Overpass with Right-In/Right-Out Cedar Lake Road

Overpass with Right-In/Right-Out Cedar Lake Road

EXAMPLE: ST. LOUIS PARK SUNFISH LAKE OVERPASS WITH RIGHT-IN/RIGHT-OUT CEDAR LAKE

US 169

OVERALL BENEFITS SCORE OPTION A OPTION B 81 81 OPTION A, $61-68M SUNFISH LAKE BLVD HIGHEST COST ALIGNMENTS BNSF RAILWAY ARE PRELIMINARY NEW FRONTAGE RD 1 50 100

SUNFISH COMMONS TOP MEASURES PLANTS AND THINGS USA OPTION A OPTION B WILLY MCCOY’S

RIGHT-IN/RIGHT-OUT RIGHT-IN/RIGHT-OUT EASE INTERSECTIONS WILL HAVE LOCATIONS ARE PRELIMINARY AN ACCELERATION AND NEW FRONTAGE RD DECELERATION ON HWY 10 BUSINESS EASE

QF SALES AND SERVICE PROPERTY IMPACTS COLLISION CENTER BLUE LINE COUNTRYSIDE SOUNDWAVES SERVICES OF MN COMFORT SUITES ONSITE GLASS MN JAC AUTO NRH COST PLUMBING OPTION B, $54-60M

SUNFISH LAKE BLVD

DO IT ALL PRINTING NEW FRONTAGE RD  RR

COST RIVERDALE DR 1 - POOR 2 - FAIR 3 - GOOD

PARCEL LINES ARE APPROXIMATE COLOR CODE BREAKDOWN GREEN SHADING DENOTES POTENTIAL GRADING AREAS

RIVERDALE DR ramseygateway.com

SUNFISH LAKE BOULEVARD GRADE-SEPARATED

OVERALL BENEFITS SCORE

SUNFISH LAKE BLVD CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER FRONTAGE ROAD ALIGNMENTS 72 ARE PRELIMINARY

BNSF RAILWAY 1 50 100 NEW FRONTAGE RD MID RANGE COST

PLANTS AND THINGS USA SUNFISH COMMONS TOP MEASURES OAK TERRACE ESTATES WILLY MCCOY’S CONCERNS WITH PEDESTRIAN COMFORT CROSSING AT ROUNDABOUT PEDESTRIAN EASE NEW FRONTAGE RD

BUSINESS EASE

QF SALES AND SERVICE PROPERTY IMPACTS COLLISION CENTER BLUE LINE JAC AUTO ONSITE GLASS MN COMFORT SUITES SOUNDWAVES COUNTRYSIDE NRH SERVICES OF MN PLUMBING

COST DO IT ALL PRINTING RIVERDALE DR

MN SCHOOL OF INTEGRATED  RR GRADE SEPARATION HORSESHOEING TECHNOLOGY COST 1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE GREEN SHADING DENOTES POTENTIAL GRADING AREAS $51-56M COLOR CODE BREAKDOWN ramseygateway.com EXAMPLE: CHICAGO, IL

SUNFISH LAKE BOULEVARD AUSTIN BLVD CENTER TURN OVERPASS

INTERSTATE 290

OVERALL BENEFITS SCORE

72 FRONTAGE ROAD ALIGNMENTS ARE PRELIMINARY

CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER SUNFISH LAKE BLVD 1 50 100

HIGHEST COST OF AT-GRADE BNSF RAILWAY RAILROAD OPTIONS DUE TO AMOUNT TOP MEASURES OF RETAINING WALLS REQUIRED NEW FRONTAGE RD

SUNFISH COMMONS PLANTS AND THINGS USA PEDESTRIAN EASE OAK TERRACE ESTATES WILLY MCCOY’S

HIGHWAY 10 ENTERS OUTPOST AND EXITS FROM THE BUSINESS EASE NEW FRONTAGE RD LEFT TURN-LANE

PROPERTY IMPACTS

QF SALES AND SERVICE

COLLISION CENTER LANO EQUIPMENT

ONSITE GLASS MN BLUE LINE SOUNDWAVES COMFORT SUITES JAC AUTO COUNTRYSIDE COST NRH SERVICES OF MN PLUMBING

DO IT ALL PRINTING RR GRADE SEPARATION  RIVERDALE DR INTEGRATED MN SCHOOL OF TECHNOLOGY HORSESHOEING COST

1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE GREEN SHADING DENOTES POTENTIAL GRADING AREAS

COLOR CODE BREAKDOWN $59-65M ramseygateway.com

SUNFISH LAKE BOULEVARD RIGHT-IN/RIGHT-OUT WITH ROUNDABOUT REDUCED ACCESS

OVERALL BENEFITS SCORE

CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER FRONTAGE ROAD ALIGNMENTS 66 ARE PRELIMINARY

SUNFISH LAKE BLVD NEW FRONTAGE RD CONCERNS WITH BNSF RAILWAY PEDESTRIAN COMFORT 1 50 100 CROSSING AT ROUNDABOUT

LOWEST COST SUNFISH COMMONS PLANTS AND THINGS USA OAK TERRACE ESTATES TOP MEASURES WILLY MCCOY’S NO WESTBOUND ENTRANCE RAMP, TRAFFIC CONTROL TO TRAFFIC IS REROUTED TO RAMSEY BLVD BE DETERMINED PEDESTRIAN EASE ON THE NEW FRONTAGE ROAD NEW FRONTAGE RD

BUSINESS EASE QF SALES AND SERVICE

COLLISION CENTER

ONSITE GLASS MN SOUNDWAVES

BLUE LINE RIGHT-IN/RIGHT-OUT COUNTRYSIDE JAC AUTO INTERSECTIONS WILL HAVE COMFORT SUITES SERVICES OF MN AN ACCELERATION AND NRH PROPERTY IMPACTS PLUMBING DECELERATION LANE ON HWY 10 DO IT ALL PRINTING RIGHT-IN/RIGHT-OUT LOCATIONS ARE PRELIMINARY

INTEGRATED COST MN SCHOOL OF TECHNOLOGY HORSESHOEING RIVERDALE DR  RR GRADE SEPARATION COST 1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE GREEN SHADING DENOTES POTENTIAL GRADING AREAS $34-38M COLOR CODE BREAKDOWN ramseygateway.com

EXAMPLE: BROOKLYN CENTER

SUNFISH LAKE BOULEVARD 63RD AVE N RIGHT-IN/RIGHT-OUT WITH ROUNDABOUT FULL ACCESS HWY 169

OVERALL BENEFITS SCORE

SUNFISH LAKE BLVD CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER 70 FRONTAGE ROAD ALIGNMENTS LOWEST COST ARE PRELIMINARY CONCERNS WITH PEDESTRIAN COMFORT CROSSING BNSF RAILWAY 1 50 100 AT ROUNDABOUT NEW FRONTAGE RD

VINEYARD & WINERY E-CIG WAREHOUSE

TWO RIVERS

SUNFISH COMMONS TOP MEASURES PLANTS AND THINGS USA OAK TERRACE ESTATES OUTPOST WILLY MCCOY’S TRAFFIC CONTROL TO PEDESTRIAN EASE BE DETERMINED NEW FRONTAGE RD

QF SALES AND SERVICE BUSINESS EASE COLLISION CENTER

BLUE LINE SOUNDWAVES TUNGSTEN ST

ONSITE GLASS MN COUNTRYSIDE COMFORT SUITES JAC AUTO SERVICES OF MN LANO EQUIPMENT PROPERTY IMPACTS RIGHT-IN/RIGHT-OUT RIGHT-IN/RIGHT-OUT INTERSECTIONS WILL HAVE NRH LOCATIONS ARE PRELIMINARY PLUMBING AN ACCELERATION AND DO IT ALL PRINTING

DECELERATION LANE ON HWY 10 INTEGRATED MN SCHOOL OF TECHNOLOGY COST HORSESHOEING RIVERDALE DR  RR GRADE SEPARATION COST

1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE

GREEN SHADING DENOTES POTENTIAL GRADING AREAS COLOR CODE BREAKDOWN $34-38M ramseygateway.com SUNFISH LAKE SunfishBOULEVARD Options: Cost OPTIONS: - Benefit COST-BENEFIT 90 Overpass with RI/RO (Option B) Overpass with RI/RO 80 (Option A) RI/RO with Grade Separated Roundabout - Full Roundabout Access Center Turn Overpass 70

RI/RO with 60 Roundabout - Higher Cost - Reduced Access Minimal Added Benefit 50

40

30 Project BenefitProject (Points)

20

10

0 $0 $10 $20 $30 $40 $50 $60 $70 $80 $90 Project Cost ($ Million) ramseygateway.com