Inmarsat Classic Aero ‘refresh’, FANS1/A over SwiftBroadband evaluation and Iris Precursor Project Gary Colledge, Head of Aviation Safety Product Development, Danny Bharj, Aviation Product & Service Specialist, Inmarsat Comms Working Group/1, ICAO Montreal, Canada I-3 and I-4 Network Harmonization New Classic I-3 Ground Stations at Burum/Perth since mid-2013

Burum Fucino Paumalu Perth

Inmarsat MMP-New York MMP-Amsterdam MSC-Burum Data-2 & Data-3 Data-2 & Data-3 Voice – H+

DP1 DP…n PSTN ACARS Processer + ACARS Processer Network Voice Switch + Voice Switch

Common network access to Classic Aero on I-3 and I-4 Access to SwiftBroadband/SB Safety on I-4

2 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 I-3 Classic Aero Coverage Map (L-Band)

Burum

Perth

This map depicts Inmarsat’s expectations of coverage, but does not Swift 64, Aero I Aero H/H+ services are provided in the full represent a guarantee of service. The availability of service at the edge of coverage areas fluctuates depending on various conditions. Coverage footprint of the global beams 3 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 I-3/I-4 Classic Aero Dual Constellation Classic I-3 and I-4 networks, having identical infrastructure, can now be supported ‘as one’ by network operations team − In support of PBCS monitoring, Inmarsat can now utilise common analytic tools across I3 and I4 networks − Inmarsat can now administer satcom short codes in the same way across the I-3/I-4 GESs. Currently approximately 180 codes defined – seeing increased interest from airlines (contact Andrew Ives or Gary Colledge) − Software tool in development to support management and distribution Available for all aircraft with: − Classic Aero-H+ − Classic Aero-H+ with SwiftBroadband More aircraft activated for dual I-4 and I-3 operation (>50%) improved network resilience Working with RC IMS(ARINC) and SITA to add I-4 to more aircraft ORT tables in a coordinated way Satvoice evaluation (FAA PARC) − Inmarsat is now supporting its partners to analyse the current satellite voice performance in the Classic Aero system [‘Satvoice Tiger Team’ within the FAA PARC]

4 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Aero-I & H Sunset Update on evaluation ˃ Inmarsat continues technical studies to evaluate the feasibility of extending AeroI/H service life over our Background I4 constellation ˃ Considerations: ˃ Invite interested airlines to contact their DP directly some airlines have to provide detail of their plans expressed concern in meeting the current ˃ Inmarsat contact: deadlines Ghislain Nicolle – Director Safety & Operational NAT FANS mandate places reliance on satcom Services Post MH370 - greater [email protected] reliance on tracking ˃ Consultation is key

5 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Inmarsat Constellations Review

Europasat/Aviation Complimentary Ground Component (A-CGC) ~2029 Launch 2016 C C Inmarsat-5 (F1) ~2029 Inmarsat-5 Inmarsat-5 o o r r Launched Dec 2013 (F2 & F3) (F4) ~2029 e e

S K ~2029 Launch 2016 - a b

- 2 Launches a b n a 2015 d n d

Alphasat Launched 2013 Inmarsat-6 Future Launch Inmarsat-4 ~2023 of 3 L-band C C

Launched 2005-08 o o Satellites r r e e

L

Inmarsat-3 ~2018 L - - b

Launched 1996-98 b a a n n d

Inmarsat-2 ~2014 d Launched 1990-92 lifespan of current fleet Scheduled launches Future launches

6 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Progress since CP/1 2014 Main events Alphasat started to deliver aero service at 25 East as part of the I4 constellation (March 2015) Preparation for FANS1A over SBB evaluation project at NAT CNSG (March 2015) First FANS over SwiftBroadband flights (June 2015); first data collection and analysis Second bizet joined (August 2015) Second Air Transport operator joined Inmarsat prepares to introduce separate backup site in the AsiaPac/Americas region (August 2015)

7 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Reminder: Inmarsat I-4 Satellite Coverage – SwiftBroadband pre-Alphasat

Burum (SBB) Beijing (SBB)

Paumalu (SBB)

This map depicts Inmarsat’s expectations of coverage, but does not represent a guarantee of service. Aero H+ services are provided in the The availability of service at the edge of coverage areas fluctuates depending on various conditions. SwiftBroadband coverage January 2014. full footprint of the global beams, narrow spot beams (SBB) also shown 8 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Alphasat Satellite Background

• Alphasat, also known as Inmarsat-4A F4, was launched on the 25th July 2013, and it had provided Inmarsat services, other than aviation services, since 19th Nov 2013.

• On the 24th March 2015 Inmarsat transitioned the EMEA (I4F2) Classic Aero and SBB services to Alphasat. (Alphasat effectively replaced I4F2 at the same orbital slot). • The 4F2 satellite has remained co-located at 25°E since the transition of services to Alphasat to mitigate any transition issues. • As announced in 2014, it is planned that the I4F2 will be moved to 63.9°E to form a new ocean region “MEAS” (Middle-East & Asia Satellite)

9 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Alphasat Satellite payload Comparison with Inmarsat-4

Alphasat will provide improvements in power, capacity and available spectrum in the I4-EMEA region The improvements include:

L-band aggregate EIRP (power): 60% increase DSP resources (channels): 20% increase (plus improved efficiency) L-band spectrum: 52% increase C-band spectrum: 100% increase

These characteristics will lead to improved performance and capacity in the busiest region, I4-EMEA

10 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Inmarsat I-4 Satellite Coverage – SwiftBroadband & Classic

Auckland (SBB)

11 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 F A N S 1 / A

o v e r

S w i f t B r o a d b a n d

FANS1/A over SwiftBroadband Benefits, overview installed system, status of evaluation project & institutional

Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 SwiftBroadband Safety Full FANS SB Safety Service – Estimated early 2016

New lower cost, More capable terminals − 2 MCU SDU size with Enhanced Low Gain Antenna − Anticipate up to 100 lbs in weight/drag savings Low Cost + Lightweight − Expect opex at least 30% less than Classic Aero Flight Deck Communications − Reduced ACARS message times − 2 Channels Cockpit voice (using VoIP) Advanced SB Safety Features − Prioritised IP link − E.g. to support EFB Connection and Applications − Up to 200, 300, or 400 kbps (by antenna type) − Aircraft Position Reporting and Tracking − Additional to WPR and ADS-C ACARS based messaging − Message rate configurable Private cockpit network (separate from cabin SwiftBroadband/Ka) SB Safety Flight Tracking

13 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 FANS1/A over SwiftBroadband project at FAA PARC

FANS Flight evaluation will use Cobham Aviator terminals with SB Safety software − Aviator 300D − Aviator 700D Hawaiian Airlines (HAL) Boeing 767s N588HA: began 3rd June 2015 − No. of aircraft: 8 Cargo operator will use 700D − No. of aircraft: 3 Inmarsat/Cobham in discussion with other air transport and air cargo candidates for evaluation flights

14 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 FANS1/A over SB-Safety configuration ACARS over SwiftBroadband and IP Data For EFB for HAL 767

Using existing SATCOM Inmarsat IGA Antenna Data Link connection to Electronic Flight Bag CMU for ACARS Updates while en Route HLD Weather, Flight Planning etc. during flight FANS1/A and ACARS via existing CMU

ARINC429 AID: ARINC 759 FMS CMU Wired

AMS Using Ethernet for Electronic Flight Bag Dialer Panel PTA12 SDU

15 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 FANS1/A over SBB Project Plan & Report FAA PARC CWG activity with surrounding ANSP/FIR participation in the Pacific Region Evaluation Schedule Target: will collect ICAO data into Q1/Q2 2016 ˃ FANS1/A Aircraft Hawaiian Airlines 767 & Cargo Operator MD-11s ˃ AOC ACARS Aircraft – two bizjets in operation Mixture of airlines and bizjets that wish to use ACARS over IP and have EFB/Crew Data Applications ˃ Recommendation Will be developed during the evaluation. The service already seen to exceed Classic Aero RCP240/RSP180 delivery performance. 16 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 SB-Safety Timeline

Inmarsat Service Commercially Available (AOC) Cargo Operator MD-11s FANS AOC over SBB Falcon 900 ACARS over SBB over SBB First flight evaluation August 15 begins

AOC ACARS over SBB Evaluation

Begins May 14

FAA PARC Evaluation ~ Q2 FANS over SBB recommendation

17 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 FANS1/A over SBB – Hawaiian B767 Implementation B767 Aircraft, 2 MCU Satellite Data Unit, IGA-5001 antenna

18 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 First SB-S FANS Evaluation Flight 3rd June ‘15

19 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 First SB-S FANS Evaluation Flight 3rd June ‘15

20 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Preliminary SB Safety FANS Latency Performance

SB Safety FANS Initial SB SafetyACARS FANS AGGW Latency From Performance Aircraft Chart (from aircraft) 100% - Note: Latency data shown for Inmarsat 90% network portion only (does not include CSP or ANSP networks) 80% - Note: Small sample size 70% s

n 60% o i t c

First data from HAL a s 2.8 sec 3.5 sec n

N588HA a 50% r t

rd th S R

- 3 to 17 June ’15 A

C 40% @95% @99.9% A

- Recent data July – end 30% Aug shows: av. delay ~ 6 to 12 20% seconds 10%

0% 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Latency [s]

21 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Preliminary SB Safety FANS Latency Performance First HAL aircraft – SB only – ADS-C downlink latency – Data prepared by FAA

s s

22 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Preliminary SB Safety FANS Latency Performance For first HAL aircraft All media ADS-C downlink latency 3rd to 9th June

Data Prepared by FAA

23 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 HAL routes HAL N588HA flights operating FANS1/A over SwiftBroadband (as of 12-8-15)

24 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Message counts

Evaluation message counts – FANS1/A and ACARS (26/06/14 to 30/07/15)

Most ANSPs are setting ADS-C contracts at 14 minute rate. Boeing are assisting in increasing the data collection by setting a 2 minute contract from their ADS-C Collection and Analysis Tool (ACAT).

25 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Integral Position Reporting

Enhanced Handshakes Search & Rescue

Typically < 1 min periodic position reporting Lat/Lon, Heading, Airspeed, Altitude

Exceeds ICAO Normal Flight Tracking Mandate Requirement

26 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 SwiftBroadband (SB) Safety – Flight tracking Continuous tracking is now a possibility with SB-Safety

Flying today over: ˃ CONUS ˃ NAT ˃ Gulf of Mexico ˃ WATRS AOC Airlines in 2015 ˃ NAT ˃ ASIA ˃ PACIFIC

ACJ SB-S integral position reporting

27 27 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Message ‘outlier’ analysis SwiftBroadband subnetwork outlier latencies

As of 30/07/15, two issues have been identified as contributing to the few long latency messages and one topic (the on-aircraft handling of Media Advisories) that are being investigated; a) positions where the aircraft is making transitions between satcom and VHF and vice-versa; b) a few longer latency messages; c) on-aircraft handing of Media Advisory

28 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Availability Records to-date

Since the first flights in June 2014 only one unplanned outage of the safety components of the system has been noted: ˃ 6th/7th August, 4 hours

Analysis by SED, the AGGW supplier, has determined the causes. Short term mitigation measures put in place, and is now working on the necessary long-term mitigation.

29 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Standards What has been completed/what remains to be done?

• MASPS DO-343 published • MOPS DO-262B published, FAA Technical Standard Order (TSO)-C159b refers • ICAO Technical Manual (TM) (Additional Chapter to ICAO Doc. 9925, “Manual on the Aeronautical Mobile Satellite (Route) Service”) • Inmarsat has prepared responses to the industry and ANSP comments • Now completed FRAC within the SBB TM Sub Group, presented now at the ICAO Comms Working Group/1 meeting requesting panel level review and ratification

30 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Iris Precursor Programme Overview, benefits, architecture & timeline

Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 What is Iris?

A partnership between ESA and Inmarsat to develop “Iris Precursor”, involving 16 companies from 8 ESA member states

The service is being developed to satisfy performance requirements set for VHF Datalink and standardised for “initial 4D trajectory management”

Integrated with the European Air Traffic Management network

A new entity would be established as service provider and undergo EASA certification

32 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Potential benefits

Improved availability and over what is available thru VDL2 only − Provides relief to VHF spectrum pressure − Increased bandwidth available for AOC apps − Increased service coverage More efficient airspace operations leading to: − Environmental benefits and fuel savings through user preferred routings including continuous climb and descent profiles − Improved traffic predictability (particularly at oceanic boundaries) leading to reduced controller workload and potentially lower ANS charges Applicable to a range of aircraft types for FANS1/A & ATN operations: − Short and Long Haul Commercial as well as Business jets Global Datalink Convergence (ICAO and SESAR goal)

33 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Functional architecture: Baseline s

Cabin P

Internet S

Applications C

PS PS AOC services PS e n PS

Other cockpit i l Inmarsat s r applications i Priority IP Ethernet (future) SwiftBroadband Safety A

(SB-S)System S

ATN/OSI s Airborne PS e Ground s n PS c r o u

Satellite i ATN ATN/OSI e t r d i c i ATN Gateway t Gateways y n SBB Radio v

u ATS ATSU / o Core F r F u

Modem + Access P n

Applications CMU y Network t c e i Antenna Network

ACARS r t ACARS c i PS i PS u o v c r Aircraft n Ground ACARS e e s S Gateway Gateway S ACARS c i f f a r T

PS Cockpit VoIP PS VoIP r i

PSTN A Voice Gateway Gateway

CS CS

VHF VHF New Modified Existing External VHF VHF Radio Datalink subsystem subsystem subsystem subsystem Radio Datalink

34 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Iris Precursor timeline European context

35 Inmarsat satcom update ICAO YUL Sept 28th_Oct 2nd 2015 Dates subject to change at Inmarsat's discretion S A e V p I t A e m T I b O e r N

1 S 5 A t h F - 1 E 6 T t Y h

2 – 0 1 A 5 E E C

D L U F

A i r b u s

T o u l o u s e