DB BR 146.5 & BR 668.2 'Intercity 2'

Total Page:16

File Type:pdf, Size:1020Kb

DB BR 146.5 & BR 668.2 'Intercity 2' Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' DB BR 146.5 & BR 668.2 'Intercity 2' © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 1 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' Contents 1 Background .......................................................................................................................................... 4 DB BR 146.5 ....................................................................................................................................... 4 DBpbzfa 668.2 Control Car 'Intercity 2' ............................................................................................... 4 2 Rolling Stock ........................................................................................................................................ 5 3 Driving the 146.5 .................................................................................................................................. 7 Cab Controls ....................................................................................................................................... 7 Key Layout .......................................................................................................................................... 8 4 Driving the DBpbzfa 668.2 ................................................................................................................... 9 Key Layout ........................................................................................................................................ 12 5 SIFA ................................................................................................................................................... 13 SIFA Key Controls ......................................................................................................................... 13 6 PZB .................................................................................................................................................... 14 PZB Track Interface ...................................................................................................................... 14 PZB Cab Controls ......................................................................................................................... 14 PZB Key Controls .......................................................................................................................... 14 7 LZB ..................................................................................................................................................... 15 8 Scenarios ........................................................................................................................................... 16 Career Scenarios .............................................................................................................................. 16 9 Acknowledgements ............................................................................................................................ 17 © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 2 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' Whilst we do our utmost to reproduce sounds that are accurate and true-to-life, sometimes these sounds may not completely tally with the user’s expectation. Due to the nature of the simulation, it is often not possible to reproduce a completely accurate soundscape for a variety of reasons such as limitations with our current technology and occasional inability to gain meaningful access to the locomotives being created. You should therefore regard the audio reproduction for our locomotives as authentic interpretations rather than perfect recreations. © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 3 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' 1 Background DB BR 146.5 The 146 TRAXX (Transnational Railway Applications with eXtreme fleXibility) P160 AC2 is an electric locomotive. This variant of the TRAXX series is classified as a 146.5. It has a maximum speed of 160km/h (99 mph), and a power output of 5,600 kW (7,613 bhp). A total of 154 "Traxx P160 AC2" were produced, with series production focusing on the years 2005- 2007 and 2010-2013. In January 2011, 27 locomotives were ordered for DB. As 146.5 designates, the vehicle numbers strictly speaking to the "private" vehicles of the series 146.5. They were to be used from December 2013 with the IC2 double-deck intercity and were delivered in the appropriate color scheme (white with traffic-red longitudinal stripes). DBpbzfa 668.2 Control Car 'Intercity 2' The Intercity 2, is an intercity train of the DB, designed with double-deck car. They have been in operation since December 2015. These coaches are used in German Regional- Express trains and for Intercity services. They are designed to have a much more comfortable interior than in regional train double-decker coaches. In comparison to other IC stock, these new trains have a top speed of 160 km/h and their intended use is on routes where higher speeds are not possible. DB later sought approval for a top speed of 185 km/h. © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 4 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' 2 Rolling Stock DB BR 146.5 in DB IC Livery DBpbzfa 668.2 Control Car 'Intercity 2' in DB IC Livery © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 5 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' DApza 687.2 1st Class in DB IC Livery DBpza 682.2 2nd Class in DB IC Livery © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 6 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' 3 Driving the 146.5 Cab Controls 1 Throttle 8 Head lights 2 AFB 9 Cab Light 3 Direction Control 10 Train Brake 4 Pantograph 11 Engine Brake 5 PZB/LZB Controls 12 Dynamic Brake 6 Emergency Stop 13 Horn 7 Sander 14 Wiper © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 7 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' Key Layout Function Key Key Increase or Decrease Power. A D Move reverser control Forward or Backward. W S Increase or Decrease Train Brake. ; ‘ Increase or Decrease Locomotive Brake. [ ] (Expert) Sander. Causes sand to be laid on the rails next to the wheels to assist with adhesion. Press and hold to X activate sander, let go to stop. (Expert) Engine Stop/Start. By default engines will already be running at the start of a scenario. Press this Z button to stop and then again to restart the engine. Alerter Reset. Q Headlights. Repeatedly pressing will cycle through H Shift + H headlight states where appropriate. Windscreen Wipers. Press once to switch on and again V to switch off. Horn. Press once to sound the Horn. Space Cab Lights / Desk Light. Toggle the Cab lights on and L off. Pantograph. Raise the selected pantograph P Pantograph. Lower the selected pantograph Ctrl P Emergency Brake. Apply the emergency brake Backspace (Expert) Sander. Toggle sand to be laid on the rails next X to the wheels to assist with adhesion. PZB. Activate/deactivate PZB. Ctrl Enter PZB Acknowledge (“PZB Wachsam”) Page Down PZB Release (“PZB Frei”) End PZB Override (“PZB Befehl40”) Del Instrument Lights. Toggle all Instrument Lights. I © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 8 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' 4 Driving the DBpbzfa 668.2 5 1 6 7 8 2 3 4 1 Emergency Power Cut-off 5 Traction Motor Blowers 2 PZB Override (“PZB Befehl40”) 6 Pantograph 3 PZB Release (“PZB Frei”) 7 Main Circuit Switch 4 PZB Acknowledge (“PZB Wachsam”) 8 Train Voltage 10 9 11 12 13 14 15 16 9 Regulator 13 Headlights 10 Master Key 14 Cab Light / Desk Light 11 Sander 15 Train Brake 12 Release Brakes 16 Electric Brake © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 9 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' 20 17 18 19 17 Brake Key 19 Horn 18 Engine Brake 20 Instrument Lights 24 22 21 23 21 SIFA 23 Emergency Brake 22 Horn High 24 Wipers © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 10 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' 25 26 27 25 Back Panel Door 27 Release Hand Brake 26 Apply Hand Brake © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 11 Train Simulator – DB BR 146.5 & BR 668.2 'Intercity 2' Key Layout Function Key Key Increase or Decrease Power. A D Move reverser control Forward or Backward. W S Increase or Decrease Train Brake. ; ‘ Increase or Decrease Locomotive Brake. [ ] (Expert) Sander. Causes sand to be laid on the rails next to the wheels to assist with adhesion. Press and hold to X activate sander, let go to stop. (Expert) Engine Stop/Start. By default engines will already be running at the start of a scenario. Press this Z button to stop and then again to restart the engine. Alerter Reset. Q Headlights. Repeatedly pressing will cycle through H Shift + H headlight states where appropriate. Windscreen Wipers. Press once to switch on and again V to switch off. Horn. Press once to sound the Horn. Space Cab Lights / Desk Light. Toggle the Cab lights on and L off. Pantograph. Raise the selected pantograph P Pantograph. Lower the selected pantograph Ctrl P Main circuit switch. Press to turn on. Z Main circuit switch. Press to turn off. Ctrl Z Emergency Brake. Apply the emergency brake Backsp ( ) (Expert) Sander. Toggle sand to be laid on the rails next X to the
Recommended publications
  • Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2006-88
    Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2006-88 Union Pacific Midas, CA November 9, 2006 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2006-88 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. Union Pacific RR Co. [UP ] UP 1106RS011 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident N/A N/A N/A 3.Name of Railroad Responsible for Track Maintenance: 3a. Alphabetic Code 3b. Railroad Accident/Incident No. Union Pacific RR Co. [UP ] UP 1106RS011 4. U.S. DOT_AAR Grade Crossing Identification Number 5. Date of Accident/Incident 6. Time of Accident/Incident Month Day Year 11 09 2006 11:02: AM PM 7. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 01 8. Cars Carrying 9. HAZMAT Cars 10. Cars Releasing 11. People 12. Division HAZMAT Damaged/Derailed HAZMAT Evacuated 0 0 0 0 Roseville 13. Nearest City/Town 14.
    [Show full text]
  • Pioneering the Application of High Speed Rail Express Trainsets in the United States
    Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 136763_Cover.indd 1 3/22/13 7:38 AM 136763_Cover.indd 1 3/22/13 7:38 AM Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 First Printing 2013 Copyright © 2013, Parsons Brinckerhoff Group Inc. All rights reserved. No part of this work may be reproduced or used in any form or by any means—graphic, electronic, mechanical (including photocopying), recording, taping, or information or retrieval systems—without permission of the pub- lisher. Published by: Parsons Brinckerhoff Group Inc. One Penn Plaza New York, New York 10119 Graphics Database: V212 CONTENTS FOREWORD XV PREFACE XVII PART 1: INTRODUCTION 1 CHAPTER 1 INTRODUCTION TO THE RESEARCH 3 1.1 Unprecedented Support for High Speed Rail in the U.S. ....................3 1.2 Pioneering the Application of High Speed Rail Express Trainsets in the U.S. .....4 1.3 Research Objectives . 6 1.4 William Barclay Parsons Fellowship Participants ...........................6 1.5 Host Manufacturers and Operators......................................7 1.6 A Snapshot in Time .................................................10 CHAPTER 2 HOST MANUFACTURERS AND OPERATORS, THEIR PRODUCTS AND SERVICES 11 2.1 Overview . 11 2.2 Introduction to Host HSR Manufacturers . 11 2.3 Introduction to Host HSR Operators and Regulatory Agencies .
    [Show full text]
  • Bilevel Rail Car - Wikipedia
    Bilevel rail car - Wikipedia https://en.wikipedia.org/wiki/Bilevel_rail_car Bilevel rail car The bilevel car (American English) or double-decker train (British English and Canadian English) is a type of rail car that has two levels of passenger accommodation, as opposed to one, increasing passenger capacity (in example cases of up to 57% per car).[1] In some countries such vehicles are commonly referred to as dostos, derived from the German Doppelstockwagen. The use of double-decker carriages, where feasible, can resolve capacity problems on a railway, avoiding other options which have an associated infrastructure cost such as longer trains (which require longer station Double-deck rail car operated by Agence métropolitaine de transport platforms), more trains per hour (which the signalling or safety in Montreal, Quebec, Canada. The requirements may not allow) or adding extra tracks besides the existing Lucien-L'Allier station is in the back line. ground. Bilevel trains are claimed to be more energy efficient,[2] and may have a lower operating cost per passenger.[3] A bilevel car may carry about twice as many as a normal car, without requiring double the weight to pull or material to build. However, a bilevel train may take longer to exchange passengers at each station, since more people will enter and exit from each car. The increased dwell time makes them most popular on long-distance routes which make fewer stops (and may be popular with passengers for offering a better view).[1] Bilevel cars may not be usable in countries or older railway systems with Bombardier double-deck rail cars in low loading gauges.
    [Show full text]
  • How Understanding a Railway's Historic Evolution Can Guide Future
    College of Engineering, School of Civil Engineering University of Birmingham Managing Technical and Operational Change: How understanding a railway’s historic evolution can guide future development: A London Underground case study. by Piers Connor Submitted as his PhD Thesis DATE: 15th February 2017 University of Birmingham Research Archive e-theses repository This unpublished thesis/dissertation is copyright of the author and/or third parties. The intellectual property rights of the author or third parties in respect of this work are as defined by The Copyright Designs and Patents Act 1988 or as modified by any successor legislation. Any use made of information contained in this thesis/dissertation must be in accordance with that legislation and must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the permission of the copyright holder. Managing Technical & Operational Development PhD Thesis Abstract The argument for this thesis is that patterns of past engineering and operational development can be used to support the creation of a good, robust strategy for future development and that, in order to achieve this, a corporate understanding of the history of the engineering, operational and organisational changes in the business is essential for any evolving railway undertaking. It has been the objective of the author of this study to determine whether it is essential that the history and development of a railway undertaking be known and understood by its management and staff in order for the railway to function in an efficient manner and for it to be able to develop robust and appropriate improvement strategies in a cost-effective manner.
    [Show full text]
  • Amtrak Cascades Fleet Management Plan
    Amtrak Cascades Fleet Management Plan November 2017 Funding support from Americans with Disabilities Act (ADA) Information The material can be made available in an alternative format by emailing the Office of Equal Opportunity at [email protected] or by calling toll free, 855-362-4ADA (4232). Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711. Title VI Notice to Public It is the Washington State Department of Transportation’s (WSDOT) policy to assure that no person shall, on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with WSDOT’s Office of Equal Opportunity (OEO). For additional information regarding Title VI complaint procedures and/or information regarding our non-discrimination obligations, please contact OEO’s Title VI Coordinator at 360-705-7082. The Oregon Department of Transportation ensures compliance with Title VI of the Civil Rights Act of 1964; 49 CFR, Part 21; related statutes and regulations to the end that no person shall be excluded from participation in or be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance from the U.S. Department of Transportation on the grounds of race, color, sex, disability or national origin.
    [Show full text]
  • Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2007-55
    Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2007-55 Amtrak/Union Pacific (ATK/UP) Martinez, California October 1, 2007 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2007-55 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. Amtrak [ATK ] ATK 105753 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident No. Union Pacific RR Co. [UP ] UP 1007RS003 3.Name of Railroad Operating Train #3 3a. Alphabetic Code 3b. Railroad Accident/Incident No. N/A N/A N/A 4.Name of Railroad Responsible for Track Maintenance: 4a. Alphabetic Code 4b. Railroad Accident/Incident No. Union Pacific RR Co. [UP ] UP 1007RS003 5. U.S. DOT_AAR Grade Crossing Identification Number 6. Date of Accident/Incident 7. Time of Accident/Incident Month 10 Day 01 Year 2007 05:35: AM PM 8. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other Code (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 09 9.
    [Show full text]
  • Commuter Rail System On-Time Performance Report
    COMMUTER RAIL SYSTEM ON-TIME PERFORMANCE REPORT October 2015 Division of Strategic Capital Planning December 2015 COMMUTER RAIL ON-TIME PERFORMANCE October 2015 This report presents an analysis of the October 2015 train delays as reported for Metra's eleven commuter rail lines. On-time is defined, for this analysis, as those regularly scheduled trains arriving at their last station stop less than six minutes behind schedule. Trains that are six minutes or more behind schedule, including annulled trains (trains that do not complete their scheduled runs), are regarded as late. “Extra” trains (trains added to handle special events but not shown in the regularly published timetables) are excluded from on-time performance calculations unless shown in special-event schedules that include all intermediate station stop times and are distributed publicly via Metra's website or on paper flyers. Cancelled (not annulled) trains and non-revenue trains are also excluded from on-time performance calculations. On-Time Performance Tables Table 1 presents the number of train delays by rail line and service period. During October 2015, Metra operated 17,717 scheduled trains, including scheduled “extras”, if any. 528 of these trains were delayed (late or annulled), representing an on-time performance rate of 97.0%. Table 2 lists on-time percentages by line for each month and year since 2010. Table 3 lists each train that was on time for less than 85% of its weekday runs in October 2015, in order of line, train, and dates delayed. The codes in the 'Delay Code' column of Table 3 are defined in Table 4 and shown sorted by delay-cause category and carrier designation in Table 5.
    [Show full text]
  • Annual Report 2000 Higher Transport Performance We Were Able to Increase Our Transport Performance in Passenger and Freight Transport Significantly in 2000
    Annual Report 2000 Higher Transport Performance We were able to increase our transport performance in passenger and freight transport significantly in 2000. Positive Income Development Our operating income after interest improved by € 286 million. Modernization of Deutsche Bahn AG A comprehensive fitness program and the expansion of our capital expenditures will pave the way to our becoming an even more effective railway. Key figures Change in € million 2000 1999 in % Revenues 15,465 15,630 – 1.1 Revenues (comparable) 15,465 14,725 + 5.0 Income before taxes 37 91 – 59.3 Income after taxes 85 87 – 2.3 EBITDA 2,502 2,036 + 22.9 EBIT 450 71 + 533.8 Operating income after net interest 199 – 87 + 328.7 Return on capital employed in % 1.6 0.3 – Fixed assets 34,671 33,495 + 3.5 Total assets 39,467 37,198 + 6.1 Equity 8,788 8,701 + 1.0 Cash flow (before taxes) 2,113 2,107 + 0.3 Gross capital expenditures 6,892 8,372 – 17.7 Net capital expenditures 1) 3,250 3,229 + 0.7 Employees (as of Dec 31) 222,656 241,638 – 7.9 Performance figures Change Passenger Transport 2000 1999 in % Passengers DB Reise&Touristik million 144.8 146.5 – 1.2 DB Regio million 1,567.7 1,533.6 + 2.2 Total million 1,712.5 1,680.1 + 1.9 Passenger kilometers DB Reise&Touristik million pkm 2) 36,226 34,897 + 3.8 DB Regio million pkm 2) 38,162 37,949 + 0.6 Total million pkm 2) 74,388 72,846 + 2.1 Train kilometers DB Reise&Touristik million train-path km 175.9 177.5 – 0.9 DB Regio million train-path km 563.9 552.4 + 2.1 Total million train-path km 739.8 729.9 + 1.4 Freight Transport
    [Show full text]
  • Using Wheel Temperature Detector Technology to Monitor Railcar Brake System Effectiveness DTFR53-00-C-00012
    U.S. Department of Transportation Using Wheel Temperature Detector Technology Federal Railroad to Monitor Railcar Brake System Effectiveness Administration Office of Research and Development Washington, DC 20590 DOT/FRA/ORD-13/50 Final Report December 2013 NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. Any opinions, findings and conclusions, or recommendations expressed in this material do not necessarily reflect the views or policies of the United States Government, nor does mention of trade names, commercial products, or organizations imply endorsement by the United States Government. The United States Government assumes no liability for the content or use of the material contained in this document. NOTICE The United States Government does not endorse products or manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this report. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
    [Show full text]
  • Federal Railroad Administration Office of Railroad Safety Accident and Analysis Branch
    Federal Railroad Administration Office of Railroad Safety Accident and Analysis Branch Accident Investigation Report HQ-2013-08 New Jersey Transit Rail Operations (NJTR) Hoboken, NJ April 6, 2013 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report, including this one, made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. U.S. Department of Transportation FRA File #HQ-2013-08 Federal Railroad Administration FRA FACTUAL RAILROAD ACCIDENT REPORT TRAIN SUMMARY 1. Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. New Jersey Transit Rail Operations NJTR 201304180 GENERAL INFORMATION 1. Name of Railroad or Other Entity Responsible for Track Maintenance 1a. Alphabetic Code 1b. Railroad Accident/Incident No. New Jersey Transit Rail Operations NJTR 201304180 2. U.S. DOT Grade Crossing Identification Number 3. Date of Accident/Incident 4. Time of Accident/Incident 4/6/2013 2:34 PM 5. Type of Accident/Incident Head On Collision 6. Cars Carrying 7. HAZMAT Cars 8. Cars Releasing 9. People 10. Subdivision HAZMAT 0 Damaged/Derailed 0 HAZMAT 0 Evacuated 0 Hoboken 11. Nearest City/Town 12. Milepost (to nearest tenth) 13. State Abbr. 14. County Hoboken 0 NJ HUDSON 15. Temperature (F) 16. Visibility 17. Weather 18. Type of Track 38ࡈ F Dark Clear Main 19. Track Name/Number 20. FRA Track Class 21. Annual Track Density 22. Time Table Direction (gross tons in millions) No.
    [Show full text]
  • CED-81-2 There Is No Shortage of Freight Cars
    BY THE COMPTROLLER GENERAL Report To The Congress OF THE UNITEDSTATES There Is No Shortage Of Freight Cars-Railroads Must Make Better UseOf What They Have flailroads cannot satisfy the demand for freight cars because they do not use the exis- tihg car fleet efficiently. Enough cars areavail- &e, but they are not in the right place at the right time. Federal agencies can do little tc) substantially improve utilization. 113712 F/ederally financed research does point the ay to improve car utilization techniques, 13 t only railroad managers can make the sberating improvements which will largely ,\iminate the illusive freight car shortage. To qpplement improved utilization, railroads :ould use greater pricing freedom to defer &ak demand for cars. The recently approved act permits greater pricing is too early to evaluate this CED-81-P NOVEMBER lo,1980 I I For sale by: Superintendent of Documents U.S. Government Printing Office Washington, D.C. 20402 Telephone (202) 783-3238 Members of Congress; heads of Federal, State, and local government agencies; members of the press; and libraries can obtain GAO documents from: US. General Accounting Office Document Handling and Information Services Facility P.O. 80x 6015 Gaithersburg, Md. 20760 Telephone (202) 2756241 COMPTROLLER OENEML OF THE UNITED -Am W~HINDTON, D.C. ;LouI B-195212 To the President of the Senate and the Speaker of the House of Representatives The inability of shippers, especially grain shippers, to obtain an adequate supply of freight cars when needed-- commonly reported as freight car shortages--has been a matter of national concern for decades.
    [Show full text]
  • Best Practices and Strategies for Improving Rail Energy Efficiency
    U.S. Department of Transportation Best Practices and Strategies for Federal Railroad Improving Rail Energy Efficiency Administration Office of Research and Development Washington, DC 20590 DOT/FRA/ORD-14/02 Final Report January 2014 NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. Any opinions, findings and conclusions, or recommendations expressed in this material do not necessarily reflect the views or policies of the United States Government, nor does mention of trade names, commercial products, or organizations imply endorsement by the United States Government. The United States Government assumes no liability for the content or use of the material contained in this document. NOTICE The United States Government does not endorse products or manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this report. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
    [Show full text]