<<

now a SMALL T 5 PERFORMANCE REGARDING BACHELOR ENLISTED QUARTERS BUSINESS 5 P-301A PARKING GARAGE, SILVERDALE, WA 2 1 3 6 ENTERPRISE “The design team was very good to work with.”

Marjorie Fossum - 4 Naval Facilities Engineering Command Northwest

8

PERFORMANCE REGARDING INDOOR WASHRACK DESIGN- 7 BUILD RFP AT NAVAL AIR STATION WHIDBEY ISLAND, WA “The A-E provided a professional team with skilled senior technical staff. . . Management was actively involved and extremely cooperative and flexible.... Providence Alaska Medical Center, Anchorage, AK The A-E did an exceptional job of completing this Reid Middleton provided the design of a project on schedule and within budget. It was a very major medical campus expansion. The following design-build enjoyable experience working with [Reid Middleton], projects total over 800,000 SF. and I highly recommend them for future work.” 1 Medical Office I 5 Skybridge Gale Schaeffer - Project Manager Naval Facilities Engineering Command Northwest 2 Medical Office Building II 6 Hickel 3 Linac Vault (in building basement) 7 Providence Region Building

PERFORMANCE REGARDING B4MDC - TRUCK QUEUE LANE 4 Parking Garage, Ph. 1 & 2 8 Child Development Center WEST END ENTRANCE, BREMERTON, WA I have reviewed the…(Design-Build) RFP and all looks good. It is the first time I have received a six part formatted RFP that did not require additional work before being sent over to contracts. Thank you…Reid CONTACT DESIGN-BUILD Middleton for all your hard work on insuring that this project with all of its coordination requirements was WASHINGTON 728 134th Street SW, Ste. 200 accomplished on time. Everett, WA 98204 425.741.3800 Kevin Sturm - Structural Engineer Bob Galteland, P.E., President, DBIA, LEED AP Method for Naval Facilities Engineering Command Delivering Value ALASKA 4300 B Street, Ste. 302 Anchorage, AK 99503 907.562.3439 David Stierwalt, P.E., S.E., Principal/Office Manager

CALIFORNIA 13220 Evening Creek Drive, Suite 112 San Diego, CA 92128-4103 858.668.0707 Darin Aveyard, P.E., S.E., Director, San Diego Office

www.reidmiddleton.com P-305A Parking Garage, P-305A BaseNaval Kitsap-Bremerton, Bremerton, WA change orders. criteria in different disciplines that might to lead eventual are also conducted to ensure doesn’t the RFP contain conflicting Interdisciplinary justRFP’s fully as with reviews projects. designed design-builder. We to assign control quality design-build staff that documents in might the RFP interpreted be by incorrectly the for and look “holes” to client meet expectations projects designed require RFP’s Design-build all the intensity of review as fully CONTROL/CRITERIAQUALITY TO CONSIDER packages that they easily can implement and manage. so our clients receiveRFPs RFP design-build competitivehighly specific writing on itself prides Middleton Reid project. design-build actual is essentialRFP for ensuring successful and competitive bidding for the Writing acomplete, design-build highly and specific, understandable RFP PREPARATION Services Design-Build

Alaska Native Science & Engineering Program Facility, Anchorage, AK expedite construction schedules and save on construction costs. costs. schedules and save construction construction on expedite criteria, and budget. are Ourengineers at adept value engineering to according progresses project the design-build to schedule, design communication contractors with and the entire design team to ensure frequent practices Middleton Reid projects. for successful design-build A cohesive, highly team design dedicated and construction is essential CONSTRUCTION ADMINISTRATION in ahealthier environment and savings cost for our clients. commonplace at Reid Middleton, and we’re proud that it has resulted in our elements designs Incorporating is portfolio. sustainable/LEED and sustainable of are Reid Middleton’s all structures part design-build stormwater management, and building user-friendly, earthquake-ready, site, adesign-build Surveying designing the site infrastructure and ENGINEERING SURVEYING & CIVIL/STRUCTURAL

Eielson Visitor’s Center, Denali National Park, Denali, AK

Port Operations Tower, Naval Base Kitsap-Bremerton, WA

P301A Bachelor Enlisted Quarters Parking Garage, Greenling Road, Naval Base Kitsap-Bangor, Silverdale, WA Naval Base Kitsap-Bangor, WA Anchorage, AK HOUSE COMMUNITY ATHABASCAN WA Island, Whidbey Station Air Naval RFP DESIGN-BUILD HANGAR WASHING AIRCRAFT Anchorage, AK VIEW 1-MOUNTAIN CREDIT UNION WABremerton, BREMERTON CENTER CHILD DEVELOPMENT AK Anchorage, Base, Force Air Elmendorf SIMULATOR BUILDING F22A FLIGHT WA Island, Whidbey Station Air Naval CENTERCHILD DEVELOPMENT Location Base, Force Air Elmendorf 15HANGARS &17 RENOVATION WA Base, Airforce McChord TAXIWAYAIRFIELD IMPROVEMENTS Anchorage, AK OFFICE OFFICE BUILDING MEDICAL TRUST LAND Anchorage, AK HEALTH SCIENCES BUILDING ALASKA OF UNIVERSITY AK &Fairbanks, Anchorage &BRANCHES 1HEADQUARTERS CREDIT UNION AK Denali, PARK NATIONAL DENALI VISITOR’S CENTER -EIELSON U.S. Coast Guard, Coos Bay, OR COVEREDNEW MOORAGE include: projects design-build notable Other campus. medical for multiple alarge on projects design-build on assistance and engineering construction to actual RFP’s, of design-build have from ranged to creation the $250 projects million. These ranging from $2.3build projects value million in constructed for design- services well as engineering surveying as structural and civil has Middleton provided Reid 6years, past the Over DeliveryDesign-Build Method Work History