Balancing the Business of Energy and Water

Total Page:16

File Type:pdf, Size:1020Kb

Balancing the Business of Energy and Water Water and energy Balancing the business of energy and water As an organisation that constantly strives to limit increases in water consumption and contribute to sustainable water use, Eskom has indicated its commitment to improving the way in which South Africa’s water resources are managed. Eskom’s Nandha Govender provides insight into how this is being achieved. Article by Debbie Besseling. ith a track record of have to go beyond our own interests. some 15 years at Eskom, The idea, which is part of our strat- Govender joined the egy, is that in the course of doing Worganisation’s Generation Divi- our business, we have to find ways sion’s Primary Energy, Water Supply and means of reducing our water ABOUT NANDHA Department in 1998 as a mechani- footprint, and managing our current GOVENDER cal engineer. Today, he is the Acting water resources so that others will General Manager: Operations, under have access to it as well.” • Professional registration: the group’s Commercial and Tech- Eskom Holdings SOC Limited Engineering Council of SA nology: Primary Energy Division, is a large consumer of fresh water, • Other memberships: Certified where he is responsible for integrated accounting for approximately 2-3% Director- Institute of Directors; planning and operations of primary of the country’s total water con- National Society of Black Engineers energy resources such as coal, water sumption annually. Eskom power • Academic qualification: and limestone. In this role he pro- stations run constantly, supplying Bachelor of Science (Mechanical vides general management of the in excess of 95% of South Africa’s Engineering), University of Durban coal supply, water supply, logistics electrical energy and more than half Westville, 1995 operations as well as environmental of the electricity used on the African • First job: Apprentice diesel and technical services; a position continent. mechanic that he enthusiastically describes as Govender adds: “It is expected • Own personal vision: I am the having a new challenge every day that Eskom’s water usage will light and from one light many can and an opportunity to learn some- increase over the next 10 years due be lit thing new. to the return to service of older • Likes: Education in human values According to Govender, one of wet-cooled power stations and the • Dislikes: Wastage of electricity the major challenges for the organi- introduction of new power stations. and water taps left running sation is the security of water sup- However, with the introduction of • Currently reading: Intuitive Lis- ply to its power stations in the long more dry-cooled stations, diversifi- tening: How Intuition Talks Through term. “This is a major area of focus cation of the energy mix and energy You by Christiane Northrup and for us. We have existing and new and water efficiency measures, Mona Lisa Schulz. power stations that last anywhere Eskom’s relative and absolute water between 50 and 60 years and it is consumption will improve consider- very important to ensure that water ably by 2030.” re-use of mine-water; and minimis- is available to sustain these power Eskom has several overarching ing the impact of its activities on stations. Secondly, to ensure proper environmental objectives relevant groundwater resources. planning, and that water resources to addressing the water challenges, and infrastructure planning is done namely avoiding harm to the natural ACHIEVING OBJECTIVES to make sure that we deliver water to environment; reducing freshwater THROUGH INNOVATION the power stations for the life of the usage; eliminating liquid effluent power stations. We are competing discharges through effective water skom has achieved significant for limited resources. We as Eskom management processes and the Ewater saving objectives through 36 The Water Wheel January/February 2014 Water and energy the implementation of various Figure 1 - Eskom’s projects over the past two decades. water use per unit of energy over the last One major innovation has been dry 40 years. cooling. To date, 17 of the newest Eskom coal-fired power generation units (at Grootvlei, Matimba, Kendal and Majuba) have been installed with dry-cooling systems. Water consumption from these units is 15 times lower when compared to conventional wet-cooled units. In addition, a policy decision has been made to implement dry- cooling technology at all new coal- Eskom Courtesy fired power plants. Thus Medupi and Kusile will be equipped with dry- treat and use mine-water at Kriel and use at the organisation’s power sta- cooling technology. Figure 1 illus- Matla power stations from the tied tions. Stations have identified major trates the positive impact of water coal collieries. The project is cur- streams, and plans are underway to usage following the introduction rently in the feasibility phase. The install flow meters at strategic points of dry-cooled large six pack power estimated time for the operation of as part of the technical plans to be stations during the period of 1983 to the plant will be in the next three implemented over a period of three 1993. It is anticipated that this will to four years. There is a temporary years to ensure full compliance to further improve with the commis- desalination plant in place, with the directive. sioning of the world’s largest dry- plans to build a permanent plant at Eskom also sets water-use tar- cooled power stations, Medupi and Lethabo Power Station for the use gets in terms of litres of water used Kusile, which are currently under of mine-water from its tied coal per unit of electricity produced for construction. colliery. each power station every year. The The second water-saving project Sewage is also treated and re- water targets are linked to the Eskom relates to diversification of Eskom’s used. Most of Eskom’s coal-fired Sustainability Index. The targets are water mix. Through the reuse of power stations (10 of the 13 stations) benchmarked against historical as treated mine-water from its coal treat and recover sewage water for well as designed water consumption suppliers and treated sewage recov- use in their operations. The total for each type of plant. ery the power company has man- amount of sewage water reuse is All power stations have water aged to reduce its freshwater usage. approximately 5 million m3/a. use performance targets that are To reduce the intake of freshwater A further innovation is Eskom’s set and monitored on a monthly at Tutuka and Lethabo power sta- implementation of a Water Account- basis and reviewed each year. The tions, mine-water is being sourced ing Framework (WAF) directive. The target setting is based on the station from nearby tied collieries, desali- objective of the WAF is to facilitate design and technology, water use nated and used to augment the sound water and effluent manage- performance, water quality and sta- Eskom accounts for freshwater supply. The total volume ment by prescribing minimum tistical/regression analysis of each up to 3% of South of mine-water recovered to Tutuka requirements for the monitoring, power station. Eskom achieved its Africa’s total water and Lethabo is approximately accounting and reporting of water best overall water use performance consumption. 8 million m3/a. Eskom has also increased its use of desalination plants. A desalina- tion plant is already in place at Tutuka Power Station to utilise excess mine-water from its tied coal colliery. An additional project, to be completed at the end of the finan- cial year, aims to manage the result- ant brine with the construction of a brine pond. Furthermore, there is a project underway for the development of a large-scale desalinisation plant to Eskom Courtesy The Water Wheel January/February 2014 37 Water and energy whose overall objective is to reduce the 17% water resources demand gap by 2030, as well as in severely stressed catchments whose water balance is in deficit. The SWPN-SA has formed three working groups which focus on the following: • Working group on Water Effi- ciency and Leakage Reduction: Focus on water use efficiency, reducing water losses and water wastage in the Municipal Sector. Group led by Nestle (South Africa) and Sasol; • Working group on Agriculture and Supply Chain water: Focus on Agricultural Supply Chain and irrigated agriculture, led by Coca Cola (South Africa); • Working group on Effluent and Courtesy Eskom Courtesy Waste Water Management: Huge potential for increasing reuse An aerial view of of 1.34 ℓ/kWh in the 2012 financial of waste water at the coast as Matimba Power Station, WHERE DOES ESKOM year against a target of 1.35 ℓ/kWh. well as in inland systems. Focus one of Eskom’s dry- USE ITS WATER? As a strategic water user Eskom on mine-water and municipal cooling stations. is committed to being proactive in effluent treatment, led by Eskom • At the coal-fired stations, water establishing water management and Johannesburg Water. is used to generate the steam procedures and initiatives to that drives the turbines to gener- protect water resources and pro- The SWPN-SA is a water manage- ate electricity, and for cooling mote conservation and judicious ment partnership between govern- purposes use of water in support of the ment, the private sector and civil • Water is used to drive the turbines national policy. A Memorandum society. to generate electricity at its hydro of Understanding (MoU) has been power and pumped storage signed between Eskom and the schemes GREATEST MILESTONE OF Department of Water Affairs to • Most power stations treat raw CAREER promote, encourage and support water to produce potable water good water management practices for certain processes and to supply ovender relates the greatest in areas of Water Conservation the nearby communities and coal milestone of his career: “I was and Water Demand Management G collieries for domestic purposes appointed to the Governing Board (WCWDM) within the power • Sea water is used for cooling of the first catchment management generation sector.
Recommended publications
  • Construction First in Portable Sanitation
    Construction First in Portable Sanitation Sanitech is the leading portable sanitation company in South Africa with branches nationwide and is renowned for its service excellence and superior product technology. Sanitech was the first portable toilet hire company to supply sanitation facilities to areas where no sanitation infrastructure existed. Experience counts and Sanitech understands the importance of choosing a trusted supplier with an outstanding track record. With more than two decades of local experience and the global support of Waco International, Sanitech is the only toilet hire company with the necessary national fleet to maintain a competitive edge. Fast and Efficient Site Solutions Sanitech currently provides ablution facilities to a substantial number of construction and industrial projects throughout the country, improving both the hygiene standards and productivity on these sites. Their services include: • Supply of fresh, clean water to the units • On-site toilet cleaning and servicing to agreed timescales • Short and long term rental of portable toilets and mobile • Replenishment of toilet rolls and soap and paper hand towels ablution units Current industry projects include: • Braamhoek Dam • Glencore Mines • Aveng Mine • Avon Power Station • Anglo Mines • Xstrata Mine • Thukela Water Project • Impumelelo Mine • Shiva Uranium • Cornubia Development • Shondoni Mine • Sasol Sigma Mine • Dube Tradeport • Total Coal Mine • Sasol Wax Phase 1 & 2 • Kouga Wind Farm • Kusile Power Station • Matlosana Mall • Dedisa Power Plant Special Projects • Sibanye Mine Construction • Sasol Synfuels • Wescoal Mine • Lethabo Power Station • PetroSA Orca Rig • Stefanutti Stocks Mine • R377 Road Construction Comprehensive Health and Safety Programme Sanitech’s world-class SHE management system is driven by Waco International Corporate Standards and helps to meet health and safety responsibilities by protecting their most valuable resources – employees, customers, communities and the environment that sustains us all.
    [Show full text]
  • Sponsored by the Department of Science and Technology Volume
    Volume 26 Number 3 • August 2015 Sponsored by the Department of Science and Technology Volume 26 Number 3 • August 2015 CONTENTS 2 Reliability benefit of smart grid technologies: A case for South Africa Angela Masembe 10 Low-income resident’s preferences for the location of wind turbine farms in the Eastern Cape Province, South Africa Jessica Hosking, Mario du Preez and Gary Sharp 19 Identification and characterisation of performance limiting defects and cell mismatch in photovoltaic modules Jacqui L Crozier, Ernest E van Dyk and Frederick J Vorster 27 A perspective on South African coal fired power station emissions Ilze Pretorius, Stuart Piketh, Roelof Burger and Hein Neomagus 41 Modelling energy supply options for electricity generations in Tanzania Baraka Kichonge, Geoffrey R John and Iddi S N Mkilaha 58 Options for the supply of electricity to rural homes in South Africa Noor Jamal 66 Determinants of energy poverty in South Africa Zaakirah Ismail and Patrick Khembo 79 An overview of refrigeration and its impact on the development in the Democratic Republic of Congo Jean Fulbert Ituna-Yudonago, J M Belman-Flores and V Pérez-García 90 Comparative bioelectricity generation from waste citrus fruit using a galvanic cell, fuel cell and microbial fuel cell Abdul Majeed Khan and Muhammad Obaid 100 The effect of an angle on the impact and flow quantity on output power of an impulse water wheel model Ram K Tyagi CONFERENCE PAPERS 105 Harnessing Nigeria’s abundant solar energy potential using the DESERTEC model Udochukwu B Akuru, Ogbonnaya
    [Show full text]
  • Overview of the South African Coal Value Chain
    SOUTH AFRICAN COAL ROADMAP OVERVIEW OF THE SOUTH AFRICAN COAL VALUE CHAIN PREPARED AS A BASIS FOR THE DEVELOPMENT OF THE SOUTH AFRICAN COAL ROADMAP OCTOBER 2011 Overview of the South African Coal Value Chain | I Disclaimer: The statements and views of the South African Coal Roadmap are a consensus view of the participants in the development of the roadmap and do not necessarily represent the views of the participating members in their individual capacity. An extensive as reasonably possible range of information was used in compiling the roadmap; all judgments and views expressed in the roadmap are based upon the information available at the time and remain subject to further review. The South African Coal Roadmap does not guarantee the correctness, reliability or completeness of any information, judgments or views included in the roadmap. All forecasts made in this document have been referenced where possible and the use and interpretation of these forecasts and any information, judgments or views contained in the roadmap is entirely the risk of the user. The participants in the compiling of this roadmap will not accept any liability whatsoever in respect of any information contained in the roadmap or any statements, judgments or views expressed as part of the South African Coal Roadmap. SYNTHESIS enables a wide range of stakeholders to discuss the future of the industry. The fact that at this stage in the process Phase The South African Coal Roadmap (SACRM) process I does not provide any clarity on the outlook for the South African coal industry is o"set by the constructive process The need for a Coal Roadmap for South Africa was identi!ed which has been initiated, which augurs well for the successful in 2007 by key role players in the industry, under the auspices development of a South African Coal Roadmap in Phase II.
    [Show full text]
  • Transmission Development Plan 2020-2029 FOREWORD by GROUP EXECUTIVE
    Transmission Development Plan 2020-2029 FOREWORD BY GROUP EXECUTIVE “As we do our best to meet our commitments in terms of the TDP, we will certainly face challenges; however, our hope is that, through collaboration, we can all own this plan and support its funding and execution in order to co-create an energy future in support of the economic growth of our country.” Segomoco Scheppers i FOREWORD BY GROUP EXECUTIVE The growth and development of our country’s economy to meet the growth in demand, and supply the future generation pattern. demands of a 21st century lifestyle relies heavily on a secure and With regard to cross-border Transmission inter connectors, our analysis reliable supply of electricity at affordable prices. It is obvious that people highlights the need to strengthen a number of our cross-border whose homes, workplaces, schools, and clinics are connected to the Transmission lines into neighbouring countries, in order to support grid for the first time will find their lives transformed for the better in increased cross-border electricity trade. This is expected to result in ways they could never previously have imagined. reduced upward pressure on tariffs and improved security of electricity supply both in South Africa and the region. The bulk of South Africa’s electricity is still produced by Eskom’s coal- fired power stations located in the coalfields of the Mpumalanga The benefits of a reliable and secure electricity supply to South Africa Highveld and near Lephalale, but the landscape for power generation is must be weighed against the associated costs to ensure that electricity rapidly changing.
    [Show full text]
  • Cenyu Scoping Report
    EASTERN CAPE DEPARTMENT OF HOUSING Cenyu/ Cenyulands Housing Dev elopment Scoping Report December 2011 J29034A Arcus GIBB (Pty) Ltd Reg. 1992/007139/07 East London Office: 9 Pearce St reet , Berea , East London PROPOSED CENYU/ CENYULANDS HOUSING DEVELOPMENT DRAFT SCOPING REPORT CONTENTS Chapter Description Page 1 INTRODUCTION 1 1.1 Purpose of Report 1 1.2 EIA Process 1 2 PROPOSED ACTIVITY 5 2.1 Location of the proposed activity 5 2.2 Description of Proposed Activity 7 2.3 Roads 9 2.4 Stormwater Drainage 9 2.5 Bulk Water Supply and Reticulation 12 2.6 Sanitation 13 2.7 Motivation for Proposed Activity 13 2.8 Alternatives 13 3 LEGISLATION AND POLICY GUIDELINES CONSIDERED 15 3.1 The Constitution of South Africa (Act No. 108 of 1996) 15 3.2 The National Environmental Management Act (Act 107 of 1998) 15 3.3 Legislation for the Conservation of Natural Resources 17 3.4 Summary of Relevant Legislation 22 4 DESCRIPTION OF THE RECEIVING ENVIRONMENT 24 4.1 Introduction 24 4.2 Physical Environment 24 4.3 Biological Environment 27 4.4 Socio-Economic Environment 31 4.5 Cultural/ Historical sites 32 i 5 DESCRIPTION OF ENVIRONMENTAL ISSUES AND IMPACTS IDENTIFIED 33 5.1 Project activities affecting the environment 33 5.2 Need and Desirability of Project 34 5.3 Biophysical Impacts 35 5.4 Ecological Impacts 36 5.5 Socio-economic Impacts 37 5.6 Cumulative Impacts 37 5.7 Key Issues to be addressed in the EIA Phase 38 6 METHODOLOGY IN ASSESSING IMPACTS 39 6.1 Introduction 39 7 PLAN OF STUDY FOR EIA 42 7.1 Introduction 42 7.2 Key Issues to be addressed in the
    [Show full text]
  • Coal - Balance Between Supplies to Eskom and Exports
    Coal - balance between supplies to Eskom and exports Written by M Dworzanowski Friday, 01 November 2013 00:00 The South African coal mining industry is very often portrayed as a poor cousin to the gold and platinum sectors. And more often than not, when coal is under the spotlight, the emphasis is on supplies to Eskom. The true contribution of coal to the South African economy and the significant size of the industry are rarely appreciated. The majority of coal mines are still based in Mpumalanga, in the vicinities of Witbank, Middelburg, Belfast, Secunda, and Ermelo. These mines supply numerous Eskom power stations, as well as Sasol’s facilities in Secunda, and they also produce a significant amount of export thermal coal. Coal mining in KwaZulu-Natal is on the decline and no longer significant. There is one coal mine in the Free State – New Vaal, which supplies the Lethabo power station. Limpopo has the very large Grootegeluk coal mine, supplying the Matimba power station and which in due course will supply the new Medupi power station. In the near future the centre of gravity of the South African coal industry will shift from Mpumalanga to Limpopo as coal reserves become depleted in Mpumalanga. However, this shift will not be a simple case of more of the same in just a different location. The Limpopo coalfields are very different to those in Mpumalanga in terms of mining and coal washing. While Grootegeluk is leading the way, new mining projects in Limpopo will require different approaches, and future developments will need innovation and extended project execution.
    [Show full text]
  • Load Management of Water Projects Using an Integrated Systems Approach by Chris Scheepers, Dr
    APPLICATION Load management of water projects using an integrated systems approach by Chris Scheepers, Dr. Gerhard Bolt and Marius Kleingeld, North-West University The Department of Water Affairs (DWA), is responsible for the sustainable supply of useable water in South Africa. This water is not only used for residential and agricultural purposes but also to provide water for industrial processes, the mining industries and cooling water for power stations. South Africa is divided into 19 water catchment areas. This case study focuses on the Usutu-Vaal government water scheme (GWS). In Mpumalanga close to Standerton, which supplies water to Sasol and four power stations – Tutuka, Matla, Kriel and Duvha. Water is also transferred from Matla to Kendal power station. Usutu-Vaal consists of six pump stations. For the purpose of this article only Grootdraai (GD), Grootfontein (GF) and Rietfontein (RF) pump stations are considered. Water is pumped from the Grootdraai dam, both to Tutuka power station and through a 40 km canal to GF which is a booster pump station. GF in turn pumps water to both Sasol and, via Trichardt dam, to Rietfontein dam. New infrastructures were implemented to control the pumps and a new control philosophy was developed for the pump operational scheduling and for the management of the two pump stations in series. Due to the long distance of the canal, changes to the water flow at GD will take from 11 to 16 h before being detectable at GF. The new philosophy involves operating two pumps at both of these pump stations. The main objective of the demand side Fig.
    [Show full text]
  • Lethabo Feiar Main Report
    ENVIRONMENTAL IMPACT ASSESSMENT PROCESS ENVIRONMENTAL IMPACT ASSESSMENT REPORT PROPOSED LETHABO PV SOLAR ENERGY FACILITY NEAR SASOLBURG, FREE STATE PROVINCE DEA REF NO.: 14/12/16/3/3/2/753 FINAL FOR SUBMISSION TO THE DEA JUNE 2016 Prepared for: Eskom Holdings SOC Limited Megawatt Park, Maxwell Drive, Sandton, Johannesburg Prepared by: Savannah Environmental Pty Ltd Unit 10, Block 2 5 Woodlands Drive Office Park, Corner Woodlands Drive & Western Service Road, WOODMEAD, Gauteng po box 148, sunninghil, 2157 Tel: +27 (0)11 656 3237 Fax: +27 (0)86 684 0547 E-mail: [email protected] www.savannahsa.com PROPOSED LETHABO PV SOLAR ENERGY FACILITY NEAR SASOLBURG, FREE STATE PROVINCE Environmental Impact Assessment Report June 2016 PROJECT DETAILS DEA Reference No. : 14/12/16/3/3/2/753 Title : Environmental Impact Assessment Process Environmental Impact Assessment Report for the Proposed Lethabo PV Solar Energy Facility near Sasolburg, Free State Province Authors : Savannah Environmental (Pty) Ltd Sandhisha Jay Narain Jo-Anne Thomas Sub-consultants : Feathers Environmental Services Limosella Consulting ARC-Institute for Soil, Climate and Water Heritage Contracts and Archaeological Consulting CC (HCAC) BM Geological Services Afzelia Environmental Consultants and Environmental Planning and Design Client : Eskom Holding SOC (state owned company) Ltd Report Status : Final Environmental Impact Assessment Report for Public Review Review Date : June 2016 When used as a reference this report should be cited as: Savannah Environmental (2016) Environmental Impact Assessment Report: Proposed Lethabo PV Solar Energy Facility near Sasolburg, Free State Province. COPYRIGHT RESERVED This technical report has been produced by Savannah Environmental (Pty) Ltd for Eskom Holding SOC (state owned company) Ltd.
    [Show full text]
  • Proposed Brine Treatment Works at Tutuka Power Station, Mpumalanga Life-Cycle Environmental Management Programme
    PROPOSED BRINE TREATMENT WORKS AT TUTUKA POWER STATION, MPUMALANGA LIFE-CYCLE ENVIRONMENTAL MANAGEMENT PROGRAMME July 2010 CONSULTANT PROPONENT Aurecon South Africa (Pty) Ltd. Eskom Holdings Ltd. 81 Church Street Eskom Generation PO Box 494 Megawatt Park Cape Town Maxwell Drive 8000 Sandton, 2199 Tel: (021) 481 2400 Tel: (011) 800 3501 Fax: (021) 424 5588 Fax : (011) 800 5140 Email: [email protected] Website : www.eskom.co.za PROPOSED BRINE TREATMENT WORKS AT TUTUKA POWER STATION, MPUMALANGA: LIFE-CYCLE EMP ii REPORT CONTROL SHEET CLIENT : Eskom Holdings (Pty) Ltd (Generation Division) CLIENT REPRESENTATIVE : Ms Deidre Herbst PROJECT NUMBER : 105684 REPORT TITLE : Proposed Brine Treatment Works at the Tutuka Power Station, Mpumalanga AUTHORS : Louise Corbett and Brett Lawson REPORT STATUS : Draft PREPARED BY : Louise Corbett REPORT NUMBER : 5192 DATE : JULY 2010 Author(s): Miss Louise Corbett ___________________________ ENVIRONMENTAL PRACTITIONER Approved by: Mr Brett Lawson (Pr.Sci.Nat., Cert. EAPSA) ___________________________ TECHNICAL DIRECTOR This report is to be referred to in bibliographies as: AURECON. 2010. Proposed Brine Treatment Works at Tutuka Power Station, Mpumalanga: Life-cycle Environmental Management Programme. Report No. 5192/105684 Aurecon (2010) No unauthorised reproduction, copy or adaptation, in whole or in part, may be made. PROPOSED BRINE TREATMENT WORKS AT TUTUKA POWER STATION, MPUMALANGA: LIFE-CYCLE EMP iii CONTENTS Report control sheet ...............................................................................................................
    [Show full text]
  • Proposed Brine Evaporation Process at Tutuka Power Station, Mpumalanga Life-Cycle Environmental
    PROPOSED BRINE EVAPORATION PROCESS AT TUTUKA POWER STATION, MPUMALANGA LIFE-CYCLE ENVIRONMENTAL MANAGEMENT PROGRAMME April 2011 CONSULTANT PROPONENT Aurecon South Africa (Pty) Ltd. Eskom Holdings Ltd. 81 Church Street Eskom Generation PO Box 494 Megawatt Park Cape Town Maxwell Drive 8000 Sandton, 2199 Tel: (021) 481 2400 Tel: (011) 800 3501 Fax: (021) 424 5588 Fax : (011) 800 5140 Email: [email protected] Website : www.eskom.co.za REPORT CONTROL SHEET CLIENT : Eskom Holdings (Pty) Ltd (Generation Division) CLIENT REPRESENTATIVE : Ms Deidre Herbst PROJECT NUMBER : 105684 REPORT TITLE : Proposed Brine Evaporation Expansion Process at Tutuka Power Station, Mpumalanga AUTHORS : Louise Corbett and Brett Lawson REPORT STATUS : Draft PREPARED BY : Louise Corbett REPORT NUMBER : 5422 DATE : April 2011 Author(s): Miss Louise Corbett (Pr.Sci.Nat.) ___________________________ ENVIRONMENTAL PRACTITIONER Approved by: Mr Brett Lawson (Pr.Sci.Nat., Cert. EAPSA) ___________________________ TECHNICAL DIRECTOR This report is to be referred to in bibliographies as: AURECON. 2010. Proposed Brine Evaporation Expansion Process at Tutuka Power Station, Mpumalanga: Life-cycle Environmental Management Programme. Report No. 5422/105684 PROPOSED BRINE EVAPORATION EXPANSION PROCESS AT TUTUKA POWER STATION, MPUMALANGA: LIFE-CYCLE EMP ii CONTENTS Report control sheet ................................................................................................................ ii Contents...................................................................................................................................
    [Show full text]
  • Enviroserv Chloorkop Landfill Site Expansion Project Wetland, Soil and Land Capability Specialist Study Report
    ENVIROSERV CHLOORKOP LANDFILL SITE EXPANSION PROJECT WETLAND, SOIL AND LAND CAPABILITY SPECIALIST STUDY REPORT Report No.: JW100/19/6007-25 May 2019 Internet presence: www.jaws.co.za Synopsis EnviroServ Waste Management (Pty) Ltd own the existing Chloorkop Landfill Site (CLS) and operate it in terms of a waste management licence (Ref: 16/2/7/A230/D17/Z1). Municipal solid waste is received from the Midrand area, including the City of Johannesburg and the Ekurhuleni Metropolitan Municipality. The CLS is located in the Chloorkop Industrial area on Portion 63 of Klipfontein 12-IR and is accessed from Marsala Road. The waste body at the CLS has finite airspace, defined by the permitted footprint, height and design parameters and will not be able to receive waste once it reaches airspace capacity. EnviroServ is proposing to expand the CLS in order to provide additional airspace for ongoing disposal of municipal solid waste. The proposal is to expand the Chloorkop Landfill Site onto adjacent properties (Erf 334 and 335 of Chloorkop Extension 6), CLS Expansion Project. The concept is to establish engineered, Class B waste disposal cells on the target properties for ongoing disposal of municipal solid waste. The additional waste disposal cells would join with the current CLS waste body. The facility will include a small Material Recovery Facility for the separation of clean recyclables from the waste. Supporting infrastructure would be integrated with the CLS and/or redeveloped as appropriate. A municipal road, Anker Street, separates part of the expansion area from the CLS and thus a phased approach is likely.
    [Show full text]
  • ASHLEA STRONG, MEM, EAP Principal Consultant (Environmental Services), Environment & Energy
    ASHLEA STRONG, MEM, EAP Principal Consultant (Environmental Services), Environment & Energy CAREER SUMMARY Ashlea is a Principal Consultant with 17 years’ experience in the environmental field. She currently provides technical and strategic expertise on a diverse range projects in the environmental management field, including environmental scoping and impact assessment studies, environmental management plans, waste and water management, as well as the provision of environmental management solutions and mitigation measures Ashlea has been involved in the management of a number of large EIAs specifically within the energy sector such as the Medupi Power Station, and Pebble-Bed Modular Reactor (PBMR) and numerous Transmission Powerlines. She also has significant environmental auditing experience and expertise. Ashlea holds a Masters in Environmental Management; a BTech (Nature Years with the firm Conservation), and a National Diploma (Nature Conservation). She is also a Registered 7 Environmental Assessment Practitioner. Years of experience EDUCATION 17 Masters in Environmental Management, University of the Free 2006 Professional qualifications State, South Africa CEAPSA B Tech, Nature Conservation, Technikon SA, South Africa 2001 Areas of expertise National Diploma in Nature Conservation, Technikon SA, South 1999 Auditing Africa Energy ADDITIONAL TRAINING Environmental Control Health & Safety Conduct outcomes based assessment (NQF Level 5), South 2009 African Qualifications Authority (SAQA) Infrastructure Mining PROFESSIONAL MEMBERSHIPS SEIR Registered Environmental Assessment Practitioner (Registration 2020 Training Number: 2019/1005) Waste Management PROFESSIONAL EXPERIENCE Energy Sector — Nakonde and Mpika Wind Energy Projects (2018): Project Manager. Compilation of two Environmental Project Briefs for the establishment of meteorological masts at the Proposed Nakonde and Mpika Wind Project Sites in Zambia. Client: Globeleq — Mozambique – Zambia Interconnector Powerline (2018): Project Manager.
    [Show full text]