Jaspers Assignments in Progress in Romania As at 30 May 2015

Jaspers Assignments in Progress in Romania As at 30 May 2015

<p>JASPERS ASSIGNMENTS IN PROGRESS IN ROMANIA AS AT 30 MAY 2015</p><p>AIR, MARITIME AND PUBLIC TRANSPORT (11) </p><p>Modernisation of Km 614-Gurasada railway </p><p>Railway Link to Bucharest Airport</p><p>Danube navigation improvement: Calarasi - Braila (ex-ISPA)</p><p>Reopening of the railway traffic on the new bridge over Arges River between railway station Vidra - Gradistea</p><p>Railway Predeal – Brasov</p><p>Modernisation of Sighisoara - Brasov railway </p><p>Urban Mobility Plan for Craiova, Iasi and Ploiesti</p><p>Urban Mobility Plan for Brasov and Constanta</p><p>Urban Mobility Plan for Bucharest</p><p>Urban Mobility Plan for Cluj and Timisoara</p><p>Guidelines on urban transport infrastructure</p><p>SMART DEVELOPMENT (6) </p><p>Enhancing the coverage and inclusiveness of the property registration system in rural Romania</p><p>International Research Center for Danube-Black Sea</p><p>ELI NP Implementation Support</p><p>ELI NP Magurele Innovation Platform</p><p>Strategic Orientation Mechanism</p><p>ELI Nuclear Physics second phase</p><p>ENERGY AND SOLID WASTE (14)</p><p>Support in developing waste management plans</p><p>Integrated solid waste management in Galati County - Phase II</p><p>PETROM II - Rehabilitation of contaminated sites</p><p>Treatment of contaminated soil from Transylvania highway in Turda (Phase II) Implementation support to Iasi District Heating - modified investment plan</p><p>Botosani District Heating Energy Efficiency </p><p>Bacau District Heating Energy Efficiency </p><p>Timisoara District Heating Energy Efficiency </p><p>Iasi District Heating Energy Efficiency </p><p>Support for the preparation of the OP Infrastructure - Energy 2014-2020</p><p>Focsani District Heating Energy Efficiency </p><p>Ramnicu Valcea District Heating Energy Efficiency </p><p>Oradea District Heating Energy Efficiency </p><p>Energy recovery from the municipal waste in Bucharest </p><p>ROADS (13) </p><p>Construction of Tecuci By-Pass </p><p>Construction of Satu-Mare by-pass </p><p>Arginesti Road Bridge Rehabilitation </p><p>Targu Jiu Bypass </p><p>Construction of Bacau By-Pass </p><p>Construction of Targu Mures By-Pass </p><p>Rehabilitation of Road Bridge over Siret River ay Cosmesti </p><p>Rehabilitation of Road Bridge over Danube at Giurgiu (DN5) </p><p>Slatina Road Bridge Rehabilitation </p><p>Poiana Sarata Road Bridge Rehabilitation </p><p>Road safety Improvements </p><p>Preparation Construction of Sibiu-Pitesti Motorway </p><p>Procurement of Winter Equipment</p><p>WATER AND WASTEWATER (57) </p><p>Bucharest wastewater infrastructure investments for 2014-2020</p><p>Support in the development of green infrastructure measures for natural risk management Bistrita-Nasaud County II - water and wastewater infrastructure investments for 2014-2020</p><p>Maramures county II - Review of water and wastewater investments </p><p>Bihor County II - Review of water and wastewater investments </p><p>Olt County II - water and wastewater infrastructure investments for 2014-2020</p><p>Arad County II - water and wastewater investments for 2014-2020</p><p>Flood risk management - Babadag area</p><p>Tulcea County II - water and wastewater infrastructure investments for 2014-2020</p><p>Ilfov County II - water and wastewater infrastructure investments for 2014-2020</p><p>Giurgiu County II - water and wastewater infrastructure investments for 2014-2020</p><p>Braila County II - water and wastewater investments for 2014-2020</p><p>Sibiu Medias County II - water and wastewater infrastructure investments for 2014-2020</p><p>Brasov County II - water and wastewater infrastructure investments for 2014-2020</p><p>Gorj County II - water and wastewater investments for 2014-2020</p><p>Sibiu - Fagaras County II - water and wastewater investments for 2014-2020</p><p>Upstream support in preparation of flood risk maps</p><p>Safety of the hydro-technical works on Dambovita river </p><p>Calarasi County II - water and wastewater infrastructure investments for 2014-2020</p><p>Dambovita II - water and wastewater infrastructure investments for 2014-2020</p><p>Dolj County II - water and wastewater infrastructure in Dolj</p><p>Caras-Severin County II - water and wastewater infrastructure investments for 2014-2020</p><p>Vrancea II - Extension and Modernisation of the Water and Wastewater Systems</p><p>Protection against coastal erosion - Phase II</p><p>Fast track flood projects</p><p>Screaning of Romanian wastewater projects</p><p>Iasi County II - water and wastewater infrastructure investments for 2014-2020</p><p>Mehenditi County II - water and wastewater infrastructure investments for 2014-2020</p><p>Botosani County II - water and wastewater infrastructure investments for 2014-2020</p><p>Suceava County II - water and wastewater infrastructure investments for 2014-2020</p><p>Arges County II - water and wastewater infrastructure investments for 2014-2020 Hunedoara County II - water and wastewater infrastructure in Jiu Valley </p><p>Timis County II - water and wastewater investments for 2014-2020</p><p>Teleorman County II - water and wastewater investments for 2014-2020 </p><p>Constanta County II - water and wastewater investments 2014-2020</p><p>Galati County II - water and wastewater investments for 2014-2020</p><p>Cluj County II - water and wastewater infrastructure in Turda – Campia Turzii region</p><p>Cluj and Salaj Counties II - water and wastewater infrastructure investments for 2014-2020 </p><p>Alba County II - water and wastewater infrastructure investments for 2014-2020</p><p>Buzau County II - water and wastewater infrastructure investments for 2014-2020</p><p>Flood risk management plan for the Mures river basin - stage 2 </p><p>Satu Mare County II - water and wastewater infrastructure investments for 2014-2020</p><p>PRAHOVA COUNTY II - water and wastewater infrastructure investments for 2014-2020</p><p>Neamt County II - water and wastewater infrastructure investments for 2014-2020</p><p>VASLUI COUNTY II - water and wastewater infrastructure investments for 2014-2020</p><p>ILFOV, GIURGIU AND IALOMITA COUNTIES - water and wastewater infrastructure investments for 2014-2020</p><p>Bacau County II - water and wastewater infrastructure investments for 2014-2020</p><p>VALCEA COUNTY II - water and wastewater infrastructure investments for 2014-2020</p><p>Mures County II - water and wastewater infrastructure investments for 2014-2020</p><p>Covasna County II - water and wastewater infrastructure investments 2014-2020</p><p>Support for the preparation of the OP Infrastructure - Environment 2014-2020</p><p>Maramures County III - water and wastewater infrastructure investments for 2014-2020</p><p>Hunedoara County III - water and wastewater infrastructure investments for 2014-2020</p><p>Bihor county III - water and wastewater infrastructure investments for 2014-2020</p><p>HARGHITA COUNTY II - water and wastewater infrastructure investments for 2014-2020</p><p>MULTI SECTOR (5) Cumulative Impacts Training for Romanian Authorities</p><p>Professional training of environmental authorities related to SEA and EIA Directives Intermodal Terminals </p><p>General Transport Master Plan II</p><p>Support for the preparation of the Operational Programme Large Infrastructure - Transport 2014- 2020</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us