Assiut Barrage in Egypt: Past, Present and Future Ayman F

Total Page:16

File Type:pdf, Size:1020Kb

Assiut Barrage in Egypt: Past, Present and Future Ayman F ge Syst Batisha, Irrigat Drainage Sys Eng 2012, 1:2 ina em a s r D E n DOI: 10.4172/2168-9768.1000e104 & g i n n o e i t e a r i g n i r g r Irrigation & Drainage Systems Engineering I ISSN: 2168-9768 Editorial Open Access Assiut Barrage in Egypt: Past, Present and Future Ayman F. Batisha* Environment and Climate Research Institute, National Water Research Center, Ministry of Water Resources and Irrigation, Cairo, Egypt, Tel. 20-2-0100-6443210, Email: [email protected]. Water Resources is becoming increasingly scarce due to construction of 2 navigation locks of 150m x 17m according to the latest unsustainable consumption and use behavior such as overexploitation international technologies to accommodate the increase in the river and pollution in Egypt. In Irrigation sector, the extraction and use and tourism transport units; the construction of a 4-lanes upper bridge of water by landowners is not sufficiently regulated to protect nation over the new barrage with capacity 70 tons to link the East and West and local communities from the depletion and pollution of the water banks of the River Nile in Assiut. The Barrage Project components are: resources. In practice, groundwater can be extracted and Nile river Sluiceway with 8 radial gates 17 m wide and Road Bridge; Hydropower water can be diverted to irrigate fields at will. The impact of climate plant: Low-head hydropower plant with 4 bulb units of 8 MW, total change also poses a further threat to food security. Assiut Barrage capacity 32 MW; new navigation lock: 120 x 17m chamber in addition plays a key role in both Egypt’s food self sufficiency and secures the to the refurbished 80 x 16 m existing navigation lock; Closure dam: livelihood of nearly 6.0 million people. embankment type, 11m high; Rehabilitation of the existing navigation lock; Replacement and Rehabilitation of the existing Ibrahimiya canal Assiut Barrage was constructed between 1892 and 1902 to sustain a head regulator; and Transmission line. water level difference of about 4 m in order to feed the Ibrahimia Canal. Since its completing in 1902, Assiut Barrage, along with the old Aswan The Barrage Project study’s components are included: Physical Dam, remains in service as the oldest Barrage on the Nile in Upper and mathematical hydraulic modeling of the Barrage and river course, Egypt. The two other old Barrages (Naga Hamadi and Isna Barrages) groundwater/seepage and foundation analysis; Determination of were replaced with new Barrages in the 1990s. Assiut Barrage supplies design parameters; feasibility level designs for technical alternatives up to 440 m3/s of Nile water. With total length about 350 km, Ibrahimia of the chosen option; preliminary design of the new barrage; Canal irrigates an area of almost 690.000 ha of Nile valley land in Upper Environmental and socio-economic study; capacity building and Egypt. The barrage was remodeled by 1938 to increase the permissible institutional development; economic and technical feasibility of headpond level difference to 4.2 m and thereby increasing the capacity of providing hydropower generation at the barrage site; Comparison the Ibrahimia Canal. After construction of High Aswan Dam in 1960s, of rehabilitation option with the new barrage option by economic, and during 1970s and 1980s, structural stability of Assiut Barrage has technical, environmental analysis; Demonstration of the viability of been reduced due to subsequent change in flow regime of the Nile and the chosen option by carrying out a full assessment of the technical, accelerated riverbed degradation downstream the barrages, so higher economic and environmental issues; Tender Design, Tender documents heads and higher hydraulic forces across the barrage structure and the and assistance in tendering procedures; Construction supervision; civil works have been affected by age and also by tail water erosion as a Preparation and implementation of an environmental management consequence of a modified river regime. plan; and Training and integration of counterpart personnel, seminars and presentations. On the Nile River, as a milestone of a National Program of rehabilitation and upgrading barrages, Egypt intends to replace the Egypt laid the foundation stone of New Assiut Barrage. The barrage existing Nile barrage in Assiut with a new one. New Assiut Barrage aims at modifying the irrigation of 1.65 million feddan, about 20% of would provide an increase in the allowed head, allowing more water the cultivated land in middle Egypt including 5 governorates: Assiut, discharges into the Ibrahimiya Canal and will improve navigation Menia, Bani Suief, Fayoum and Giza. The barrage executed works conditions. The new Barrage will also include a low head hydropower with total cost value EGP 2.4 billion (475 M€) will be achieved by a plant providing about 40 Megawatts. Egypt has investigated the options consortium comprising of international and local Contractors. New of rehabilitation of the existing Assiut Barrage and the Ibrahimiya Assiut Barrage Study showed the technical and economical feasibility head regulator against reconstruction of a new barrage with a hydro- of the rehabilitation of the existing barrage including the installation power plant. Two alternatives at the same level for correct evaluation of a hydropower plant. The New Assiut Barrage Project has very have been analyzed, the first option “New Assiut Barrage 200-300 m promising positive aspects in relation to sustainable development, downstream of the existing one with hydropower plant” and the other poverty alleviation, social and economic development in Egypt. alternative is “Rehabilitation with hydropower”. The most economic option is constructing a new Barrage 200 m downstream of the existing barrage with power generating capabilities. There is a concern that the new maximum pool level will increase the groundwater levels in Assiut city and in some areas in the upstream. Dealing with this situation, different layouts of the project have been studied and some mitigation measures have been suggested. The corresponding measures would *Corresponding author: Ayman F. Batisha, Environment and Climate Research cover an increase of the headpond level for improvement of waterintake Institute, National Water Research Center, Ministry of Water Resources and to Ibrahimia Canal, improvement of navigation conditions as well Irrigation, Cairo, Egypt, Tel. 20-2-0100-6443210; E-mail: [email protected] as optimization hydropower output, without serious environmental Received June 14, 2012; Accepted June 14, 2012; Published June 18, 2012 impacts. Citation: Batisha AF (2012) Assiut Barrage in Egypt: Past, Present and Future. Irrigat Drainage Sys Eng 1:e104. doi:10.4172/2168-9768.1000e104 The proposed Barrage is multipurpose Project: irrigation, navigation, and hydropower. New Assiut Barrage Project consists of Copyright: © 2012 Batisha AF. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted an embankment dam, a gated spillway, a river hydropower plant and use, distribution, and reproduction in any medium, provided the original author and a navigation lock in the river Nile. The project scope of works: the source are credited. Irrigat Drainage Sys Eng Volume 1 • Issue 2 • 1000e104 ISSN: 2168-9768 IDSE, an open access journal.
Recommended publications
  • Morphological Study of the Nile River Fourth Reach
    Cairo University Faculty of Engineering Irrigation and Hydraulics Department MORPHOLOGICAL STUDY OF THE NILE RIVER FOURTH REACH By Dalia Ahmed Fouad Mostafa A Thesis Submitted to Irrigation and Hydraulics Department Faculty of Engineering - Cairo University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Irrigation and Hydraulics FACULTY OF ENGINEERING, CAIRO UNIVERSITY GIZA, EGYPT 2012 Cairo University Faculty of Engineering Irrigation and Hydraulics Department MORPHOLOGICAL STUDY OF THE NILE RIVER FOURTH REACH By Dalia Ahmed Fouad Mostafa A Thesis Submitted to Irrigation and Hydraulics Department Faculty of Engineering - Cairo University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Irrigation and Hydraulics Under the Supervision of Prof. Dr. Mohamed Sherif El Prof. Dr. Medhat Said Aziz Manadely Director of the Professor of Hydraulics Irrigation and Hydraulics Department Nile Research Institute Faculty of Engineering National Water Research Center FACULTY OF ENGINEERING, CAIRO UNIVERSITY GIZA, EGYPT 2012 Cairo University Faculty of Engineering Irrigation and Hydraulics Department MORPHOLOGICAL STUDY OF THE NILE RIVER FOURTH REACH By Dalia Ahmed Fouad Mostafa A Thesis Submitted to Irrigation and Hydraulics Department Faculty of Engineering - Cairo University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Irrigation and Hydraulics Approved by the Examining Committee Prof. Dr. Mohamed Sherif El Manadely Thesis Main Advisor Professor
    [Show full text]
  • 2-D Modeling of Flow Dynamics Downstream New Assuit Barrage
    INTERNATIONAL JOURNAL of ACADEMIC RESEARCH Vol. 4. No. 3. May, 2012 2-D MODELING OF FLOW DYNAMICS DOWNSTREAM NEW ASSUIT BARRAGE M. B. Ezzat, R. A. Rady, F. S. Fahmy Researcher, National Water Research Center (EGYPT) E-mails: [email protected], [email protected], [email protected] ABSTRACT To make optimum use of the River Nile water, a decision to construct a new barrage downstream the old Assuit Barrage was taken based on a detailed feasibility study. The impacts of constructing the new Barrage were assessed using the 2-D capabilities of a three-dimensional hydrodynamic model “Delft-3D”. The model was calibrated against measured data, precisely velocity distributions from field survey at the Barrage site. The impact of constructing the Barrage on the flow distribution and velocities was then investigated using this model. Model predicted hydrodynamic parameters, without and with the Barrage, were analyzed in detail. The model revealed that the best flow distribution between the left and right branches of Bani-Murr Island is 60% and 40% respectively. In the same context, the velocity comparison between baseline tests and the Barrage’s different operating schemes indicates that the proposed alternatives has almost no effect on the velocity magnitudes or flow distribution at the downstream reach, except for the case of passing 1000 m3/s through the powerhouse with equal flow distribution between Bani-Murr Island branches. Key words: Barrage; 2-D Modeling; Velocity Distribution 1. INTRODUCTION Water resources management in Egypt depends on a complex set of infrastructure along the entire length of the river. The key element of this infrastructure is the High Aswan Dam (HAD) that forms Lake Nasser.
    [Show full text]
  • Stakeholder Engagement Plan (Sep)
    Public Disclosure Authorized Railway Improvement and Safety for Egypt Project (RISE) for Railway Corridor Alexandria - Nag Hammadi Project Public Disclosure Authorized STAKEHOLDER ENGAGEMENT PLAN (SEP) Public Disclosure Authorized Prepared by: Integral Consult© Cairo Office: 2075 El Mearaj City, Ring Road, Maadi – Cairo – Egypt Phone +202 2 25204515 Fax +202 2 25204514 A Member of Public Disclosure Authorized Environmental Alliance December, 2020 Stakeholder Engagement Plan (SEP) ã Integral Consult Cairo Office 2075 El Mearaj City, Ring Road, Maadi – Cairo - Egypt Phone +202 25204515 • Fax +202 25204514 Doha Office 6th Floor Al Mana Tower B, Al Sadd, C-Ring Road, P.O Box. 55781 Tel: +974 4466 4203, +974 4455 0483 Fax +974 4466 7843 Email: [email protected] Railway Improvement and Safety for Egypt Project (RISE) for Railway Corridor Alexandria - Nag Hammadi Project ii Contributors to the Study Dr. Amr Osama, Integral Consult President Dr. Anan Mohamed, Social Development Consultant TABLE OF CONTENTS ACRONYMS ....................................................................................................................... 1 1 Introduction ................................................................................................................... 2 1.1 Project Description ................................................................................................. 2 1.1.1 Component (1): Improvement of safety and operational efficiency on the entire railway line Alexandria – Cairo – Nag Hammadi ..............................................
    [Show full text]
  • The Nile Basin and the Grand Ethiopian Renaissance Dam
    Water Urbanism in Transboundary Regions: The Nile Basin and the Grand Ethiopian Renaissance Dam Irina Grcheva Thesis submitted to obtain the degree of Master of Science in Human Settlements Supervisor: Prof. dr. Bruno De Meulder Academic Year 2015 - 2016 © Copyright by KU Leuven Zonder voorafgaande schriftelijke toestemming van zowel de promoter(en) als de auteur(s) is overnemen, kopiëren, gebruiken of realiseren van deze uitgave of gedeelten ervan verboden. Voor aanvragen tot of informatie i.v.m. het overnemen en/of gebruik en/of realisatie van gedeelten uit deze publicatie, wend u tot de KU Leuven, Faculteit Ingenieurswetenschappen - Kasteelpark Arenberg 1, B-3001 Heverlee (België). Telefoon +32-16-32 13 50 & Fax. +32- 16-32 19 88. Voorafgaande schriftelijke toestemming van de promoter(en) is eveneens vereist voor het aanwenden van de in dit afstudeerwerk beschreven (originele) methoden, producten, schakelingen en programma’s voor industrieel of commercieel nut en voor de inzending van deze publicatie ter deelname aan wetenschappelijke prijzen of wedstrijden. © Copyright by KU Leuven Without written permission of the supervisor(s) and the authors it is forbidden to reproduce or adapt in any form or by any means any part of this publication. Requests for obtaining the right to reproduce or utilize parts of this publication should be addressed to KU Leuven, Faculty of Engineering Science - Kasteelpark Arenberg 1, B-3001 Heverlee (Belgium). Telephone +32-16-32 13 50 & Fax. +32-16-32 19 88. A written permission of the supervisor(s) is also required to use the methods, products, schematics and programs described in this work for industrial or commercial use, and for submitting this publication in scientific contests.
    [Show full text]
  • Multipurpose Development of the Eastern Nile, One–System Inventory Report on Water Resource Related Data and Information EGYPT
    Multipurpose Development of the Eastern Nile, One–System inventory report on water resource related Data and information EGYPT ENTRO (Eastern Nile Technical Regional Office) Draft By Eng. Ahmen Fahmy Egypt July 2006 Disclaimer This Consultants report does not necessarily represent the views and opinions of Easter Nile technical Regional Office (ENTRO) or any institution of the Eastern Nile Countries. The designation employed in the maps and the presentation of the material in this document does not imply the expression of any opinion whatsoever on the part of the Eastern Nile Technical Office concerning the legal or constitutional status of any administrative region, state or Governorate ,country, or concerning the delimitation of any frontier. Draft Table of Contents LIST OF ACRONYMS ................................................................................................iv EXECUTIVE SUMMARY ...........................................................................................v 1- INTRODUCTION.....................................................................................................1 1-1 General.................................................................................................................1 1-2 Objectives ............................................................................................................2 1-3 Outlines................................................................................................................2 2- BASIN PHYSICAL FEATURES .............................................................................3
    [Show full text]
  • Nile Water and Agriculture: Past Present and Future
    :he need tor a much better under­ ld productive development of Nile e realization of the need for coop­ 2 lificant progress in this regard. An las, and is, given to water and agri­ eeds to be better consideration for Nile water and agriculture institutions involved in water and man and institutional capacity to Past, present and future Karen Conniff, David Molden, Don Peden and Seleshi B. Awulachew ie, and Source of livelihood of the :ient attentions and investment in momic growth, food security and the NBI programmes. ;Vater availability for food produc­ Key messages Jeneficial' water to managed land has been a dominant feature of Nile Basin countries for centuries. Irrigated expansion over the last hundred years, often driven by foreign powers, has 1 expansion.There is ample scope Lake Nasser. Further addition in caused change in the use of the Nile water, and continues to be a major intlu­ >peration and integrated manage­ ence on the decisions around the Nile River use today. • Use of Nile River water is a cause for transboundary cooperation and conflict. More than ty gains, fisheries and small-scale ever, the Nile Basin countries teel the pressure of expanding population requirements for food production and energy to develop their economies. However, historical treaties and , improve productivity and Sif,'l1if... nr~,rhr,>< continue to significantly shape directions of future Nile water use. 1e landscape is high and can be • Power development is changing the Nile River. Many dams are planned and several are under construction. The dam projects will have direct consequences for local populations lensive agreement and the Nile and governments as they negotiate for water resources, land and power.
    [Show full text]
  • Project Technical Report 060 Hydraulic Conductivity and Vertical Leakage in the Clay-Silt Layer of the Nile Alluvium in Egypt
    PROJECT TECHNICAL REPORT 060 HYDRAULIC CONDUCTIVITY AND VERTICAL LEAKAGE IN THE CLAY-SILT LAYER OF THE NILE ALLUVIUM IN EGYPT By: James W. Warner, Timothy K. Gates, Wadie Fahim, Mahmoud Ibrahim, Magdy Awad and Thomas W. Ley July, 1984 EGYPT WATER USE AND MANAGEMENT PROJECT 22 El Galaa St., Bulak, Cairo, Egypt HYDRAULIC CONDUCTIVITY AND VERTICAL LEAKAGE IN THE CLAY-SILT LAYER OF THE NILE ALLUVIUM IN EGYPT By: James W. Warner, 'rimothy K. Gates, Wadie Fahim, Mahmoud Ibrahim, Magdy Awad and Thomas W. Ley EWUP PROJECT TECHNICAL REPORT NO. 60 Prepared under support of WATER DISTRIBUTION RESEARCH INSTITUTE, WATER RESEARCH CENTER MINISTRY OF IRRIGATION, GOVERNMENT OF EGYPT ContracLing agencies Colorado State University Consortium for International Engineering Research Center Development Ft. Collins, Colorado 80521 5151 E. Broadway, Ste., 1500 USA Tucson, Arizona 85711 USA All reported opinions, conclusions or recommendations are those of the writers and not those of the supporting or contracting agencies. I I, ABSTRACT Data were collected from three sites in Egypt's Nile Valley and Delta to determine saturated hydraulic conductivity in the clay-silt water table aquifer and vertical leakage to the underlying Nile River sands. Auger hole test results gave saturated horizontal hydraulic conductivities of 1103 mm/day for Abuyha in the middle Nile Valley, 197 mm/day for Beni Magdul near Cairo, and 103 mm/day for Abu Raya in the northern Delta. Auger hole, permeameter, and consolidation tests resulted in saturated vertical hydraulic corductivites of 0.03 to 4.9 mm/day for Abyuha, 0.03 to 0.87 mm/day for Beni Magdul, and 0.03 to 0.45 mm/day for Abu Raya.
    [Show full text]
  • RISE) for Railway Corridor Alexandria - Nag Hammadi Project Public Disclosure Authorized ENVIRONMENTAL and SOCIAL ASSESSMENT (ESA
    Public Disclosure Authorized Railway Improvement and Safety for Egypt Project (RISE) for Railway Corridor Alexandria - Nag Hammadi Project Public Disclosure Authorized ENVIRONMENTAL AND SOCIAL ASSESSMENT (ESA) Public Disclosure Authorized Prepared by: Integral Consult© Cairo Office: 2075 El Mearaj City, Ring Road, Maadi – Cairo – Egypt Phone +202 2 25204515 Fax +202 2 25204514 A Member of Public Disclosure Authorized Environmental Alliance December, 2020 Contributors to the Study Dr. Amr Osama, Integral Consult President Dr. Yasmine Kamal, Technical and Operations Manager Dr. Nermin Eltouny, Technical Team Lead Dr. Anan Mohamed, Social Development Expert Eng. Mai Ibrahim, Technical Team Lead Eng. Basma Sobhi, MSc., Senior Environmental Specialist Railway Improvement and Safety for Egypt Project (RISE) for Railway Corridor Alexandria - Nag Hammadi Project Environmental and Social Assessment (ESA) ii CONTENTS LIST OF ACRONYMS .........................................................................................................x EXECUTIVE SUMMARY ...................................................................................................1 Introduction ........................................................................................................................1 Study Approach ..................................................................................................... 2 Project overview .................................................................................................................2 Components
    [Show full text]
  • Impacts of Grand Ethiopian Renaissance Dam on Different Water Usages in Upper Egypt
    British Journal of Applied Science & Technology 8(5): 461-483, 2015, Article no.BJAST.2015.225 ISSN: 2231-0843 SCIENCEDOMAIN international www.sciencedomain.org Impacts of Grand Ethiopian Renaissance Dam on Different Water Usages in Upper Egypt Fahmy S. Abdelhaleem1* and Esam Y. Helal2 1Department of Civil Engineering, Benha Faculty of Engineering, Benha University, Benha, Egypt. 2Department of Civil Engineering, Faculty of Engineering, Menoufia University, Shebin Elkom, Egypt. Authors’ contributions This work was carried out in collaboration between both authors. Both authors read and approved the final manuscript. Article Information DOI: 10.9734/BJAST/2015/17252 Editor(s): (1) Rares Halbac-Cotoara-Zamfir, Hydrotechnical Engineering Department, “Politehnica” University of Timisoara, Romania. Reviewers: (1) Abdel Razik Ahmed Zidan, Irrigation and Hydraulics Department, Mansoura University, Egypt. (2) Anonymous, China. Complete Peer review History: http://www.sciencedomain.org/review-history.php?iid=1073&id=5&aid=8970 Received 4th March 2015 th Original Research Article Accepted 11 April 2015 Published 27th April 2015 ABSTRACT A Large scale dam named as Grand Ethiopian Renaissance Dam (GERD) is currently under construction on the Blue Nile River in Ethiopia. The final report of the International Panel of Experts (IPoE) on the GERD project which was submitted to the governments of Ethiopia, Sudan and Egypt, reported that the Aswan High Dam (AHD) will reach the minimum operational level during 4 consecutive years. Consequently, this project could significantly affect the water supply to Egypt, in case if the first impounding of the GERD occurs during dry years. The present paper assesses the potential impact of the shortage of Egypt water resources that will reduce the releases from AHD due to the construction of the GERD on the Nile water in Egypt.
    [Show full text]
  • MINISTRY of TRANSPORT EGYPTIAN NATIONAL RAILWAYS Public Disclosure Authorized EGYPTIAN NATIONAL RAILWAYS RECONSTRUCTION PROJECT
    E1997 v1 MINISTRY OF TRANSPORT EGYPTIAN NATIONAL RAILWAYS Public Disclosure Authorized EGYPTIAN NATIONAL RAILWAYS RECONSTRUCTION PROJECT ENVIRONMENTAL IMPACT AASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Environmental Quality International Public Disclosure Authorized 18 El Mansour Mohamed St., Zamalek, Cairo 11211, Egypt April 2008 EGYPTIAN NATIONAL RAILWAYS EGYPTIAN NATIONAL RAILWAYS RESTRUCTURING PROJECT Environmental and Social Impact Assessment Report Environmental Quality International 18 El Mansour Mohamed St., Zamalek, Cairo 11211, Egypt May 2008 Environmental Quality International 1 Environmental Impact Assessment of ENRRP ESIA Report TABLE OF CONTENTS 1.0 Executive Summary...................................................................................................... 6 1.1 Project Objectives and Description....................................................................... 6 1.2 Legal and Institutional Aspects ............................................................................. 7 1.2.1 Relevant Egyptian Legislations ......................................................................... 7 1.2.2 Relevant World Bank Policies......................................................................... 10 1.3 Analysis of Alternatives........................................................................................ 10 1.4 Significant Impacts ............................................................................................... 13 1.4.1 Socio-economic impact...................................................................................
    [Show full text]
  • A New and Scalable Approach for Rural Sanitation in Egypt
    Alterra Wageningen UR Alterra Wageningen UR is hét kennisinstituut voor de groene leefomgeving en Postbus 47 bundelt een grote hoeveelheid expertise op het gebied van de groene ruimte en het A new and scalable approach for rural 6700 AB Wageningen duurzaam maatschappelijk gebruik ervan: kennis van water, natuur, bos, milieu, T 317 48 07 00 bodem, landschap, klimaat, landgebruik, recreatie etc. www.wageningenUR.nl/alterra sanitation in Egypt De missie van Wageningen UR (University & Research centre) is ‘To explore the potential of nature to improve the quality of life’. Binnen Wageningen UR bundelen Alterra-rapport 2584 The village of Deir Gabal El-Tair as a pilot 9 gespecialiseerde onderzoeksinstituten van stichting DLO en Wageningen ISSN 1566-7197 University hun krachten om bij te dragen aan de oplossing van belangrijke vragen in het domein van gezonde voeding en leefomgeving. Met ongeveer 30 vestigingen, 6.000 medewerkers en 9.000 studenten behoort Wageningen UR wereldwijd tot de Joop Harmsen, Kamal Ouda Ghodeif, Mohamed Sherif Saad S. El Tony, Hakiem El Wagieh, aansprekende kennisinstellingen binnen haar domein. De integrale benadering van Enas Michael, Esam Helmy and Floris van der Veen de vraagstukken en de samenwerking tussen verschillende disciplines vormen het hart van de unieke Wageningen aanpak. A new and scalable approach for rural sanitation in Egypt The village of Deir Gabal El-Tair as a pilot Joop Harmsen1, Kamal Ouda Ghodeif2, Mohamed Sherif Saad S. El Tony3, Hakiem El Wagieh4, Enas Michael5, Esam Helmy5 and Floris van der Veen6 1 Alterra, Wageningen UR 2 Geology Department - Suez Canal University- Ismailyia 3 Minya, Mallawi, Irrigation Inspection, East Mallawi 4 Plant Systems 5 Minya Company for Water and Wastewater 6 REBEL group This research was undertaken as a joint activity of Alterra Wageningen UR Wageningen, in association with the Holding Company for Water & Wastewater (HCWW), Egypt.
    [Show full text]
  • Developments in Water Dams and Water Harvesting Systems Throughout History in Different Civilizations
    International Journal of Hydrology Book Review Open Access Developments in water dams and water harvesting systems throughout history in different civilizations Abstract Volume 2 Issue 2 - 2018 The use of water for domestic and agricultural purpose is not a new phenomenon. It has been used throughout centuries all over the world. After food, water is the basic Alper Baba,1 Chr Tsatsanifos,2 Fatma El component of human life and their settlement. This paper considers developments in Gohary,3 Jacinta Palerm,4 Saifullah Khan,5 S water dams and water harvesting systems throughout history in different civilisations. Ali Mahmoudian,6 Abdelkader T Ahmed,7 The major component of this review consists of hydraulic dams during Pre-Historical 8,9 Time, Bronze Ages (Minoan Era, Indus Valley Civilization, Early Ancient Egyptian Gökmen Tayfur,1 Yannis G Dialynas, 10 Era, Hittites in Anatolia, and Mycenaean Civilization), Historical Period, (Pre- Andreas N Angelakis 1 Columbian, Archaic Period, Classical Greek and Hellenistic Civilizations, Gandahara Department of Civil Engineering, Izmir Institute of Technology, and Mauryan Empire, Roman Period, and early Chinese dynasties), Medieval times Engineering Faculty, Turkey 2Pangaea Consulting Engineers Ltd, Greece (Byzantine Period, Sui, Tang and Song Dynasties in China, Venetian Period, Aztec 3Department of Water Pollution Research, National Research Civilization, and Incas) and Modern Time (Ottoman Period and Present Time). The Centre, Egypt main aim of the review is to present advances in design and construction of water 4Colegio de Posgraduados de Chapingo, Mexico dams and water harvesting systems of the past civilizations with reference to its use 5Institute of Social Sciences and Directorate of Distance for domestic as well as agricultural purposes, its impact on different civilizations Education, Bahauddin Zakariya University, Pakistan 6 and its comparison to the modern technological era.
    [Show full text]