Enroute Charts General

Total Page:16

File Type:pdf, Size:1020Kb

Enroute Charts General 1 OCT 21 CHART CHANGE NOTICES P-1 PACIFIC q$i Jeppesen CHART CHANGE NOTICES highlight only significant changes affecting Jeppesen Charts, also regularly updated at www.jeppesen.com. IMPORTANT: CHECK FOR NOTAMS AND OTHER PERTINENT INFORMATION PRIOR TO FLIGHT. ENROUTE CHARTS JAPAN 10-1B. Jeppesen continually strives to improve the usability and readability of our GENERAL charting products. In doing so we would like to CRUISE TABLE FOR BANGKOK AND YANGON announce a change to our 10-1B charts within FIRs modified as follows: Japan. As these charts are revised they will 360° - 179°: FL290-FL310- FL330, etc only depict the route structure which is provided 180° - 359°: FL300-FL320-FL240, etc by source documentation. They will no longer SPECIAL PROCEDURES FOR IN-FLIGHT provide the complete route structure as seen on CONTINGENCIES IN OCEANIC AIRSPACE our 10-1 Area charts and Enroute charts. revised in part: Nagasaki VORDME temporarily OTS from 14 JUL If prior clearance cannot be obtained, the 21 1500 UTC to 26 JAN 22 1500 UTC. For following contingency procedures should be temporary operation of alternate to Minoshima employed until a revised clearance is received: VORDME (MNE) details refer to CCN P-324. a. Leave the cleared route or track by initially SHIMIZU VORTAC temporarily OTS from 6 OCT 21 turning at least 30 degrees to the right or to the 1500 UTC to 26 JAN 22 1500 UTC. For temporary left in order to intercept and maintain a parallel, operation of alternate to Ashizuri VORDME (AZE) same direction track or route offset 9.3 km (5.0 details refer to CCN P-315. Eff 06 Oct 21. NM). P H/L-2, P HI-1, P H/L-3, P H/L-4. TEMPORARY FIRING EXERCISES by the Japan Air Self Defense Force will be conducted until 31 ALASKA OCT 2021as follows: INFLIGHT CONTINGENCIES - ANCHORAGE NR-1 and NR-2, 2300UTC- 0800UTC, Except AND OAKLAND FIR's replaced with 2300UTC on Sat - 0800UTC on Sun and SPECIAL PROCEDURES FOR INFLIGHT 2300UTC on the Day before 20 SEP, 23 SEP, - CONTINGENCIES IN OCEANIC AIRSPACE . 0800UTC 20 SEP, 23 SEP. P HI-1. NR-3, 2200UTC - 0900UTC, Except 2200UTC on Sat - 0900UTC on Sun and 2200UTC on the Day AUSTRALIA before 20 SEP, 23 SEP, - 0900UTC 20 SEP, 23 CONTINENTAL AUSTRALIA CTA E1 lower limit SEP. FL125. NR-4, 2200UTC - 1000UTC, Except 2200UTC on Sat - 1000UTC on Sun and 2200UTC on the Day CAMBODIA before 20 SEP, 23 SEP, - 1000UTC 20 SEP, 23 PHNOM PENH FIR ident chgd to 'VDPF'. (N11 SEP. E104) NR-6, 2200UTC - 1000UTC JAPAN NR-5 and NR-7, 2200UTC - 0800UTC, Except 2200UTC on Sat - 0800UTC on Sun and ATS ROUTE SYSTEM estbld within the AKARA 2200UTC on the Day before 20 SEP, 23 SEP, - - Fukue Corridor Effective 24 MAR 21. For 0800UTC 20 SEP, 23 SEP. details refer to CCN P-317. FE HL-5, FE HL-12, For boundary details refer to CCN P-307. FE HL-13. TEMPORARY TESTING AREA MRJ-200 desig Chitose VORDME temporarily OTS from 21 APR 21 1500UTC 25 MAR 20 to 1500UTC 23 MAR 2022. 1500 UTC to 6 OCT 21 1500 UTC. For temporary An irregular shaped area approx 86 NM N-S by operation of alternate to Tarumae VORDME approx 78 NM E-W beginning approx 70 NM SW (TME) details refer to CCN P-321. of Hachijo Jima VOR (HCE). Altitude and exact Chubu VORDME temporarily OTS from 6 OCT date/time will be notified by further NOTAM . 21 1500 UTC to 23 MAR 22 1500 UTC. FE H/L-5/5CD. For temporary operation of alternate to Chita TEMPORARY TRAINING AREAS for Japan Self VORDME (CTE) details refer to CCN P-319. Eff Defense Force estbld until 1300UTC 31 MAR 06 Oct 21. 2022. For boundary details refer to CCN P-316. IWAKUNI TEMPORARY RESERVED AIRSPACE TEMPORARY TRAINING AREAS (OKINAWA) for (ITRA) estbld from 1500UTC 27 JAN 2021 to Japan Self Defense Force estbld from 2100UTC 1500UTC 31 MAR 2022. For boundary details 27 JAN 2021 to 1300UTC 23 Feb 2022. For refer to CCN P-322 and P-323. boundary details refer to CCN P-318. MYANMAR IATA In-Flight Broadcast Procedure (IFBP) withdrawn within Yangon FIR (VYYF). YANGON ACC Sectors vertical limits chgd as follows: Sector 1: FL170 - FL560 Sector 2: FL170 - FL560 q$z Please Visit Jeppesen’s Web Site: www.jeppesen.com © JEPPESEN, 2021. ALL RIGHTS RESERVED. P-2 CHART CHANGE NOTICES 1 OCT 21 PACIFIC q$i Sector 3: FL170 - FL260 Q22 established BORTO NCRP (S36 23.6 E140 Sector 4: FL170 - FL560 44.5) - OTBOK CRP (S36 08.6 E135 00.0) 262°/ 088°, 279NM; OTBOK - CLAMY CRP (S35 51.2 PAPUA NEW GUINEA E131 30.0) 268°/092°, 171NM. YPAD. MOMOTE (MOE) NDB Freq 212 kHz unserviceable. Q26 withdrawn Brisbane (BN) VOR - Cairns (CS) RUSSIA VOR. (S22 E148) YBCS. Q46 established one-way W-bnd BORTO - DONBU ATS ROUTE SYSTEM (HIGH/LOW) revised within CRP (S35 39.0 E135 00.0) 268°, 283NM. YPAD. Khabarovsk FIR. For details refer to CCN 301. Q67 estbld Brisbane (BN) VOR - BIXAD NCRP FE HL-7. (S26 41.5 E153 14.8) 357°, 41NM; BIXAD - VIETNAM GUDSO NCRP (S26 16.7 E153 06.2) 332°, 26NM; GUDSO - TAPET NCRP (S26 06.5 E152 Location indicators of Ha Noi FIR VVVV chged to 57.9) 313°, 13NM; TAPET - LOAFA 314°, 79NM; VVHN and Ho Chi Minh FIR VVTS chged to LOAFA - Glandstone (GLA) VOR 314°, 86NM; VVHM. CPDLC added. (GLA) VOR - CAPRI 320°, 111NM; CAPRI - The following airways and segments within Vietnam Hamilton (HM) VOR 320°, 134NM; (HM) VOR - will not be approved for overflight: SWALO 313°, 195NM; SWALO - BARIA 315°, G221 direction from Phu Cat VOR, PCA to 43NM; BARIA - UPOLO 315°, 39NM; UPOLO - BUNTA. Cairns (CS) VOR 226°, 15NM. YBCS. W1-A1 direction from Tan Son Nhat VOR, Q94 redesig Q923 SUNSHINE COAST (SU) VOR to TSN-W1-Da Nang VOR, DAN-A1-BUNTA CANTY (S36 E144) YMML, YSSY. Q2-A1 direction from TSN - Q2 - PATNO -A1- Q116 redesig Q210 OSTAM to Narrabri (NBR) BUNTA. NDB. SANEG - OSTAM 210°, 45NM (S27 E153). AU LO-5, AU LO-6. Q168 BOLAM On-Request Int estbld (S34 58.9 E141 ALASKA 28.2) ROBET - BOLAM - KABEK 69/140 NM. YPAD. CHINOOK, Alaska (AUB) NDB mag var chgd to Q172 withdrawn BORTO - TUNAA. YPAD. 11°E. Add 5° to all conventional airway/formation Q210 UPSIX NCRP estbld (S29 48.5 E150 26.8). bearings (N58 W156). P HI-1, NP HI-2. VIGUT - UPSIX - Narrabri (NBR) NDB 27/44 NM. AMERICAN SAMOA AU LO-5. V134 redesig V308 Brisbane (BN) VOR - Cairns LOGOTALA HILL (LOG) NDB decmsnd (S14 W170). (CS) VOR. (BN) VOR - AKOBA NCRP (S26 NSTU. 42.3 E153 03.7) 343°, 40NM; AKOBA - SAGLI NCRP (S2618.3 E152 53.0) 327°, 26NM; SAGLI AUSTRALIA - MAGPI 311°, 88NM. (S21 E149) YBCS, YBTL. ATS ROUTES changed: V140 REVGU NCRP (S33 10.0 E151 37.3) estbld. H62 redesig H91 BRISBANE (BN) VOR to CORKY TOOKI - REVGU - Williamtown (WLM) NDB 7/24 (S32 E150). YSSY, YWLM. NM. AU LO-6, YSSY, YWLM. H76 OVMIN NCRP (S32 06.4 E150 20.3), LOVGO V316 GAZEL renamed RUTOS (S33 E150). NCRP (S31 32.1 E150 10.4) and VAPKI NCRP AU LO-6, YSSY, YWLM. (S30 34.5 E149 54.1) estbld. GAZEL renamed W128 MACKA renamed UPRUM (S30 E151). LO-4, RUTOS. RUTOS - OVMIN - LOVGO - VAPKI LO-6. - Narrabi (NBR) NDB 70/35/59/16 NM. YSSY, W170 PUDUT NCRP (S32 57.7 E151 28.4) estbld. YWLM. IKIMO - PUDUT - LOWEP 13/14 NM. YSSY, H84 NINEP renamed ASILI (S34 E137). YPAD, YWLM. AU LO-4, AU LO-2. W174 IGMOB NCRP estbld (S32 25.5 E151 36.5). H91 MEHAN renamed MESIM (S31 E151). YWLM. BUBRI - IGMOB - TIMBO 10/17 NM. AU LO-6, H185 SUMSA NCRP estbld (S33 12.6 E151 45.6). YSSY, YWLM. MARTO - SUMSA - Williamtown (WLM) NDB 7/25 W182 AVDED NCRP (S32 23.2 E151 55.6) NCRP NM. TOJAM renamed OMKAX. YBBN, YSSY, estbld. NICLA - AVDED - OMBUP 21/10. YWLM. AU LO-6, YWLM. H202 BOYSY - EMROT NCRP (S32 45.3 E149 48.8) W226 YMIP ALA withdrawn and replaced by OLMAR 54 NM; EMROT- MISIT 13 NM; MISIT - MUDGI NCRP (S14 47.4 E125 49.6). AU LO-1. 3 NM; MUDGI - MOVBU NCRP (S32 18.1 E149 W267 VILLA renamed TATEN (S28 E152). YBBN, 26.4) 17 NM; MOVBU - DAMAG NCRP (S31 07.4 AU LO-5, AU LO-6. E148 45.0) 79 NM; DAMAG - BIDNONCRP (S30 W417 YMGR Apt withdrawn and replaced by 47.3 E148 33.5) 22 NM; BIDNO - AGETA 51 NM. PAMDO NCRP (S18 37.3 E126 53.0). AU LO-3, AU LO-4, AU LO-6, YSSY, YWLM. AU LO-1. H247 BOLAM On-Request Int estbld (S34 58.9 W499 YINJ Apt withdrawn and replaced by RIGTU E141 28.2) PANKI - BOLAM - NATYA 55/87 NM. NCRP (S25 51.0 E148 33.0); YDBI Apt withdrawn YPAD. and replaced by GODIM NCRP (S28 35.5 E148 MACEL NCRP withdrawn. (S42 E147) YMHB. 13.0). AU LO-4, AU LO-5, AU LO-6. Q12 redesignated Q33 Adelaide VOR (AD) - W512/W693 YBTR Apt withdrawn and replaced by Esperance VOR (ESP). YPAD. NUGRU NCRP (S23 36.2 E148 48.4). AU LO-5. W551 BEKAM renamed MEKOD (S32 E150). AU LO-6, YSSY, YWLM. q$z Please Visit Jeppesen’s Web Site: www.jeppesen.com © JEPPESEN, 2021. ALL RIGHTS RESERVED. 1 OCT 21 CHART CHANGE NOTICES P-3 PACIFIC q$i W674 DOVPO NCRP estbld (S32 22.9 E151 47.4).
Recommended publications
  • Study on Water Resources Allocation for Kertajati, Jatitujuh, and Ligung
    MATEC Web of Conferences 147, 03010 (2018) https://doi.org/10.1051/matecconf/201814703010 SIBE 2017 Study on Water Resources Allocation for Kertajati, Jatitujuh, and Ligung Sub-Districts to Support the Development of West Java International Airport (BIJB) and Kertajati Aerocity Area Yadi Suryadi2,3,*, Asrini Chrysanti1, Febya Nurnadiati1, Mohammad Bagus Adityawan2,3, and Arno Adi Kuntoro2 1Graduate School of Civil Engineering, Institut Teknologi Bandung, Jalan Ganesha 10, Bandung 40132, Indonesia 2Water Resources Engineering Research Group, Institut teknologi Bandung, Jalan Ganesha 10, Bandung 40132, Indonesia 3Water Resources Development Center, Institut teknologi Bandung, Jalan Ganesha 10, Bandung 40132, Indonesia Abstract. The Bandarudara Internasional Jawa Barat (BIJB) and Kertajati Aerocity are under construction and expected to be a center of economic activity supported by potential of natural resources and agriculture. They later will act as a driver of economic growth in West Java, especially for surrounding area such as Kertajati, Jatitujuh and Ligung Sub-districts. As an affect of the the development of BIJB and Kertajati Aerocity, the water demand of surrounding area will increase. Therefore an analysis of water demand and availability is needed. This research supports by analyzing the water balance, water demand, and also water allocation using WEAP (Water Evaluation and Planing) software tool. Water balance of Cimanuk-Tomo, Cimanuk-Monjot, and Cilutung-Dam Kamun river are analyzed, water demand of the three sub-districts are also projected and become the inputs of the water allocation model. The result of WEAP model simulation shows that the Cimanuk River can meet the water demand of the three sub-districts until 2040.
    [Show full text]
  • Land Suitability and Dynamic System Model for Land Use Planning Of
    LAND SUITABILITY AND DYNAMIC SYSTEM MODEL FOR LANDUSE PLANNING OF PADDY FIELD IN INDRAMAYU REGENCY, WEST JAVA, INDONESIA Presented at the FIG Working Week 2017, May 29 - June 2, 2017 in Helsinki, Finland Wiwin Ambarwulan, Widiatmaka, Titik Suparwati, Irman Firmansyah, Niendyawati FIG 2017 GEOSPATIAL INFORMATION AGENCY BOGOR AGRICULTURAL UNIVERSITY I. INTRODUCTION 1.1. Background • Serious problem of food supply in Indonesia: – High amount of population : 250 million (No. 4 in the world) – High rice consumption: 113 kg.capita-1.year-1 – Most of rice (50%) was produced by agricultural land in Java Island – Java island: only 7% of Indonesian territory – 50% of Indonesian population in Java Island • Pressure on Java island to produce food as well as conversion to residence, industry, etc. 1. PRODUCTION CONCENTRATION IN JAVA ISLAND outsid Population (million) [VALU e P. Jawa, E] 101,48 5.5 , 43% [VALU [CATE Outside E] GORY P. Jawa, NAME 34,172,8 Pady (ton) ],[VAL 35 , 48% 2015 UE] [CATEGO RY NAME],[ Source: Indonesian Statistics (2015) VALUE] Implication • High dependence on food production in Java Island • High pressure for agricultural land in Java island • High rate of paddy field conversion into other land utilization How to solve the FOOD INSECURITY problem? 1. Spatially location with HIGH LAND SUITABILITY should be conserve 2. Each region should maintain its self sufficiency in order to maintaining country’s food security 1.2. Objective 1. To asses land suitability for paddy field 2. To model the adequacy of food in the regency 3. To plan land utilization based on land suitability for paddy field and dynamic system model 2.1.
    [Show full text]
  • NO NAMA PT KOTA 1 Universitas Wiralodra Indramayu 2 Universitas Winaya Mukti Sumedang 3 Universitas Widyatama Bandung 4 Universi
    DAFTAR UNDANGAN DESEMINASI BIDIKMISI DAN PENYERAHAN KUOTA BIDIKMISI PERGURUAN TINGGI SWASTA DI LINGKUNGAN LLDIKTI WILAYAH IV TAHUN 2019 NO NAMA PT KOTA 1 Universitas Wiralodra Indramayu 2 Universitas Winaya Mukti Sumedang 3 Universitas Widyatama Bandung 4 Universitas Wanita Internasional Bandung Bandung 5 Universitas Telkom Bandung 6 Universitas Swadaya Gunung Djati Cirebon 7 Universitas Suryakancana Cianjur 8 Universitas Subang Subang 9 Universitas Serang Raya Serang 10 Universitas Sangga Buana Bandung 11 Universitas Putra Indonesia Cianjur 12 Universitas Pembangunan Jaya Tangerang Tangerang 13 Universitas Pasundan Bandung 14 Universitas Pakuan Bogor 15 Universitas Nusa Putra Sukabumi 16 Universitas Nurtanio Bandung 17 Universitas Nasional Pasim Bandung 18 Universitas Nahdatul Ulama Cirebon 19 Universitas Muhammadiyah Tasikmalaya Tasikmalaya 20 Universitas Muhammadiyah Tangerang Tangerang 21 Universitas Muhammadiyah Sukabumi Sukabumi 22 Universitas Muhammadiyah Cirebon Cirebon 23 Universitas Mathla`ul Anwar Pandeglang 24 Universitas Ma'soem Sumedang 25 Universitas Majalengka Majalengka 26 Universitas Kuningan Kuningan 27 Universitas Kristen Maranatha Bandung 28 Universitas Komputer Indonesia Bandung 29 Universitas Kebangsaan Bandung Bandung 30 Universitas Katolik Parahyangan Bandung 31 Universitas Islam Syehk Yusuf Tangerang 32 Universitas Islam Nusantara Bandung 33 Universitas Islam Bandung Bandung 34 Universitas Ibn Khaldun Bogor 35 Universitas Garut Garut 36 Universitas Galuh Ciamis Ciamis 37 Universitas Djuanda Bogor 38 Universitas
    [Show full text]
  • Characteristics of Mango Farmers and Factors Associated with Their Land Tenure Area
    International Journal of Scientific and Research Publications, Volume 9, Issue 9, September 2019 758 ISSN 2250-3153 Characteristics of Mango Farmers and Factors Associated with Their Land Tenure Area Elly Rasmikayati1 *, Ellisa Agri Elfadina1, Bobby Rachmat Saefudin1 1Social Economic Department, Faculty of Agriculture, Padjadjaran University *E-mail: [email protected] DOI: 10.29322/IJSRP.9.09.2019.p93102 http://dx.doi.org/10.29322/IJSRP.9.09.2019.p93102 Abstract – Mango is the main exotic fruits in West Java, Indonesia. Then, the government and farmers try to develop the agribusiness of mango. But, the productivity still fluctuatives and land tenure of mango farmers are mostly narrow. The purpose of this study is to describe the characteristics of the mango farmers and factors associated with their land tenure area in Cikedung Sub-district, Indramayu Regency, West Java. The methods used in this research is a survey method with descriptive statistics analysis tool and crosstabulation with Chi-square test. The results showed that mango farmers in Cikedung Sub-district mostly have an experience less than 10 years, earn income from mango farming are less than 10 million rupiah/year, and the land tenure area with narrow categories (< 0.5 Ha) i.e. 49% from total respondents. The Number of mango farmer-controlled trees less than 25 trees, but its production can reach more than 700 kg/year. Factors associated with mango land tenure area in Cikedung Sub-district, Indramayu Regency, i.e. income from mango farming, the distances from mango land area to the final market, the government contribution, and the land tenure status.
    [Show full text]
  • Re: Request Stop the Indramayu Coal-Fired Power Plant Expansion Project, West
    October 19, 2020 Mr. Joko Widodo, President of Indonesia Mr. SUGA Yoshihide, Prime Minister of Japan Re: Request Stop the Indramayu Coal-fired Power Plant Expansion Project, West Java, Indonesia Dear Mr. Joko Widodo and Mr. SUGA: The undersigned groups from Indonesia and Japan are writing to you to call on the Indonesian government not to push through and the Japanese government not to support the expansion of the Indramayu coal-fired power plant1 (1,000 MW) (hereinafter, the “Project”) in West Java, Indonesia, any more. As far as we know, the Japan International Cooperation Agency (JICA) conducted the feasibility studies of the Project in 2009-2010 and is currently disbursing its loan to the Indonesian state-owned electricity company PT PLN (Persero) for the consulting service, such as the basic design, under the scheme of Engineering Service (E/S) Loan. The loan agreement of E/S loan was concluded in March 2013 with the total amount of 1,727 million Yen (241.5 billion Rupiah with a current exchange rate). And JICA is expected to provide its loan of USD 1,845 million (27.2 trillion Rupiah or 194.3 billion Yen) for the main construction of the Indramayu Project.2 The main construction of the Project, however, hasn’t started yet. Therefore, it is not too late for both of the governments to review the necessity of the Project and to decide the cancellation of the Project, considering the points described as below. There are mainly 5 reasons why this coal power plant must not be constructed. (1) The Project is not necessary from the viewpoint of energy security, as the Java-Bali electrical grid has excessive power supply.
    [Show full text]
  • PENGAMATAN BURUNG-BURUNG AIR DI PANTAI INDRAMAYU-CIREBON, JAWA BARAT (Observation on Waterbirds in Indramayu-Cirebon Coastal Area, West Java)
    Media Konservasi Vol. V No. (I), April 1996 : 11 - 15 PENGAMATAN BURUNG-BURUNG AIR DI PANTAI INDRAMAYU-CIREBON, JAWA BARAT (Observation on Waterbirds in Indramayu-Cirebon Coastal Area, West Java) W. WIDODO', YUS Rusrln NOOR? DAN S.~WIKJOATMODJO~ ') Puslitbang Biologi-LIPI, Bogor 2, Asinn Wetland Bureau - Indonesia, tinggal di Bogor ABSTRACT A waterbird observation was conducted in October and November 1990 along the northern coast of West Java from lndramayu to Cirebon. During the study 27 waterbird species of 10 families were recorded. They inhabited two different types of habitats, i.e., pond and mudflat habitats, where several kinds of food resources can be found in large numbers, especially species feed on insects and other benthic invertebrate. More attention are needed for two species i.e., Oriental Pralincole and Milky Stork. The Oriental Pratincole, Glnrroln maldiwarum, is a good insect predator in the paddy field, but its population is threatened due to overcaptured by local people for food. Glareoln mcrldi~~nrumis the most abundant species while Ixohrychus cint~nmomeusand Amnurornisphocnicurus are the rarest. rnerupakan program jangka panjang yang telah dirnulai sejak tahun 1985 - 1986. Penelitian burung-burung air di sepanjang pantai utara Dari pengarnatan-pengarnatan tersebut di atas dapat Jawa, khususnya di Jawa Barat, rnendapat perhatian besar diketahui bahwa pantai utara Jawa rnerupakan salah satu areal terutarna sejak dekade 1980-an. Sajudin dkk. (1982) telah yang tersisa untuk burung-burung air dalam rangka rnencari rnenginventarisir jenis-jenis burung air di hutan bakau Tanjung rnakanannya, baik penetap rnaupun pendatang. Juga diketahui Karawang (Bekasi). Rusila (1988) rnelakukan suatu studi bahwa burung-burung air di daerah tersebut berperanan keberadaan burung air di sepanjang pantai Indrarnayu-Cirebon penting bagi rnasyarakat seternpat, terutarna yang berkaitan dalam kaitannya dengan studi rnengenai penangkapan burung dengan pernberantasan harna padi.
    [Show full text]
  • Peraturan Menteri Perhubungan Republik Indonesia
    MENTERI PERHUBUNGAN REPUBLIK INDONESIA PERATURAN MENTERI PERHUBUNGAN REPUBLIK INDONESIA NOMOR : PM 40 TAHUN 2014 TENTANG ORGANISASI DAN TATA KERJA KANTOR UNIT PENYELENGGARA BANDAR UDARA DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI PERHUBUNGAN, Menimbang bahwa dalam rangka menindaklanjuti ketentuan Pasal 233 Undang-Undang Nomor 1 Tahun 2009 tentang Penerbangan perlu dilakukan penataan organisasi dan tata kerja Unit Pelaksana Teknis di bidang penyelenggaraan bandar udara dalam Peraturan Menteri Perhubungan; Mengingat 1. Undang-Undang Nomor 1 Tahun 2009 tentang Penerbangan (Lembaran Negara Republik Indonesia Tahun 2009 Nomor 1, Tambahan Lembaran Negara Republik Indonesia Nomor 4956); 2. Peraturan Pemerintah Nomor 3 Tahun 2001 tentang Keamanan dan Keselamatan Penerbangan (Lembaran Negara Republik Indonesia Tahun 2001 Nomor 9, Tambahan Lembaran Negara Republik Indonesia Nomor 4075); 3. Peraturan Pemerintah Nomor 40 Tahun 2012 tentang Pembangunan dan Pelestarian Lingkungan Hidup Bandar Udara (Lembaran Negara Republik Indonesia Tahun 2012 Nomor 71, Tambahan Lembaran Negara Republik Indonesia Nomor 5295); 4. Peraturan Pemerintah Nomor 77 Tahun 2012 tentang Perusahaan Umum (Perum) Lembaga Penyelenggara Pelayanan Navigasi Penerbangan Indonesia (Lembaran Negara Republik Indonesia Tahun 2012 Nomor 176); 5. Peraturan Presiden Nomor 47 Tahun 2009 tentang Pembentukan dan Organisasi Kementerian Negara Republik Indonesia, sebagaimana telah diubah terakhir dengan Peraturan Presiden Nomor 13 Tahun 2014; 1 6. Peraturan Presiden Nomor 24 Tahun 2010 tentang Kedudukan, Tugas, dan Fungsi Kementerian Negara serta Susunan Organisasi, Tugas dan Fungsi Eselon I Kementerian Negara, sebagaimana telah diubah terakhir dengan Peraturan Presiden Nomor 14 Tahun 2014; 7. Peraturan Menteri Negara Pendayagunaan Aparatur Negara Nomor PER/ 18/M. PAN/11/2008 tentang Pedoman Organisasi Unit Pelaksana Teknis Kementerian dan Lembaga Pemerintah Non Kementerian; 8.
    [Show full text]
  • Profil Jawa Barat
    Profil Wilayah Provinswa barat PROFIL JAWA BARAT 5.1 KARAKTERISTIK SOSIAL 5.1.1 Kependuukan Jumlah penduduk Wilayah Provinsi Jawa Barat pada tahun 2016 berdasarkan hasil proyeksi dari BPS berjumlah 47,379,389 jiwa dengan rata-rata laju pertumbuhan rata-rata sebesar 1,32% pertahun. Jumlah penduduk terbesar berada di Provinsi Jawa Barat dengan jumlah penduduk 46.709,6 ribu jiwa. Tabel 0.1 Jumlah Penduduk dan Laju Pertumbuhan Penduduk Menurut Provinsi di Wilayah Pulau Jawa-Bali Tahun 2010-2015 Proyeksi Penduduk 2010-2015 (Jiwa) NO Wilayah Jawa Barat Laju Pertumbuhan 2000 - 2010 Laju Pertumbuhan 2010 - 2014 2010 2015 1 Bogor 4,813,876 5,459,668 3.19 2.47 2 Sukabumi 2,358,418 2,434,221 0.95 0.55 3 Cianjur 2,186,794 2,243,904 0.70 0.43 4 Bandung 3,205,121 3,534,114 2.13 1.89 5 Garut 2,422,326 2,548,723 1.03 0.93 6 Tasikmalaya 1,687,776 1,735,998 0.51 0.48 7 Ciamis 1,135,724 1,168,682 0.12 -0.18 8 Kuningan 1,023,907 1,055,417 -0.43 -0.14 9 Cirebon 2,044,181 2,126,179 -0.11 0.03 10 Majalengka 1,153,226 1,182,109 -0.24 -0.26 11 Sumedang 1,101,578 1,137,273 0.78 0.55 12 Indramayu 1,645,024 1,691,386 -0.76 -0.19 13 Subang 1,449,207 1,529,388 0.65 0.32 14 Purwakarta 859,186 921,598 1.91 1.32 15 Karawang 2,144,185 2,273,579 1.53 1.09 16 Bekasi 2,656,884 3,246,013 5.69 4.04 17 Bandung Barat 1,522,076 1,629,423 0.36 1.28 18 Pangandaran 379,518 390,483 19 Kota Bogor 958,077 1,047,922 2.20 1.72 20 Kota Sukabumi 301,014 318,117 1.23 1.03 21 Kota Bandung 2,412,093 2,481,469 0.74 0.48 22 Kota Cirebon 293,206 307,494 1.12 0.21 23 Kota Bekasi 2,356,100 2,714,825
    [Show full text]
  • 00-Program-And-Abstracs-EACEF5
    2 CONTENT Welcome Message Conference Chairman ·····················································4 Welcome Message Founding Chairman of EACEF ··········································5 COMMITTEES ································································································6 GENERAL INFORMATION ···············································································8 VENUE INFORMATIONS ··············································································· 10 PROGRAM AT A GLANCE ············································································· 13 KEYNOTE SPEAKERS····················································································· 15 INVITED SPEAKERS ······················································································ 19 KEYNOTE AND INVITED SPEECHES ······························································· 21 PARALLEL SESSIONS····················································································· 23 INSTRUCTION FOR SPEAKERS ······································································ 39 SOCIAL PROGRAM ······················································································· 40 INFORMATION ABOUT SURABAYA ······························································ 49 ABSTRACTS ·································································································· 51 Construction Project and Safety Management ····································· 51 Environmental Engineering ··································································
    [Show full text]
  • S. Shigeru the Pangreh Praja in Java Under Japanese Military Rule In
    S. Shigeru The pangreh praja in Java under Japanese military rule In: Bijdragen tot de Taal-, Land- en Volkenkunde, Japan, Indonesia and the WarMyths and realities 152 (1996), no: 4, Leiden, 586-608 This PDF-file was downloaded from http://www.kitlv-journals.nl Downloaded from Brill.com09/29/2021 07:48:34AM via free access SATO SHIGERU The pangreh praja in Java under Japanese military rule After occupying Java the Japanese military attempted to redirect the human and the natura1 resources of Java into their own war effort. In so doing, they heavily relied on the local administrative corps, the pangreh praja (literally: the rulers of the realm). Therefore the Japanese, the pangreh praja and the peasantry are arguably the most important groups that should be studied if we are to understand the impact of the Japanese occupation on Javanese society. Though there is a strong case for this, these groups are among the least scrutinized. Scholarly attention over the past fifty years has been primarily directed elsewhere: Hany Benda studied the Islamic elite; George Kanahele the nationalist intellectuals; Benedict Anderson the politicized youths; and Nugroho Notosusanto the self- defence forces.1 These groups attracted scholarly attention because they either spearheaded changes along nationalistic lines or had the clear potential to do so. The Islamic and the nationalist elites were exponents of powerful ideologies, whereas the youths and the Peta soldiers contributed a great deal to the physical revolution that followed in the wake of the Japanese occupation. In contrast, the pangreh praja and the peasantry are usually considered conservative.
    [Show full text]
  • Agenda Item 4: Deficiencies in the Air Navigation Fields
    AGENDA ITEM 4: DEFICIENCIES IN THE AIR NAVIGATION FIELDS APANPIRG/14 4-1 Report on Agenda Item 4 Agenda Item 4: Deficiencies in the Air Navigation Field Report of the First Meeting of the Deficiency Review Task Force (DRTF) 4.1 The meeting was briefed on the first meeting of the Deficiency Review Task Force (DRTF/1) which was convened from 22 – 23 July 2003 and attended by ten (10) members from Australia, Hong Kong (China), Fiji, India, Malaysia, Singapore, IATA, IFALPA and IFATCA. 4.2 The meeting recalled that APANPIRG/13 considered the need to develop a supplement to the Uniform Methodology for Identification, Assessment and Reporting of Air Navigation Deficiencies in order to provide guidance in identifying and evaluating deficiency. It was noted that the existing Methodology does not clearly specify what subjects or requirements, including SARPs, should be considered when PIRGs develop a list of deficiencies and this has been left at the discretion of the PIRGs. Another problem was the lack of precise procedures for validation and assessment of the reported deficiencies as well as for monitoring of the corrective actions. In view of the above, APANPIRG/13 agreed to the setting up of a Task Force to assist APANPIRG and the Secretariat in progressing the work on management of deficiencies. 4.3 The meeting was apprised on the single definition of deficiency as approved by the Council on 30 November 2001 and its broad definition, which now included elements of regularity and efficiency. During the discussions that subsequently ensued, comments were raised as to what constitute regularity and efficiency as these were, in some instances, arbitrary and subjective.
    [Show full text]
  • An Analysis of Gendered Labor Migration: the Case of Indramayu Regency, West Java Province, Indonesia
    Summary of Doctoral Dissertation An Analysis of Gendered Labor Migration: The Case of Indramayu Regency, West Java Province, Indonesia TITAN Listiani* Indonesia is a major source of migrant labor in Southeast Asia. In the late 1970s, the Indonesian government began actively exporting workers overseas as one strategy to address poverty, reduce unemployment, generate foreign exchange, and foster growth. Indonesian labor migration is characterized by a high number of female migrant laborers employed as domestic workers on a contract basis. The high demand for domestic workers in Middle Eastern countries and some industrialized countries in Asia, as well as the abundant domestic supply of labor, have spurred labor migration from Indonesia. This supply and demand relationship, along with the migration policies of the sending and receiving countries, has sustained a continuous flow of migration. However, the absence of females from their families, especially mothers, may have a negative impact on children, as women have traditionally been the primary caregivers in child rearing. Despite this potential for a negative impact and the demand within patriarchal society for females to stay at home, economic pressures have induced women to join international labor migration. This study analyzes the determining factors behind gendered migration, female circular migration and the impact of migration on children who have been left behind. The study begins by examining the household characteristics that influence the decision to choose female over male family members to participate in labor migration. Due to the high prevalence of female circular migration, this study also analyzes the determining factors and characteristics of circular migration. Finally, this study examines the impact of gendered migration on the growth of migrants’ children.
    [Show full text]