BALBY INTERNATIONAL LIST OF THE TECHNICAL DOCUMENTATION REALISED FROM YEAR 1990 TO 1999 Protect the nature because the nature protects us! BALBY INTERNATIONAL consulting, engineering and construction company Address: 27 Marta 71 street 11 120 Beograd Tel: 381-11-337-66-81; Tel/fax: 381-11-337-68-03 Mobil. tel. 381-63/200-248 http://www.balby.com E-mail:
[email protected] [email protected] 2 Fajl:spisprojeng1.doc BALBY INTERNATIONAL - Beograd 11120, 27 Marta 71 REALISED IN 1990 No. place project 1 PRIZREN Report on technical review of construction works of the water treatment system in the town of Prizren 1a PRIZREN Final report on technical review and technical approval of construction works of the water treatment system in the town of Prizren REALISED IN 1991 2 PRIZREN Design of sanitary protection of structures in the water treatment system in Prizren 3 KIKINDA Pre - investment program for water supply, sewerage and rainwater drainage networks of Kikinda municipality - Volume 1 Pre - investment program of water supply - Volume 2 Pre - investment program of sewerage and rainwater drainage networks - Volume 3 Technical and economical parameters 4 KIKINDA Feasibility study for water supply, sewerage and rainwater drainage networks of the town Kikinda and surrounding settlements - Volume 3: Technical and economical parameters 5 KIKINDA Expertise on the first stage activities in solving problems of water supply of the town of Kikinda 6 KIKINDA VOLUME 2: Sewerage and rainwater network of the Kikinda municipality 7 KIKINDA VOLUME 3: Tech-economical