Jaspers Assignments in Progress in Romania As at 30 May 2015

Total Page:16

File Type:pdf, Size:1020Kb

Jaspers Assignments in Progress in Romania As at 30 May 2015

JASPERS ASSIGNMENTS IN PROGRESS IN ROMANIA AS AT 30 MAY 2015

AIR, MARITIME AND PUBLIC TRANSPORT (11)

Modernisation of Km 614-Gurasada railway

Railway Link to Bucharest Airport

Danube navigation improvement: Calarasi - Braila (ex-ISPA)

Reopening of the railway traffic on the new bridge over Arges River between railway station Vidra - Gradistea

Railway Predeal – Brasov

Modernisation of Sighisoara - Brasov railway

Urban Mobility Plan for Craiova, Iasi and Ploiesti

Urban Mobility Plan for Brasov and Constanta

Urban Mobility Plan for Bucharest

Urban Mobility Plan for Cluj and Timisoara

Guidelines on urban transport infrastructure

SMART DEVELOPMENT (6)

Enhancing the coverage and inclusiveness of the property registration system in rural Romania

International Research Center for Danube-Black Sea

ELI NP Implementation Support

ELI NP Magurele Innovation Platform

Strategic Orientation Mechanism

ELI Nuclear Physics second phase

ENERGY AND SOLID WASTE (14)

Support in developing waste management plans

Integrated solid waste management in Galati County - Phase II

PETROM II - Rehabilitation of contaminated sites

Treatment of contaminated soil from Transylvania highway in Turda (Phase II) Implementation support to Iasi District Heating - modified investment plan

Botosani District Heating Energy Efficiency

Bacau District Heating Energy Efficiency

Timisoara District Heating Energy Efficiency

Iasi District Heating Energy Efficiency

Support for the preparation of the OP Infrastructure - Energy 2014-2020

Focsani District Heating Energy Efficiency

Ramnicu Valcea District Heating Energy Efficiency

Oradea District Heating Energy Efficiency

Energy recovery from the municipal waste in Bucharest

ROADS (13)

Construction of Tecuci By-Pass

Construction of Satu-Mare by-pass

Arginesti Road Bridge Rehabilitation

Targu Jiu Bypass

Construction of Bacau By-Pass

Construction of Targu Mures By-Pass

Rehabilitation of Road Bridge over Siret River ay Cosmesti

Rehabilitation of Road Bridge over Danube at Giurgiu (DN5)

Slatina Road Bridge Rehabilitation

Poiana Sarata Road Bridge Rehabilitation

Road safety Improvements

Preparation Construction of Sibiu-Pitesti Motorway

Procurement of Winter Equipment

WATER AND WASTEWATER (57)

Bucharest wastewater infrastructure investments for 2014-2020

Support in the development of green infrastructure measures for natural risk management Bistrita-Nasaud County II - water and wastewater infrastructure investments for 2014-2020

Maramures county II - Review of water and wastewater investments

Bihor County II - Review of water and wastewater investments

Olt County II - water and wastewater infrastructure investments for 2014-2020

Arad County II - water and wastewater investments for 2014-2020

Flood risk management - Babadag area

Tulcea County II - water and wastewater infrastructure investments for 2014-2020

Ilfov County II - water and wastewater infrastructure investments for 2014-2020

Giurgiu County II - water and wastewater infrastructure investments for 2014-2020

Braila County II - water and wastewater investments for 2014-2020

Sibiu Medias County II - water and wastewater infrastructure investments for 2014-2020

Brasov County II - water and wastewater infrastructure investments for 2014-2020

Gorj County II - water and wastewater investments for 2014-2020

Sibiu - Fagaras County II - water and wastewater investments for 2014-2020

Upstream support in preparation of flood risk maps

Safety of the hydro-technical works on Dambovita river

Calarasi County II - water and wastewater infrastructure investments for 2014-2020

Dambovita II - water and wastewater infrastructure investments for 2014-2020

Dolj County II - water and wastewater infrastructure in Dolj

Caras-Severin County II - water and wastewater infrastructure investments for 2014-2020

Vrancea II - Extension and Modernisation of the Water and Wastewater Systems

Protection against coastal erosion - Phase II

Fast track flood projects

Screaning of Romanian wastewater projects

Iasi County II - water and wastewater infrastructure investments for 2014-2020

Mehenditi County II - water and wastewater infrastructure investments for 2014-2020

Botosani County II - water and wastewater infrastructure investments for 2014-2020

Suceava County II - water and wastewater infrastructure investments for 2014-2020

Arges County II - water and wastewater infrastructure investments for 2014-2020 Hunedoara County II - water and wastewater infrastructure in Jiu Valley

Timis County II - water and wastewater investments for 2014-2020

Teleorman County II - water and wastewater investments for 2014-2020

Constanta County II - water and wastewater investments 2014-2020

Galati County II - water and wastewater investments for 2014-2020

Cluj County II - water and wastewater infrastructure in Turda – Campia Turzii region

Cluj and Salaj Counties II - water and wastewater infrastructure investments for 2014-2020

Alba County II - water and wastewater infrastructure investments for 2014-2020

Buzau County II - water and wastewater infrastructure investments for 2014-2020

Flood risk management plan for the Mures river basin - stage 2

Satu Mare County II - water and wastewater infrastructure investments for 2014-2020

PRAHOVA COUNTY II - water and wastewater infrastructure investments for 2014-2020

Neamt County II - water and wastewater infrastructure investments for 2014-2020

VASLUI COUNTY II - water and wastewater infrastructure investments for 2014-2020

ILFOV, GIURGIU AND IALOMITA COUNTIES - water and wastewater infrastructure investments for 2014-2020

Bacau County II - water and wastewater infrastructure investments for 2014-2020

VALCEA COUNTY II - water and wastewater infrastructure investments for 2014-2020

Mures County II - water and wastewater infrastructure investments for 2014-2020

Covasna County II - water and wastewater infrastructure investments 2014-2020

Support for the preparation of the OP Infrastructure - Environment 2014-2020

Maramures County III - water and wastewater infrastructure investments for 2014-2020

Hunedoara County III - water and wastewater infrastructure investments for 2014-2020

Bihor county III - water and wastewater infrastructure investments for 2014-2020

HARGHITA COUNTY II - water and wastewater infrastructure investments for 2014-2020

MULTI SECTOR (5) Cumulative Impacts Training for Romanian Authorities

Professional training of environmental authorities related to SEA and EIA Directives Intermodal Terminals

General Transport Master Plan II

Support for the preparation of the Operational Programme Large Infrastructure - Transport 2014- 2020

Recommended publications