Overpass with Right-In/Right-Out Cedar Lake Road
EXAMPLE: ST. LOUIS PARK SUNFISH LAKE BOULEVARD OVERPASS WITH RIGHT-IN/RIGHT-OUT CEDAR LAKE ROAD
US 169
OVERALL BENEFITS SCORE OPTION A OPTION B 81 81 OPTION A, $61-68M SUNFISH LAKE BLVD HIGHEST COST FRONTAGE ROAD ALIGNMENTS BNSF RAILWAY ARE PRELIMINARY NEW FRONTAGE RD 1 50 100
SUNFISH COMMONS TOP MEASURES PLANTS AND THINGS USA OPTION A OPTION B WILLY MCCOY’S
RIGHT-IN/RIGHT-OUT RIGHT-IN/RIGHT-OUT PEDESTRIAN EASE INTERSECTIONS WILL HAVE LOCATIONS ARE PRELIMINARY AN ACCELERATION AND NEW FRONTAGE RD DECELERATION LANE ON HWY 10 BUSINESS EASE
QF SALES AND SERVICE PROPERTY IMPACTS COLLISION CENTER BLUE LINE COUNTRYSIDE SOUNDWAVES SERVICES OF MN COMFORT SUITES ONSITE GLASS MN JAC AUTO NRH COST PLUMBING OPTION B, $54-60M
SUNFISH LAKE BLVD
DO IT ALL PRINTING NEW FRONTAGE RD RR GRADE SEPARATION
COST RIVERDALE DR 1 - POOR 2 - FAIR 3 - GOOD
PARCEL LINES ARE APPROXIMATE COLOR CODE BREAKDOWN GREEN SHADING DENOTES POTENTIAL GRADING AREAS
RIVERDALE DR ramseygateway.com
SUNFISH LAKE BOULEVARD GRADE-SEPARATED ROUNDABOUT
OVERALL BENEFITS SCORE
SUNFISH LAKE BLVD CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER FRONTAGE ROAD ALIGNMENTS 72 ARE PRELIMINARY
BNSF RAILWAY 1 50 100 NEW FRONTAGE RD MID RANGE COST
PLANTS AND THINGS USA SUNFISH COMMONS TOP MEASURES OAK TERRACE ESTATES WILLY MCCOY’S CONCERNS WITH PEDESTRIAN COMFORT CROSSING AT ROUNDABOUT PEDESTRIAN EASE NEW FRONTAGE RD
BUSINESS EASE
QF SALES AND SERVICE PROPERTY IMPACTS COLLISION CENTER BLUE LINE JAC AUTO ONSITE GLASS MN COMFORT SUITES SOUNDWAVES COUNTRYSIDE NRH SERVICES OF MN PLUMBING
COST DO IT ALL PRINTING RIVERDALE DR
MN SCHOOL OF INTEGRATED RR GRADE SEPARATION HORSESHOEING TECHNOLOGY COST 1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE GREEN SHADING DENOTES POTENTIAL GRADING AREAS $51-56M COLOR CODE BREAKDOWN ramseygateway.com EXAMPLE: CHICAGO, IL
SUNFISH LAKE BOULEVARD AUSTIN BLVD CENTER TURN OVERPASS
INTERSTATE 290
OVERALL BENEFITS SCORE
72 FRONTAGE ROAD ALIGNMENTS ARE PRELIMINARY
CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER SUNFISH LAKE BLVD 1 50 100
HIGHEST COST OF AT-GRADE BNSF RAILWAY RAILROAD OPTIONS DUE TO AMOUNT TOP MEASURES OF RETAINING WALLS REQUIRED NEW FRONTAGE RD
SUNFISH COMMONS PLANTS AND THINGS USA PEDESTRIAN EASE OAK TERRACE ESTATES WILLY MCCOY’S
HIGHWAY 10 TRAFFIC ENTERS OUTPOST AND EXITS HIGHWAY FROM THE BUSINESS EASE NEW FRONTAGE RD LEFT TURN-LANE
PROPERTY IMPACTS
QF SALES AND SERVICE
COLLISION CENTER LANO EQUIPMENT
ONSITE GLASS MN BLUE LINE SOUNDWAVES COMFORT SUITES JAC AUTO COUNTRYSIDE COST NRH SERVICES OF MN PLUMBING
DO IT ALL PRINTING RR GRADE SEPARATION RIVERDALE DR INTEGRATED MN SCHOOL OF TECHNOLOGY HORSESHOEING COST
1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE GREEN SHADING DENOTES POTENTIAL GRADING AREAS
COLOR CODE BREAKDOWN $59-65M ramseygateway.com
SUNFISH LAKE BOULEVARD RIGHT-IN/RIGHT-OUT WITH ROUNDABOUT REDUCED ACCESS
OVERALL BENEFITS SCORE
CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER FRONTAGE ROAD ALIGNMENTS 66 ARE PRELIMINARY
SUNFISH LAKE BLVD NEW FRONTAGE RD CONCERNS WITH BNSF RAILWAY PEDESTRIAN COMFORT 1 50 100 CROSSING AT ROUNDABOUT
LOWEST COST SUNFISH COMMONS PLANTS AND THINGS USA OAK TERRACE ESTATES TOP MEASURES WILLY MCCOY’S NO WESTBOUND ENTRANCE RAMP, TRAFFIC CONTROL TO TRAFFIC IS REROUTED TO RAMSEY BLVD BE DETERMINED PEDESTRIAN EASE ON THE NEW FRONTAGE ROAD NEW FRONTAGE RD
BUSINESS EASE QF SALES AND SERVICE
COLLISION CENTER
ONSITE GLASS MN SOUNDWAVES
BLUE LINE RIGHT-IN/RIGHT-OUT COUNTRYSIDE JAC AUTO INTERSECTIONS WILL HAVE COMFORT SUITES SERVICES OF MN AN ACCELERATION AND NRH PROPERTY IMPACTS PLUMBING DECELERATION LANE ON HWY 10 DO IT ALL PRINTING RIGHT-IN/RIGHT-OUT LOCATIONS ARE PRELIMINARY
INTEGRATED COST MN SCHOOL OF TECHNOLOGY HORSESHOEING RIVERDALE DR RR GRADE SEPARATION COST 1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE GREEN SHADING DENOTES POTENTIAL GRADING AREAS $34-38M COLOR CODE BREAKDOWN ramseygateway.com
EXAMPLE: BROOKLYN CENTER
SUNFISH LAKE BOULEVARD 63RD AVE N RIGHT-IN/RIGHT-OUT WITH ROUNDABOUT FULL ACCESS HWY 169
OVERALL BENEFITS SCORE
SUNFISH LAKE BLVD CULLIGAN OF ANOKA ACCENT HOME & KITCHEN CENTER 70 FRONTAGE ROAD ALIGNMENTS LOWEST COST ARE PRELIMINARY CONCERNS WITH PEDESTRIAN COMFORT CROSSING BNSF RAILWAY 1 50 100 AT ROUNDABOUT NEW FRONTAGE RD
VINEYARD & WINERY E-CIG WAREHOUSE
TWO RIVERS
SUNFISH COMMONS TOP MEASURES PLANTS AND THINGS USA OAK TERRACE ESTATES OUTPOST WILLY MCCOY’S TRAFFIC CONTROL TO PEDESTRIAN EASE BE DETERMINED NEW FRONTAGE RD
QF SALES AND SERVICE BUSINESS EASE COLLISION CENTER
BLUE LINE SOUNDWAVES TUNGSTEN ST
ONSITE GLASS MN COUNTRYSIDE COMFORT SUITES JAC AUTO SERVICES OF MN LANO EQUIPMENT PROPERTY IMPACTS RIGHT-IN/RIGHT-OUT RIGHT-IN/RIGHT-OUT INTERSECTIONS WILL HAVE NRH LOCATIONS ARE PRELIMINARY PLUMBING AN ACCELERATION AND DO IT ALL PRINTING
DECELERATION LANE ON HWY 10 INTEGRATED MN SCHOOL OF TECHNOLOGY COST HORSESHOEING RIVERDALE DR RR GRADE SEPARATION COST
1 - POOR 2 - FAIR 3 - GOOD PARCEL LINES ARE APPROXIMATE
GREEN SHADING DENOTES POTENTIAL GRADING AREAS COLOR CODE BREAKDOWN $34-38M ramseygateway.com SUNFISH LAKE SunfishBOULEVARD Options: Cost OPTIONS: - Benefit COST-BENEFIT 90 Overpass with RI/RO (Option B) Overpass with RI/RO 80 (Option A) RI/RO with Grade Separated Roundabout - Full Roundabout Access Center Turn Overpass 70
RI/RO with 60 Roundabout - Higher Cost - Reduced Access Minimal Added Benefit 50
40
30 Project BenefitProject (Points)
20
10
0 $0 $10 $20 $30 $40 $50 $60 $70 $80 $90 Project Cost ($ Million) ramseygateway.com