Existing Dams and Main Irrigation Areas

Total Page:16

File Type:pdf, Size:1020Kb

Existing Dams and Main Irrigation Areas WATER INFRASTRUCTURE IN THE NILE BASIN Existing dams and main irrigation areas n:JSYRIAN ARAB About this poster ISRAEL11---<:REPUBLIC''' MediterraneanSea This poster locates the key water infrastructure elements across the Nile basin, existing cle-usale dams and irrigation schemes. Data is taken from the FAO AQUATAT dams database for Africa and the Global Map of Irrigation Areas (GMIA). The poster also indicates the Alexandria -91-y-*Amman locations of proposed dams to illustrate the interest in hydropower development in the NILE OEM equatorial and eastern Nile sub-basins. Existing dams in the Nile basin Dam name Country Crest Reservoir Purpose Operational Height Capacity since (m) (km3) Assiut barrage Egypt 16 NA irrigation, navigation 1902 r's SAUDI ARABIA Esna barrage Egypt 16 NA irrigation, navigation 1902 Assuit Barrage High Aswan Egypt 111 162 irrigation, flood 1970 LIBYAN dam , .... control, hydropower ARAB : Naga HaMmadi Barrage . Nag-Hamady Egypt irrigation, navigation JAMAHIRIYA Esna Barrage 16 NA 1930 EGYPT barrage Al Jawf Old Aswan Egypt 53 5 irrigation, hydropower 1933 ',.Asw5n dam Old Aswan Dam ...... High Aswan Dal'n', Alwero Ethiopia NA 0.075 irrigation 1995 Fincha’a Ethiopia 25 0.65 irrigation 1973 Lake Nasser run of .... Tana Beles Ethiopia - hydropower 2010 river ........... s.-- Jiddah/ econd Catarad Tekezze Mecca Ethiopia 185 3 hydropower 2009 Tis Abay I + II Ethiopia run of 3.5 hydropower 1953 /2001 river Thii.d(Cataract Jebel Aulia Sudan 22 3.5 irrigation, hydropower 1937 Khashm Sudan 35 1.3 irrigation, hydropower 1964 El Gibra Merowe Merowe Sudan 67 12.5 irrigation, hydropower 2009 Fifth CataractX) z North Agr. Prod. Corp. Roseires Sudan 60 3 irrigation, hydropower 1966 SUDAN 1925 )fz' Sennar Sudan 48 0.93 irrigation, hydropower ERITREA 0Mdurman Bujagali Uganda 30 0.75 hydropower 2011 Gash Khartoum 111 Amara Haifa Suga Owen Falls Uganda irrigation, hydropower 1954 el Aulia 30 200* Guneid Extension New Haifa Pro. Corp Guneid Sugar Co. l(ashm IGirba * Additional capacity on lake Victoria. Elensi n GE4IRA ad Corp. Gezira Equipped irrigation Areas (ha) Senn Suki Hagar Asalaja Nilagr. Pro. Corp, `1040(enana Burundi 3 212 Serma Sugar Co. Agr. Pro. Corp. r had 111 Dem. Rep. of the Congo 0 Abu Naama Lake Roseires Tana-Bales Tana Egypt 3 401 717 Tona-Beles lis Abay r Eritrea 5 865 Ethiopia 88 024 Kenya 14 501 Buhr el Arab Rwanda 7 885 1,4641 cm Sudan 1 830 908 `s. Addis Ababa Await Tanzania 935 Uganda 9063 CENTRAL A7IC N )Jr' REPU6LIC Total 5 362 109 N < N,.& ETHIOPIA N. Proposed dams in the Nile basin Legend N Dam name Country Administration Country boundary I Baro multi-purpose dam Ethiopia N 1 - - Country boundary in dispute Bahr &Jebel. dedden D.* 1 Grand Millenium Ethiopia CD Capital, major city Bahr ElJebel.- La 4.4 Bahr &Jebel.- Shokoti Hydrography Uele Bahr ELJebel.- Ful.¡DaM, Karadobi Ethiopia NO Lake, reservoir Mabil Ethiopia River Intermittent river KENYA DEMOCRATIC, Mendala Ethiopia Canal (under construction) SOMALIA Tunnet (under construction) REPUBLIC / Rusumo Rwanda Basin boundary OF THE CONG Irrigation Bahr El Jebel - Bedden Dam Sudan Schemes and zones Kalagata gotaL area eqmpped tor IrrigatIon Elan Bahr El Jebel - Lakki Dam Sudan 100 to <-2 000 Bujagal. Gash Kampala 2 000 to 500 000 Bahr El Jebel - Shukoll Dam Sudan BLUE NILE Main irrigation zone Lake Bahr El Jebel - Fula Dam Sudan Intensity of irrigation &heard [percentage of area egulpped farr Igatra NAP 1<iro 2 Fifth Cataract - Shereik Dam Sudan 5 Second cataract - Dal Dam Sudan 25 RWANDA Kiga.ti 100 Third cataract - Kajbar Dam Sudan Dams ylt A Existing Kalagala Uganda 4 Under construction Bujumbura 4 Planned , . Karuma Uganda 0 50 100 200 300 km Murchison Falls Uganda Or) conformaL conic protection (W05 1984) UNITEd REPUBLIC Standard para[Lels: 25°N and Wild- Central meridian: 32°E )r4iBUI:(UNDI OFTANZANIA South-North Ayago Uganda < - Information Products for Nile Basin Water Resources Management GCP/INT/945/ITA burundi d.r.congo egypt eritrea ethiopia kenya rwanda sudan u.r.tanzania uganda The project attempted to strengthen the ability of the governments of the Nile Riparian States to take informed decisions on water resources policy and management matters regarding the common Nile resource. It included a major capacity building component. The project www.fao.org/nr/water/faonile was implemented under the umbrella of the Nile Basin Initiative. Disclaimer A project sponsored by the Government of Italy The designations employed and the presentation of material in the map do not imply the expression of any opinion whatsoever on the part of FAO concerning the legal or constitutional status of any country, territory or sea area, or concerning the delimitation of frontiers..
Recommended publications
  • Morphological Study of the Nile River Fourth Reach
    Cairo University Faculty of Engineering Irrigation and Hydraulics Department MORPHOLOGICAL STUDY OF THE NILE RIVER FOURTH REACH By Dalia Ahmed Fouad Mostafa A Thesis Submitted to Irrigation and Hydraulics Department Faculty of Engineering - Cairo University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Irrigation and Hydraulics FACULTY OF ENGINEERING, CAIRO UNIVERSITY GIZA, EGYPT 2012 Cairo University Faculty of Engineering Irrigation and Hydraulics Department MORPHOLOGICAL STUDY OF THE NILE RIVER FOURTH REACH By Dalia Ahmed Fouad Mostafa A Thesis Submitted to Irrigation and Hydraulics Department Faculty of Engineering - Cairo University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Irrigation and Hydraulics Under the Supervision of Prof. Dr. Mohamed Sherif El Prof. Dr. Medhat Said Aziz Manadely Director of the Professor of Hydraulics Irrigation and Hydraulics Department Nile Research Institute Faculty of Engineering National Water Research Center FACULTY OF ENGINEERING, CAIRO UNIVERSITY GIZA, EGYPT 2012 Cairo University Faculty of Engineering Irrigation and Hydraulics Department MORPHOLOGICAL STUDY OF THE NILE RIVER FOURTH REACH By Dalia Ahmed Fouad Mostafa A Thesis Submitted to Irrigation and Hydraulics Department Faculty of Engineering - Cairo University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Irrigation and Hydraulics Approved by the Examining Committee Prof. Dr. Mohamed Sherif El Manadely Thesis Main Advisor Professor
    [Show full text]
  • 2-D Modeling of Flow Dynamics Downstream New Assuit Barrage
    INTERNATIONAL JOURNAL of ACADEMIC RESEARCH Vol. 4. No. 3. May, 2012 2-D MODELING OF FLOW DYNAMICS DOWNSTREAM NEW ASSUIT BARRAGE M. B. Ezzat, R. A. Rady, F. S. Fahmy Researcher, National Water Research Center (EGYPT) E-mails: [email protected], [email protected], [email protected] ABSTRACT To make optimum use of the River Nile water, a decision to construct a new barrage downstream the old Assuit Barrage was taken based on a detailed feasibility study. The impacts of constructing the new Barrage were assessed using the 2-D capabilities of a three-dimensional hydrodynamic model “Delft-3D”. The model was calibrated against measured data, precisely velocity distributions from field survey at the Barrage site. The impact of constructing the Barrage on the flow distribution and velocities was then investigated using this model. Model predicted hydrodynamic parameters, without and with the Barrage, were analyzed in detail. The model revealed that the best flow distribution between the left and right branches of Bani-Murr Island is 60% and 40% respectively. In the same context, the velocity comparison between baseline tests and the Barrage’s different operating schemes indicates that the proposed alternatives has almost no effect on the velocity magnitudes or flow distribution at the downstream reach, except for the case of passing 1000 m3/s through the powerhouse with equal flow distribution between Bani-Murr Island branches. Key words: Barrage; 2-D Modeling; Velocity Distribution 1. INTRODUCTION Water resources management in Egypt depends on a complex set of infrastructure along the entire length of the river. The key element of this infrastructure is the High Aswan Dam (HAD) that forms Lake Nasser.
    [Show full text]
  • The Nile Basin and the Grand Ethiopian Renaissance Dam
    Water Urbanism in Transboundary Regions: The Nile Basin and the Grand Ethiopian Renaissance Dam Irina Grcheva Thesis submitted to obtain the degree of Master of Science in Human Settlements Supervisor: Prof. dr. Bruno De Meulder Academic Year 2015 - 2016 © Copyright by KU Leuven Zonder voorafgaande schriftelijke toestemming van zowel de promoter(en) als de auteur(s) is overnemen, kopiëren, gebruiken of realiseren van deze uitgave of gedeelten ervan verboden. Voor aanvragen tot of informatie i.v.m. het overnemen en/of gebruik en/of realisatie van gedeelten uit deze publicatie, wend u tot de KU Leuven, Faculteit Ingenieurswetenschappen - Kasteelpark Arenberg 1, B-3001 Heverlee (België). Telefoon +32-16-32 13 50 & Fax. +32- 16-32 19 88. Voorafgaande schriftelijke toestemming van de promoter(en) is eveneens vereist voor het aanwenden van de in dit afstudeerwerk beschreven (originele) methoden, producten, schakelingen en programma’s voor industrieel of commercieel nut en voor de inzending van deze publicatie ter deelname aan wetenschappelijke prijzen of wedstrijden. © Copyright by KU Leuven Without written permission of the supervisor(s) and the authors it is forbidden to reproduce or adapt in any form or by any means any part of this publication. Requests for obtaining the right to reproduce or utilize parts of this publication should be addressed to KU Leuven, Faculty of Engineering Science - Kasteelpark Arenberg 1, B-3001 Heverlee (Belgium). Telephone +32-16-32 13 50 & Fax. +32-16-32 19 88. A written permission of the supervisor(s) is also required to use the methods, products, schematics and programs described in this work for industrial or commercial use, and for submitting this publication in scientific contests.
    [Show full text]
  • Nile Water and Agriculture: Past Present and Future
    :he need tor a much better under­ ld productive development of Nile e realization of the need for coop­ 2 lificant progress in this regard. An las, and is, given to water and agri­ eeds to be better consideration for Nile water and agriculture institutions involved in water and man and institutional capacity to Past, present and future Karen Conniff, David Molden, Don Peden and Seleshi B. Awulachew ie, and Source of livelihood of the :ient attentions and investment in momic growth, food security and the NBI programmes. ;Vater availability for food produc­ Key messages Jeneficial' water to managed land has been a dominant feature of Nile Basin countries for centuries. Irrigated expansion over the last hundred years, often driven by foreign powers, has 1 expansion.There is ample scope Lake Nasser. Further addition in caused change in the use of the Nile water, and continues to be a major intlu­ >peration and integrated manage­ ence on the decisions around the Nile River use today. • Use of Nile River water is a cause for transboundary cooperation and conflict. More than ty gains, fisheries and small-scale ever, the Nile Basin countries teel the pressure of expanding population requirements for food production and energy to develop their economies. However, historical treaties and , improve productivity and Sif,'l1if... nr~,rhr,>< continue to significantly shape directions of future Nile water use. 1e landscape is high and can be • Power development is changing the Nile River. Many dams are planned and several are under construction. The dam projects will have direct consequences for local populations lensive agreement and the Nile and governments as they negotiate for water resources, land and power.
    [Show full text]
  • Impacts of Grand Ethiopian Renaissance Dam on Different Water Usages in Upper Egypt
    British Journal of Applied Science & Technology 8(5): 461-483, 2015, Article no.BJAST.2015.225 ISSN: 2231-0843 SCIENCEDOMAIN international www.sciencedomain.org Impacts of Grand Ethiopian Renaissance Dam on Different Water Usages in Upper Egypt Fahmy S. Abdelhaleem1* and Esam Y. Helal2 1Department of Civil Engineering, Benha Faculty of Engineering, Benha University, Benha, Egypt. 2Department of Civil Engineering, Faculty of Engineering, Menoufia University, Shebin Elkom, Egypt. Authors’ contributions This work was carried out in collaboration between both authors. Both authors read and approved the final manuscript. Article Information DOI: 10.9734/BJAST/2015/17252 Editor(s): (1) Rares Halbac-Cotoara-Zamfir, Hydrotechnical Engineering Department, “Politehnica” University of Timisoara, Romania. Reviewers: (1) Abdel Razik Ahmed Zidan, Irrigation and Hydraulics Department, Mansoura University, Egypt. (2) Anonymous, China. Complete Peer review History: http://www.sciencedomain.org/review-history.php?iid=1073&id=5&aid=8970 Received 4th March 2015 th Original Research Article Accepted 11 April 2015 Published 27th April 2015 ABSTRACT A Large scale dam named as Grand Ethiopian Renaissance Dam (GERD) is currently under construction on the Blue Nile River in Ethiopia. The final report of the International Panel of Experts (IPoE) on the GERD project which was submitted to the governments of Ethiopia, Sudan and Egypt, reported that the Aswan High Dam (AHD) will reach the minimum operational level during 4 consecutive years. Consequently, this project could significantly affect the water supply to Egypt, in case if the first impounding of the GERD occurs during dry years. The present paper assesses the potential impact of the shortage of Egypt water resources that will reduce the releases from AHD due to the construction of the GERD on the Nile water in Egypt.
    [Show full text]
  • Developments in Water Dams and Water Harvesting Systems Throughout History in Different Civilizations
    International Journal of Hydrology Book Review Open Access Developments in water dams and water harvesting systems throughout history in different civilizations Abstract Volume 2 Issue 2 - 2018 The use of water for domestic and agricultural purpose is not a new phenomenon. It has been used throughout centuries all over the world. After food, water is the basic Alper Baba,1 Chr Tsatsanifos,2 Fatma El component of human life and their settlement. This paper considers developments in Gohary,3 Jacinta Palerm,4 Saifullah Khan,5 S water dams and water harvesting systems throughout history in different civilisations. Ali Mahmoudian,6 Abdelkader T Ahmed,7 The major component of this review consists of hydraulic dams during Pre-Historical 8,9 Time, Bronze Ages (Minoan Era, Indus Valley Civilization, Early Ancient Egyptian Gökmen Tayfur,1 Yannis G Dialynas, 10 Era, Hittites in Anatolia, and Mycenaean Civilization), Historical Period, (Pre- Andreas N Angelakis 1 Columbian, Archaic Period, Classical Greek and Hellenistic Civilizations, Gandahara Department of Civil Engineering, Izmir Institute of Technology, and Mauryan Empire, Roman Period, and early Chinese dynasties), Medieval times Engineering Faculty, Turkey 2Pangaea Consulting Engineers Ltd, Greece (Byzantine Period, Sui, Tang and Song Dynasties in China, Venetian Period, Aztec 3Department of Water Pollution Research, National Research Civilization, and Incas) and Modern Time (Ottoman Period and Present Time). The Centre, Egypt main aim of the review is to present advances in design and construction of water 4Colegio de Posgraduados de Chapingo, Mexico dams and water harvesting systems of the past civilizations with reference to its use 5Institute of Social Sciences and Directorate of Distance for domestic as well as agricultural purposes, its impact on different civilizations Education, Bahauddin Zakariya University, Pakistan 6 and its comparison to the modern technological era.
    [Show full text]
  • The Grand Renaissance Dam and Prospects for Cooperation on the Nile
    The Grand Renaissance Dam and Prospects for Cooperation on the Eastern Nile By Dale Whittington 1 John Waterbury 2 Marc Jeuland 3 February 10, 2014 1 University of North Carolina at Chapel Hill (USA), and the Manchester Business School (UK) Email: [email protected] 2 Global Professor, New York University Abu Dhabi 3 Sanford School of Public Policy and Duke Global Health Institute, Duke University 1 I. Introduction Throughout recorded history, Egypt has been the dominant and sometimes the sole significant user of Nile water. Since the pharaohs, it has developed a sophisticated infrastructure for irrigation and flood control. Until the colonial era none of the other peoples or riparian countries in the basin (which today include Sudan, South Sudan, Ethiopia, Uganda, Kenya, Tanzania, Rwanda, Burundi, Central African Republic, and Eritrea) had any water resources infrastructure on the Nile, and even now the value of Egyptian infrastructure far exceeds that of all the others. And it is a simple but stark fact that Egypt receives virtually all of its surface water from the Nile and that these Nile flows come entirely from outside its borders. No other Nile riparian exhibits anything close to that level of dependency on the river. It is on the basis of these facts that Egypt has laid claim to “acquired rights” to most of the annual flow of the Nile. In most water law regimes, demonstrated use over time has bestowed powerful rights (“first in time, first in right”) against which other claims have been futile. Yet in 1997 the International Law Commission completed a draft convention on the non-navigational uses of international watercourses that enshrined the concept of “equitable use” (McCaffrey and Sinjela 1998, UN 1997).
    [Show full text]
  • The Effect of the High Aswan Dam on the Hydrological Regime of the River Nile
    The influence of man on the hydrological regime with special reference to representative and experimental basins — L'influence de l'homme sur le régime hydrologique avec référence particulière aux études sur les bassins représentatifs et expérimentaux (Proceedings of the Helsinki Symposium, June 1980; Actes du Colloque d'Helsinki, juin 1980): IAHS-AISHPubl.no. 130. The effect of the High Aswan Dam on the hydrological regime of the River Nile S. SHALASH Research Institute of High Dam Side Effects, Cairo, Egypt Abstract. Results from the many theoretical studies undertaken since 1954 to determine the magnitude and rate of degradation, and the effect of the degradation on hydraulic structures on the Nile below the High Aswan Dam, have varied widely. In this paper four methods are used to find the actual degradation, and drop in water levels and bed levels between 1964 and 1978, to assess the effect of the High Aswan Dam on the hydrological regime and the hydraulic structures. Effet du grand barrage d'Assouan sur le régime hydrologique du NU Résumé. De nombreuses études théoriques ont été entreprises depuis 1954 pour déterminer l'ampleur et la vitesse de dégradation ainsi que les effets de la dégradation sur les structures hydrauliques du Nil à l'aval du grand barrage d*Assouan et les résultats de ces études varient largement. Dans cette communication quatre méthodes ont été utilisées pour déterminer la dégradation actuelle ainsi que la baisse des niveaux de l'eau et du niveau du Ut entre 1964 et 1968, pour déterminer l'effet du grand barrage d'Assouan sur le régime hydrologique et les aménagements hydrauliques.
    [Show full text]
  • Assiut Barrage in Egypt: Past, Present and Future Ayman F
    ge Syst Batisha, Irrigat Drainage Sys Eng 2012, 1:2 ina em a s r D E n DOI: 10.4172/2168-9768.1000e104 & g i n n o e i t e a r i g n i r g r Irrigation & Drainage Systems Engineering I ISSN: 2168-9768 Editorial Open Access Assiut Barrage in Egypt: Past, Present and Future Ayman F. Batisha* Environment and Climate Research Institute, National Water Research Center, Ministry of Water Resources and Irrigation, Cairo, Egypt, Tel. 20-2-0100-6443210, Email: [email protected]. Water Resources is becoming increasingly scarce due to construction of 2 navigation locks of 150m x 17m according to the latest unsustainable consumption and use behavior such as overexploitation international technologies to accommodate the increase in the river and pollution in Egypt. In Irrigation sector, the extraction and use and tourism transport units; the construction of a 4-lanes upper bridge of water by landowners is not sufficiently regulated to protect nation over the new barrage with capacity 70 tons to link the East and West and local communities from the depletion and pollution of the water banks of the River Nile in Assiut. The Barrage Project components are: resources. In practice, groundwater can be extracted and Nile river Sluiceway with 8 radial gates 17 m wide and Road Bridge; Hydropower water can be diverted to irrigate fields at will. The impact of climate plant: Low-head hydropower plant with 4 bulb units of 8 MW, total change also poses a further threat to food security. Assiut Barrage capacity 32 MW; new navigation lock: 120 x 17m chamber in addition plays a key role in both Egypt’s food self sufficiency and secures the to the refurbished 80 x 16 m existing navigation lock; Closure dam: livelihood of nearly 6.0 million people.
    [Show full text]
  • The Hydrology of the Nile
    The Hydrology of the Nile by J. V. Sutcliffe Gibb Ltd, Gibb House, London Road, Reading RG6 1BL, UK Y. P. Parks Institute of Hydrology, Wallingford, Oxfordshire 0X10 8BB, UK This publication was financially sponsored by: IWMI The International Water ManagemenI%t IftM Institute , Colombo. Sri Lanka and GIBB1 Water LAWGIBB Group Member Ja Gibb Water, Reading, UK IAHS Special Publication no. 5 (February 1999) IAHS Special Publication no. 5 ISBN 1-910502-75-9 Published by the International Association of Hydrological Sciences 1999 IAHS Press, Institute of Hydrology, Wallingford, Oxfordshire OX10 8BB, UK British Library Cataloguing-in-Publication Data. A catalogue record for this book is available from the British Library. Editors for the Series of IAHS Special Publications: H. Salz The International Institute for Infrastructural, Hydraulic and Environmental Engineering, Delft, The Netherlands Zbigniew W. Kundzewicz Editor Hydrological Sciences Journal, Research Centre of Agricultural and Forest Environment, Polish Academy of Sciences, Poznan, Poland The designations employed and the presentation of material throughout the publication do not imply the expression of any opinion whatsoever on the part of IAHS concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. The use of trade, firm, or corporate names in the publication is for the information and convenience of the reader. Such use does not constitute an official endorsement or approval by IAHS of any product or service to the exclusion of others that may be suitable. ® IAHS Press and the authors 1999 This publication may be reproduced in whole or in part in any form for education or nonprofit uses, without special permission from the copyright holders, provided acknowledgement of the source is made.
    [Show full text]
  • National Investment Profile. Water for Agriculture and Energy: Egypt
    National Investment Profile Water for Agriculture and Energy Egypt 1 National Investment Profile. Water for Agriculture and Energy: Egypt. EXECUTIVE SUMMARY This analysis has been conducted within the TCP/INT/3404 "Support to the pre- and post-CAADP compact process for improved agricultural water management" project that covers four countries in Africa: Egypt, Malawi, the Sudan, and Swaziland. The project aims at assisting these countries to foster sustainable agricultural water management (AWM) through the effective implementation of the Comprehensive Africa Agriculture Development Programme (CAADP) compact and post-compact process, the refinement of national agricultural water development strategies and the alignment to national strategies for food security strategies and programmes. The Egyptian economy traditionally relied on agriculture as one of the main sectors. The agricultural sector currently contributes about 13.3 percent of the total Gross Domestic Product (GDP) of Egypt (CAPMAS, 2015). Industries related to agriculture, (e.g. processing, marketing, and supplies) account for a further 20 percent of the total GDP (CAPMAS, 2015). The agricultural sector provides formal and informal employment for about 6.70 million persons (CAPMAS, 2015) and about 8.25 million persons respectively (ILO, 2011). It furthermore accounts for 10 percent of the total national exports (CAPMAS, 2015). The majority of agricultural holdings were of small size. More than 62 percent of the agricultural output comes from agricultural holdings with less than one to three hectares under cropping. Typical farm sizes range from one to two hectares (MALR, 2014 b). Egypt has achieved good progress in agricultural productivity, reflecting the success of horizontal expansion by the expansion of reclaimed areas and vertical expansion by improving productivity.
    [Show full text]
  • Assiut Barrage, to Rehabilitate Or to Rebuild
    Assiut Barrage, to rehabilitate or to rebuild T.J.F. HILL, Mott MacDonald Ltd, Cambridge, UK SYNOPSIS. Assiut barrage, 400 km upstream of Cairo, is the last barrage downstream of the High Aswan Dam (HAD) before the Nile reaches Cairo. It was built between 1898 and 1902 in order to divert Nile river flows to the Ibrahimia canal. The barrage was remodelled extensively between 1934 and 1938, increasing the annual discharge to the Ibrahimia canal which, in its present form, has a length of about 350 km and irrigates an area of 690,000 ha. The barrage was designed as an arched viaduct founded on a mass concrete floor, with a 16 m wide lock positioned on the extreme left bank. The overall length of the structure is 820 m with a water-way capable of discharging 14,000 m3/s provided by 110 individual openings of 5 m width. Each opening contains a double leaf vertical lift roller gate designed for a maximum head difference of 4.2 m. This paper describes the results and conclusions of a feasibility study carried out by Mott MacDonald in association with CES Salzgitter, Fichtner and Inros Lackner, all of Germany, and Hamza Associates of Egypt, to investigate the present structural and operational conditions at the barrage and to outline options for the future. The principal conclusion of this feasibility phase, completed in December 2005, was a recommendation to construct a new barrage downstream of the existing one rather than rehabilitating the existing barrage. A HISTORY OF THE BARRAGE Original Construction, 1898-1902 The Ibrahimia canal was excavated in 1873 to serve the cultivated area on the left bank of the Nile as far as Giza to the north, and Fayum to the West.
    [Show full text]