Welcome Pre-Construction Information Session New Vision: 100 Street to 97 Street Imagine Jasper Avenue: 114 Street to 109 Street

Today you can: » View final streetscape designs » Learn about construction schedules, lane and sidewalk closures and other changes during construction » Have your questions answered by the project team

Learn more about these projects at: .ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue Jasper Avenue: A key destination

Two projects are underway to revitalize the Jasper Avenue streetscape from 124 Street to 92 Street to create a unified corridor, balance the needs of all users and improve the pedestrian experience.

» Jasper Avenue New Vision: 109 Street to 92 Street » Imagine Jasper Avenue: 124 Street to 109 Street

Designs for Jasper Avenue both east and west of 109 Street will maintain the same number of through traffic lanes as today and are influenced by the function of each area:

» West: Community-focused as central to the Oliver neighbourhood » East: Designed to be part of the downtown business core

Construction on two sections of Jasper Avenue - one in each project area - will begin this spring.

Learn more about these projects at: edmonton.ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue Jasper Avenue: A key destination

Two Projects With One Vision: A Unified Jasper Avenue

IMAGINE JASPER AVENUE JASPER AVENUE NEW VISION

124 ST (124 street to 109 street) 109 ST (109 Street to 92 Street) 92 ST

CONCEPT DESIGN CONSTRUCTION CONCEPT DESIGN CONSTRUCTED CONSTRUCTION CONCEPT DESIGN 124-114 STREET 114 - 109 STREET 109-102 STREET 100-102 STREET 100-97 STREET 97-92 STREET CONSTRUCTION NOT YET DETERMINED CONSTRUCTION NOT YET DETERMINED (2013) CONSTRUCTION NOT YET DETERMINED

Learn more about these projects at: edmonton.ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue How We Got Here

Planning for the transformation of Jasper Avenue began many years ago with technical studies, design and public and stakeholder engagement at each Phase of the project.

engineering and engineering and concept planning landscape landscape construction Preliminary Design Detailed Design

Learn more about these projects at: edmonton.ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue What to Expect During Construction: Drivers

» One lane of traffic in each direction maintained along Jasper Avenue with occasional full closures overnight » Access for deliveries to businesses will be maintained » Right and left turns may be impacted » Traffic will be monitored and adjustments made, where possible to improve traffic flow » Construction will be coordinated with Valley Line construction

Jasper Avenue New Vision » Traffic impacts on 100 Street / Jasper Avenue begin March 2020 » Off peak hour closures on 100 Street » Full closure of 97 Street will occur between Jasper Avenue and 101A Avenue in 2021

Learn more about these projects at: edmonton.ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue What to Expect During Construction: Pedestrians/Transit Users

» One sidewalk and one crosswalk at each intersection maintained » Universal access for pedestrians to all businesses maintained with the use of bridges / detours » Bus route timing monitored » Bus stops temporarily relocated as required » Certain bus routes may be modified. Visit edmonton.ca/TransitAlerts.

Learn more about these projects at: edmonton.ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue What to Expect: Trees

» All trees within the project limits will be replaced. » New trees will be planted in soil cells which surround the tree with topsoil for enhanced protection for healthy growth.

Affected trees: 97 Street Jasper Ave 97-100 Street 110-112 Street 14 removed 43 removed 22 removed 45 planted 80 planted 123 planted

Soil cell

Learn more about these projects at: edmonton.ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue Who to Contact During Construction If you have questions or information to share, call 311.

Learn more about these projects at: edmonton.ca/JasperAvenueNewVision and edmonton.ca/ImagineJasperAvenue Jasper Avenue New Vision Construction: March 2020 - Fall 2022

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Project Overview

Jasper Avenue from 100 Street to 97 Street and 97 Project Area Street from Jasper Avenue to 102 Avenue will be revitalized, with construction beginning this spring 102 Avenue Construction has been prioritized for these sections to coincide with the required rehabilitation of the

Edmonton Convention Centre under Jasper Avenue 100 St.

97 St. Project Highlights 99 St.

» Two vehicle travel lanes in each direction Jasper Avenue (the same as what currently exists) » Wider, unobstructed sidewalks » Enhanced plantings and furniture » Unobstructed access at transit stops » Rehabilitation of the roof of the Edmonton Convention Centre » Removal of the Frank Oliver Pedway at 100 Street » New separated storm sewer » Full roadway reconstruction » New street and pedestrian lighting

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Overall Plan

Legend

PROJECT BOUNDARY

LIT BOLLARD

HB HERITAGE TRAIL BOLLARD

TREE GRATE

STREET PLAQUE

PML PEDESTRIAN MEGALITH STREET LIGHT WITH PEDESTRIAN LIGHT

TRAFFIC SIGNAL

PEDESTRIAN LIGHT

BIKE RACK

WESTIN HOTEL WASTE RECEPTACLE WR

ARCADA BENCH

RAISED PLANTER A

100 STREET SUNLIFE 97 STREET PLACE RAISED PLANTER D

TREASURY RAISED PLANTER C BUILDING RAISED PLANTER B CANADA WORLD PLACE RENOVATED KIOSK TRADE IMPARK GOBO LIGHT CENTRE HOTEL BROOM FINISHED 99 STREET CONCRETE THOUGH ZONE 9888 CONCRETE HEADER

SANDBLASTED CONCRETE JASPER AVENUE ATB PLACE SANDBLASTED CONCRETE - ROAD JASPER AVENUE TACTILE PAVERS HERITAGE TRAIL EDMONTON CONVENTION CENTRE FURNISHING ZONE PAVERS FRANK (HALL D EXPANSION) ANCILLARY ZONE PAVERS EDMONTON OLIVER WELCOME CENTRE PAVERS - FRANK OLIVER CONVENTION PARK MACDONALD ESTATES CENTRE 300X300 GREY PAVERS IMPARK BIKE LANE

100 STREET PLANTING AREA

THRONTON CT.

PROPOSED DECIDUOUS BOULEVARD TREE SPECIES GRIERSON HILL

HOTEL MACDONALD MARRIOT HOTEL SHRUBS & PERENNIALS

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Design Elements

Paving Vegetation Standard Furnishings

BROOM FINISHED CONCRETE SANDBLASTED BANDS PEDESTRIAN LIGHT POLE CURVED LIGHT POLES WASTE RECEPTACLES

BLACK PAVERS LIGHT GREY PAVERS STREET TREES IN SOIL CELLS (MIN 20m3) ROADSTAR LUMINAIRE PHASE 1 SIGNAL POLE ANAPOLIS LIT BOLLARD

PAINTED BIKE LANES MEDIAN PLANTING AT-GRADE PLANTING ARCATA BENCH Q-BIKE RACK TREE GRATE

STAMPED ASPHALT TACTILE IRON PAVERS PERENNIALS IN RAISED BEDS RAISED BEDS STREETLIGHT POLE HERITAGE TRAIL BOLLARDS HERITAGE TRAIL HEADER PEDESTRIAN MINILITH PEDESTRIAN MEGALITH CROSSWALK Custom Furnishings

RAISED PLANTER TYPE A RAISED PLANTER TYPE B RAISED PLANTER TYPE C RAISED PLANTER TYPE D CONCRETE UPSTAND WITH ARCATA STREET PLAQUE BENCH TOPPER

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Jasper Avenue at 100 Street

» Existing pedway under 100 Street removed Key Plan LIT BOLLARD

HB HERITAGE TRAIL BOLLARD » Wider sidewalks constructed TREE GRATE STREET PLAQUE

PEDESTRIAN MEGALITH » New plantings added PML STREET LIGHT WITH PEDESTRIAN LIGHT » Shared-use path bike connection added along the south side of TRAFFIC SIGNAL PEDESTRIAN LIGHT

Jasper Avenue to 99 Street BIKE RACK

WASTE RECEPTACLE WR » Heritage Trail marked with paving reflective of and complimentary ARCADA BENCH to the existing and original Heritage Trail RAISED PLANTER A RAISED PLANTER D

RAISED PLANTER C

Legend RAISED PLANTER B

WORLD TRADE CENTER IMPARK RENOVATED KIOSK PROJECT BOUNDARY GOBO LIGHT

LIT BOLLARD BROOM FINISHED CONCRETE THOUGH ZONE

HB HERITAGE TRAIL BOLLARD CONCRETE HEADER

TREE GRATE SANDBLASTED CONCRETE

STREET PLAQUE SANDBLASTED CONCRETE - ROAD JASPER AVENUE PEDESTRIAN MEGALITH PML TACTILE PAVERS STREET LIGHT WITH PEDESTRIAN LIGHT HERITAGE TRAIL TRAFFIC SIGNAL FURNISHING ZONE PAVERS PEDESTRIAN LIGHT ANCILLARY ZONE PAVERS BIKE RACK

PAVERS - FRANK OLIVER WASTE RECEPTACLE WR

ARCADA BENCH 300X300 GREY PAVERS

RAISED PLANTER A BIKE LANE

RAISED PLANTER D PLANTING AREA

RAISED PLANTER C

PROPOSED DECIDUOUS RAISED PLANTER B BOULEVARD TREE SPECIES 100 STREET 100 STREET 100 MACDONALD ESTATES RENOVATED KIOSK SHRUBS & PERENNIALS GOBO LIGHT

FRANK OLIVER PARK BROOM FINISHED CONCRETE THOUGH ZONE

CONCRETE HEADER

SANDBLASTED CONCRETE

SANDBLASTED CONCRETE - ROAD TACTILE PAVERS Learn more about this project at: edmonton.ca/JasperAvenueNewVision HERITAGE TRAIL FURNISHING ZONE PAVERS

ANCILLARY ZONE PAVERS

PAVERS - FRANK OLIVER

300X300 GREY PAVERS

BIKE LANE

PLANTING AREA

PROPOSED DECIDUOUS BOULEVARD TREE SPECIES

SHRUBS & PERENNIALS Jasper Avenue at 100 Street

Looking East Key Notes

1 Waste Receptacle

2 Pedestrian Light Pole

3 Bike Rack

4 Furnishing Zone

5 Pedestrian Through Zone

6 Heritage Trail Red bricks highlighting the Heritage Trail route.

9 7 Raised Cross Walk

8 Raised Planter with Bench

9 Street Trees 2 Brandon Elm, Autumn Blaze Maple and Little Leaf Linden are the species proposed. 10 10 Heritage Bollard 3 7 1

8

6

4

5

Learn more about this project at: edmonton.ca/JasperAvenueNewVision 100 Street

Key Plan Key Notes

» Shared-use path/bike connection added from funicular PROJECT BOUNDARY to Jasper Avenue along east side of 100 Street » New plantings added

ETS STATION JASPER AVENUE

100 STREET

JASPER AVENUE

HOTEL MACDONALD

FRANK OLIVER PARK

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Jasper Avenue at 99 Street

Key Plan Legend

» Intersection realigned to provide better north-south movements PROJECT BOUNDARY

LIT BOLLARD » New mini-plaza at northwest corner features “Merchant Statue” HB HERITAGE TRAIL BOLLARD moved from World Trade Centre TREE GRATE STREET PLAQUE

PEDESTRIAN MEGALITH » Bike connection on south side of Jasper Avenue crosses intersection PML STREET LIGHT WITH PEDESTRIAN LIGHT and continues along west side of 99 Street TRAFFIC SIGNAL PEDESTRIAN LIGHT

BIKE RACK

WASTE RECEPTACLE WR 9888 JASPER AVENUE ARCADA BENCH RAISED PLANTER A

RAISED PLANTER D IMPARK STREET 99 RAISED PLANTER C

RAISED PLANTER B

RENOVATED KIOSK

GOBO LIGHT

BROOM FINISHED CONCRETE THOUGH ZONE

CONCRETE HEADER

SANDBLASTED CONCRETE

SANDBLASTED CONCRETE - ROAD JASPER AVENUE TACTILE PAVERS

HERITAGE TRAIL

FURNISHING ZONE PAVERS

ANCILLARY ZONE PAVERS

PAVERS - FRANK OLIVER

300X300 GREY PAVERS

BIKE LANE

PLANTING AREA IMPARK PROPOSED DECIDUOUS BOULEVARD TREE SPECIES MACDONALD ESTATE SHRUBS & PERENNIALS THRONTON COURT 100 STREET 100

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Jasper Avenue at 99 Street

Northwest 99 Street Intersection View Key Notes

1 Signal Pole

2 Pedestrian Minilith (Wayfinding signage) 9

1 3 Merchant Statue Relocate the Merchant Statue from with the World Trade Centre building.

4 Dedicated Bike Lane

5 Pedestrian Through Zone

5 6 Curb Ramp 8 Each ramp contains a Tactile Walking Surface Indicator.

3 8 5 7 At-Grade Planters 10

8 Raised Planter with Bench 7 7 4 2 8 9 Street Trees Brandon Elm, Autumn Blaze Maple and Little Leaf Linden are the species proposed.

11 10 Bench

Paver Plaza 6 12 11

12 Street Plaque At all street crossings a street plaque will be embedded flush with the concrete.

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Jasper Avenue at Edmonton Convention Centre

Key Plan Legend » Special paving treatment creates a plaza space at the PROJECT BOUNDARY Edmonton Convention Centre south of Jasper Avenue LIT BOLLARD HB HERITAGE TRAIL BOLLARD

TREE GRATE

» Trees and plantings added STREET PLAQUE

PML PEDESTRIAN MEGALITH » Enhanced pedestrian crossing STREET LIGHT WITH PEDESTRIAN LIGHT

TRAFFIC SIGNAL

PEDESTRIAN LIGHT

BIKE RACK

WASTE RECEPTACLE WR ALBERTA HOTEL CANADA PLACE ARCADA BENCH

RAISED PLANTER A

RAISED PLANTER D

RAISED PLANTER C

RAISED PLANTER B

RENOVATED KIOSK

GOBO LIGHT

BROOM FINISHED CONCRETE THOUGH ZONE

JASPER AVENUE CONCRETE HEADER

SANDBLASTED CONCRETE

SANDBLASTED CONCRETE - ROAD TACTILE PAVERS

HERITAGE TRAIL

FURNISHING ZONE PAVERS

ANCILLARY ZONE PAVERS

PAVERS - FRANK OLIVER

300X300 GREY PAVERS

BIKE LANE

PLANTING AREA HALL D EDMONTON CONVENTION WELCOME CENTRE VETERANS WAR MEMORIAL PROPOSED DECIDUOUS CENTRE BOULEVARD TREE SPECIES

SHRUBS & PERENNIALS

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Jasper Avenue at Edmonton Convention Centre

Edmonton Convention Centre Looking West Key Notes 1 1 Street Light Pole

2 Heritage Bollard

3 Lit Bollard

7 4 Planted Median

5 Paver Plaza

6 Curb Ramp Each ramp contains a Tactile Walking Surface Indicator. 9 7 Festive Banners Temporary festive banners to be mounted to poles. 9 8 Raised Planter with Bench Raised concrete upstand with seating, adjacent to at-grade planters.

9 Street Trees Brandon Elm, Autumn Blaze Maple and Little Leaf Linden are the species proposed.

10 Street Plaque At all street crossings a street plaque will be embedded flush with the concrete. 4 3 8

2

10

5 6

Learn more about this project at: edmonton.ca/JasperAvenueNewVision 97 Street North of Jasper Avenue

Key Plan Legend » Wider sidewalks constructed PROJECT BOUNDARY

» New plantings added LIT BOLLARD

HB HERITAGE TRAIL BOLLARD » Enhanced pedestrian crossings with flashing lights at 101A Avenue TREE GRATE STREET PLAQUE

PML PEDESTRIAN MEGALITH STREET LIGHT WITH PEDESTRIAN LIGHT

TRAFFIC SIGNAL

PEDESTRIAN LIGHT

BIKE RACK CANADA PLACE WASTE RECEPTACLE WR

ARCADA BENCH

RAISED PLANTER A

RAISED PLANTER D

RAISED PLANTER C

RAISED PLANTER B

RENOVATED KIOSK

GOBO LIGHT FUTURE BROOM FINISHED CONCRETE THOUGH ZONE

HARBIN GATE CONCRETE HEADER

SANDBLASTED CONCRETE 97 STREET SANDBLASTED CONCRETE - ROAD TACTILE PAVERS

HERITAGE TRAIL

FURNISHING ZONE PAVERS

ANNEX INN & ANCILLARY ZONE PAVERS HARDWARE GRILL SUITES PAVERS - FRANK OLIVER

300X300 GREY PAVERS

BIKE LANE 101 A AVENUE PLANTING AREA

PROPOSED DECIDUOUS BOULEVARD TREE SPECIES EXISTING BUILDING

SHRUBS & PERENNIALS

Learn more about this project at: edmonton.ca/JasperAvenueNewVision 97 Street North of Jasper Avenue

97 Street Looking South from 101A Avenue

Key Notes

1 Crosswalk

2 Informal Path

3 Pedestrian Through Zone

4 Furnishing Zone

5 Ancillary Zone On street parking during peak hours, with opportunity for flex space in off peak hours.

6 Curb Ramp Each ramp contains a Tactile Walking Surface Indicator for visually impaired.

7 At-Grade Planters

8 Street Trees

8 7 5 4

3 2

1 6

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Construction Schedule

2020 102 Avenue Jasper Avenue: 100 Street to 97 Street - south side 100 Street from funicular to Jasper Avenue

2021 100 St.

97 St. Jasper Avenue: 100 Street to 97 Street - north side 99 St.

97 Street from Jasper Avenue to 102 Avenue Jasper Avenue

2022 Thornton Court, landscape and streetscape finalization

Annual construction schedules will follow a similar pattern: March 1 Utility work begins April 1 Roadwork begins October 31 Stage complete

Learn more about this project at: edmonton.ca/JasperAvenueNewVision Imagine Jasper Avenue

114 Street to 109 Street

Construction: April 2020 - Fall 2022 Landscaping: 2022

Learn more about this project at: edmonton.ca/ImagineJasperAvenue KEY IMPROVEMENTS ALONG IMPROVED CONDITIONS FOR PEDESTRIANS GATHERING SPACES AT CORNERS IMPROVED INTERSECTION AT 110 STREET DOWNTOWN TRAFFIC COORDINATION AVENUE ALONG AVENUE • Larger corner bulbs provided to reduce crossing • High visibility bike lane crossing markings added WITH VALLEY LINE WEST LRT • Trees provided along both sides of the • Crossing distance across Jasper Avenue and side streets distances, and for planting and gathering spaces through intersection to improve safety for cyclists CONSTRUCTION avenue reduced • Recessed seating nodes in planting beds • Traffic signal with dedicated phase for cyclists • Bus pullouts provided on Jasper Avenue at 109 • Space created for pedestrian amenities • Signals at all intersections are timed for pedestrians • Cycle track separated from sidewalk north of Street (WB) and 111 Street (EB). These will be such as seating, bus shelters, planting, • Crosswalks are provided on each side of the intersection, Jasper Avenue in place until LRT construction on 104 Avenue is garbage cans, etc. in all directions • Redeveloped plaza space on north side provides complete. • Improved lighting along avenue and at • Crosswalk markings - “zebra stripes” will be provided at improved landscaping and gathering space intersections, including pedestrian-oriented each crosswalk to increase pedestrian visibility lighting on sidewalks • Curb ramps are separated, and direct pedestrians to the Existing Lane • Bike parking distributed along the avenue center of the crosswalk Configurations • Continuous pedestrian through-zone, free Maintained of obstacles • Flex space provides on-street parking and space for patios and other uses NORTH

• Open planting beds with trees and 114 STREET 113 STREET 112 STREET 111 STREET CANTERRA 109 STREET ornamental grasses and shrubs SUITES Circle K CACTUS CLUB

B LEGEND JASPER AVENUE Street Tree B Broom or Decorative Finish Concrete with Tooled Joints Precast Concrete Unit Pavers ST. JOSEPH’S Shrub and Perennial Planting EDMONTON GENERAL BASILICA Sod CONTINUING CARE CENTRE 300mm HT. Concrete Curb Concrete Seat Wall With Timber Seat Traffic Signal Pole Combined Street/Pedestrain Light Pole Pedestrian Light Pole Existing Curbs, Walks, Walls, And Other Features 110 STREET CYCLE CONNECTION Existing Trees To Remain And Be FUTURE POTENTIAL • Separated cycle track along 110 Street and across Jasper Protected Potential locations to accommodate Avenue provides a direct cyclist connection to the existing 110 STREET Full Traffic Signal on-street programming by allowing shared-use path system the public space to extend onto • Stop control for vehicles travelling north on 110 Street UPGRADED SIGNALS AT Bus Shelter On Concrete Pad roadway surface prioritizes the cyclist connection 109 STREET Vehicle Access 114 STREET TO 109 STREET • 4 TRAVEL LANES, WITH CENTER LEFT-TURN LANE

Learn more about this project at: edmonton.ca/ImagineJasperAvenue Roadway and Pedestrian Lighting High-Contrast Furnishing Zone Wood Benches at Gathering Areas Streetlight fixtures will be the same as Surface Comfortable wood seating with back and arm rests will be provided those used on Jasper Avenue New Vision. Contrasting colour of paving in the along Jasper Avenue. The adaptable design allows for the creation of Simpler poles will be used for both roadway furnishing zone improves wayfinding clarity a variety of seating types that are visually consistent. and sidewalk lighting. for the visually impaired. Dark colour concrete paving stones, similar to Jasper Avenue New Vision are proposed.

NORTH

‘FLEX ZONE’

REPRESENTATIVE BLOCK PLAN (114 STREET TO 109 STREET)

‘FLEX ZONE’

Pedestrian Wayfinding Tactile Walking Surface Indicators Provided at select intersections Benches, Bike Racks, Waste Receptacles & Tree Grates Used at intersection curb ramps to improve to direct users to key Consistent with Jasper Avenue New Vision to provide visual continuity and simplify maintenance and/or replacement in the future. safety for the visually impaired. destinations.

Traffic Signals Full signals at all intersections with automatic pedestrian cycle (no need to push button to get crossing light).

Learn more about this project at: edmonton.ca/ImagineJasperAvenue Learn more about this project at: edmonton.ca/ImagineJasperAvenue View of Typical Seating Node View of Typical Seating Node Key Notes

1 FLEXIBLE SPACE Flexible space is provided in some locations beside the sidewalk. These spaces can be used by the adjacent businesses for things like patios or pop- up shops.

2 CURB RAMPS Curb ramps are provided at each intersection and are aligned with the sidewalks. Each ramp contains a Tactile 4 7 Walking Surface Indicator (dimpled steel strip) to assist those with visual impairment.

3 CROSSWALKS Marked crosswalks are provided at each intersection in all directions. This allows for more convenient crossings for all users. The crosswalks are marked with “zebra stripes” to help them appear more visible to drivers.

4 TRAFFIC SIGNALS New signals are provided at each 6 intersection and are timed so that they don’t require pedestrians to push a button to get a walk signal. Push buttons are provided to trigger an audible signal 1 for those with visual impairment.

5 SIDE STREETS Corner bulbs extend onto side streets for a short distance. Side streets corner bulbs are treated simply with sod or shrub beds. Existing trees are retained.

3 6 BUSES (FUTURE OPERATIONS) Buses operate in the standard vehicle travel lanes, rather than in the peak- hour express lanes that exist today. They load and unload at bus stops out of this vehicle travel lane as well. This 5 allows for the creation of a ‘flex zone’ along Jasper Avenue that can be used for permanent on-street parking, patios, 2 parklets or other temporary uses. 7 STREET TREES Street trees are provided along the length of Jasper Avenue. Brandon Elm, Autumn Blaze Maple and Bur Oak are 3 the species proposed. Trees are shown at approximately 10 years growth from time of planting.

LearnLearn more more about about this this project project at: at:edmonton.ca/ edmonton.ca/ImagineJasperAvenueImagineJasperAvenue View of Typical Sidewalk View of Typical Sidewalk Key Notes

1 BUS STOP IN CORNER BULB (FUTURE OPERATIONS) Bus stops are located in long corner bulbs, separate from the sidewalk. The 9 8 area is paved in dark concrete pavers to provide visual contrast for those with visual impairments.

2 SEATING AND PLANTING Open planting beds with seating walls are provided at bus stops to create a more pleasant environment for waiting. Beds contain ornamental grasses or shrubs and street trees.

3 BUS SHELTER (FUTURE OPERATIONS) Bus shelters are provided at each bus stop and are located off the sidewalk.

4 CIRCULATION SPACE 3 Approximately 2.0m of unobstructed circulation space is provided between the curb and the seating walls to provide adequate space for loading and unloading of buses.

5 CURB RAMPS Curb ramps are provided at each intersection and are aligned with the sidewalks. Each ramp contains a Tactile 2 Walking Surface Indicator (dimpled steel strip) to assist those with visual 6 impairment. 6 BUSES (FUTURE OPERATIONS) Buses operate in the standard vehicle 4 travel lanes, rather than in the peak- hour express lanes that exist today. They load and unload at bus stops out of this vehicle travel lane as well. This allows for the creation of a ‘flex zone’ 1 along Jasper Avenue that can be used 7 for permanent on-street parking, patios, parklets or other temporary uses.

7 SIDEWALK Sidewalks along Jasper Avenue are a minimum of 2.75m wide, allowing enough space for three people to comfortably pass. Sidewalks are made of concrete to minimize tripping hazards and allow for easy shovelling in winter.

8 LIGHTING Pedestrian lighting to illuminate the 5 sidewalk and seating areas. Light fixtures match those used on Jasper Avenue New Vision.

9 STREET TREES Street trees are provided along the length of Jasper Avenue. American Elm and Patmore Green Ash are the species Learn more about this project at: edmonton.ca/ImagineJasperAvenue proposed. Trees are shown at approximately 10 years growth from time of planting. Learn more about this project at: edmonton.ca/ImagineJasperAvenue ViewView ofof 110110 Street Street Intersection Intersection Key Notes

1 CYCLE ROUTE THROUGH INTERSECTION A marked crossing is provided for cyclists across Jasper Avenue.

2 NEW SIGNALS WITH CYCLE PHASE New traffic signals are provided on the north and south sides of Jasper Avenue with a protected phase for cyclists.

3 SEPARATED CYCLE TRACK A separated cycle track is provided to guide cyclists to the shared crossing of the access to the Canterra commercial site.

4 PLAZA AND PEDESTRIAN CONNECTION 7 The existing plaza is reconfigured to provide additional landscaping and various forms of seating. A wide, unobstructed route is provided for 6 pedestrians from the intersection at Jasper Avenue to the shared-use-path to the north.

5 TERRACED SEATING STRUCTURE A large structure of wood seating is provided. The seating is terraced to allow people to sit at different levels. Larger areas for lounging are provided. 3 5 The seating is oriented to the west to take advantage of the afternoon sunlight.

4 6 RAISED PEDESTRIAN & CYCLE CROSSING 2 The roadway access to the Canterra commercial site is raised to the level of the plaza to slow down vehicle traffic. Bollards are used to direct vehicles. Pedestrians and cyclists are directed to a single crossing point.

7 CONNECTION TO SHARED-USE-PATH The plaza treatment extends north of the crossing into Railtown Park. The planting beds and seating walls warn cyclists of the upcoming crossing and provide space for seating. Sidewalk connections are provided to the adjacent alley.

1

LearnLearn more more about about this this project project at: at: edmonton.ca/ edmonton.ca/ImagineJasperAvenueImagineJasperAvenue JasperJasper Avenue/110Avenue/ 110 StreetStreet FloodFlood MitigationMitigation

NORTH 112 STREET 111 STREET 110 STREET 109 STREET

CACTUS CANTERRA CLUB SUITES

JASPER AVENUE

EDMONTON GENERAL CONTINUING CARE CENTRE

This drawing is for the sole use of any PCL operating company, or any PCL joint venture company. It is not to be used, altered or reproduced without or reproduced without the written permission ROAD CENTRE LINE of the PCL family of companies. FLOOD MITIGATION STORAGE TANK LEGEND

Purpose SIDEWALK ACCESS • Reduce depth of flooding in roadway during heavy rainfall WORKING AREA WORKING AREA • Protect surrounding businesses/properties from flood risk Description SIDEWALK ACCESS • 3 m diameter concrete pipe • Length - Approximately 260 m • Depth - 5 m to 7 m CURRENT SIDEWALK & CURB Construction Impacts • Traffic reduced to single lane each direction during construction SITE FENCE • Pedestrian traffic to be maintained

t

• Deep open cut excavation to be fenced and barricaded during construction v

r

.

SAFETY FENCE m

o

c

.

l

c

p

@

z

e

p

o

L

E

O

_

D

49 4 30 _

ø 2

V

-

0

2

R

No. IB Date Description _

r

e

p

s

a

J

Imagine Jasper

n

i

Learn more about this project at: edmonton.ca/ImagineJasperAvenue g Avenue a

m

I

\

s

t

n

Edmonton, AB e

m

Learn more about this project at: edmonton.ca/ImagineJasperAvenue u

c

o

D

y

M Project Number: 0001 \

z

e

p

Created By: Designer o

L

E

Drawn By: OEL O

\

s

t

Checked By: Checker n

e

m

Scale: u As indicated c

o

D

\

$

s

r South Phase - Pipe i

d

e

m

Installation Setup o

H

\

1

0

S

D

M

D

E

A100 \

\