1 Contents 8 20 32 40 50 54 60 68 70 Tramway Workshop Yapıray Intercity Systems and Sleeper, Machinery Rail System means; Railway Transit Depot Stations Turnout System Park Systems Systems Systems Areas Bearer & • Environmental sensitivity, LVT Block • Comfortable and safe transport, • A way to prosperity, • Increase in the quality of life

2 433 "World Brand in Rail Systems"

Yapı Merkezi realizes projects of universal dimensions. Yapı Merkezi’s rail system adventure, starting with Founded in 1965, Yapı Merkezi aims "to create and to realize Söğütlüçeşme Railway Station Construction in 1975 has construction projects that will serve humanity by creating reached to 39 rail systems, 2.600 km length railway and 300 happy environments". Yapı Merkezi always reaches its station which carries more than 2 millions of passengers targets with the determination to complete every project by safely everyday. Yapı Merkezi is a world brand in the field of delivering products and services on time, within budget and rail technologies. 2004 UITP (International Association for ) “Light Rail Project of the Year” award is given with the specified quality by managing the risks well. to ESTRAM (Eskişehir LRTS), UITP “2010 Best Urban Integration Project of the Year” and British Light Rail Transit Association’s In realizing these targets Yapı Merkezi pursues beauty with “Worldwide Project of the Year” awards are given to Rail System Awards a passion and always considers aesthetic sense as a bridge ( Light Rail System). Also in 2012, British Light Rail of judgement between concept and reality. Yapı Merkezi Transit Association’s “Best World Class Rail System of the Year” considers professional and humanitarian measures as well as award is given to . technical measures and processes knowledge to be a scale organization. In all its activities Yapı Merkezi is a transparent Yapı Merkezi always considers the development of , and innovative company. Also it shows determination the progress of world civilization, and satisfaction of its to finish every project on time; thus it is a leading group customers, project partners, employees and shareholders companies in its operating sectors. as its top priorities. Yapı Merkezi places faith in nature as a source of inspiration, and to apply successfully the Yapı Merkezi respects the laws, beliefs, traditions and history solutions nature shows, Yapı Merkezi invests continuously in knowledge and technology, human resources and new of all communities where its activities are located. management systems. Yapı Merkezi realized the importance of the rail systems for Yapı Merkezi, with a confidence originating from half a development of civilization and established Yapıray in 1998 century of experience, is a rising value of Turkey with its with its vast experience in design and implementation in rail investments, equity and thousands of family members, as systems. Yapıray with its factories in Afyon and Karabük; is expert well as its successful history. As it has been to this day, so in track laying, production of Rayton branded concrete sleeper, will it be from this day on that as our skill in “Knowledge Raykas branded concrete bearer, ballast laying, rail assembling, Processing” and "Displaying Aesthetic Sense” grows, Yapı track laying, feasibility works, supplying of rail equipments and Merkezi will be a company with the quality of being a production of concrete bearer and metro type block. Since its trusted and admirable world brand. In the history of the foundation, Yapıray whose name is associated with quality, modern civilization of Turkey, Yapı Merkezi has always had a continues its leadership and permanency of trust that is formed distinguished place and in the future will continue to have a with its service and equipment in rail systems. privileged place in the history of world civilization as well.

4 435 "Beauty is achieved through the well implementation of productive ideas"

1975 1976 1980 1986 1989 1990 1992 1997 1998 2000 2002 2003 2005 2006 2007 2008 2010 2011 2012 2013 2014 2015

Söğütlüçeşme İzmit Railway Metro Light Beyoğlu İstanbul Metro Antalya İzmir Metro Eskişehir - Metro Topkapı - Ankara- Eskişehir-İnönü Morocco Saudi Arabia Ethiopia Algeria Saudi Arabia Railway City Crossing (Project) Railway Bridge Rail System Nostalgic Tramway (Project and Metro Light Rail Kabataş Habibler High Speed High Speed Casablanca Mecca and Awash - Sidi Bel Abbes Metro CTW 130 Viaduct and (Project) Tramway Consultancy) Transit Funicular Tramway Railway Railway Tramway Madinah High Weldia Tramway () Railway Stations System System Kayseri Light Speed Railway Railway (Project & Rail Transit Konya Algeria Stations Consultancy) Kadıköy-Moda System Tramway Caroubier Bursa Light Rail Bandırma- Algeria Nostalgic (University Workshop Transit Hasanbey Balıkesir Setif Tramway Tramway Line) System Logistics Center (BC1) Railway Kadıköy - Algeria Bir Electrification Polatlı- Metro Touta-Zeralda Irmak- Konya Railway Zonguldak Saudi Arabia Bozkurt- Signalization Railway Line Al Nariyah Dinar Rehabilitation Depot and Railway Çatalca- and Workshop Rehabilitation Kabakça From 1975 until today, Signalization Balastless Track Tekirdağ- Konya Line with 2600 km of railways and 300 stations in 39 projects, Muratlı Adliye Electrification Tramway

we provide safe transport for more than 2 million passengers daily in 3 continents… Kayaş - Çetinkaya Railway Electrification

Polatlı- Konya Electrification

6 437 Intercity Railway Systems

Total Conventional Railway Line: 23 km double line 447 km single line Total Capacity: 40.000 passengers / day Total High Speed Railway: 242 km double line Total Capacity: 10.000 passengers / day Total Railway Rehabilitation: 477 km

8 439 Ankara-Konya Length: 212 km double track Owner: (TCDD) İstanbul High Speed Railway Contractor: Yapı Merkezi

Ankara - Konya High Speed Railway which was started with the Sub Contractor: Dimetronic, Areva impetus gained from the sage Mevlana’s call “come with love” by Railway Systems Railway Yapı Merkezi and first rail welded in 17 July 2009. The project came Scope: All track superstructure, construction of stations, into service in August 2011 and its construction speed is considered as a world record time. With this project, the travel time between electrification, signalling, telecommunication Metro Sistemi / Sistemi Metro Ankara and Konya decreased to 1 hour 15 minutes and also it was planned to provide comfortable, contemporary, fast and economic works and training of employees transportation to passengers. Number of Siding lines: 6 During the project with solidarity of Yapı Merkezi employees, Number of Stations: unprecedented pace of work was achieved not only in Turkey 1 station having 5 lines but also abroad. Everyday approximately 2 km of single trackway was installed and thousands of supplies processed. On occasion daily track installation speed increased up to 3 km. The project was completed so fast that it took the title of “World’s Quickest Constructed High-Speed Railway”. Also compared to the other high speed railway projects, Ankara-Konya High Speed Railway is regarded as world’s most economic project as well.

Scope of the works: Brief Summary of the Project All works pertaining to design, manufacture, assembly and operation startup of track superstructure, electrification, signaling, telecommunication, central control systems, 8.000 Sheets of design and the trainig of the employer’s personnel are being carried out by Yapı Merkezi. 3,3 million tons Ballast • Track superstructure (Sub-ballast and ballast layers, sleepers, rail, turnouts, etc.) 240.000 ton sleepers construction and commissioning works 40.000 ton Cable Duct • Electrification systems (Transformer stations, -catenary system, scada system) design, supply, installation and commissioning works 60.000 tons Rail

• Signaling system design, supply, installation and commissioning works 8.000 Catenery Poles

• Telecommunication systems (GSM-R system, transmission system, fiber optic and 5.000 km Cable communication cable network, phone-announce-information systems) design, 21 Technical Buildings supply, installation and commissioning works 4 Electrical Transformer Stations • Training of the employer's personnel and Control Center

10 4311 Bir Touta-Zeralda Railway Length: 23 km double track Owner: ANESRIF (Algeria National Agency of Railroad Investment)

Railway Systems Railway Contractor: Yapı Merkezi (Leader) - Infrarail SpA Consortium The project is located at a distance of 25 km on the south-west of the Algeria capital city, Algiers. It is a new 23 km double-track Number of Stations: 5 railway line based on 140 km/h design speed. Once constructed, it will serve as the railway link between the city center and the Viaducts and bridges: 30.000 (5 railway viaducts, 12 road bridges, 3 under passes) Zeralda district. Along the alignment, there are five railway : 340 m Cut&Cover viaducts, 12 overpasses, three prefabricated railway bridges, one cut-and-cover tunnel of 340 m, and 5 stations. The geography Scope: Turnkey civic works, electrification, signalization, being hilly at the zone, the project includes approximately 10 million of earthworks and 30.000 m2 heavy construction telecommunication and commissioning service structures like bridges and viaducts. Electrification, signalization (ERTMS Level 1), telecommunication and commissioning are also in the scope of the turn-key contract.

Eskişehir-İnönü High Speed Railway 30 km part of Ankara-İstanbul High Speed Project is constructed by Yapı Merkezi with double track. Ballast laying, sleepers, track and Under construction - 2014 turn-out assemblage, commissioning service, track certification and training of the employer's personnel is in the scope of the project which has a design speed of 250 km/hour.

Under construction - 2014

12 4313 A project that is environmental friendly and in EU Standards Length: 477 km track rehabilitation Irmak-Karabük- Being a rehabilitation of a line along the existing (415 km track length + 62 km station lines length) alignment with no changes of the location of the Zonguldak Railway Owner: Turkish State Railways (TCDD) permanent way:

Contractor: Yapı Merkezi (Leader) - MON Consortium • All track will be renovated by 49E1 rail

Railway Systems Railway Rehabilitation and Turn outs: 200 pcs • A command center will be established in Karabük Signalization Ballast: 635.000 tons • Track will be certified by International Certification Institution Number of Stations: 31 • Rehabilitation of 477km of level-line track according Sleepers: 229.930 pcs Irmak - Zonguldak railway line, which starts from Irmak to modern railway standards town located at the northeast part of Ankara, passes • Rehabilitation of some of the existing out of through Çankırı and Karabük and ends at Zonguldak 55 in total and some of the existing railway bridges constructed approximately 80 years ago. out of 118 in total The project scope includes the rehabilitation of One of the biggest rail slope stabilizations, tunnel portals, engineering • Installation of automatic protection systems on 253 structures and stations along the line, in addition infrastructure projects with level-line crossings to the rehabilitation of track infrastructure and • Installation of passenger information and telecom superstructure. Furthermore, the installations of the i systems on 32 stations to provide disabled telecommunication and signalization systems together European f nancing in turkey with their power supply (compatible with EU norms) passengers with safely access are within the scope of the project • Extension of track-lines at Çankırı, Karabük, Ülkü, Irmak-Karabük-Zonguldak Railway Rehabilitation and Balıkesik and Yeşilyenice Stations Signalization Project’s total cost is 227 million € and • Installation of European rail traffic management The European providing a grant of €190 million system (ERTMS) and European Train Control System to the project through its instruments for pre-accession (ETCS) Level 1 signalization and telecom systems (IPA) funds. This project is therefore an excellent example of complementary use of EU grants and according to 120km/h speed EIB loans for a priority investment in the sustainable • Design of the all above mentioned works. transport infrastructure in the country.

14 4315 Owner: Awash - Kombolcha - Hara Gebaya All design work of the Awash-Weldia/Hara Gabaya Railway Project Length: 426 km will be completed by Yapı Merkezi within 42 months. Designer: Yapı Merkezi Addition to the main track, catenary system will also be installed Contractor: Yapı Merkezi to the warehouse and overnight tracks. While the signalization and telecommunication works are realized both in the main track Number of Bridges: 56 (6.295 m) and stations, an operation control center will also be constructed. Number of Tunnels: 14 (9.880 m)

*Project data is subject to change according to final design

Under construction - 2014

Awash - Kombolcha - All design work of the Awash-Kombolcha-Hara Gabaya Railway Project will be completed by Yapı Merkezi within 42 months.

Addition to the main track, catenary system will also be installed to the warehouse and overnight tracks. While the signalization and Hara Gebaya telecommunication works are realized both in the main track and stations, an operation control center will also be constructed. In the project, there will be 10 stations. Alongside of the stations, there will be 2 main maintenance facilities, a workshop, depot, a

Railway Systems workshop for painting, generator rooms, mechanical service, a service building, a car washing plant and offices. 426 km long Awash-Kombolcha- Hara Gabaya railway project is being constructed as a single track starting from the northeast of the city of Awash, extending towards north through the city of Kombolcha and eventually reaching to the city of Weldia.

The project is highly important and crucial due to the establishment of connection between northern and eastern Ethiopia and support to the traffic of passenger and freight, as well as the contribution to import and export through the harbour of Djibuti. In addition, this railway line will also connect the northern part of the country to the center.

16 4317 18 Railway Systems Fastenings: Type of Rail: Type ofSleepers: Gauge: Number of Turnouts : Truck L Contractor: Owner: otatr Poles:Number ofCatenary Contractor: Owner: Excavation: Contact Wire: Wire:Messenger Number ofPendulum andStitch Wire: Return Conductor: Foundations: NumberofCantileverSets: ength 4.915 m 4.915 m 81.740 m 81.740 10.465 m 60.400 4.328 m 4.328 1.543 1.282 Yapı Merkezi-UsluelJoint Ventury Turkish State (TCDD) Railways W14 60 E1 B70 Concrete 1.435 mm 60 Single 19,5 km Track Yapıray Turkish (TC State Railways 3 3 DD) 18.06.2012. T km catenary km of theproject. 18.06.2012. T m of concrete Logistictrack (for loading / disembarking). ballasted andsidingtracks) track and6.5000 (for parking center has1,4milliontons offreight handlingannually. closed area. In thelogisticclosed area. center In there are 13.000mof center. inatotal isconstructed area of541.000m It has atotal of365.000m Hasanbey Logistic Center isthe Turkey’s firstlogistic otal lengthof67 Logistic Center 2 concrete area and10.000m Hasanbey 2 . It . It 2

otatr Poles:Number ofCatenary Contractor: Owner: Number of Catenary Vehicles:Number ofCatenary Number ofCantileverSets: Wires: Catenary service buildingwillbecompleted.service power transformer substations, 1remote control center and1 testingdesign, &commissioning construction, works of5 Directorate of Turkish Railways. Within scope ofproject; signed on9May 2013between Yapı and General Merkezi regions. Total Contract hasbeen lengthofthelineis310km. between Egeanmain connection andMediterranean railway -Menemen -BalıkesirManisa Bandırma lineisthe complete in600days railway.for almost300km Project isscheduledto testing &commissioning works willbeexecuted Within scope ofproject, design, installation, 3, 4and5contracts are signed on11.10.2013. Project ÇetinkayaKayaş Electrification Section to becompleted in225days. with newtrack andsuperstructure. The isgoing project track replacing andsuperstructure theexisting 75km andDinar.between Bozkurt The scope ofthework is Yapı therenewal ofthetrack undertakes Merkezi Bandırma -Menemen Power Substations 3 9.292 m 1.410.000 5.887 Yapı Merkezi Turkish State (TCDD) Railways Fastenings: Gauge: Number of Turnouts: Type ofSleeper: Type ofRail: : Track L Contractor: Owner: Nme fDsonco: transformers: service Number ofAuxiliary Number ofCurrent/Voltage Transformers: Number ofCircuit Brakers: NumberofDisconnector: Number of154/27,5kVPower Transformer: Contractor: Owner: ength Railway Electrif Railway Bozkurt -Dinar Bozkurt Kayaş -ÇetinkayaKayaş Railway TrackRailway W14 1.435 mm 10 B 70Concrete Sleeper 60 E1 Single 75 km Track Yapıray Turkish State (TCDD) Railways Renewal 10 90 20 120 10 Ya Turkish State (TCDD) Railways pı Merkezi i cation 43 19 Railway Systems Metro Systems

Total Length: 118,8 km double track Total Tunnel Length: 47,2 km Total Viaducts Length: 64,3 km Total Capacity: 860.000 passengers / day

20 4321 World Record

1,5 km metro line and 30.000 m2 construction every month The longest full automatic driverless metro in the world constructed under a single contract

Metro Systems Metro The turnkey construction of Dubai Metro has been realized by DURL Consortium constituted by Mitsubishi, Obayashi, Kajima from Japan and Yapı Merkezi from Turkey.

Dubai Metro is the longest full automatic driverless metro in the world constructed under a single contract. came into service in 9.9.9 and in 9.9.11.

There are 45 stations as being 10 thereof underground and 35 thereof elevated on these two lines having a total length of 75 km. Furthermore, 3 depot areas and repair & maintenance workshops, 3 main power substations and 3 multi-storey car parks having a total capacity of 12.000 cars are constructed together with the system.

The biggest prefabricated construction site of the world has been established. The construction process has been accelerated by means of producing precast pieces of viaducts on an area of 700.000 m². TBM tunnel boring machines have been used for the tunnel having a diameter of 9,5 m and “Diaphragm wall” technique has been implemented in underground stations.

Dubai Metro is the first urban train network in the Arabian Peninsula.

100% eco friendly metro with “0” carbon emission

22 4323 24 Metro Systems (74.7 km) that was underasingle constructed (74.7km) contract passengeroverpasses complete system, includingthetunnels communication provided throughout the Why Metro isDubai Different? Provided at eachstation: • Middle EastRegion Middle stations intheworld of earth, water, ofearth, fire andair iconic concept andfuturistic includingentrance halls, busstations and carbon emission carbon • • • • • • • • • • • •

The longestautomated metro intheworld The rail firsturban transit system built inthe h otlxrosadms ofral The andmostcomfortable mostluxurious Unique station interiors basedonthethemes Station buildingsdesigned withapioneering, The metro, firstfullyair-conditioned 100% environmentally metro friendly with0% Mobile phoneandwirelessMobile (wi-fi) Passenger safety assured with3.000cameras Medical teamMedical andspecialmetro police Signage speciallydesigned for thedisabled Easy access to nearby facilities Full integration withothermodesoftransport Tunnel: 12 km (10 km (10km Cut&Cover) 12km TBM, 2km 61,5km 45pcs Turnkey Tunnel: ETA, Freysinet, Rizzani, VSL, Yongham Viaducts: Link)Consortium; Rapid DURL(Dubai RTA and (Roads Transport Authority) Stations: doubletrack 75km Scope: Sub Contractor: Contractor: Owner: Length: Mitsubishi, Obayashi, Kajima and Obayashi,Mitsubishi, Kajima Yapı Merkezi Unique harmony between engineering, technology, andarchitecture art 43 25 Length: 11,6 km double track İzmir Metro

Owner: İzmir Metropolitan Municipality High capacity and

Contractor: ABB - Yapı Merkezi Consortium efficiency... Metro Systems Metro

Sub Contractor: Brecknell & Willis, Yaptag, Özgün The first stage, Üçyol-Bornova route is 11.6 km long and has 10 stations; The Scope: Turnkey civil, electromechanical and track works, capacity of the route is 45.000 passenger/ hour/direction. All design and civil works rolling stock procurement (tunnels, bridges, viaducts, stations, tracks, infrastructures, depot area and the Stations: 10 pcs (4 Underground, 4 At Grade, 2 Viaduct) workshop building) and the 3rd rail system Tunnel: 5,7 km (2,8 km TBM; 1,7 km NATM; 1,2 km Cut & Cover) was undertaken by Yapı Merkezi.

Viaduct Line: 2,8 km "Ümmühan Ana" twin tunnels located between Konak, Çankaya and Basmane Levelline: 3,6 km stations of İzmir Metro were drilled at a depth of 18 m below ground level. Ümmühan Ana Tunnel consists of two 1400 m long tunnels, parallel to each other, located in strata that can almost be called "marshy". In order not to impair the historical texture of İzmir, a special TBM machine having a length of 80 m and a diameter of 6.45 m was designed.

Tunnels were bored by EPBM - Earth Pressure Balance Method because İzmir is located in a first degree earthquake zone. That method provided capability of flexing during an earthquake.

The 1.7 km Nene Hatun Tunnel between Konak and Üçyol was constructed using the New Austrian Method (NATM). In the section of the line between Üçyol and Konak the work had to be performed with much more care and attention due to existence of fault (breaks) rather than the hardness of rock formation. Connection of station units in Konak, Çankaya and Basmane were performed using the cut- cover method.

İzmir Metro which was the biggest rail system project in its period, delivered to owner as a “real” turn-key project including project financing design, civil works, electrification, rail lying, operation organization establishment and education of employees.

26 4327 Concrete track structure in complience with the international and Turkish State Railways standart Marmaray (BC1) The scope of the project is to connect the railway lines on both sides of the Bosphorus by a tunnel. The line gets underground at Kazlıçeşme, passing Metro Systems Metro Metro Systems Metro through the new underground stations, Yenikapı and Sirkeci, proceeds along the Bosphorus, and reaches to another new underground station Üsküdar and finally, goes over the ground starting from Söğütlüçeşme. Total Length of tracks: 29 km double track Marmaray, which is one of the world's largest Concrete Fixed Track Length (Inside tunnel): 26 km double length transportation infrastructure projects connects Turnouts: 8 pcs Europe and Asia continents. The total length of the upgraded and new railway system is approximately Rayton B70 Sleepers: 4.204 pcs 76 km long. The project covers the main structures and systems, immersed tube tunnels, bored tunnels, *LVT Block: 81.000 pcs cut-and-cover tunnels, level crossing structures, three new underground stations, 36 overground stations Wooden Sleepers or Direct Fixation Systems: 1.000 pcs

(renovation and upgrading), operations control *Manifactured under the licence of Sonneville AG center, yards, workshops, maintenance facilities on the ground, as well as newly built third line, upgrading of existing lines, entirely new electrical and mechanical systems and finally, new modern rolling stocks.

Technical Aspects

Rail Type 60 E1 Welding 3.150 Butt - Welding

Sleeper Type 81.000 pcs bi-block concrete Rail Fastenings Type Vossloh W14 Sound and Vibration Lowering Vossloh System 300 190 Wooden Sleeper Vossloh KS System 4.270 B70

Distance between Turnout Quantity one 60 E1 – 300 – 1 :9 Track Axis 63 cm four 49 E1 – 300 – 1 :9 three 49 E1 – 140 – 1 :7

28 4329 Length: 14,4 km double track Qatar Owner: Qatar Railways Company Contractor: ALYSJ Consortium (Yapı Merkezi - STFA - Aktor - Larsen & Tourbo - Al Jaber Engineering) Metro Systems Metro Metro Systems Metro Scope: Double track railway tunnels (11,7 km) , Cut & Cover buildings (2,7 km), (Gold Line)

stations, railway facility, switches (4 pcs), emergency exit

Number of Stations: 9 underground The 212 km Doha Metro will cover the Tunnel: 11,7 km Greater Doha area and will include connections to town centers and vital commercial and residential areas throughout the city. In central Doha, the metro will be underground, whilst at the outskirts; it will mainly be at ground level or elevated. It will consist of four lines – Red, Gold, Green and Blue – and will have 85 stations. Yapı Merkezi will be involved in construction of Gold Line with consortium partners.

Kadıköy-Kartal Metro Owner: İstanbul Metropolitan Municipality (Anadoluray) Contractor: Yapı Merkezi-Doğuş-Yenigün-Belen Joint Venture Scope: All civil works Anadoluray was planned in order to reduce the traffic density on the D-100 highway between Kadıköy and Kartal (İstanbul), Number of Stations: 7 to ensure rapid and massive transportation of passengers along Tunnel: 17,8 km (TBM 12,3 km, cut&cover 5,5 km) this route and also, to accelerate the transportation between the two continents. The responsibility of Yapı Merkezi was to bore the tunnels using Tunnel Boring Machine-TBM. To this extent, two of EPM-TBM “Ground Pressure Balanced Tunnel Boring Machines”, were used to bore the main tunnels between Kadıköy and Kozyatağı, while two of TBM, “tunnel boring machines” were used for the tunnels between Kozyatağı and Kartal. The station platform tunnels and switch tunnels were constructed using "New Austrian Tunnel Method-NATM"

30 4331 Light Rail Systems

Total Length: 61,6 km double track Total Tunnel Length: 6,7 km Total Viaducts Length: 2,8 km Total Capacity: 610.000 passengers / day

32 4333 İstanbul Light Length: 18,5 km double track Rail Systems Owner: İstanbul Metropolitan Municipality Contractor: ABB - Yapı Merkezi Consortium İstanbul Light Rail Transit System that had started operating in 1989 between and Scope: Turnkey civil works, electromechanics, Light RailLight Systems Atatürk Airport, consists of three phases. First phase covers the route between Aksaray and the track works and supply of rolling stock intercity terminal, while second and third phases cover the route starting from the intercity Number of Stations: 16 (5 underground, 8 At Grade, 3 viaducts) bus terminal up to Yenibosna. DTM and Airport Tunnel: 4,9 km stations were added to the system later. Yapı Merkezi, not only completed the line between Viaducts: 2,8 km Aksaray and Yenibosna, but also designed and constructed all structures (tunnels, viaducts, Depot Area: 60.000 m2 bridges and station buildings), infrastructures, 2 line and switch equipments, repair and Workshop Area: 9.200 m maintenance workshops and storage areas. Rolling stock, electro-mechanical parts, catenary system, signalization, telecommunications and remote control systems, were carried out by the consortium partner ABB ().

34 4335 36 Light Rail Systems Tunnel: 2,1 km cut&cover 2,1km Turnkey civilworks, andtrack electromechanics works 8 Yapı Merkezi-Tewet Consortium BursaMetropolitan Municipality Tunnel: singletrack area) (Depot 1,5km doubletrack, 9km Number ofStations: Scope: Contractor: Owner: Length: • Engineering ofsignalization, • long, singletrack, The of2km construction • longdoubletrack The of3.2km construction • longlinefrom Küçük The of6.5km construction associated tests. works andrealizationand interface ofthe telecommunication, SCADA, electro-mechanical rollingsingle track, stock test line. long workshop lineanda1.5km extension subtransient tunnels. highway subtransient ofBursaand2pedestrian underground station, 1substation, thelargest route, including1level crossing platform, 1 Mudanyarail system alongthenorthern subtransient tunnel. 1 substation, 1fanroom and1pedestrian level crossing platforms, 1underground station, at west to UludağUniversity including5 wasproject consisted of: to Mudanya by isconstructed Yapı Merkezi. The Bursa, covering route from the9km University The second phaseofthelight rail system in Light Rail SystemLight Rail Bursa 43 37 Light Rail Systems Eskişehir Light Rail Kayseri Light Rail Total Length: 14,1 km double track Length: 18 km double track System (Estram) 2,3 km single track System (Kayseray) Number of Stations: 31 (29 At Grade, 2 underground) Eskişehir Tramway System joined the city’s northwest- Number of Station: 26 - At Grade Within the coverage of Kayseray Project, Yapı Merkezi completed southeast and southwest-northeast areas across. Thus, Owner: Kayseri Metropolitan Municipality

Light RailLight Systems the whole construction of infrastructure and superstructure of universities, big hospitals, bus station and city centre joined Owner: Eskişehir Metropolitan Municipality RailLight Systems the rail system with 17,8 km length and 31 passenger stations with each other. 26 stations were constructed on the line. Contractor: Yapı Merkezi - Ansaldo Breda SpA Consortium including warehouse and repair-maintenance workshop There is a 35.000 m2 workshop building is present in the bus Contractor: Yapı Merkezi - Bombardier Consortium Scope: Turnkey buildings, along with their whole electromechanical systems, station area where periodically maintenance and repairs are Scope: Turnkey power supplying, catenary, signaling, communication and done. Also depot area which has a 3 km length overnight stay control systems and provided taking into operation of the whole line is present in the same area. system with the needed technical training and educational programs. System's construction works, line works, electro- mechanical systems (power supply, catenery, signalization, Kayseri Light Rail Project received 2 awards in 2010. UITP- communication systems and maintenance equipments) were International Association of Public Transport’s “2010 Best Urban realized by Yapı Merkezi-Bombardier Consortium as turnkey. Integration Project of the Year” and British Light Rail Transit Association’s “Worldwide Project of the Year” Awards given to Eskişehir Light Rail System was awarded as “Light Rail Project Kayseri Light Rail Project because of the harmony of the system of the Year” in 2004 by UITP (International Association of with its environment and green track feature (8000 trees and Public Transport). 56,000 m2 grass were planted within the scope of the project), customer satisfaction, comfort and safety offered by the system and its integration with the existing public transport systems.

Awarded for: Awarded for: • Sustainable urban development planning, sustainable transportation solution in rail systems, quality of the system • Environmentally sensitive project design, application of high-technology and environmental as well as quality management • Passenger satisfaction • Environmentally sensitive • Integration with other transportation systems of the city • Operational productivity • 24 months of construction period (very short for similar projects) • High quality turn-key project. • International partnership: Consortium of Yapı Merkezi from Turkey and Bombardier from Canada • Comfort, safety and economy of the system

38 4339 Tramway Systems

Total Length: 74 km double track 10,5 km single track Total Capacity: 1.000.000 passenger/day

40 4341 İstanbul Tramway Length: 15,5 km double track

"In harmony with city’s identity" Owner: Istanbul Metropolitan Municipality

The line’s first part, Sirkeci-Aksaray was put Contractor: Yapı Merkezi into service in 1992 and then firstly connected Scope: Turnkey civil works, electromechanics and track works to Topkapı and Zeytinburnu after that its Tramway Systems Tramway connected to Eminönü. Lastly in 29 June 2006 Number of Stations: 29 - At Grade by the connection of Kabataş, it is united with the Taksim-Kabataş Funicular hence connected Depot Area: 35.000 m2 to Taksim-Darüşşafaka metro so that continous transportation between Darüşşafaka and Atatürk Workshop Area: 1.100 m2 Airport is provided. Yapı Merkezi constructed the Viaducts: 1,2 km first stage Sirkeci-Aksaray part in 1992, second stage Aksaray-Topkapı part in 1993 and third stage Topkapı-Zeytinburnu part in 1994 and handed over to İstanbul Metropolitan Municipality.

Yapı Merkezi completed the Zeytinburnu- Bağcılar Line in the year 2005. The scope of the construction works of Zeytinburnu Bağcılar - Line consist of appliance project services, levelline study and geotechnical survey, 9 levelline stations, 640 m long viaduct, 646 m long over pass, 3.748 m long levelline track and all track works. Electrical and mechanical works consist of power supply (2 substation centre equipments), catenery system, SCADA system, communication systems, procurement of passenger crossing control system, assemblage and commissioning works were realized. System was put into service in September 2005.

42 43 44 Tramway Systems Tramway Casablanca Year” by Tramways &Urban Transit Magazine. as was elected “Best World System ClassRail ofthe Casablanca line, in12.12.12, cameinto service theexecutionduring ofthemaincontract. has beenassigned to Yapı by theemployer Merkezi workshop. Additionally of12stations construction linewhichisinsidethemaintenance 6,5 km coverage) doublelinerail system of21km and and assemblage;railways’ welding andplatform and lineworks (travers’ andrail’s procurement Casablanca Tramway Project includesplatform Engineering andDevelopment Consultants. SYSTRA, SYSTRA Morocco andMoroccan CID firm Transports by SAandengineering undertaken Yapı Merkezi. This Project istendered by Casa by longisconstructed line whichhas6km city, Casablanca. Also maintenance workshop inMorocco’sa total lengthof30km biggest ofthetramway part whichhas project 20 km Yapı completed ofthe Merkezi theconstruction idcs 1,2km 1.100m turnouts, rail welding, track concrete pouring) 35.000m Viaducts: Workshop Area: All track works (Procurement andassemblingofsleepers 29-At Grade Area:Depot Yapı Merkezi Number ofStations: SYSTRA, SYSTRA Morocco, CIDEngineering andDevelopment CASA Transports enSite Amenage Scope: single track depotline doubletrack +6,5km 21km Contractor: Consultant: Owner: Length: 2 2 43 45 46 Tramway Systems Tramway Abbes Sidi Bel Algeria to 1370 m. to 1370m. between stations ranging from speed willbe19.1km/h 400m university campus. When iscompleted, theproject theaverage Sidi Yacine passengerstation, Hospital, Maternity northern Sciences, ofMedical suchasInstitute hospital, park, city city ofthe parts is goingto provide to theimportant transportation to whichwillbeconnected Cascadethe city Station. This route Station andcontinues road alongtheeastring that surrounds project. from Cité southofthecity- du20Aout This linestarts Yapı offirstlinethe theconstruction undertakes Merkezi Setif TramwaySetif Algeria Depot Area 100.000 m 100.000 urnkey 37-AtGrade AlgeriaMetroCompany Depot Area Number ofStations singletrackdepotline doubletrack+6,7km 22,4km Scope T Contractor Y Owner Length 75.440 m 26-At Grade Yapı Merkezi Metro Algeria Company AreaDepot Number ofStations singletrack depotline doubletrack +5,5km 17,8km Scope Turnkey Contractor Owner Length of Maintenance No.1. Terminus oftheCenter Station inEast, includingonstruction from Station theElBez at starts of 15,3km, West andendsat and itconsists oftwo phases. The closedphasehasalength First LineinAlgeria. The total lengthofthelineis22,4km Yapı ofSetif theconstruction undertakes Tramway Merkezi apı Merkezi-AlstomFrance - Algeria 2 2 structures and7park&drive areasstructures alongtheroute oftheproject. 37 stations, 16substations, stations, 5connection 4engineering ofCenterincludes theconstruction ofMaintenance No.2. There are Wilaya Station to Station Multimodale insoutheast. This phase also the The andconnects Conditional Phase hasalengthof7,2km İstanbul Metropolitan Municipality in2007hasatravelİstanbul Metropolitan Municipality timeof and there are 18stations; 12ofthemare over theground, 6of cataneri systems, training andcommissioning works Civil andtrack works, power supplyandoverhead 1 Number ofStations: Yapı - Merkezi Yapıray Konya Metropolitan Municipality Scope: single line 3,3km Contractor: Owner: Length: fixation Direct track andinstallationworks ofswitches 31 Yapı - Merkezi Yapıray Number ofStations: İstanbulMetropolitan Municipality Scope: double track 13,3km Contractor: Owner: Length: 20 minutes and capacity of95.000passengers/day.20 minutes andcapacity The lineis system andoperation works were completed. Also necessary Konya Tramway was projected in1986andcameinto service Tramway ofthelineisunderground andMetrobüs. 6km integrated Metro, withAksaray-Airport Kabataş-Zeytinburnu the construction of infrastructure and superstructure works, ofinfrastructure andsuperstructure the construction system. thescope oftheproject, In Yapı completed Merkezi the clock and is a backbone oftheKonya the clockandisabackbone transportation Topkapı -Habibler Tramway by whichwas putinservice in 1992. It isoperational between Zaferin 1992.It -Campus round one station, supplysystem, overhead catenery training for theoperation ofthesystems provided Topkapı-Habibler (University Line) (University Konya Tramway them are undertheground. Tramway 43 47 Tramway Systems Nostalgic

Antalya Tramway Tramways Trackworks, catenary system, workshop and depot area and site arrangement works of 5.1 km long line between Lara Interchange and Antalya Archeology Museum was undertaken by

Yapı Merkezi. The system was realized as a turn- Systems Tramway key project. Antalya Tramway provides safe and Beyoğlu Nostalgic efficient service to 21.000 passengers daily. Length: 2 km single track İstanbul Tramway Owner: Istanbul Metropolitan Municipality

By the end of year 1990, the historical tram line of Beyoğlu Contractor: Yapı Merkezi Length: 5,1 km double track has recommenced to service with restoration of old wagons Tramway Systems Tramway Scope: Turnkey civil, track and electromechanical works taken out from the museum and it has been operating Owner: Antalya Metropolitan Municipality on a line of 2 km with 3 mortises and 2 wagons, making Number of Stations: 3 - At Grade Contractor: Yapı Merkezi Metro Sistemi / Sistemi Metro 14.600 trips, totaling 23.944 km per year and carrying 6,000 passengers a day on average; as well as serving for touristic Scope: Turnkey civil works, electromechanics and purposes. track works Yapı Merkezi, by way of its accumulated experience in modern rail transit systems, completed the 2 km long Number of Stations: 9 new tramway line in a very short time, including the track Depot Area: 2.100 m2 laying, turnouts, posts, the catenary system, passenger stations and the workshop. Workshop Area: 680 m2

Kadıköy-Moda Tramway Kadıköy-Moda Tramway has a length of 2,6 km and consists 10 stations. There are 4 rolling stocks operating in the system. The trip starts from Kadıköy Square, follows Bahariye and Moda and finally ends in Kadıköy completing the ring. Yapıray completed the track laying and turnouts on the level.

Length: 3,2 km single track

Owner: İstanbul Metropolitan Municipality

Contractor: Yapıray

Scope: Track lying works and rail installation

4844 454349 Funicular System

Length: 0,84 km Tunnel Length: 0,64 km Slope: Between 22 % Capacity: 35.000 passengers/day

50 4351 Taksim-Kabatas Length: 0,84 km

Owner: İstanbul Metropolitan Municipality İstanbul Funicular Contractor: Yapi Merkezi – Garaventa Consortium A funicular system Sub Contractors: Grupteknik, Novatek Funicular System Funicular having maximum passenger capacity all Scope: Turnkey civil, electromechanical and track works including supplying Metro Sistemi / Sistemi Metro over the world of vehicles with traction systems Daily Passenger Capacity: 35.000 İstanbul Taksim-Kabataş Funicular System, composed of two rolling stocks with double carrier which move by ropes opposingly between two stations, has a capacity of 7.500 passengers per hour at one direction and 15.000 passengers at both directions with a trip takes 110 seconds in a tunnel length 640 m at each 3 minutes frequencies. The system has been obtained the title of "Funicular System" which has maximum passenger capacity all over the world as of 2006 with this property.

This specific project which is one of the numbered samples all over the world and constructed secondly after 131 years in Turkey as a similar of historical Tunel which connects Karaköy - Istiklal Street, has a property of a rarely engineering project type and fitted out with architectural designs suited to the concept of 21st century.

Yapı Merkezi - Graventa AG Consortium has completed the system as turn-key basis; including all design works, underground stations, railway works, electro-mechanical works, supply of vehicles and training for operation.

52 4353 Workshop and Depot Areas

Total Workshop and Depot Area: 1.400.000 m2

54 4355 Caroubier Workshop Workshop Area: 28.300 m2 Al Nariyah Workshop

Depot Area: 105.000 m2 and Depot Area Workshop Area: 73.053 m2 and Depot Area Workshop Track Length: 10 km Yapı Merkezi - Infrarail SpA Consortium constructed Depot Area: 93.797 m2 As part of North-South Railway - located at the eastern part the Caroubier Workshop and Depot Area in Algiers. Switch: 38 pcs of Saudi Arabia -Al Nariyah Workshop is constructed as a Owner: SAR (Saudi Railway Company) The goal of the project was to replace the old turnkey project. Owner: ANESRIF - National Railway Investments Authority of Algeria workshop of freight at the Algerian capital Contractor: Yapı Merkezi and to built a new maintenance and depot area for The scope of the project covers; locomotive and wagon Contractor: Yapı Merkezi - Infrarail SpA Consotium the new 64 suburban trains that are acquired by the Scope: Turnkey maintenance shop, general stores, fuelling system, generator Workshop and Depot Areas Workshop Workshop and Depot Areas Workshop Algerian National Company of Railway Transports Scope: Turnkey rooms, paint shop, wagon washing facility, yard facility, track (S.N.T.F) from . The Client responsible & signal maintenance units. for conducting the Contract is the National Railway Investments Authority of Algeria - ANESRIF. In addition to these, all electromechanical works including one domestic and one industrial water treatment plants, fire fighting and HVAC network, domestic water supply network, industrial water collection network, waste water collection network, pumping stations, water wells, storm water drainage system, road works, earth ditch and underground power distribution networks, package type substations, outdoor lightings are constructed

Under construction - 2014

56 4357 Jebel Ali 58 Workshop and Depot Areas Depot AreaDepot Workshop and MetroDubai Obayashi, Kajima and Obayashi, Kajima Yapı Merkezi) -Mitsubishi, LinkConsortium Rapid DURL(Dubai RTA and (Road Transport Association) Contractor: Owner: te ml ulig: 1.520m 1.169m 11.962m Small Buildings: Other Traction Power Substation: 621m OCC /Admin Building: 2.027m Train Washing Machine: Diesel Engine Workshop: eea vralWrso: 19.057m 230.000m 4.482m General Overhaul Workshop: 30.724m Light Repair Workshop: Siding &CleaningBuilding: Total Area: 1.112m 1.169m 5.020m SmallBuildings: Other Traction Power Substation: 618m OCC /Admin Building: 477m 107.000m 4.036m Train Washing Machine: Diesel Engine Workshop: 21.571m Light Repair Workshop: Siding &CleaningBuilding: Total Area: 1.779m 1.584m 8.630m SmallBuildings: Other Traction Power Substation: 621m OCC /Admin Building: 2.024m Train Washing Machine: Diesel Engine Workshop: eea vralWrso: 18.552m 175.000m 8.032m General Overhaul Workshop: 32.033m Light Repair Workshop: Siding &CleaningBuilding: Total Area: 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 eo ra 65.000m Complete Workshop Equipment: Metropolitan Municipality Kayseri 5.400m Area:Depot Workshop Area: Owner: 36.400m Complete Workshop Equipment: Metropolitan Municipality Eskişehir 3.515m Area:Depot Workshop Area: Owner: 57.000m Metropolitan Municipality İzmir 10.500m Area:Depot Workshop Area: Owner: 60.000m İstanbulMetropolitan Municipality 9.200m Area:Depot Workshop Area: Owner: Workshop and Workshop and Workshop Workshop and Workshop and Eskişehir LRTS Eskişehir 2 2 2 2 2 2 2 2 Kayseri LRTS Kayseri İzmir Metro İzmir Depot AreaDepot Depot AreaDepot Depot AreaDepot Depot AreaDepot 43 59 Workshop and Depot Areas Stations

Total Number of Constructed Stations: 300

60 4361 62 Stations Contractor: DURL (Dubai Rapid Link Consortium - Mitsubishi, -Mitsubishi, LinkConsortium Rapid DURL(Dubai RTA and (Road Transport Association) Contractor: Owner: Underground Stations: 10,Elevated Stations: 35 270.000m and Obayashi, Kajima Yapı Merkezi) Total ClosedArea: Line:27,Green 45-Red Line:18 Total NumberofStations: no qaeSain-Gon hmdSainBaniyas Square Station -Air Themed Station Union Square Station -Ground Themed Station Al Rigga Station - Fire Themed Station Khalid BinAl Khalid Waleed Stattion - Water Themed Station StationAl -Fire Rigga Themed Station 2 Dubai MetroDubai Stations 43 63 Stations Under construction - 2014

Mecca and Madinah Owner: SRO (Saudi Railway Organization)

Contractor: Yapı Merkezi - Saudi Bin Ladin Consortium

Stations Stations Stations Type: Side & Central Platform Yapı Merkezi - Saudi Bin Ladin Group Consortium has constructed the turnkey project of Mecca Total Construction Area: 428.000 m2 (Mecca: 284.000 m2, Madinah: 144.000 m2) and Madinah railway stations of the 450 km long Platform Length: 470 m (Mecca: 10 lanes, Madinah: 6 lanes) Haramain High Speed Rail Project which will connect Mecca - Jeddah - King Abdullah Economic Platform Width: 9,6 m - Side Platform City - Madinah in Saudi Arabia. 19,7 m - Central Platform

Total Number of Elevators: 30 (Mecca: 22, Madinah: 8)

Total Number of Escalators: 44 (Mecca: 32, Madinah: 12)

Under construction - 2014

64 4365 İstanbul Metro Stations Stations Stations

Owner: İstanbul Metropolitan Municipality Taksim - Kabataş Contractor: ABB - Yapı Merkezi Consortium Funicular Stations Number of Stations: 15 - Underground: 5, At Grade: 7, Viaduct: 3

Owner: İstanbul Metropolitan Municipality

Contractor: Yapı Merkezi - Graventa Consortium Number of Stations: 2 - Underground İzmir Metro Stations

Owner: İzmir Metropolitan Municipality

Bursa LRTS Contractor: ABB - Yapı Merkezi Consortium Stations Number of Stations: 10 - Underground: 4, At Grade: 4, Viaduct:2

Owner: Bursa Metropolitan Municipality

Contractor: Yapı Merkezi - Tewet AG Consortium

Number of Stations: 8 - At Grade Eskişehir LRTS Stations

Owner: Eskişehir Metropolitan Municipality

Contractor: Yapı Merkezi - Bombardier Consortium İstanbul LRTS Number of Stations: 26 - At Grade Stations

Owner: İstanbul Metropolitan Municipality

Contractor: Yapı Merkezi

Number of Stations: 29 - At Grade Kayseri LRTS Stations

Owner: Kayseri Metropolitan Municipality

Contractor: Yapı Merkezi - Ansaldo Breda SpA Consortium

Number of Stations: 31 - 29 At Grade, 2 underground

66 4367 Yapıray Machinery

Machineries Brand Quantity "Virtuoso Tamping Machine, Dynamic Track Stabilizer & Regulator Plasser & Theurer 8 Flash Butt Welding Machines Schlatter 2 in rail Track And Turnout Laying Machines Vaicar/Lancer/PEM 9 Locomotives & Unimogs LDH/MERCEDES-BENZ 12 systems" Railway Excavators Caterpillar - O&K - LIEBHERR 8 High Capacity Ballast Cleaning Machine Plasser & Theurer 1

Material Conveyor and Hopper Unite Plasser & Theurer (MFS100 & MFS40) 8

Ballast (Hopper) Wagons 43

Flat Wagons 47

Cranes 5

SSP -110 SW Balast Profiling and Distrubuting Machine MFS40 Material Conveyor and Hopper Unite

PEM- Remote Controlled Laying and Renewal Gantries 09 -32 CSM Plain Line Tamping Machine DGS - 62 N Dynamic Track Stabilizer

68 RM80 High Capacity Ballast Cleaning Machine 09-32 CSM Plain Line Tamping Machine SSP -110 SW Balast Profiling Machine 08 - 475 / 45 Turnout Tamping Machine 4369 Sleeper, Concrete Bearer & LVT Block Production*

Yapı Merkezi Group Company Yapıray Rayton Sleepers have conformity of EN produces 750.000 pcs/year of B70 type 13230 by Munich University and TÜV prestressed concrete sleeper under SÜD and appropriate to EU and UIC Rayton trademark in Karabük and Afyon norms. factories. Always considers professional and humanitrian measures as well as technical measures Hourly manufacturing capacity is 52 pieces of B70 type prestressed concrete Yapı Merkezi has 10 companies, more than 5000 family sleeper with the fully automated system members, 800 million USD annual income, 250 million of “Carousel”. *Produced under the Sonoville AG Licence USD paid capital and 610 million USD exports. Rayton is registered trademark of Yapıray Inc.

42 million m2 of structures we have engineered, provide happiness for their users. With 2600 km of railways and 300 stations in 39 projects, we provide safe transport for more than 2 million passengers daily in three continents. 5600 km of waterproof pipeline rovides clean water to hundreds of locations in 40 countries. We can produce 3000 kg/cm2 strength concrete. More than thousands of students are developing themselves daily though the education that we provide in our school. All these are meaningful marks of success for the Yapı Merkezi family. Fields of Activities General Contracting Incity and Intercity Mass Transit Systems Intercity Railway and Highway Rail Monitoring and Communication Systems City Planning and Mass Housing B70 Prestressed Concrete Sleeper; 750.000 pcs/year Special Buildings Restoration and Strengthening Real Estate Development Post Tensioning and Heavy Lifting Prefabrication Fab-Tek Mass Housing Concrete Structural Systems Steel Structural Systems Prefabricated Roof Systems Glass Reinforced Plastic Pipe Production

LVT Blocks; 100.000 pcs/year Concrete Bearer; 100.000 m./year Education (From Kindergarten to University)

Rayton Afyon Rayton Karabük Raykas Afyon Monitoring Control and Communication System Sleeper Factory Sleeper Factory Concrete Bearer Factory