Aeronautical Information Promulgation Advice Form

Total Page:16

File Type:pdf, Size:1020Kb

Aeronautical Information Promulgation Advice Form UNITED REPUBLIC OF TANZANIA DAILY NOTAM TANZANIA CIVIL AVIATION AUTHORITY Aeronautical Information Management LIST TEL: 255 22 2110223/224 International NOTAM Office FAX: 255 22 2110264 AFTN: HTDAYNYX P. O. Box 18001, E-mail: [email protected] 13 MAY 2020 [email protected] DAR ES SALAAM Website: www.tcaa.go.tz TANZANIA Document No: Page 1 of 9 Title: Daily List of Valid NOTAM TCAA/FRM/ANS/AIM-33 THE FOLLOWING NOTAM SERIES (A, B & C) WERE STILL VALID AT 0001 UTC. 2020: 0128, 0123, 0119, 0118, 0115, 0114, 0113, 0107, 0104, 0090, 0077, SERIES:A 0076, 0075, 0070, 0068, 0058 AND 0010 200507 DAR ES SALAAM FIR HTDC A0128/20 2005071440/2007101530 EST COVID -19: RESTRICTIONS ALL SCHEDULED AND NON-SCHEDULED INTERNATIONAL PAX FLIGHTS ARE SUSPENDED. THIS RESTRICTION DOES NOT APPLY TO AIRCRAFT OPERATING UNDER THE FOLLOWING CIRCUMSTANCES 1. EMPTY FLIGHTS FOR THE PURPOSE OF PICKING-UP PASSENGERS WITH A CONDITION OF CREW NOT TO DISEMBARK. IN CASE A COMPLETE ROUTING FLIGHT DURATION REQUIRES CREW CHANGE, IT IS ADVISED TO DEPLOY TWO SETS OF CREWS TO WORK IN ROTATION IN ORDER TO MINIMIZE CHANCES OF BEING SUBJECTED TO A MANDATORY QUARANTINE; 2. FLIGHTS FOR THE PURPOSE OF DROPPING TANZANIAN CITIZENS OR RESIDENTS THAT ARE STRANDED IN FOREIGN COUNTRIES; 3. AIRCRAFT IN A STATE OF EMERGENCY; 4. OVERFLIGHTS; 5. OPERATIONS RELATED TO HUMANITARIAN AID, MEDICAL AND RELIEF FLIGHTS; 6. ALTERNATE AERODROMES IDENTIFIED IN THE FLIGHT PLAN [INCLUDING THOSE BEING USED FOR EXTENDED DIVERSION TIME OPERATIONS (EDTOs)]; This is a controlled Document 9Document No: TCAA/FRM/ANS/AIM-33 Title: Daily List of Valid NOTAM Page 2 of 9 7. TECHNICAL LANDINGS WHERE PASSENGERS DO NOT DISEMBARK; 8. DIPLOMATIC FLIGHTS AS MAY BE ENDORSED BY NGOME/MINISTRY OF FOREIGN AFFAIRS AND EAST AFRICAN COOPERATION; AND 9. OTHER SAFETY-RELATED OPERATIONS. 200501 DAR ES SALAAM FIR HTDC 2005010000/2005312359 EST CHECKLIST OF NOTAM SERIES A IN FORCE ON MAY 1 2020 A0123/20 YEAR=2020 0010 0058 0068 0070 0075 0076 0077 0089 0090 0104 0107 0108 0111 0113 0114 0115 0118 0119 0122 0123 LATEST PUBLICATIONS: AIP AMENDMENT NR 0071/20 AIP SUPPLEMENT NR 0011/20 AIC NR 0006/20 CHECKLIST OF VALID AICS: YEAR 2000: 3 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 28 29 30 31 33 35 36 37 40 41 43 46 47 51 53 55 AND 56 2001: 3 2002: 2 AND 4 2003: 3 7 8 13 AND 14 2004: 5 AND 8 2005: 4 AND 12 2006: 8 9 AND 10 2007: 8 2008: 3 6 8 AND 10 2009: 4 7 8 10 12 13 AND 14 2010: 3 AND 4 2011: 3 4 AND 5 2012: 10 AND11 2013: 3 AND 9 2014: 3 AND 4 2015; 5 2017: 4 6 8 9 10 AND 11 2018: 3 4 5 7 AND 8 2019: 3 5 6 7 AND 8 2020: 1 2 5 AND 6 CHECKLIST OF VALID AIP SUPPLEMENTS: YEAR 2006: 15 2007: 13 2010: 20 2013: 11 2014: 2 AND 4 2015: 7 8 9 16 17 AND 18 2016: 4 15 AND 16 This is a controlled Document 9Document No: TCAA/FRM/ANS/AIM-33 Title: Daily List of Valid NOTAM Page 3 of 9 2017: 17 2019: 3 4 24 25 AND 29 2020: 2 3 4 5 6 7 AND 11 . 200423 ABEID AMANI KARUME INTL AIRPORT HTZA A0119/20 2004231406/2006231530 EST TWR SGL LAMP U/S. 200423 DAR ES SALAAM FIR HTDC A0118/20 2004231258/2005212359 EST NIL AIRAC PUBLICATION EFFECTIVE DATE 21 MAY 2020. (REF: AIP GEN 3.1-4) 200420 MWANZA HTMW 2004201235/2007201530 EST A0115/20 NEW PAPI RWY 12/30 INSTL, AWAITING FLTCK. 200420 JULIUS NYERERE INTL AIRPORT HTDA A0114/20 2004200752/2007201530 EST HTDA/HKNA AND HTDA/FAOR CIRCUITS WILL BE SWITCHED FM AFTN TO AMHS, USERS TO EXP INTERMITTENT COM FOR BOTH INCOMING AND OUTGOING DATA COM. 200417 DAR ES SALAAM FIR HTDC A0113/20 2004170638/2005181530 EST NDB DS 282.5KHZ U/S. 200408 MWANZA HTMW 2004081305/PERM APP AND TWR SER SEPARATED. 1.APP FREQ-132.1MHZ(PRIMARY) A0107/20 2.APP FREQ-122.8MHZ(SECONDARY) 3.TWR FREQ-119.8MHZ (REF. AIP HTMW AD 2.18). 200407 DAR ES SALAAM FIR HTDC 2004070935/2007081530 EST A0104/20 DV 112.7 MHZ DVOR OPR ON A SINGLE TRANS. 200330 DAR ES SALAAM FIR HTDC 2003300820//2006011530 EST A0090/20 ZZ 385 KHZ NDB U/S. A0077/20 200305 DAR ES SALAAM FIR HTDC 2003050500/2006051300 EST 0500 - 1300 DANGER AREA HTD9, HTD10 AND HTD11 ACTIVATED (REF: AIP ENR 5.1-3) FM GND TO 20000FT AMSL. This is a controlled Document 9Document No: TCAA/FRM/ANS/AIM-33 Title: Daily List of Valid NOTAM Page 4 of 9 200305 DAR ES SALAAM FIR HTDC 2003050500/2006051300 EST 0500 - 1300 A0076/20 MIL TRAINING FLT WILL TAKE PLACE FM HTMW COORD 022638S 0325554E TO THE AREA HTD9, HTD10, HTD11 AND BACK TO HTMW, PILOTS TO EXP DLA AND STRICTLY ADHERE TO ATC INSTRUCTIONS. FM GND TO 10000FT AMSL. 200305 DAR ES SALAAM FIR HTDC A0075/20 2003050400/2006051300 EST 0400 – 1300 MIL TRAINING FLT WILL TAKE PLACE FM TANGA WI AN AREA ENCLOSED WITH THE FOLLOWING COORD:- 05 02 24.705S 038 59 05.881E 04 56 35.986S 038 48 33.782E 05 22 27.105S 038 58 33.955E 05 11 02.295S 039 02 26.620E, PILOTS TO AVOID THE AREA AND STRICTLY ADHERE TO ATC INSTRUCTIONS. CIVILIAN OPS AT HTTG COMMENCE AT NML TIME 0430 UTC, FM GND TO 6000FT AMSL. 200302 JULIUS NYERERE INTL AIRPORT HTDA 2003020600/2006021530 EST A0070/20 GP ILS RWY 05 FREQ 329.6 MHZ OPR ON SINGLE SYSTEM ONLY. 200228 KILIMANJARO INTL AIRPORT HTKJ 2002281440/2005281538 EST A0068/20 ATIS U/S 200121 KILIMANJARO INTL AIRPORT HTKJ 2002211149/2005211530 EST A0058/20 ATC TRAINING ON PROGRESS AT TWR AND APP PSN FREQ 120.1 MHZ AND 119.9 MHZ. PILOTS TO BE PATIENT AND COOPERATIVE. 200107 MWANZA HTMW 2001090300/PERM RWY 12/30 DECLARED DISTANCES TO READ AS FLW :- RWY TORA TODA ASDA LDA A0010/20 12 3712 3712 3712 3712 30 3712 3712 3712 3712 (REF:AIP AD HTMW 2.13) 2020: 0026,0025, 0024, 0023, 0019, 0017, 0016, 0010 AND 0009 SERIES:B 2017: 0057 2016: 0097 AND 0095 This is a controlled Document 9Document No: TCAA/FRM/ANS/AIM-33 Title: Daily List of Valid NOTAM Page 5 of 9 200507 DODOMA AIRPORT HTDO 2005070935/2007301530 EST B0026/20 EXTD APRON WIP. PILOTS ADVISED TO ADHERE TO ATC AND MARSHERLLER INSTRUCTIONS. 200505 SONGWE AIRPORT HTGW 2005051300/2007041530 EST B0025/20 PAPI RWY 09 / 27 U/S. 200501 DAR ES SALAAM FIR HTDC 2005010000/2005312359 EST CHECKLIST OF NOTAM SERIES B IN FORCE ON MAY 1 2020 YEAR=2016 0095 0097 YEAR=2017 0057 YEAR=2020 0009 0010 0016 0017 0019 0021 0022 0023 0024 B0024/20 LATEST PUBLICATIONS: AIP AMENDMENT NR 0071/20 AIP SUPPLEMENT NR 0011/20 AIC NR 0006/20 CHECKLIST OF VALID AICS: YEAR 2000: 3 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 28 29 30 31 33 35 36 37 40 41 43 46 47 51 53 55 AND 56 2001: 3 2002: 2 AND 4 2003: 3 7 8 13 AND 14 2004: 5 AND 8 2005: 4 AND 12 2006: 8 9 AND 10 2007: 8 2008: 3 6 8 AND 10 2009: 4 7 8 10 12 13 AND 14 2010: 3 AND 4 2011: 3 4 AND 5 2012: 10 AND11 2013: 3 AND 9 2014: 3 AND 4 2015; 5 2017: 4 6 8 9 10 AND 11 2018: 3 4 5 7 AND 8 2019: 3 5 6 7 AND 8 2020: 1 2 5 AND 6 CHECKLIST OF VALID AIP SUPPLEMENTS: YEAR 2006: 15 2007: 13 2010: 20 2013: 11 2014: 2 AND 4 This is a controlled Document 9Document No: TCAA/FRM/ANS/AIM-33 Title: Daily List of Valid NOTAM Page 6 of 9 2015: 7 8 9 16 17 AND 18 2016: 4 15 AND 16 2017: 17 2019: 3 4 24 25 AND 29 2020: 2 3 4 5 6 7 AND 11 200427 TABORA AIRPORT HTTB 2004271145/2005271530 EST B0023/20 WDI U/S 200327 SONGEA AIRPORT HTSO 2003270948/2006271530 EST THR RWY 32 DISPLACED BY 745M DUE WIP. DECLARED DIST TO READ AS FLWS: B0019/20 RWY TORA TODA ASDA LDA 14 880M 880M 880M 880M 32 880M 880M 880M 880M. PILOTS STRICTLY ADHERE TO ATC INSTRUCTIONS. 200319SONGEA AIRPORT HTSO B0017/20 2003190901/2006271530 EST TWY Z CLSD DUE REHABILITATION WIP ON RWY 32. 200302 PEMBA AIRPORT HTPE 2003021000/2006011530 EST B0016/20 SGL LAMP U/S 200225 KIGOMA AIRPORT HTKA B0010/20 2002251341/ PERM FREQ 118.4 MHZ (KIGOMA TWR) CHANGED TO 133.5 MHZ (REF: AIP HTKA AD 2.18). 200225 DODOMA AIRPORT HTDO B0009/20 2002251341/ PERM FREQ 119.2 MHZ (DODOMA TWR) CHANGED TO 133.0 MHZ (REF: AIP HTDO AD 2.18). 170606 DODOMA AIRPORT HTDO 1706060937/PERM DUE TO THE EXTENSION OF RWY BY 500M DECLARED DIST NOW HAVE CHANGED TO: B0057/17 RWY TODA TORA ASDA LDA 09 2250M 2250M 2250M 2250M 27 2450M 2450M 2450M 2250M (REF: AIP HTDO AD 2.13). 160909 DODOMA AIRPORT HTDO B0097/16 1609091042/PERM THR COORD AND MAG BRG HAS NOW CHANGED AS FLWS:- This is a controlled Document 9Document No: TCAA/FRM/ANS/AIM-33 Title: Daily List of Valid NOTAM Page 7 of 9 RWY THR COORD MAG BRG 09 061012.7860S 0354437.1160E 091 DEG 27 061014.7900S 0354556.4960E 272 DEG (REF: AIP HTDO AD 2.12 AND 2-6).
Recommended publications
  • THE UNITED REPUBLIC of TANZANIA Tanzania Airports Authority
    THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION Tanzania Airports Authority Tender No AE-027/2019-2020/HQ/N/1 For Lease of Space for Provision of Services at Tanzania Airports Authority Managed Airports Invitation to Bid Date: 06th December, 2019 1. Tanzania Airports Authority has available spaces for various business opportunities (for Leasing) at various managed airports and intends to lease the premises to interested companies for provision of various services. It is expected that TAA will generate more revenues under the contracts and hence improve service delivery to its airports. 2. The Tanzania Airports Authority now invites sealed bids from eligible business community for leasing the spaces (Business premises) at various airports as follows: LOT DESCRIPTION ITEM DESCRIPTION QUANTITY AREA OF LOT OF BUSINESS (SQM) 1. Arusha Airport 7 Kiosk for Soft 1 33 Drink 2. Bukoba Airport 6 Kiosk for Mobile 1 4 money services 3. Dodoma Airport 3 Kiosk for Snacks 1 4 4. Iringa Airport 1 Baggage Wrapping 1 4 Services 3 Restaurant 1 72 4 Kiosk for Curio 2 3 Shop 3 LOT DESCRIPTION ITEM DESCRIPTION QUANTITY AREA OF LOT OF BUSINESS (SQM) 5 Kiosk for Retail 1 3.5 shop 5. Kigoma Airport 1 Baggage Wrapping 1 4 Services 2 Restaurant 1 19.49 3 Kiosk for Retail 2 19.21 shop 4 Kiosk for Snacks 1 9 5 Kiosk for Curio 1 6.8 Shop 6. Kilwa Masoko 1 Restaurant 1 40 Airport 2 Kiosk for soft 1 9 drinks 7. Lake Manyara 2 Kiosk for Curio 10 84.179 Airport Shop 3 Kiosk for Soft 1 9 Drink 4 Kiosk for Ice 1 9 Cream and Beverage Outlet 5 Car Wash 1 49 6 Kiosk for Mobile 1 2 money services 8.
    [Show full text]
  • Attachment a the United Republic of Tanzania
    ATTACHMENT A THE UNITED REPUBLIC OF TANZANIA ANNEXES TO THE GUIDELINES FOR THE PREPARATION OF ANNUAL PLAN AND BUDGET FOR 2013/14 IN THE IMPLEMENTATION OF THE FIVE YEAR DEVELOPMENT PLAN 2011/12-2015/16 DECEMBER, 2012 TABLE OF CONTENTS LIST OF ABREVIATIONS ............................................................................................................................. IV CHAPTER I: REVIEW OF MACROECONOMIC PERFORMANCE AND 2011/12 ANNUAL DEVELOPMENT PLAN 1 INTRODUCTION ................................................................................................................................................. 1 REVIEW OF MACROECONOMIC PERFORMANCE ........................................................................................................ 1 IMPLEMENTATION OF ANNUAL DEVELOPMENT PLAN 2011/12 ................................................................. 12 REGIONAL COOPERATION ........................................................................................................................ 24 ACHIEVEMENTS: ....................................................................................................................................... 24 CHAPTER II: MACROECONOMIC OUTLOOK AND MEDIUM TERM FOCUS .................................................. 26 INTRODUCTION ............................................................................................................................................... 26 Global Economic Growth and Outlook ..................................................................................................
    [Show full text]
  • Register of IJS Locations V1.Xlsx
    REGISTER OF IJS LOCATIONS Region Country Location JIG Member Inspected Africa Angola Fishing Port Terminal PUMA May 2018 Africa Angola Luanda 4 de Fevereiro Airport PUMA May 2018 Africa Angola Lubango Mukanka Airport PUMA May 2018 Africa Benin Cadjehoun Airport PUMA May 2018 Africa Benin Cotonou Terminal PUMA May 2018 Africa Botswana Francistown Airport PUMA November 2018 Africa Botswana Gaborone Sir Seretse Khama AirpoPUMA November 2018 Africa Botswana Gaborone Sir Seretse Khama AirpoPUMA November 2018 Africa Botswana Kasane Airport PUMA November 2018 Africa Ethiopia Arba Minch OiLibya October 2018 Africa Ethiopia Axum OiLibya October 2018 Africa Ethiopia Bole OiLibya October 2018 Africa Ethiopia Dire Dawa OiLibya October 2018 Africa Ethiopia Gondar OiLibya October 2018 Africa Ethiopia Jijiga OiLibya October 2018 Africa Ethiopia Jimma OiLibya October 2018 Africa Ghana Kotoka International Airport PUMA November 2018 Africa Kenya Mombasa IP OiLibya OiLibya October 2018 Africa Kenya Nairobi IP OiLibya OiLibya October 2018 Africa Malawi Chileka Int Airport (Blantyre) PUMA April 2018 Africa Malawi Kamuzu int.Airport (Lilongwe) PUMA April 2018 Africa Morocco Ben Slimane OiLibya November 2018 Africa Morocco Casablanca OiLibya May 2018 Africa Morocco Fez OiLibya November 2018 Africa Morocco Nador OiLibya November 2018 Africa Morocco Oujda OiLibya November 2018 Africa Morocco Rabat OiLibya May 2018 Africa Morocco Tangier OiLibya May 2018 Africa Morocco Tetouan OiLibya May 2018 Africa Morocco Tit Melil OiLibya November 2018 Africa Mozambique Maputo
    [Show full text]
  • Flight Calibration of Landing and Navigation Aids
    UNITED REPUBLIC OF TANZANIA AIC TANZANIA CIVIL AVIATION AUTHORITY Aeronautical Information Management 05/19 Nyerere/ Kitunda Road Junction FAX: (255 22) 2844300, 2844302 (Pink 70) Aviation House, 1st Floor, PHONE: (255 22) 2198100, 2844291. P.O. Box 2819, DAR ES SALAAM AFS: HTDQYOYO 07 OCT Email: [email protected], [email protected] Website: www.tcaa.go.tz Document No: Title: AIC Page 1 of 2 TCAA/FRM/ANS/AIS-30 The following circular is promulgated for information, guidance and necessary action Hamza S. Johari Director General FLIGHT CALIBRATION OF LANDING AND NAVIGATIONAL AIDS The following Landing and Navigational Aids in the Dar es Salaam Flight Information Region (DAR FIR) were flight checked and approved for operational use on the dates indicated:- 1. Julius Nyerere International Airport – HTDA i) ILS (GP) and (LLZ) Runway 05 routine flight checked on 11 September 2019 and approved for operational use. ii) PAPI Runway 05 and 23 routine flight checked on 11 March 2019 and approved for operational use. iii) ‘DV’ DVOR/DME DV 112.7 MHz routine flight check carried out on 25 September 2018 and approved for operational use. 2. Kilimanjaro International Airport – HTKJ i) ‘KV’ DVOR/DME KV 115.3 MHz routine flight checked on 24 September 2018 and approved for operational use. ii) ILS (GP) and (LLZ) Runway 09 routine flight checked on 09 September 2019 and approved for operational use. iii) PAPI Runway 09 and 27 routine flight checked on 05 March 2019 and approved for operational use. 3. Abeid Amani Karume International Airport – HTZA i) PAPI Runway 18 and 36 routine flight checked on 10 March 2019 and approved for operational use.
    [Show full text]
  • SYNOPTIC SUMMARY Pemba Airport, with About 360 Mm Reported During the Third Dekad
    ISSN No: 0856-0919, Volume 8, Issue 4 April 2006 APRIL – HIGHLIGHTS • Long rains (Masika) continued over much of the bimodal rainfall regime while rainfall activities tapered off over unimodal areas of the central and southwestern highlands • Wet and cloudy conditions in May will further improve growth of immature crops but also impede drying and harvesting of matured crops amount recorded during the month was 563.3 mm at SYNOPTIC SUMMARY Pemba Airport, with about 360 mm reported during the third dekad. Over most of central region and parts of southern Lake Victoria basin he dominant feature for April was the non- Fig. 1: April 2006 Rainfall Totals (mm) T propagating (stationary) easterly wave which Bukoba Kayanga Musoma maintained its position along the coast of East Africa 2 thus advected moist air from the Indian Ocean Ngara Mwanza Arusha Shinyanga Moshi towards northern coast and north-eastern highlands. Mbulu Same 4 Babati During April, the Azores and Siberian anticyclones Kasulu Singida Kigoma Urambo Tanga over the northern hemisphere relaxed while the Tabora Handeni Pemba Pangani Arabian ridge remained weak, thus allowing the 6 Dodoma ude (°S) t i Zanzibar southern systems especially the East African ridge to t Morogoro La Dar es Salaam extend further north. In the southern hemisphere Iringa Sumbawanga systems, the anticyclones (St. Helena and Mascarene) 8 continued to intensify giving way to an East African Mbozi Mbeya Mufindi Mahenge Kilwa ridge to dominate over most areas in the country. The Makete 10 Mtwara zonal component of the Inter-Tropical Convergence Songea Zone (ITCZ) was active over northern cost, Newala northeastern highlands and Lake Victoria basin.
    [Show full text]
  • A TRIANGLE of VULNERABILITY Changing Patterns of Illicit Trafficking Off the Swahili Coast
    RESEARCH REPORT A TRIANGLE OF VULNERABILITY Changing patterns of illicit trafficking off the Swahili coast ALASTAIR NELSON JUNE 2020 A TRIANGLE OF VULNERABILITY Changing patterns of illicit trafficking off the Swahili coast W Alastair Nelson JUNE 2020 ACKNOWLEDGEMENTS This study is based on knowledge, understanding and personal experiences from numerous people who shared their time and insights with us during the research and writing. Some of these were dispassionate, some deeply personal and based on incredible lived histories. Profound thanks are due to everyone who gave their time, insights and reflections. Thanks are due to ‘field researcher #1’ who undertook independent field- work, accompanied the author in the field, and used prior connections to some of the illicit networks to develop our understanding of the illicit flows in this triangle. Thanks to Simone Haysom for support in the field and numerous discussions to guide the work all the way through, also to Julian Rademeyer for input and critical motivation towards the end. Mark Shaw and Julia Stanyard gave crucial intellectual input and transformed the structure of the report. Thanks to Tuesday Reitano and Monique de Graaff for making things happen. Also, to Mark Ronan, Pete Bosman and Jacqui Cochrane of the GI editorial and production team for producing the maps and the final report. ABOUT THE AUTHOR Alastair coordinates the GI’s Resilience Fund work in Mozambique and conducts research into illicit trafficking, with a particular focus on the illegal wildlife trade. He has 25 years’ experience implementing and leading field-conservation programmes in the Horn of Africa, East and southern Africa.
    [Show full text]
  • World Bank Document
    Zanzibar: A Pathway to Tourism for All Public Disclosure Authorized Integrated Strategic Action Plan July 2019 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 List of Abbreviations CoL Commission of Labour DMA Department of Museums and Antiquities (Zanzibar) DNA Department of National Archives (Zanzibar) GDP gross domestic product GoZ government of Zanzibar IFC International Finance Corporation ILO International Labour Organization M&E monitoring and evaluation MoANRLF Ministry of Agriculture, Natural Resources, Livestock and Fisheries (Zanzibar) MoCICT Ministry of Construction, Industries, Communication and Transport (Zanzibar) MoEVT Ministry of Education and Vocational Training (Zanzibar) MoFP Ministry of Finance and Planning (Zanzibar) MoH Ministry of Health (Zanzibar) MoICTS Ministry of Information, Culture, Tourism and Sports (Zanzibar) MoLWEE Ministry of Lands, Water, Energy and Environment (Zanzibar) MoTIM Ministry of Trade, Industry and Marketing (Zanzibar) MRALGSD Ministry of State, Regional Administration, Local Government and Special Departments (Zanzibar) NACTE National Council for Technical Education (Tanzania) NGO nongovernmental organization PPP private-public partnership STCDA Stone Town Conservation and Development Authority SWM solid waste management TISAP tourism integrated strategic action plan TVET technical and vocational education and training UNESCO United Nations Educational, Scientific and Cultural Organisation UWAMWIMA Zanzibar Vegetable Producers’ Association VTA Vocational
    [Show full text]
  • Dodoma Aprili, 2019
    JAMHURI YA MUUNGANO WA TANZANIA WIZARA YA UJENZI, UCHUKUZI NA MAWASILIANO HOTUBA YA WAZIRI WA UJENZI, UCHUKUZI NA MAWASILIANO MHESHIMIWA MHANDISI ISACK ALOYCE KAMWELWE (MB), AKIWASILISHA BUNGENI MPANGO NA MAKADIRIO YA MAPATO NA MATUMIZI YA FEDHA KWA MWAKA WA FEDHA 2019/2020 DODOMA APRILI, 2019 HOTUBA YA WAZIRI WA UJENZI, UCHUKUZI NA MAWASILIANO MHESHIMIWA MHANDISI ISACK ALOYCE KAMWELWE (MB), AKIWASILISHA BUNGENI MPANGO NA MAKADIRIO YA MAPATO NA MATUMIZI YA FEDHA KWA MWAKA WA FEDHA 2019/2020 A. UTANGULIZI 1. Mheshimiwa Spika, baada ya Mwenyekiti wa Kamati ya Kudumu ya Bunge ya Miundombinu kuweka mezani Taarifa ya Utekelezaji wa Mpango na Bajeti ya Wizara, naomba sasa kutoa hoja kwamba Bunge lako Tukufu likubali kupokea na kujadili Taarifa ya Utekelezaji wa Mpango na Bajeti ya Wizara ya Ujenzi, Uchukuzi na Mawasiliano kwa mwaka wa fedha 2018/2019. Aidha, naomba Bunge lako Tukufu lijadili na kupitisha Mpango na Bajeti ya Wizara kwa mwaka wa fedha 2019/2020. 2. Mheshimiwa Spika, nianze kwa kumshukuru Mwenyezi Mungu kwa kutujalia uhai na kutuwezesha kukutana tena leo kujadili maendeleo ya shughuli zinazosimamiwa na sekta za Ujenzi, Uchukuzi na Mawasiliano. 3. Mheshimiwa Spika, nitumie fursa 1 hii kuwapongeza Mheshimiwa Dkt. John Pombe Joseph Magufuli, Rais wa Jamhuri ya Muungano wa Tanzania, Mheshimiwa Dkt. Alli Mohammed Shein, Rais wa Serikali ya Mapinduzi ya Zanzibar, Mheshimiwa Samia Suluhu Hassan, Makamu wa Rais wa Jamhuri ya Muungano wa Tanzania na Mheshimiwa Kassim Majaliwa Majaliwa (Mb.), Waziri Mkuu wa Jamhuri ya Muungano wa Tanzania kwa uongozi wao thabiti ambao umewezesha kutekelezwa kwa mafanikio makubwa Ilani ya Uchaguzi ya CCM ya mwaka 2015, ahadi za Viongozi pamoja na kutatua kero mbalimbali za wananchi.
    [Show full text]
  • Kwanini Carrying Capacity Assessment Study
    Kwanini Carrying Capacity Assessment June - September 2014 Investors Government Guests Kwanini People Workforce Prepared for Ministry of Information, Culture, Tourism and Sports Hon. Said Ali Mbarouk By Denise Bretlaender & Pavol Toth Table of Contents KWANINI CARRYING CAPACITY ASSESSMENT ................................................................................................................. 1 1. INTRODUCTION ............................................................................................................................................... 3 2. LITERATURE REVIEW ....................................................................................................................................... 3 2.1 SUSTAINABLE TOURISM ....................................................................................................................................... 3 2.2 MANAGEMENT TOOLS FOR SUSTAINABLE TOURISM .................................................................................................. 4 3. CARRYING CAPACITY EXERCISE ........................................................................................................................ 5 4. METHODOLOGY .............................................................................................................................................. 8 5. ANALYSES ...................................................................................................................................................... 10 5. 1 CURRENT STATE OF TOURISM ............................................................................................................................
    [Show full text]
  • MOZAMBIQUE November 2019 - October 2020
    MOZAMBIQUE November 2019 - October 2020 1 There would be no us without you. 2 4 Sense of Oceans - Who we are 6 About Us 8 Our people 10 Product offering 12 Sustainable tourism 14 Systems through technology 16 Regional maps 18 Parks of Mozambique 20 Attractions of Mozambique MOZAMBIQUE 22 Introduction 24 Country information 26 Tours at a Glance COMFORT TOUR 28 Mozambique Highlights CLASSIC TOUR 30 Northern Mozambique Explorer COMFORT SELF-DRIVE TOUR 32 Bush and Beach Comfort 34 Accommodation KENYA 44 Introduction 46 Country information CLASSIC GUIDED TOUR 48 Tsavo East and Tsavo West: Safari and Beach TANZANIA 50 Introduction 52 Country information CLASSIC GUIDED TOUR 54 Tanzania and Zanzibar: Safari and Beach 56 ADD ON PACKAGES 58 COMING SOON Reunion and Madagascar 60 INDEX Contents 3 Sense of Oceans… Who we are For over three decades, Tourvest Destination Management has prided itself in offering only the highest quality, most memorable and professional tour services to both local and international travellers. With our aim to grow our already expansive African footprint, we have joined hands with Mozambique Voyages to form Sense of Oceans – a division that will take both organisations into a new phase of exploring travel possibilities throughout the Indian Ocean, starting with Mozambique. Sense of Oceans combines the expertise of two successful organisations. Mozambique Voyages specialises in both self-drive and tailor-made holidays in Mozambique and are known for providing travellers with an unprecedented level of access and specialisation to ensure truly unforgettable travel experiences. On the other hand, Tourvest Destination Management’s heritage and reputation as one of the best destination management companies in Africa is proven by our inbound business unit being the largest ground handler of foreign tourists to Africa.
    [Show full text]
  • BUDGET BACKGROUND and MEDIUM TERM FRAMEWORK 2012/13 – 2014/15 Table of Contents
    BUDGET BACKGROUND AND MEDIUM TERM FRAMEWORK 2012/13 – 2014/15 Table of Contents List of Tables ........................................................................................................................... iii List of Acronyms and Abbreviations ........................................................................................ iv PREFACE ............................................................................................................................... vii Chapter I ................................................................................................................................... 1 BACKGROUND ....................................................................................................................... 1 1.1 Introduction ............................................................................................................................................. 1 1.2 Organisation of the Report .................................................................................................................... 1 Chapter II ................................................................................................................................. 3 THE MACROECONOMIC FRAMEWORK........................................................................... 3 2.1 Recent Macroeconomic Development ............................................................................................... 3 A: Annual GDP Growth and Sector Contributions ...........................................................................
    [Show full text]
  • The United Republic of Tanzania Ministry of Works, Transport and Communication Tanzania Airports Authority Proposed Projects
    THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA AIRPORTS AUTHORITY PROPOSED PROJECTS WRITE UP FOR THE BELGIAN TRADE MISSION TO TANZANIA NOVEMBER, 2 0 1 6 , S No. REMARKS I. PROJECT NAME Upgrading of MWANZA AIRPORT PROJECT CODE 4209 PROJECT LOCATION IATA:MWZ; ICA0:1-1.TMW; with elevation above mean sea level (AMSL) 3763ft/1147m FEASIBILITY STUDY Feasibility Study for construction of new terminal building REMARKS and landside pavements, parallel taxiway, widening of runway 45wide to 60m including relocation of AGL System and improvement of storm water drainage was completed in June, 2016 STATUS Contractor for extension of runway, rehabilitation of taxiway to bitumen standard, extension of existing apron and cargo apron, construction of control tower, cargo building, power house and water supply system has resumed to site. ncti, ahold03-)3 ConSkiNclp4) N_ Teicyrri2 WORKS REQUIRING and landside paveThents, parallel taxiway, widening of runway FUNDING 45wide to 60m including relocation of AGL System and improvement of storm water drainage PROJECT COST ESTIMATES/ USD.113 Million FINANCING GAP1 • Improved efficiency and comfort upon construction of new terminal building. • Improved efficiency upon installation of AGL and NAVAIDS • Improved safety upon Construction of Fire Station and PROJECT BENEFITS associated equipment • Improved safety and security upon construction of Control Tower • Improved security upon implementation of security programs. FINANCING MODE PPP, EPC, Bilateral and Multilateral Financing
    [Show full text]