4.070 1.835 .040 4 .770 3.216 3 2 1 2.50 1.750 7 TITLE: 6 QMSRC: SHARED RAIL COMPOSITION MOUNT 5 UNLESS OTHERWISE SPECIFIED: SIZE DRAWN BY: AAP REV DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL 1/8 A DATE: 10/18/2018 1 PROPRIETARY AND CONFIDENTIAL TWO PLACE DECIMAL .19 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE DO NOT SCALE DRAWING THREE PLACE DECIMAL .094 WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED.
    [Show full text]
  • Quick Mount PV Products Are NOT Designed for and Should NOT Be Used to Anchor Fall Protection Equipment
    E-Mount Lag QMSE - LAG ,7(0 '(6&5,37,21 47<%2; 7+,6('*(72:$5'6522)5,'*( 12 )/$6+,1*;;0,// 4%/2&.&/$66,&$&$67$/0,// 3/8*6($/,1*;(3'066 /$*6&5(:+(;+($'[66 :$6+(5)(1'(5,';2'66 5$&.,1*&20321(176 127,1&/8'(' 7,7/( 406(/$*4039(02817 $9$,/$%/(,10,//$1' %521=($12',=('),1,6+(6 :,7+/$*%2/7 81/(6627+(5:,6(63(&,),(' 6,=( '5$:1%< 5$' 5(9 ',0(16,216$5(,1,1&+(6 72/(5$1&(6 )5$&7,21$/ $ '$7( 35235,(7$5<$1'&21),'(17,$/ 7:23/$&('(&,0$/ 7+(,1)250$7,21&217$,1(',17+,6'5$:,1*,67+(62/(3523(57<2)48,&.0281739$1<5(352'8&7,21,13$5725$6 '21276&$/('5$:,1* $:+2/(:,7+2877+(:5,77(13(50,66,212)48,&.0281739,6352+,%,7(' 7+5((3/$&('(&,0$/ 6&$/( :(,*+7 6+((72) Lag pull-out (withdrawal) capacities (lbs) in typical lumber: Lag Bolt Specifications Specific Gravity 5/16" shaft per 3" thread depth 5/16" shaft per 1" thread depth Douglas Fir, Larch .50 798 266 Douglas Fir, South .46 705 235 Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 705 235 Hem, Fir .43 636 212 Hem, Fir (North) .46 705 235 Southern Pine .55 921 307 Spruce, Pine, Fir .42 615 205 Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) .50 798 266 Sources: American Wood Council, NDS 2005, Table 11.2 A, 11.3.2 A Notes: 1) Thread must be embedded in a rafter or other structural roof member.
    [Show full text]
  • Quick Mount PV
    Your Solution in Mounting Products Solar . H2 O . Conduit . HVAC . Custom Composition Mount Specifications - 5/16” - PV - Quick Mount PV ® is an all-in-one waterproof flashing and mount to anchor photovoltaic racking systems, solar thermal panels, air conditioning units, satellite dishes, or anything you may need to secure to a new or existing roof. It is made in the USA of all aluminum and includes stainless steel hardware. It works with all standard racks, installs seamlessly and saves labor by not need- ing to cut away any roofing, will out live galvanized 2 to 1, and is a better low-profile mount. Split Lock Washer SS 5/16” (Not a theft- prevention feature) Fender Washer SS 5/16” x 1” EPDM Rubber Washer 60 Durometer 5/16” Sealing Washer SS 5/16” ESR-2835 Hanger Bolt SS 5/16” x 6” 1 1/4” Machine, 1 3/4” Spacer, 3” Lag (2) Hex Nuts SS 5/16” Mount & Flashing Aluminum Mount 1 1/4” x 1 1/4” x 2 1/4” Beveled Block Flashing .05” thick For standard composition roofs: flashing is 12” x 12” mount is attached 3” off center Lag pull-out (withdrawal) capacities (lbs) in typical lumber: Lag Bolt Specifications Specific 5/16” shaft 5/16” shaft gravity per 3” per 1” thread depth thread depth Douglas Fir, Larch .50 798 266 Douglas Fir, South .46 705 235 Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 705 235 Hem, Fir .43 636 212 Hem, Fir. (North) .46 705 235 Southern Pine .55 921 307 Spruce, Pine, Fir .42 615 205 Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) ..50 798 266 Sources: Uniform Building Code; American Wood Council Notes: 1) Thread must be embedded in a rafter or other structural roof member.
    [Show full text]
  • Softwashsystems.Com © Copyright 2010-2018 HRHIC INDUSTRIES INC
    855.763.8669 SoftWashSystems.com © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. Building The SoftServ™ Wall Systems Building a 12’ rail style tracking wall for sales accountability. SoftWash Systems • 341 Specialty Point, Sanford, FL 32771 • 855.763.8669 • SoftWashSystems.com 03 © Copyright 2010-2018 HRHIC INDUSTRIES INC. • SoftWashSystems.com • All rights reserved. • Use only by permission. 04 Building The SoftServ™ Wall Systems 1. What Is It? • The SoftServTM Rail System is a _______________________ tracking system that uti- lizes a single curtain rod to hang various sales tracking devices. • Developed by AC Lockyer during his __________________ in the service industry. • Created to allow easy organization without putting a lot of holes in a wall. • Easy to __________________ as company grows. • Easy to transport or _________________________________ with minimal effort and company down time. 2. Tools You Will Need • Cordless Screw Gun. • Phillips bit for Screw Gun. • Crescent Wrench. • __________________. • Paint Brush. • Rags. • Hole Saw. • Drill Bits. • Socket Set. • ___________________. 3. What You Will Need (Lowe’s) • One (1) piece of 4’x 8’ 5/8 Ply Wood. (sand ply) • Six (6) 1”x 6”x 6’ #1 pine boards. • Box of 1.5” dry wall screws. • Six (6) door stops. • Six (6) robe hooks. • Half gallon of wood stain. (color your choice) • 36’ of small black chain. • One (1) 12’ curtain rod kit. • Four (4) deck post tops. (if drywall is weak or studs wont cooperate) • 25 count 2.5” dry wall screws. 4. What You Will Need (Staples) • Three (3) Clear Lexan Wall Sign Pockets.
    [Show full text]
  • NIR Spectroscopy for Predicting the Nutritional, Anthelmintic And
    NIR spectroscopy for predicting the nutritional, anthelmintic and environmental effects of sainfoin Irene Mueller-Harvey, Marta Martin Lorenzo, Elisabetta Stringano, R. Barnes, J. Oliver, Aikaterini Theodoridou, Jocelyne Aufrere, B. Hatew Chuko, Wilbert Pellikaan, Foteini Manolaraki, et al. To cite this version: Irene Mueller-Harvey, Marta Martin Lorenzo, Elisabetta Stringano, R. Barnes, J. Oliver, et al.. NIR spectroscopy for predicting the nutritional, anthelmintic and environmental effects of sainfoin. 8. International Symposium on the Nutrition of Herbivores (ISNH8), Sep 2011, Aberystwyth, United Kingdom. Cambridge University Press, Advances in Animal Biosciences, 2 (2), 2011, Proceedings of the 8th International Symposium on the Nutrition of Herbivores (ISNH8). hal-02747141 HAL Id: hal-02747141 https://hal.inrae.fr/hal-02747141 Submitted on 3 Jun 2020 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. 241 The role of sheep in saltbush domestication – what can they tell us? H Norman1,3, P Jessop2,3, M Wilmot1,3 1CSIRO Livestock Industries, Western Australia, Australia, 2Industry & Investment NSW, New South Wales, Australia, 3CRC Future Farm Industries, Western Australia, Australia Email: [email protected] Introduction Climate change, leading to shorter and more variable seasons, represents a major challenge for livestock producers in southern Australia.
    [Show full text]
  • Projected Tool List
    The Vancouver Tool Library - Projected Tool List Tool Category Tool Tool Category Tool Awl Brick and Jointing Tools Chalk line Bull Float draw knife bull float handles, 6 ft flatbar cement finishing tools hammers (various) darby trowels, edgers, groovers, level (various) cement mixer, electric mallet, rubber cement mixing box miter box chisels: brick, cold, bull point nail puller concrete tamper (jitterbug) Concrete and Masonry nail set sledge hammer planes, various saw, tile (wetsaw) plum bob Grinder plybars, various Grout Float, various rasp, wood mortar hoe router table mortar mixing box router rebar cutter / bender Carpentry and saw, hand crosscut rotary hammer Woodworking saw horses x2 rotary hammer bits speed square pipe clamps, 2'-8' screwdriver set spring clamps squares, various c-clamps, various Clamps stud finder hand-screw tape measure, various vice-grips utility knife corner-clamps wood chisels, various Box cable cutter Screw gun circuit tester Electricians drill extension cords, <50' angle grinder, Electrical extension cords, >50' random orbital sander soldering iron saw, circular (skilsaw) wire stripper saw, power miter (chop) Multimeter saw, reciprocating (sawzall) saw, saber (jigsaw) saw, table The Vancouver Tool Library - Projected Tool List Caulking gun Bow saw drywall mud knives, various digging bar, various drywall corner knife posthole digger drywall hand sander garden trowel drywall pole sander hedgeshear, manual drywall T-square hedgetrimmer, electric Floor and Wall floor and roof scraper hoe, planters heat gun
    [Show full text]
  • SIM 2016 Pisa, Palazzo Dei Congressi 25 - 28 Settembre 2016
    44°CONGRESSO NAZIONALE DELLA SOCIETÀ ITALIANA DI MICROBIOLOGIA SIM 2016 Pisa, Palazzo dei Congressi 25 - 28 settembre 2016 Abstract Book CONTENTS INVITED LECTURES DEVELOPMENTS ON ANTIMICROBIAL RESISTANCE SPECIAL SESSIONS _______________________________________________ 7 _______________________________________________ 2 ANTIBIOTIC RESISTANCE AND NEW EMERGENT IMMUNOLOGY OF TUBERCULOSIS RESISTANCE MECHANISMS IN GRAM-POSITIVE F. Dieli BACTERIA S. Stefani EXOSOMES AS INTERCELLULAR PATHOGENESIS, IMMUNITY AND COMMUNICATORS INNOVATIVE THERAPEUTIC APPROACHES IN VIRAL INFECTIONS _______________________________________________ 2 EXOSOMES IN THE DIAGNOSIS OF _______________________________________________ 8 TUBERCULOSIS: ROLE OF SERUM MICRORNAS HOST AND VIRAL GENETIC FACTORS AS A IN THE DIFFERENTIAL DIAGNOSIS BETWEEN RESPONSE TO ANTIVIRAL THERAPY ANTI-HCV: ACTIVE AND LATENT TUBERCULOSIS YESTERDAY AND TODAY COMPARED G. Russo, P. Miotto, A. Ambrosi, D. Goletti, L.R. Codecasa, F. Ceccherini-Silberstein D.M. Cirillo _______________________________________________ 3 _______________________________________________ 8 ROLE OF EXTRACELLULAR VESICLES IN FUNGI INTERFERON AND VIRUSES: A DELICATE AS MEDIATORS OF CELLULAR COMMUNICATION BALANCE BETWEEN YIN AND YANG A. Tavanti C. Scagnolari _______________________________________________ 3 _______________________________________________ 9 microRNA AND EXOSOMES IN HUMAN NEW THERAPEUTIC APPROACHES IN HIV-1 PAPILLOMAVIRUS-INDUCED TUMORIGENESIS INFECTION M.V. Chiantore, G. Fiorucci, G. Mangino, M. Iuliano, I. Bon G.
    [Show full text]
  • Installation and Cabinet Care & Maintenance Guide Thank You for Your Diamond Cabinetry Purchase!
    INSTALLATION AND CABINET CARE & MAINTENANCE GUIDE THANK YOU FOR YOUR DIAMOND CABINETRY PURCHASE! THIS GUIDE WILL HELP YOU INSTALL YOUR KITCHEN CABINETS. PLEASE READ THE GUIDE IN ITS ENTIRETY BEFORE GETTING STARTED. BEFORE YOU BEGIN GATHER YOUR SUPPLIES • #10 2 1/2” phillips pan head screws supplied with cabinets (use in both wall and base cabinets) • #8 2 1/2” phillips flat head screws (recommended but not supplied) • tapered wood shims • patching plaster & putty knife • shims • fine grade sand paper • touch-up kit (markers, wax stick, and putty) Be sure to include a touch-up kit with your cabinet order. • miter adhesive GATHER YOUR TOOLS • steel tape measure (20’) • scribing tool & pencil • carpenter’s 36” level • chalk line or string • variable speed drill (minimum 9.6v) • 3/32”, 1/8”, 7/32” drill bits & screwdriver attachments • stud finder • 3” - 6” bar clamps or “c” clamps • carpenter’s square • small carpenter’s saw or circular saw • claw hammer • step ladder • extension cord STEP ONE: GETTING STARTED COLLECT ALL MATERIALS • cabinets • flooring (if needed) • lighting (if needed) • plumbing materials • electrical materials • countertop • paint & dry wall supplies • optional: miter saw (80 tooth blade) • optional: air compressor & brad nailing gun (1/2”, 3/4”, 1-1/4”, & 1-1/2” brad nails) STEP ONE: GETTING STARTED CHECK ALL CABINETS FIRST • Inspect each cabinet carefully. • All cabinets are subjected to numerous quality inspections and are carefully packaged before leaving the factory. Unfortunately, damage may occasionally occur in handling between the factory and final destination. • If damage is discovered, place the cabinet back in the box and notify your store of purchase.
    [Show full text]
  • Shiplap Installation Instructions 1
    SHIPLAP INSTALLATION INSTRUCTIONS 1. Let the shiplap acclimate for 72 hours before installation. Wood products need to acclimate to their indoor environment before you install them. Stack your shiplap on 2 x 4’s off of the floor in the room where you will eb installing the shiplap. Do not store your shiplap in any environments where drastic or prolonged fluctuation in humidity will occur. Always protect your shiplap from outdoor environments. 2. Shiplap can be installed directly to sheet rock/drywall. Simply mark the stud locations for nailing the shiplap or you can apply a construction adhesive such as liquid nails. If applying directly to the studs, you will need to check local building and fire codes to ensure the proper requirements are met. 3. It is extremely important to properly set the first piece to ensure a uniform application. Start the firstboard in one corner, leaving an 1/8” gap between corner and the first panel, keeping the longer flange to the top. Apply construction adhesive (per adhesive manufacturer’s instructions) and set the board. Use a level to make sure the first board is level. 4. Use a nail gun with 18 gauge 1 3/4”long brad nails. Nail through the top flange which is the longer of the two flanges. On the first board a second nail should be placed approximately 1” from the bottom edge. Face/Finished Edge Short Flange Long Flange Back/Raw Edge 5. Continue fastening the shiplap by leaving a 1/16” gap between all end to end butt joints for expansion and contraction.
    [Show full text]