Railway Transit Contents Influences of Active Node on Overall Bearing Capacity of Steel Bracing in Excavations...... 6 Effects of Spatial Variability on Post Construction Settlement of Composite Foundation of High Speed Railway...... 8 Effect of Buried Depth and Avoidance Distance on the Vibration of Ground Building in Loess Area...... 9 Analysis and Forecast on Travel Characteristics Considering Passengers' Heterogeneity...... 10 Simulation Analysis of Coordination between Train and Passenger Operation of Xipu Transfer Station...... 11 Study on Seamless Transfer of Regional Rail Transit...... 12 Study on Dynamic Characteristics of Asphalt Concrete Substructures Under CRTS Type Ballastless Track...... 13 Research on Crew Scheduling Problem Based on Time Space State Network and Lagrangian Relaxation...... 14 Research on Seismic Damping of Long-Span Steel Truss Beam Based on Viscous Damper.16 A Computational Graph Approach for Identifying Trip Generation, Destination Choice and Mode Choice...... 17 Research on the Intelligent Detection and Evaluation System of Railway Vehicle Wheel...... 18 Time- And Spatial- Based Vulnerability Analysis of Railway Systems...... 19 Numerical Analysis on the Aerodynamic Drag of High-speed Train...... 20 Study on Calculation and Estimation of Cumulative Deformation of High-Speed Railway Under Cyclic Dynamic Loading...... 21 Vietnam Track Maintenance Management...... 22 A Reachability Study on the Characteristics of 's High Speed Railway Station...... 23 Vehicle-Bridge Interaction Characteristics of High-speed Trains Passing on Bridge at the Same Speed...... 24 Optimization of the Number of Automatic Ticket Checkers for Urban Rail Transit Station.25 Study on the Adaptability of 400km / h High - speed Train Running at 350km / h High -Speed Railway...... 26 Vibration Characteristics of Pile-Group Foundation Based on TLM-PML-VM Method...... 27 Situation Analysis and Development Prospect of High-speed Rail Freight in China...... 29 Transit Network Efficiency: Through-Running vs. Dead-end Operations in Metropolis...... 30 Review of Rolling Contact Fatigue Crack Between Railway Wheels and Rail...... 31 Dynamic Monitoring Technology of Deep Foundation Pit Construction in Complex Environment...... 32 Model and Algorithm for Train Platform Scheme Rescheduling at High-Speed Railway Hub Station...... 33 Analysis of the Ground Vibrations Induced by Passenger Trains and Freight Trains...... 34 Risk Assessment and Counter Measures of Rail Transportation Industry Based on Financial

1 Sensitivity...... 35 Damping Rail Properties in Frequency Domain by Using 2.5D Finite Element and Boundary Element Method...... 36 Study on High-Speed Wheel-Rail Transient Response at Rail Welding Joint...... 37 Development and Prospect of Suspended Monorail in China...... 38 A New Prediction Method of Vertical Z-vibration Level of Ground Building Induced by Subway Operation...... 39 Key Construction Techniques of No Reaction Frame Shield Machine Originating in Small Radius Curve Tunnel...... 40 Research on the Monitoring Technology of Temperature Stress in High-Speed Railway Jointless Track...... 41 An Optimization Model for Rail Container Operation Planning...... 42 Research on the Experience for the Development of Rail Transportation Industry in the World ...... 43 An Efficient Time-Domain Solution of Slab Track Dynamic Model Based on Periodic Spectral Method...... 44 Discussion on the Protection of the Karst Cultural Relics and Ancient Wells in the Subway Station...... 45 Simulation Analysis on the Stress of Deep Foundation Pit Bitten Pile in Metro Complex Area ...... 46 Analysis of Force and Damage of Broad-Narrow Joint of CRTSⅡSlab Track...... 47 Research on Dynamic Response and Influential Parameters of the Ballastless Track Including ACSL...... 48 Noise Prediction for Rail Bridges Based on Power Flow Method and Two-Dimensional Sound Field Model...... 49 A Study of Snow Accumulation on Bogie of a High-Speed Train Based on Discrete Phase Model...... 50 Dynamic Identification of Wheel/Rail Contact Parameters and Its Application...... 51 Research on China High Speed Rail Passenger Revenue Management Based on Unconstrainted Demand...... 52 Discussion on Quality Control Technology of Bored Pile in Strong Karst Area...... 53 Research on Safety Evaluation and Management of High-Speed Railway Drivers...... 54 Research on Railway Passenger Transportation Risks Evaluation Using LEC and Grey System Theory...... 55 Can Line Extension Planning Mitigate Capacity Mismatch on Existing Rail Network?...... 56 Study on Connecting of Through Train Based on Freight Delivery Time Frame...... 57 Study on the Selection of Similar Days in the Passenger Flow Prediction of Urban Rail Transit ...... 58 Research on Railway Passenger Traffic Safety Risk Assessment Method Based on Fuzzy Fault Tree...... 60

2 The Numerical Simulation and Analysis of the Critical Velocity in Cross-Passage of Metro Tunnel...... 62 A Simple Model for Vertical Stress Attenuation of Ballasted Subgrade in High-Speed Railway ...... 63 Research on Passenger Flow Characteristics of Urban Rail Transit in Valley Linear City...... 64 The Application of BIM Technology on the Construction of the Metro Station Projects...... 65 Applicability Analysis on Small and Medium Carrying-Capacity Urban Rail Transit...... 66 Study of Network Operation Organization of ...... 67 Technology and Case of Hazards-Reduction Railway Selection in Complicated Mountainous Region...... 68 Research on Passenger Flow Simulation System of Urban Rail Transit(UTPS)...... 69 Research and Application of Wireless Interference Detection Method for High-Speed Railway ...... 70 A Conditional Frailty Survival Model for Recurrent Rail Defects...... 71 Study on Reasonable Angle of Subway Arch Feet’sToe Angle Based on Surrounding Rock of Lode Angle and Failure Approach Index...... 72 Train Planning Optimization for the Intercity Railway with Time-varying Demand...... 74 Study on the Space-Time Reachability of Railroad Comprehensive Hub City...... 76 Noise Reduction Effects of Different Sound Barriers on Rail Transit Bridge...... 77 Analyses the Phenomenon of Sd Over-Limit of Line 8...... 79 Structure and Characteristics Analysis of Tram Network...... 80 Analysis Method of Important Degree of Urban Rail Transit Station...... 81 Development and Research Status of Resilient Wheels for Urban Rail Vehicles...... 82 Static Test of Node of the Subway Station Construction by Combining the Shield Method and PBA Method...... 83 Research on Urban Rail Transport Operation Subsidy...... 84 Research on Rail Pre-grinding Strategy&Growth Characteristics of Rail Defects in High-speed Railway...... 85 Effects of Pire Deformation on Train Operations Within High Speed Railway Bridge...... 86 Research on Capacity Control for Railway Containers with Customer Rating...... 87 Analyse the Metro Safety Accident and Safety Management...... 88 Recovery of Freight Locomotive Schedule in Emergency Condition...... 89 Time Effect of Pile-Soil-Geogrid-Cushion Interaction of RPCF under High-Speed Railway Embankments...... 91 New Technology and Application of Road Slope Disaster Prevention...... 92 Optimize the Utilization of Arrival-departure Tracks and Throat Area in High Speed Railway Station...... 94 Numerical Analysis of Ballast-TDA Mixture under Cyclic Loading...... 95 Research on High-Speed Railway Express Freight Transportation Organization...... 96 Numerical Analysis of CFG Pile Settlement in Soft Rock Foundation of High-Speed Railway

3 ...... 98 Research on Unsteady Nonthermal Equilibrium Seepage Model and Numerical Algorithm of Riprap Subgrade...... 99 Study on Chloride Diffusion Model and Life Prediction of Concrete Box Girder Bridge...... 100 Rail Condition Monitoring Using ABA Measurements: Defect Detection in the Netherlands and Romania...... 101 Structure of Compacted Maryland Clay and Suction Profiles...... 102 Research in Rail Trainsit Connection System for Tianjin Binhai Airport under The New Situation...... 103 Hybrid Simulation to Investigate the Dynamic Behavior of Track Transition Zones...... 104 Shallow of Subway Deep Foundation Pit Adjacent to High-Rise Building Construction Control Technology...... 105 Structure Analysis on Information System of Railway Cold Chain Logistics Park Based on Multi-Agents...... 106 The Analysis and Treatment of Lining Cracks under the Influence of Adjacent Existing Tunnel...... 107 Effects of Spatial Variability on Settlement of Composite Foundation of High Speed Railway ...... 108 Dynamic Behaviors of Railway’s Base Course Materials Subjected to Long-Term Low-Level Cyclic Loading...... 109 Local Vibration and Structure Noise Analysis of U - Beam Based on FE-SEA Hybrid Method ...... 110 Optimization Research on the Operation Organization of Express/Local Train in Urban Rail Transit...... 111 Research on the Skip-Stop Operation in Batong Line Using Genetic Algorithm...... 112 Relation Between Wheel Polygon and Wheel-rail Impact Vibration for Passenger Car in Ordinary Railway...... 113 Research on Psychologies and Behaviours of Subway Crowd under Special Events...... 114 The Optimization Design for Facilities and Equipment Layout in Urban Rail Transit Stations ...... 115 Passenger Travel Identification of Rail Transit Based on WiFi Information...... 116 Gradient Based Methods Used in Dynamic Transportation System Optimization: Review and Discussions...... 117 The Application of Dedicated Dispatching System in Urban Rail Transit...... 118 Vibration Serviceability Assessment on Bridge-Architecture Unification of Rail Transit Station...... 119 Research on Intelligent Dispatching Problem of Single-Track Railway Network Based on Multi-Agent...... 120 Detection and Transient Impact Characteristic of Ballastless Track with Mortar Defects...... 122

4 Research on Robust Optimization of Empty and Loaded Container Allocation of Railway Container...... 123 Simulation and Optimization of the Passenger Streamline of Xiao-Zhai Subway Interchange Station...... 125 Motion Tracking Algorithm for Catenary Suspension Based on Dynamic Template Matching ...... 126 Study on the Maximum Ceiling Temperature and Longitudinal Decay in a Sealing Tunnel Fire ...... 128 The Quantitative Analysis of the Superficial Abrasion and the Internal Damage of the Frog Rail...... 129 Research on Stress Diffusion Characteristics of Geogrid Reinforced Earth Retaining Wall.. 130 Short - Time Passenger Entering Flow Forecasting of Xi’AN Subway Based on SARIMA.....131 Metro Passenger Flow Forecasting Based on Sliding Unbiased Gray Markov Model...... 132 Discussion On The Wireless Coverage System of Urban Rail Transit...... 133 Research on Intelligent High-Speed Train Operation Simulation Based on Cellular Automata Theory...... 134 Research on Integer Programming Model of Shunting Operation Plans for Trains Detaching and Attaching...... 135

5 基坑工程钢楔式活络端对钢管支撑整体承载性能的影响

张明聚,谢治天 (北京工业大学)

摘 要:在基坑工程内撑式围护结构中,钢管内支撑由多段法兰连接的钢管和活络端组成。 活络端是钢管内支撑体系中的重要节点之一,但是该节点能否满足“强节点,弱构件”的设 计要求目前不得而知。本文通过理论计算得到了 18m、20m、24m 跨钢管支撑的屈服荷载、极 限承载力和刚度。同时,在北京地铁工地抽取了 3 组活络端作为试件,进行了室内加载试验, 得到了各试件的荷载-位移曲线。通过比较活络端试验结果与不同跨度钢管支撑的屈服荷载、 极限承载力和刚度,得到如下结论:(1)各试件屈服荷载和刚度有很大差别,屈服荷载最大 为 4790kN,最小为 1780kN,刚度最大约为 428kN/mm,最小仅为 266.7kN/mm;;(2)双厢式 活络端的质量为单厢式活络端的一半,但其屈服荷载为 2750kN 是第二组单厢式活络端屈服 荷载的 1.6 倍,刚度为 345.7kN/mm 是第一组单厢式活络端刚度的 1.3 倍。综合比较,双厢 式活络端的性能更优;(3)强度较好的试件但刚度不足,刚度较好试件的但强度不足。所以 活络端是整个钢管支撑体系中变形的主要来源或承载能力方面的薄弱节点。

关键词:基坑工程;钢管支撑;活络端;承载力;刚度

Influences of Active Node on Overall Bearing Capacity of Steel Bracing in Excavations

Zhang Ming Ju,Xie Zhi Tian (北京工业大学)

Abstract: In bracing structure in excavations, steel pipe internal support consists of steel pipes and active node connected by multiple segment flanges. The active node is one of the important nodes in the steel bracing system. However, it is not known whether the node can meet the demands of the practical engineering designs of "strong node and weak component". In this paper, the yield load, ultimate bearing capacity and stiffness of 18m, 20m and 24m steel pipe support are obtained by calculation. Meanwhile, three groups of active nodes were taken as specimens from the Beijing subway site, and the loading tests were carried out in the laboratory, and the load-displacement curves of the specimens were obtained. The following conclusions are obtained by comparing the yield load, the ultimate bearing capacity and the stiffness of the active node and the steel pipe support. (1) There is a great difference between the yield load and the stiffness of the specimens. Among the specimens, the maximum yield load is 4790kN but the minimum one is 1780kN; and the maximum stiffness is about 428kN/mm but the minimum on its only 266.7kN/mm. (2) The 6 quality of the double-box active node is only half of the single-box active node, but its yield load is 2750kN, which is 1.6 times the yield load of the second group of single-box active node, and the stiffness is 345.7kN/mm, which is 1.3 times of the first group of single-box active node. Considering the influence of bearing capacity, stiffness and economic benefit, the double-box active node is better. (3) For the active nodes, the strength is better, but the stiffness is insufficient, and the stiffness is better, but the strength is insufficient. So the active node is the main source of deformation or the weak node in the bearing capacity of the whole steel pipe support system. keywords: excavation engineering; steel strut; active node; bearing capacity; stiffne; 作者简介:张明聚,北京工业大学,电话:13910519663,邮箱:[email protected]

7 Effects of Spatial Variability on Post Construction Settlement of Composite Foundation of High Speed Railway

陈宏智 中国铁路设计集团有限公司 [email protected]

陈飞扬 同济大学地下建筑与工程系 [email protected]

张洁 同济大学地下建筑与工程系 [email protected]

冯世进 同济大学地下建筑与工程系 [email protected]

Abstract:Composite foundation is often utilized to reduce the post-construction settlement of high speed railway embankments constructed on the soft soil. Due to the uncertainties in the properties of the soft soil and mixed columns, the settlement of the composite foundation is also uncertain. To consider the influence of the spatial variability on the settlement, the finite difference method is used to predict the settlement of an embankment supported by the DM columns. Both spatial variability and complex interaction between soil and columns can be considered by the random field finite difference method. Sensitive analysis is conducted to the random variables investigated in this study. Effect of the spatial variability on the settlement happened during the construction period is studied, and the effect of the spatial variability on the maximum post-construction settlement is also investigated. Key words:Random field, high-speed railway, composite foundation, settlement

8 Effect of Buried Depth and Avoidance Distance on the Vibration of Ground Building in Loess Area

臧景超 同济大学 [email protected]

杨新文 同济大学 [email protected]

沈剑罡 同济大学 [email protected]

杨志团 兰州市轨道交通有限公司 [email protected]

Abstract:The effect on the vibration of ground building caused by subway are various and comprehensive. The method of combining the theory of vehicle-track coupling dynamics with the finite element method is used to develop a finite element model of subway vehicle-track-tunnel-soil-building coupling system. Taking Lanzhou Subway for example, three evaluation criteria of acceleration in the time domain, 1/3 octave frequency acceleration vibration level and VLZ (Vibration Level Z) are used to study the effects of buried depth and avoidance distance to the ground building vibration. The results show that the vibration responses of ground buildings caused by metro trains in the loess area are different from the vibration responses caused by the subway trains already operated in Beijing, Shanghai and Nanchang, but the overall trend of change is consistent. The change of vibration of ground buildings caused by subway ’ s operation with the change of buried depth, the vibration response of buildings is piecewise linear. When the depth is in the range of 11 ~ 19m and 19 ~ 27m, the average buried depth increases by 1m, and the maximum of VLZ decreases by 0.7dB and 1.16dB respectively. With the increase of avoidance distance of ground buildings, the general trend of vibration of ground buildings decreases gradually, but there is an amplification area of vibration at the avoidance distance around 30m. Key words:Vibration of buildings; buried depth of tunnel; distance of building; loess area; vibration level

9 考虑旅客异质性的西兰客运通道出行特征分析与预测

李玉斌,何世伟,冯骁 (北京交通大学)

摘 要:以普速铁路、高铁和航空为研究对象,针对西安兰州运输通道,在对出行者个人属 性进行模糊 C 均值聚类分类的基础上,建立了考虑旅客异质性,以效用函数为基础的 logit 模型。分析并预测西兰高铁开通后,各运输方式之间分担率变化及相互间竞争博弈关系。预 测结果表明,在正常情况下,高铁至少能分担西兰运输总体 35%左右客流,通过对高铁票价 及在途时间进行适当调整,比如,高铁票价在 185 左右时,西兰客运通道高铁分担率将会超 过普速铁路。通过对分担率的预测,为制定通道内客运产品方案具有指导意义。

关键词:综合交通运输;出行选择;分担率;模糊 C 均值聚类;行为异质性

Analysis and Forecast on Travel Characteristics Considering Passengers' Heterogeneity

Li Yu Bin,He Shi Wei,Feng Xiao (北京交通大学)

Abstract: The paper takes regular railway, high-speed rail and aviation on the Xi-Lan(Xi'an to Lanzhou) passenger corridor as the research object, based on fuzzy C means clustering classification on travelers' personal attributes, a logit model is constructed based on utility function considering passenger heterogeneity. Afterward, an analysis and prediction are made about the sharing rate changes among various modes of transport and mutual competition relation after the Xi-Lan high speed railway established and applied. The prediction results demonstrate, under normal circumstances, the high speed railway can share about at least 35% passengers from the whole passenger corridor, and by appropriate adjustments high-speed rail travel fares in transit time, the sharing rate of high-speed rail will exceed the regular railway's when the high-speed rail travel fares around 185. Through the forecast of the sharing rate, which has guiding significance for the development of the program of passenger transport in the corridor. keywords: integrated transportation; travel choice; mode split; fuzzy C-means clustering; behavior heterogeneity 作者简介:李玉斌,北京交通大学,电话:18810641978,邮箱:[email protected]

10 区域轨道交通车站行车作业与客运作业换乘协调性仿真分析——以

犀浦站为例

何必胜 1,张宏翔 1,闻克宇 2,鲁工圆 1 (1.西南交通大学交通运输与物流学院,2.中国铁路经济规划研究院) 摘 要:在区域轨道交通一体化的背景下,为充分发挥换乘车站作用,最大程度实现旅客出 行无缝衔接,研究区域轨道交通换乘车站行车作业与客运作业换乘协调性。以犀浦站为实际 案例,使用 AnyLogic 仿真软件对犀浦站城际铁路与地铁的同站台换乘系统进行仿真,在分 析换乘系统设备设施布置和流线组织冲突基础上,提出车站行车作业与客运作业换乘协调性 关键指标。通过不同情境下仿真分析,提出犀浦站同站台换乘优化方案。结果表明优化方案 能够提高犀浦站行车作业与客运作业的协调性,减少旅客换乘时间,提升旅客换乘服务水平。 所提出的仿真模型及分析方法能够为区域轨道交通体系下车站的换乘组织、行车作业和客运 作业提供有效建议。

关键词:城际铁路;地铁;同站台换乘;仿真分析

Simulation Analysis of Coordination between Train and Passenger Operation of Xipu Transfer Station

He Bi Sheng,Zhang Hong Xiang,Wen Ke Yu,Lu Gong Yuan (1.西南交通大学交通运输与物流学院,2.中国铁路经济规划研究院) Abstract: The coordination problem on transfer with train operation and passenger management in integrated rail transit station aims to improve the capacity of a transfer station and maximize the passenger travel convenience. A simulation method based on AnyLogic software is developed for the case study of of the coordination problem to model the transfer operation of the intercity railway system and metro system. The key indicators of the coordination problem are proposed based on the analysis the conflicts on the flyout of transfer equipment and infrastructure and passenger transfer flow. The adjustment measures of the transfer at the same platform are addressed after the experiments of different scenarios. The results show that the adjustment measures can improve the coordination degree of train operation and passenger management in a high service level with low travel time. This simulation method can be applicated for the integrated rail transit system with the effective suggestions. keywords: Intercity railway; Metro system; Transfer at the same platform; Simulation analysis 作者简介:何必胜,西南交通大学交通运输与物流学院,电话:13730636052,邮箱: [email protected]

11 城际轨道交通网络同步换乘仿真模拟研究

赵阳

摘 要:轨道交通网络存在一些不足之处,如换乘距离长,换乘不合理等。为了解决这些问 题,我们构建了交通网络同步传输模型。一方面,该模型是基于每条路线的出发频率和时间 间隔来实现在换乘点同时到达的车辆数目最大化,另一方面,该模型应考虑乘客的出行时间, 并调整不同路线出发的时间。最终能够得到调整后的不均匀间隔的发车时间表。为了验证模 型的有效性,本文对大连北站和地铁站采集的数据进行了实证研究,对收集的数据进行分析 和建立模型,并通过编程和仿真得到了结果。结果表明,该模型不仅优化了线路的出发时间, 而且减少了乘客的通勤时间,提高了出行效率,最终制定新的出发时间表。该模型有效缓解 交通压力,提高出行效率,对复杂地区的轨道交通优化具有重要意义。

关键词:区域轨道交通;同步换乘;出行时间;出发时间表

Study on Seamless Transfer of Regional Rail Transit

Zhao Yang

Abstract: There are some shortcomings in the rail transit network, such as long -distance transfer, unreasonable transfer and so on. To solve those problems, the synchronous transfer model in the traffic network is constructed. On the one hand, based on the departure frequency and time interval of each route, the model is to maximize the number of vehicles arriving at the same time. On the other hand, the model should consider passengers’ travel time and adjust the departure time of different route trips. In the end, we can get an unevenly adjusted departure schedule. In order to verify the validity of the model, an empirical study was carried out on Dalian north station and metro station. We use the collected data to analysis and build model, and get results through programming and simulation. The results show that the model not only optimizes the departure time of the line in the network, but also reduces the transmission time and improves the transmission efficiency. Eventually formulate a new departure timetable. The model is effective to release the crowded traffic pressure and improve the efficiency of travel. It is important for the optimization of rail transit transfer in a special region. keywords: regional rail transit; synchronous transfer; travel time; departure timetable 作者简介:赵阳,电话:17615102857,邮箱:[email protected]

12 CRTS III 型无砟轨道沥青混凝土轨下基础动力特性研究

李游

摘 要:为研究 CRTSⅢ型无砟轨道沥青混凝土轨下基础动力特性,采用数值模拟的方法研究 各参数诸如沥青层厚度、温度、列车速度等对沥青轨下基础动力特性的影响。结果表明:沥 青层厚度越大,竖向加速度和竖向位移越小,但考虑到经济成本,沥青层厚度不宜过大,故 取 15cm 左右较为适宜;沥青层温度对各指标的影响则呈抛物线形态,先减后增,总体看来 在-6℃附近力学性能表现最好;车速主要对竖向加速度有较大影响,而竖向位移和横、纵拉 应变基本不受车速影响。

关键词:沥青混凝土轨下基础;数值模拟;列车荷载;有限元模型;黏弹性

Study on Dynamic Characteristics of Asphalt Concrete Substructures Under CRTS Type Ballastless Track

Li You

Abstract: In order to investigate the dynamic characteristics of asphalt concrete substructures under CRTS III type ballastless track, numerical simulation method is used to study the influence of parameters such as layer thickness, layer temperature and train speed. The results show that vertical displacement and acceleration decrease with the increase of the thickness of asphalt layer. Balancing the performance and cost, the thickness of 15cm is appropriate. Optimal performance of asphalt concrete structure appears near -6 ℃ .The influence of vehicle speed on vertical acceleration is enormous, but little has shown on the displacement. keywords: CRTSIII slab ballastless track; Numerical simulation; Train load; Finite element model; Viscoelasticity 作者简介:李游,电话:18761897573,邮箱:[email protected]

13 基于时空状态网络和拉格朗日松弛的乘务交路计划优化研究

张哲铭,王莹 (北京交通大学交通运输学院)

摘 要:乘务交路计划属于考虑混合时间约束的大规模组合优化问题,该类问题难以运用时 空网络描述。因此,本文提出基于乘务规则的时空节点状态坐标递推原则和乘务任务可行转 化判定条件,将此作为网络生成策略构建时空状态网络以刻画乘务规则,达到控制网络规模 并简化数学模型复杂度的目的。建立基于该网络的网络流模型,设计拉格朗日松弛算法,将 多乘务交路组合优化问题分解为单乘务交路时空最短路径问题集合,提高求解效率。针对该 问题存在“强对称”和“超松弛”的特性,提出“打破对称性”和“控制超松弛”的线性不 等式约束,以加速算法收敛并提升下界质量。最后,以单条城际铁路和区域高速铁路网为背 景进行验算。结果表明本文方法可有效解决高速铁路乘务交路计划这类考虑混合时间约束的 大规模组合优化问题。

关键词:乘务交路计划;混合时间约束;时空状态网络;网络流;拉格朗日松弛

Research on Crew Scheduling Problem Based on Time Space State Network and Lagrangian Relaxation

Zhang Zhe Ming,Wang Yin School of Traffic and Transportation, Beijing Jiaotong University

Abstract: Crew scheduling problem is a large-scale combinatorial optimization problem considering the ‘ mixing time ’ constraint. It is difficult to make use of the time-space network to solve. Therefore, this paper proposes recursion principle of time-space-state coordinates between adjacent two nodes and judgment method of feasible transformation between crew tasks as a network generation strategy which controls the network scale and reduces the model complexity to construct a time-space-state network. Then the paper establishes the network flow model base on time-space-state network and designs Lagrangian relaxation algorithm to divide multi-crew duties combinatorial optimization problem into a single-crew duty of time-space shortest path problem set. The solving efficiency is improved. Aiming at the characteristics of ‘strong symmetry’ and ‘overrelaxation’, this paper proposes the linear inequality constraints to break‘symmetry’and control ‘overrelaxation’ to accelerate the convergence of the algorithm and improve the quality of the lower bound. Finally, the model and algorithm are verified by an inter-city railway and the regional railway network experiment. The results show that this method could high-quality and efficiently solve the large-scale combinatorial optimization problem with ‘ mixing time ’ 14 constraints such as high speed railway crew scheduling problem. keywords:crew scheduling; ‘mixing time’ constraint; time-space-state network; network flow model; Lagrangian relaxation algorithm 作 者 简 介 : 张 哲 铭 , 北 京 交 通 大 学 交 通 运 输 学 院 , 电 话 : 17744412996 , 邮 箱 : [email protected]

15 Research on Seismic Damping of Long-Span Steel Truss Beam Based on Viscous Damper

刘应龙 兰州交通大学土木工程学院 [email protected]

何志刚 兰州交通大学大学土木工程学院 [email protected]

蔺鹏臻 兰州交通大学土木工程学院 [email protected]

Abstract:Installing longitudinal viscous damper on the one continuous unit of a continuous steel truss beam and flexible arch bridge, the paper studied the seismic response reduction performance of viscous dampers by nonlinear time-historic analysis. The paper discussed the influence of the parameters of viscous dampers on the structural seismic response from reducing the axial force of the arch springing, the internal force of pier bottom and the relative displacements between superstructure and piers. Then preliminary selected damping coefficient C and velocity index ζ with good damping effect compared with the seismic response in the case of no viscous dampers, finally set the viscous dampers at the full-bridge and analysed its damping effect. The results show that the axial force of the arch springing of the fixed bearing is significantly reduced after installing longitudinal viscous damper, but the axial force of the arch springing is increased individually at the top of the movable pier. When ζ is constant, the damping effect is more obvious with the C increase. The relative displacement between superstructure and piers at the top of the movable pier decreased with the decrease of ζ and the increase of C.The paper selected the damper parameters then setting the viscous dampers at the full-bridge by taking one continuous unit of a continuous steel truss beam and flexible arch bridge as the research object. The results show the maximum positive damping rate of the full-bridge is 76.55%, and the maximum negative damping rate is -21.40%. Although there are some negative damping rates in some locations after set the viscous dampers on the full-bridge, their seismic response of the full-bridge is still the smallest. The viscous damper effectively improves the damping effect of the full-bridge. Key words : High-speed railway bridge; Steel truss girder with flexible arch; Nonlinear time-historic analysis; Seismic response; Viscous damper

16 A Computational Graph Approach for Identifying Trip Generation, Destination Choice and Mode Choice

吴丹婷 北京交通大学交通运输学院 [email protected]

Abstract:Travel demand is one of the fundamental inputs for transportation planning models to evaluate current/future network states. Nowadays, the emergence of multi-source heterogeneous data such as cell phone data, parking lot survey data, transit IC card data and sensor data provides a new opportunity to estimate origin-destination (OD) demand in a much more reliable way. Besides, machine learning has become a new solution to complex models and algorithms as the research progresses. This paper proposes a computational graph approach for multi-modal traffic demand estimation using various sources of heterogeneous data. First, a hierarchical feed-forward framework based on gravity model and logit model is built for multi-modal demand estimation. Further, for backward parameter calibration and estimation, we use a computational graph combining multi-source big data in four layers which are the trip generation layer, trip distribution layer, multi-modal trip distribution layer and link layer. For better illustration of the proposed methodology, one hypothetical example is tested based on TensorFlow and large-scale experiments based on the transportation network in Beijing with multi-source real sample data are implemented for further demonstration and validation. Key words : OD estimation; multi-modal; big data; gravity model; logit model; computational graph

17 铁道车辆车轮智能检修系统研究

江亚男 (中铁科学研究院有限公司)

摘 要:铁道车辆车轮踏面状态的准确检测与合理维修是保障列车安全平稳运行的关键,同 时也是提高轮对检修经济效益的有效手段。本文以实现铁道车辆车轮入库后快速检测、合理 维修为目的,开展车轮尺寸智能检修系统研究,并开发了一套集参数检测、状态评估和维修 决策于一体的智能化系统(WDAS 系统)。系统检测模块基于非接触式激光三角测量原理,实 现了踏面廓形、轮径和内侧距等特征参数的快速、精确测量;分析模块具备车轮特征参数、 轮轨接触状态和等效锥度计算与评估功能,并根据本文提出的以“保障尽量小的镟修量和尽 量大的轮缘厚度”为目标的经济性镟修优化算法实现了车轮镟修方案决策功能。通过实验室 和现场测试,验证了本系统检测功能的准确性、评估的有效性和镟修方案的经济性。

关键词:铁道车辆;车轮踏面;经济镟

Research on the Intelligent Detection and Evaluation System of Railway Vehicle Wheel

Jiang Ya Nan (中铁科学研究院有限公司)

Abstract: It is the critical problem for the stable and safe operation of railway vehicle that wheel tread profile is accurately detected and reasonably maintained. It is also an effective mean for increase maintenance economic efficiency of wheelset. This paper focuses on the critical problem. A wheel detection and evaluation system (WDES) is developed. It integrates detection function, evaluation function and lathing decision function. The detection equipment of WDES is based on the laser triangulation principle. It realizes the fast and correct measurement of tread profile, wheel diameter and wheel back-to-back distance. The analysis software has calculation and evaluation function of wheel parameters, wheel-rail contact and the equivalent conicity. This paper presents an algorithm for wheelset economic lathing. On the base of the algorithm, the lathing decision module is developed in the software. Through laboratory and field test, the stability and reliability of WDES is verified. keywords: Railway Vehicle; Wheel Tread; Economic Lathing 作 者 简 介 : 江 亚 男 , 中 铁 科 学 研 究 院 有 限 公 司 , 电 话 : 13402842013 , 邮 箱 : [email protected]。 18 Time- And Spatial- Based Vulnerability Analysis of Railway Systems

叶博文 华中科技大学 [email protected]

洪流 华中科技大学 [email protected]

Abstract : This paper is aimed to give a comprehensive framework for the vulnerability analysis of railway system with the consideration of time and spatial information. A two-layer network model is first proposed for the railway system, in which the physical layer is used to capture the time and spatial attributes of disruptions, and the service layer is used to assess the railway system performance and vulnerability. Varies kinds of railway system performance metrics can be reunited in this comprehensive framework. In order to capture the time and spatial attributes of disruption, the concept of component damage scenario is proposed to identify the damage state of physical infrastructure of railway system and further to calculate the vulnerability of railway system. The proposed framework is applied to analyze the vulnerability of Chinese Railway System under spatial localized attacks, in which the vulnerability of different railway networks formed by different types of trains has been discussed respectively. Key words : Vulnerability, Two-layer network model, Railway system, Spatial localized attack

19 Numerical Analysis on the Aerodynamic Drag of High-speed Train

Hyeokbin KWON(Korea,Republic Of) Koran National University of Transportation [email protected]

JINYingMei(China) Koran National University of Transportation [email protected]

Hyungmin KANG Dongyang Mirae University [email protected]

Abstract:Numerical simulation have been conducted in order to investigate and assess the aerodynamic drag of the Korean high-speed train. Computational fluid dynamics based on three dimensional Navier-Stokes equation has been employed to calculate the flow field around high-speed train and two equation k-ω SST turbulence model has also been used to calculate the turbulence eddy viscosity. For the modelling of the shape, the next generation Korean high-speed train named HEMU-430X has been used. Based on the calculated flow fields around the train, the total aerodynamic drag as well as the drag due to each sources have been analyzed. The results show that the pressure drag especially by the roof housing of the vehicle is the most important drag source of the high-speed train and the ratio of the skin friction drag to the total aerodynamic drag is relatively smaller than that of modern high-speed train. Key words:high-speed trains, aerodynamic drag, computational fluid dynamics

20 高铁循环动载作用基床累积变形的推算与估算研究

商拥辉 (中南大学)

摘 要:高铁“亿万次”循环列车荷载作用下,基床累积变形与列车运营安全及运营养修密 切相关,如何有效获取基床累积变形已经成为高铁走出国门战略核心课题之一。本文依托沪 宁城际铁路工程背景,结合建设期与运营期(3 年)实测数据,基于分离动、静荷载引起沉降 的思路,将运营期沉降数据推算工后沉降与建设期沉降数据推算工后沉降差值(推算法)、以 及运营期沉降与静载计算固结沉降差值(估算法)近似作为动载引起变形(累积变形),由此提 出由实测数据推算及估算基床累积变形变新方法。建立“列车-无砟轨道-路基-地基”结构 动力系统耦合三维数值模型,对推算与估算结果进行验证。研究结果表明:推算及估算方法 获取累积变形随时间发展规律基本吻合,均呈现快速、缓慢和稳定 3 阶段特征;相比推算结 果离散型较大不同,估算结果一致性较好,且与数值计算结果更为接近;不同途径获取累积 变形在铁路运营前 3 年基本稳定,基本控制在 3.5mm 以内。

关键词:高速铁路;列车荷载;累积变形;推算与估算;数值模型

Study on Calculation and Estimation of Cumulative Deformation of High-Speed Railway Under Cyclic Dynamic Loading

Shang Yong Hui (中南大学) key words: Highway; Train load; Accumulative deformation; Calculate and estimate; Numerical mode 作者简介:商拥辉,中南大学,电话:15939655963,邮箱:[email protected]

21 Vietnam Track Maintenance Management

Dinh DuyKhanh(China) 西南交通大学 [email protected]

Abstract:It has been about 5 years since One Belt and One Road was unveiled in 2013. Under the leadership of China president Xi Jin Ping, with the focus on connectivity and cooperation between Eurasian countries to bridge the infrastructure gap and accelerate economic growth across Asia Pacific and Central and Eastern Europe, many important projects of , railway and highway, automobile, real estate, power grid etc have been launched in many countries. However, not many One Belt and One Road projects of railway have been invested in Vietnam due to the lack of survey and studies focusing on this area. As an S-shaped country in Southeast Asia, a neighbor country of China, Vietnam will be a lucrative market right in the center area of the railway investment competition among Europe, China, and Japan. This is clearly shown in many researches and articles such as Europe Faces China, Japan in High-Speed Rail Battle in Asia by Srinivas Mazumdaru - February 15, 2018,“A Tale of Two Rail Lines”China and Japan’s Soft Power Competition in Indonesia by Ann Listerud - May 12, 2017 and High-speed Railways and Sino-Japanese Rivalry in Southeast Asia by Dragan PAVLIĆEVIĆ and Agatha - November 9, 2016. We, Vietnamese side, are well aware of this important chance for a win-win cooperation to modern our railway system. This research will show the existing conditions and our expectation for railway system in Vietnam. Moreover, based on this research, there would be more considerations of further investment to Vietnam railway market in the future. Key words : maintenance management, transition period, human resources, policy, application, equipment

22 我国高铁站点区位特征研究—基于可达性视角

王文聪 1,汪淳 2 (1.上海市城市建设设计研究总院(集团)有限公司,2.杭州市交通规划设计研究院)

摘 要:随着我国高速铁路的快速发展,高铁“时空收缩”效应必将引起区域交通可达性格 局的改变,而交通又是区域经济发展的重要引擎之一,探讨高铁站点在区域网络和城市内部 可达性的现状尤为必要。类型研究是其它相关研究的基础,本文结合 48 个已开通运营的高 铁站点为具体案例,从可达性的视角对其进行了分类分级的研究,总结了三类高铁站点的区 位类型,以作为高铁站点规划与建设的参考。

关键词:高铁站点;可达性; 聚类分析

A Reachability Study on the Characteristics of China's High Speed Railway Station

Wang Wen Cong,Wang Chun (1.上海市城市建设设计研究总院(集团)有限公司,2.杭州市交通规划设计研究院)

Abstract: With the rapid development of China's high-speed railway (HSR), the “ space-time contraction” effect of HSR will change the regional traffic accessibility. Traffic is the important engine of pulling regional economic development, so it is necessary to explore the accessibility status of HSR in different cities both on regional and metropolitan dimension. Typological study is the basis for other related studies. In this paper, taking 48 HSR stations in 41 cities in China, we studied the location characteristics and then a Two-step Cluster analysis is made with the location potential value and average travel time. We found that the HSR stations can be classified into three clusters. The method and conclusion in this study could help urban planners and policymakers make a further analysis on the planning and construction of HSR stations. keywords: High Speed Railway Station; Reachability; Classification 作者简介:王文聪,上海市城市建设设计研究总院(集团)有限公司,电话:18801784238, 邮箱:[email protected]

23 Vehicle-Bridge Interaction Characteristics of High-speed Trains Passing on Bridge at the Same Speed

王亚朋 兰州交通大学 Lanzhou Jiaotong University [email protected]

蔺鹏臻 兰州交通大学 [email protected]

Abstract : Based on the theory of 3D unsteady turbulence and dynamics of rigid-flexible multi-body system, a railway train-bridge interaction model is established, the air pressure pulse is taken into account, in order to analyze the influence of wind load to the train-bridge system when two high speed trains meeting on the bridge. A 40m freely supported beam bridge model is created, which will probably be used for higher speed railway in future. Safety, ride comfort, displacements, impact coefficient, accelerations and other dynamical variables are analyzed during the numeric simulation. The results show that the dynamical responses of train and bridge increase with the speed, except that the vertical displacement of bridge, which firstly decreases and then increases as the speed increases. The pressure of wind has much more influence on the vertical responses of train than lateral responses, and little influence to the bridge. Taking lateral acceleration and Sperling index as safety criteria for train, the maximal meeting speed for high speed trains on bridge is 450km/h. Considering the high-speed trains passing on the bridge, the impact factor of the bridge will be greater than that of the existing standard. Key words:High-Speed Railway;Bridge;Vehicle-Bridge Dynamics Interaction;Trains Passing Each Other;Air Pressure Pulse;FEM

24 城市轨道交通车站自动检票闸机配置数量优化

廖定芳 (长安大学)

摘 要:城市轨道交通车站闸机(自动检票机)是乘客进出车站付费区的节点,闸机配置数 量是影响车站运营效率的重要因素。乘客在城市轨道交通进出站闸机处的通过过程是一个多 服务台、多队列的排队服务过程,根据排队论原理,本文将该排队过程简化成多个单通道等 待制排队系统,然后对站点检票闸机系统高峰时的排队情况进行分析。考虑闸机检票系统的 经济性及服务效率,建立了闸机配置数量优化模型,并通过对比闸机通过量和车站运能,验 证了增加闸机是否会导致乘客在站台滞留,留下安全隐患。最后以西安市地铁 2 号线南稍门 站进站检票闸机系统为实例对模型进行了验证,优化结果为进站闸机数量从 6 个增加到 7 个时,进站检票闸机系统达到最优。

关键词:城市轨道交通;闸机数量;排队论;优化模型

Optimization of the Number of Automatic Ticket Checkers for Urban Rail Transit Station

Liao Ding Fang Abstract: The gate ( automatic ticket checker) of urban rail transit station is the node for passengers entering and out of the pay area of stations, and the number of the gate is an important factor affecting the operation efficiency of the stations. The process passengers enter or out of the gate in the urban rail transit is a queuing service process of multi service platform and multi queue. According to the queuing theory, the queuing process is simplified as multifarious single channel waiting queuing systems in this paper. Then, the queuing situation in the peak time of the station check gate system is analyzed. Considering the economy and service efficiency of the system, the optimization model of gate number is built, and by comparing the gate throughput capacity and the station, to verify the increased gate would cause the passengers stranded in the platform, leave hidden dangers. Finally, this paper give a practical example of Xi'an Metro Nan ShaoMen station intake gate system to verify the evaluation mode. The optimization result is when the number of the intake gate is increased from 6 to 7, the benefit of the station intake gate system will reach the maximum. key words: urban rail transit, number of the gate, queuing theory, optimization model 作者简介: 廖定芳,长安大学,电话:18109283132,,邮箱:[email protected]

25 现行 350km/h 高铁线路技术条件运营 400km/h 高速列车适应性研究

孙宪夫,时瑾,徐平,高雅 (北京交通大学)

摘 要:根据车线动力学理论,建立中国标准动车组车辆-线路动力学分析模型,从安全性、 舒适性角度研究了更高时速下,平面曲线半径、超高与车速间的匹配关系。并对某高铁区段 线路进行动力学评估。研究表明:(1)建议 400km/h 高铁最小平面曲线半径在优、良、一般 条件下分别取 9 000m、8 000m 和 7 000m,设计超高 175mm。(2)某高铁区段线路运行 400km/h 高速列车,满足运行安全性、车体振动加速度的舒适性要求,Sperling 横向平稳性、ISO2631 针对低频振动的评价等级有所下降。(3)通过对比发现,ISO2631 相比 Sperling 指标和 UIC513, 考虑了低频振动对于旅客乘坐舒适性的影响,评价标准也更为严格,行车安全性的频数统计 分析可以更有效的反映不同车速、不同线路条件下轮轨作用的强弱程度。 关键词:时速 400km/h 高速铁路;线路参数匹配;动力学仿真;安全性;舒适性

Study on the Adaptability of 400km / h High - speed Train Running at 350km / h High -Speed Railway

Sun Xian Fu,Shi Jin,Xu Ping,Gao Ya

Abstract: A Chinese standard EMU vehicles - line dynamic analysis model was established based on vehicle-track coupled dynamics theory. The matching relationship between curve radius, superelevation and vehicle speed was studied at a higher speed from the point of safety and comfort. A dynamic calculation analysis of Jinan-Qingdao high-speed railway has been done. The research shows that: (1) The recommended value of minimum curve radius is 9 000 m when speed is 400 km/h, the recommended value is 8 000 m under normal conditions and the recommended value is 7 000 m under difficult conditions. The design superelevation is 175mm. (2) Running 400km/h high-speed trains on a high-speed railway achieved the demand of safety and the comfort of train body vibration acceleration. The horizontal Sperling index and ISO2631 in low frequency vibration has declined. (3) By comparative analyses. ISO2631 has considered the influence of low frequency vibration acting on for passenger compared with Sperling index and UIC513, its evaluation criteria are more stringent. The traffic safety index frequency statistics can reflect the dynamic effect of train on track under different speed and different line conditions. keywords:400km/h high-speed railway; line parameters match; dynamic simulation; safety; comfort 作者简介:孙宪夫,北京交通大学,电话:18811771715,邮箱:[email protected]

26 基于 TLM-PML-VM 方法的群桩基础振动特性研究

曹艳梅, 吴攀 (北京交通大学土建学院)

摘 要:利用薄层法(TLM)与理想匹配层(PML)求解了层状地基土的位移 Green 函数,研究了 地基土振动的二维平面内与平面外问题。根据容积法(VM)基本原理建立了承台群桩基础-分 层地基土动力分析模型,基于该模型使用 TLM-PML 方法推导了承台-群桩基础的动力阻抗函 数。对层状地基中群桩基础的动力阻抗进行了分析,比较了地基土剪切波速、桩间距对群桩 基础水平阻抗和竖向阻抗的影响。研究结果表明:桩间距较小时,桩-土动力相互作用不显 著,群桩基础动力阻抗函数随频率变化不呈现波动现象;桩间距较大时,群桩基础动力阻抗 有很强的频域相关性,群桩的动刚度和阻尼随频率变化出现震荡现象。桩间距一定时,群桩 基础阻抗函数的峰值频率与其剪切波速呈正相关。

关键词:薄层法;理想匹配层法;容积法;群桩基础;动力阻抗

Vibration Characteristics of Pile-Group Foundation Based on TLM-PML-VM Method

Cao Yan Mei,Wu Pan

Abstract: The Green’s function of layered subsoil displacement is derived by adopting the Thin Layer Method (TLM) and Perfectly Matched Layer (PML). And the TLM-PML method is applied in a study of foundation soil in and out of two-dimensional plane. A dynamic analysis model of pile group foundation with pile caps and foundation soil is established according to the principle of Volumetric Method (VM). Based on the model, a dynamic impedance function of pile cape and pile group foundation is deducted by adopting TLM-PML method. Then, an analysis of pile group foundation’s dynamic impedance in layered-soil is carried out. What’s more, a comparative study of the influence of subsoil’s shear wave velocity, pile spacing effect to pile group foundation’ impedance from horizontal direction and vertical direction is conducted. The conclusion can be reached out that: when the distance between piles is small, the dynamic interaction of pile and soil is not evident and the dynamic impedance function of pile group foundation does not fluctuate with the change of frequency. And when the distance between piles is large, the dynamic impedance of the pile group foundation shows a strong correlation with the change of frequency domain, and the dynamic stiffness and damping of piles foundation displays variation with the

27 change of frequency. When the pile placing is fixed, there is a positive correlation between the peak frequency and the shear wave velocity of pile group foundation.

keywords:Thin layer method; Perfect matching layer; Volumetric method; group-piles foundation; Dynamic impedance 作者简介:曹艳梅,北京交通大学土建学院,电话:13691304561,邮箱:[email protected]

28 我国高铁货运发展现状分析与前景展望

王红杰,李进龙 (西南交通大学)

摘 要:随着多样化的货物运输需求日益增长,高铁货运逐渐成为一种更能满足实际需求的 运输方式。作为一种新型货运工具,高铁具有安全、快速、可靠、环保等诸多优势,但也受 到建设成本高、编组不灵活等缺点的限制。虽然我国已经建成世界上最大的高速铁路网络, 但高铁货运起步较晚,只有很少的高铁资源运用在货运方面,而国外高铁货运已有较长的发 展历史,且形成相应货运组织模式。基于此,本文首先对我国高铁货运现状进行分析,并结 合国外高铁货运的开行现状和发展模式,对高铁货运的发展进行了总结。此外,本文还对高 铁货运进行了市场分析,梳理总结了相关的政策,在此基础上对我国高铁货运的发展进行展 望。

关键词:货物运输;高铁货运;运输需求;发展前景

Situation Analysis and Development Prospect of High-speed Rail Freight in China

Wang Hong Jie,Li Jin Long

Abstract: With the increasing demand for diversified cargo transport, high-speed rail freight has become more suitable to meet the actual needs. As a new type of freight tool, high-speed rail is safe, fast, eco-friendly and reliable, while it also has many disadvantages such as high construction costs, inflexible and so on. Although China has built the world's largest high-speed railway network, China's high-speed rail freight started late and only a few high-speed rail resources were used on the high-speed rail freight, meanwhile foreign high-speed rail freight had a long development history and formed a transportation organization modes. Based on this, this paper analyzed the present situation of high-speed rail freight transportation in China, and summarizes the development of high-speed rail freight basing on the present situation and development mode of foreign high-speed rail freight. Furtherly, this paper carried out the market analysis to the high-speed rail freight in China, and summarized the related policy, then the development of China's high-speed rail freight was prospected. keywords:cargo freight; high-speed rail freight; transportation demand; development prospect 作者简介:王红杰,西南交通大学,电话:15520836648,邮箱:[email protected]

29 Transit Network Efficiency: Through-Running vs. Dead-end Operations in Metropolis Vukan Vuchic University of Pennsylvania Depart. of Electrical and Systems Engineering and City Planning United States [email protected]

Jim Venturi Rethink Studio 6464896250 Founder and Chief Executive Officer Rethink Studio United States [email protected]

Eugene (Wubin) Chao University of Pennsylvania Depart. of Electrical and Systems Engineering and City Planning United States [email protected]

Abstract:The opinions on large-scale metropolis rail transit network planning, design and operation vary the transit systems geometric shape and service strategies, which influence future patterns of urban development and metropolis’ economic gravitation. Studying the evolution of rail transit network in cities can provide valuable lessons for new projects, including the choice of appropriate transit modes and the design of network efficiency. Digesting the historical land use theories from distinguished experts, a critical topic has not yet been discussed. That is, how could a through-running station and a regional unified network (RUN) generate long-term sustainable economic growth for the cities and metropolises. This article focuses on the comparison of through-running vs. dead-end rail operations within the central business district (CBD). The analyses focus on three components of network design. First, the definition, measures, and decision-making trade-offs are well-interpreted. These guidance could be applied to an evaluation of network efficiency for medium capacity modes and metros in metropolitan areas and regional rails in metropolises. Second, the time-distance measure shows two independent concepts of static and dynamic transport units (either vehicles or persons) on a common variable, allowing network experts and operators to precisely define the minimal headway of leading and following trains. The reduced headway lowers the deadhead non-revenue operating time to further increase fleet utilization. There is a positive correlation between network efficiency and metropolis’ long-term economic competiveness. Third, a series of comparison analyses of several international case studies across independent vs. integrated lines; trunk vs. feeder lines, through-running vs. dead-end operations on metros and regional rail systems are presented. It is, now, time to pay systematic attention to the planning, design, and operation of efficient regional unified network. Key words:Network Efficiency, Systems Operational Design, Regional Unified Network, Economic Gravitation, Large-scale Metropolis Planning

30 轮轨滚动接触疲劳损伤研究综述

刘虹蔚,陆正刚 (同济大学)

摘 要:本文综述了最近五年轮轨滚动接触疲劳损伤的研究情况,总结分析了轮轨接触理论、 裂纹的萌生、裂纹的扩展的研究近况.目前研究主要停留在滚动接触疲劳损伤的影响因素分 析和数值预测方面,之后的研究可以从滚动接触疲劳裂纹损伤形成机理、热应力对滚动接触 疲劳裂纹损伤的影响、裂纹扩展角度变化、裂纹寿命检测等方向研究。

关键词:滚动接触;疲劳裂纹;最新研究;塑性变形

Review of Rolling Contact Fatigue Crack Between Railway Wheels and Rail

Liu Hong Wei,Lu Zheng Gang

(Tongji University)

Abstract: In this paper, recent development of reseach of wheel/rail rolling contact fatigue damage in the last five years is reviewed, including wheel/rail contact theory, crack initiation and propagation. At present, plenty of researches mainly focus on the analysis and numerical prediction of the influence factors of rolling contact fatigue damage. After that, the formation mechanism of rolling contact fatigue crack, the effect of thermal stress on rolling contact fatigue crack damage, crack propagation angle, crack life monitoring and so on can be studied. keywords: rolling contact; fatigue crack; latest research; plastic deformation 作者简介:刘虹蔚,同济大学,电话:15111905091,邮箱:[email protected]

31 复杂环境下地铁深基坑施工动态监测技术

龙中皇 (中铁二十四局集团南昌铁路工程有限公司)

摘 要:深基坑施工是一个非常复杂的过程,尤其是在复杂环境下的施工,风险极高。为降 低复杂环境下地铁车站深基坑的施工风险,在施工过程中的施工动态监测尤为重要。本文将 通过对贵阳地铁延安路站的现场实际施工动态监测技术进行分析,深入地表述了地铁深基坑 施工动态监测技术的重要性,降低了延安路站的施工风险,希望该动态监测技术对行业内相 类似工程具有一定的借鉴作用。

关键词:复杂环境;城市地铁;深基坑;动态监测

Dynamic Monitoring Technology of Metro Deep Foundation Pit Construction in Complex Environment

Long Zhong Huang

Absrtact: The construction of deep foundation pit is a very complicated process, especially in the complex environment, the risk is very high. The construction dynamic monitoring is particularly important in the construction process. This paper will analyze the actual construction dynamic monitoring technology of Metro Yan'an Road Station, and deeply express the importance of the construction dynamic monitoring technology of subway deep foundation pit. The construction risk of Yanan Road Station is reduced, and it is hoped that the dynamic monitoring technology can be used for reference to similar projects in the industry. keywords: Complex Environment;Urban Subway;Deep Foundation Pit;dynamic Monitoring 作者简介:龙中皇,中铁二十四局集团南昌铁路工程有限公司,电话:18370226089,邮箱: [email protected]

32 高铁枢纽站到发线运用调整模型及算法

宁佳,鲁工圆 (西南交通大学)

摘 要:高铁枢纽站常衔接多条高铁线路,其车站作业需要考虑多方向列车的到发线合理安 排与进路冲突疏解。当车站作业受到干扰时,快速制定合理的到发线运用调整方案,对于保 障所衔接各线路上列车的正常运行具有重要作用。高铁枢纽站到发线运用调整问题的决策需 要满足实时性、可执行性和安全性三方面要求。在考虑到发线与咽喉区进路综合运用优化的 前提下,以列车运行晚点和车站作业秩序影响双方面最小化为目标,建立了混合整数线性规 划模型。将该问题分解为到发线运用方案编制子问题和列车到发时刻调整子问题,并设计了 基于分支定界的算法框架。在 12 条到发线、84 列列车的算例实验中耗时 1.33 秒获得测试 干扰场景下的最佳调整方案,验证了模型及算法的有效性。

关键词:高铁枢纽站;冲突疏解;到发线运用方案调整;线性规划;分支定界算法

Model and Algorithm for Train Platform Scheme Rescheduling at High-Speed Railway Hub Station

Ning Jia,Lu Gong Yuan

Abstract: The hub station connecting multiple high-speed railways needs reasonable arrange- ment of platforms for multi-direction trains and is required to ease the route conflicts in the operation. Making reasonable train platform rescheduling instantly after interference guarantees train operation order on the connected high-speed rails. The decision-making of train platform scheme rescheduling needs to meet the requirements of real-time, executability and safety. Under the premise of integrated optimization of platforms and routes in the throat, in order to minimize the impact on train delay and station operation, the mixed integer linear programming model was established. In which the problem was decomposed into two subproblems: the train platform allocation problem and the arrival and departure time rescheduling problem, and the algorithm framework based on branch and bound algorithm was designed. The best adjustment was obtained in the test experiment of 12 arrival and departure tracks and 84 trains under the interference, which further verifies the validity of the model and the algorithm. keywords:high-speed railway hub station; conflict resolution; train platform scheme rescheduling; linear programming; branch and bound algorithm 作者简介:宁佳,西南交通大学,电话:18215632400,邮箱:[email protected]

33 Analysis of the Ground Vibrations Induced by Passenger Trains and Freight Trains

马蒙 北京交通大学 [email protected]

杜林林 北京交通大学 [email protected]

曹容宁 北京交通大学 [email protected]

Abstract : Compared with traditional passenger trains, environmental vibration property induced by freight trains is significantly different due to vehicle types, vehicle marshalling, load capacity and operating speed. Freight trains may cause more vibration effects on sensitive targets along railways. To compare the dynamic property of vibration source and environmental vibration, the coupled vehicle-rail model was established in frequency domain based on the periodic theory. According to the transfer matrix, Fourier integral transform and coordinate transformation methods, the vehicle-track model was excited by the moving load. Dynamic loads acting on the fasteners of four vehicle types (passenger train YZ22, freight train C62A 、 C70 、 C80) were obtained. Based on the track-soil finite element model, the train-induced ground vibrations were analysed in the time and frequency domains. The calculation results show that: the dynamic load acting on fasteners caused by wheel-rail interaction is significantly different due to the different train type. With the increase of axle load, the low-frequency vibration and environmental vibration become lager. The greater the axle load is, the farther the vibration wave propagates. Key words:freight train; environmental vibration; coupled vehicle-track model; numerical analysis; propagation property

34 基于财务敏感度的轨道交通产业风险评价及对策研究

闫旭,殷勇,刘杰,张翔 (西南交通大学)

摘 要:本文对我国轨道交通产业的风险源进行了归纳分析,以此构建风险评价体系,引入 财务评价中敏感度分析方法结合专家打分法构建了风险评价模型,从经济可行性角度出发对 轨道交通产业风险进行综合评价。随后以宜宾市轨道交通产业为例进行了方法验证,并从多 角度进行结果分析,均与实际情况相吻合。最后根据评价结果针对性的提出了风险防控措施。 相关成果可为我国轨道交通产业的风险评价提供依据,针对实例提出的风险防控措施也可为 实际运营管理提供参考借鉴。

关键词:轨道交通产业;财务敏感度;风险评价;风险防控

Risk Assessment and Counter Measures of Rail Transportation Industry Based on Financial Sensitivity

Yan Xu,Yin Yong,Liu Jie,Zhang Xiang

(Southwest Jiaotong University)

Abstract: This paper construct a risk assessment system based on the sources of risk analyses in rail transportation industry. Then a risk assessment model is given combining sensitivity analysis in financial evaluation with expert scoring method. This model evaluates the risk of rail transportation industry from the perspective of economic feasibility. Then the Yibin rail transportation industry is taken as an example to verify the model, and the results are analyzed in multiple angles. All of them are in agreement with the actual situation. Finally, the risk prevention and counter measures are put forward according to the pertinence of the assessment results. The related results can provide a basis for risk assessment of China’s rail transportation industry. The counter measures of example can also provide references for actual operation management. keywords: rail transportation industry; financial sensitivity; risk assessment; counter measure 作者简介:闫旭,西南交通大学,电话:18583973697,邮箱:[email protected]

35 Damping Rail Properties in Frequency Domain by Using 2.5D Finite Element and Boundary Element Method

Feng Qing Song [email protected]

Abstract:It is an effective method to control the rail vibration noise from the sound source. In order to research the vibration and noise performance of damping rail,a standard rail and a damping rail are taken as the research targets. Firstly, using the 2.5D finite element method to build damping rail, considering the effect of rail fastener, applying the vertical unit harmonic load on the upper part of the damped rail as a response to obtain the vibration response of the rail surface, using acoustic wavenumber in boundary element method to calculate the acoustic radiation characteristics. Analysing the influence of damping layer parameters on the vibration and sound radiation of damped rails. The results indicate that compared with the standard rail, the damping rail can effectively reduce the vibration and noise. Besides in the frequency domain, with the increase of the loss factor of the damping layer, the acoustic radiation reduction of the damped rail is more obvious. With the increase of the stiffness of the fastener of the damping layer, the vibration reduction of the damped rail is more obvious. Key words : damping rail; acoustic radiation; vibration ; 2.5D finite element; boundary element method

36 钢轨焊接接头处高速轮轨瞬态响应研究

于淼 (中国铁道科学研究院)

摘 要:针对高速铁路钢轨焊接接头不良问题,建立了高速轮轨瞬态有限元模型,考虑了轨 道-车辆系统耦合作用以及轮轨材料非线性,分别从时域和频域角度对列车高速通过焊接接 头时轴箱动态响应进行了分析。结果表明:轴箱加速度对不良焊缝响应敏感,适用于检测钢 轨焊接接头状态;钢轨焊接不良将引起轴箱加速度 240Hz 左右的振动主频,可利用该主频的 功率谱密度检测钢轨焊缝处不平顺程度。焊接接头处钢轨平直度为 0.1mm 时基本满足 400km/h 以下列车运行速度要求;当运行速度不超过 350km/h 时,焊接接头处钢轨平直度限 值可设为 0.2mm;当焊缝处钢轨平直度为 0.3mm 时,列车运行速度应该控制在 250km/h 以下。

关键词:钢轨焊接接头;高速轮轨接触;有限元分析;轴箱加速度

Study on High-Speed Wheel-Rail Transient Response at Rail Welding Joint

Yu Miao

Abstract: Aiming at high-speed rail welding joint diseases , a high-speed wheel-rail transient finite element model was established. Considering track-vehicle coupling dynamics and wheel-rail elastic-plastic deformations, the axle-box dynamic response of a high-speed train passing a rail welding joint was presented in both time and frequency domains. The response of axle-box vertical acceleration at bad welding joint is sensitive, it is suitable for the detection of rail welding joint state. The bad rail welding will cause the axle-box vibration at 240Hz and the PSD of it can be used to detect rail welding joint unevenness. The train speed of 400km/h meets the basic requirements with 0.1mm rail straightness at welding joint. When the speed is not more than 350km/h, it can be set to 0.2mm. If it is 0.3mm, the speed should be controlled below 250km/h. keywords:rail welding joint; high-speed wheel-rail contact; finite element analysis; axle-box acceleration 作者简介:于淼,中国铁道科学研究院,电话:18811735070,邮箱: [email protected]

37 悬挂式单轨交通在国内的发展与展望

余浩伟 (中铁二院工程集团有限责任公司)

摘 要:作为一种新型的轨道交通,悬挂式单轨在国内逐渐步入大规模应用阶段。本文从悬 挂单轨列车的基本原理出发,对其特点进行了系统总结分析,研究提出了其在国内的适用范 围以及应用中需重点解决的问题,可为后续悬挂式单轨交通项目的规划、建设提供借鉴与指 导。

关键词:悬挂式单轨;特点;适用范围

Development and Prospect of Suspended Monorail in China

Yu Hao Wei

Abstract: As a new type of rail transit , suspended Monorail its more and more application in China.This article based on its basic principles, systems analysis its characteristic, propose its Suitabilityand the key problems to be solved in application. It can provide reference and guidance for the planning and construction of the suspension monorail. keywords:Suspended Monorail; characteristic; Scope of application 作者简介:余浩伟, 中铁二院工程集团有限责任公司,电话:15982349365,邮箱: [email protected]

38 A New Prediction Method of Vertical Z-vibration Level of Ground Building Induced by Subway Operation

薛翊国 山东大学岩土工程中心 [email protected]

周炳桦 山东大学岩土工程中心 [email protected]

李术才 山东大学岩土工程中心 [email protected]

张敦福 山东大学岩土工程中心 [email protected]

邱道宏 山东大学岩土工程中心 [email protected] Abstract : A certain amount of random vibration excitation to subway track is caused by subway operation. This excitation is transmitted through the track foundation, tunnel, soil medium, and ground building to the ground and ground structure, causing vibration. The vibration affects the ground building. In this study, the results of ANSYS numerical simulation was used to select five influencing factors including the distance from the center, buried depth of tunnel, elastic modulus of rock stratum, Poisson’s ratio, and rock density, and a back-propagation neural network model was established. Moreover, a BP neural network model consisting of five input neurons, one hidden layer, 11 hidden-layer neurons, and three output neurons was used to analyze and calculate the vertical Z-vibration level of New Capital’s ground buildings of phase I Project (). The Z-vibration level under different working conditions was calculated from monolithic roadbed, steel-spring floating slab roadbed, and rubber-pad floating slab roadbed under the working condition of a center point of 0–100 m. The steel-spring floating slab roadbed was used in the New Capital area to monitor the subway operation vibration in this area. By comparing the monitoring and prediction results, it was found that the calculated results are less accurate and have a good linear relationship with the actual measured values. The research results have good reference and guiding significance for predicting vibration caused by urban subway operation. Key words:BP neural network;vibration induced by subway operation;ground building; Z-vibration level;prediction

39 盾构小半径曲线半环割线无反力架始发关键施工技术

张振波,张明聚 (北京工业大学)

摘 要:针对盾构始发井场地狭小无法设立反力架以及盾构处于小半径圆曲线上始发问题, 结合福州地铁 1 号线新店车辆段~象峰站盾构区间工程实践,分析给出了盾构始发关键控制 技术,主要包括:1)采用盾构管片与钢管共同构成的支撑体系,该体系与盾构始发井一边 侧墙相连,提供盾构机始发时所需反力,起到反力架作用,盾构完成半环始发;2)采用割 线始发技术,合理设计始发角度,实际最大偏差为 40mm,满足盾构始发平偏要求;3)采取 相应盾构始发关键措施,结合盾构的姿态调整等方案,保证了盾构在满足各项要求的安全始 发。

关键词:盾构;半环始发;割线始发;小半径曲线

Key Construction Techniques of No Reaction Frame Shield Machine Originating in Small Radius Curve Tunnel

Zhang Zhen Bo, Zhang Ming Ju

(Beijing University of Technology)

Abstract: Aimed at the problem that reaction frame can not be set up in narrow shaft and the shield machine is originated in the small radius curve tunnel, the key control technologies of shield machine launching were developed based on the engineering practice of the tunnel section from Xin-Dian vehicles depot to Xiang-Feng station of Line 1, Fuzhou Subway. The developed technologies are mainly as follows: 1) shield machine will be launched successfully by the supporting system connected to the wall and composed of steel pipes and shield lining segment and the system will provide the reaction force which acted as the reaction frame; 2) the technology of secant launching will be applied for shield machine starting,and the maximum deviation will be 40mm in practice through designing the reasonable driven angle which meets the requirement of horizontal deviation; and 3) to ensure shield launching safety in meeting all requirements , key measures of shield launching will be taken, combined with schemes of shield posture adjustment. keywords: shield tunnel; shield machine semi-ring driven; shield machine secant launching; small radius curve tunnel 作者简介:张振波,北京工业大学,电话:13161125689,邮箱:[email protected]

40 高速铁路无缝线路钢轨温度应力监测技术研究

郭高冉 (武汉大学)

摘 要:无缝线路钢轨温度应力是高速铁路钢轨状态监测的主要指标。目前,针对高速铁路 无缝线路钢轨两端被扣件扣住而不能随着温度变化而自由伸缩从而产生温度应力的监测,国 内外有多种监测手段,这些监测手段都有其特定的应用背景。为了更加明确的选用合适的监 测手段保证高速铁路的安全运行,本文按照不同的分类标准将各种监测手段归纳为三个方面, 并对三个方面的监测手段进行全面系统的分析,为高速铁路无缝线路钢轨温度应力监测技术 的选用提供了一定的依据。

关键词:无缝线路;温度应力;监测技术

Research on the Monitoring Technology of Temperature Stress in High-Speed Railway Jointless Track

Guo Gao Ran

Abstract: Temperature stress of rail is the main index for the monitoring of high speed railway. At present, there are many monitoring methods at home and abroad to monitor temperature stress resulted from inalterability of the rail with temperature shift. However, these monitoring methods have their specific application background. In order to choose the appropriate means of monitoring methods explicitly to ensure the safety operation of the high speed railway, the article summarized the various monitoring methods into three aspects according to the different classification standards and analyzed these monitoring methods systematically, thus providing a certain basis for the selection of temperature stress monitoring technology of the high speed railway. keywords:jointless track; temperature stress; monitoring technology 作者简介:郭高冉,武汉大学,电话:18733174352,邮箱:[email protected]

41 An Optimization Model for Rail Container Operation Planning

Zhang Xiao Qiang Southwest Jiaotong Univercity [email protected]

Li Lin Southwest Jiaotong Univercity [email protected]

Abstract : The profit of rail operators is related to the pricing policy and the operation planning. The operator’s pricing policy affects the demand, and demand is connected to profit. There are lots of researches on maximizing the profit of rail transport operator, most of which tried to optimize pricing or operation planning separately. As in fact, these two factors are connected with each other. The isolated research on either of them cannot get the optimal profit for operators. In this paper, a bi-level model is proposed, which integrate the pricing and operation planning, to maximize the profit of rail operator. The model includes a lower layer for minimizing the customer’s generalized cost, and a top layer for maximizing the benefit of rail operators. Simultaneously, the competition from road container transportation is considered in this model. An algorithm based on sensitivity analysis method was designed to solve this bi-level programming model. Numerical experiments have been made and the results prove the effectiveness of the proposed model. Key words:Rail Container Transportation;Operation Planning;Dynamic Pricing;Bi-level Model

42 国内外轨道交通产业发展经验研究

汪益纯 (江苏省城市规划设计研究院)

摘 要:从轨道交通基本概况、轨道交通与土地利用规划、轨道交通装备制造产业以及轨道 交通其他相关产业四个方面,分析日本、欧洲、香港轨道交通产业的发展情况,总结发展经 验,为江苏发展轨道交通产业提供参考。

关键词:轨道交通产业;土地利用;装备制造;

Research on the Experience for the Development of Rail Transportation Industry in the World

Wang Yi Chun

Abstract: From the basic situation, rail transit and land use planning, rail transportation equipment manufacturing industry and other related industries to rail traffic in four aspects, this paper analyses the development of Japan, Europe and rail transportation industry, summarizes the development experience, and provide a reference for the development of rail transportation industry in Jiangsu. keywords: rail transportation industry; land use; rail transportation equipment manufacturing industry 作者简介:汪益纯,江苏省城市规划设计研究院,电话:18252011363,邮箱:[email protected]

43 An Efficient Time-Domain Solution of Slab Track Dynamic Model Based on Periodic Spectral Method

杨新文 同济大学 [email protected]

沈剑罡 同济大学 [email protected]

舒瑶 同济大学 [email protected]

Abstract:For evaluating efficiently the vibration response of the slab track in high speed railway, and based on the classical dynamic model for the track structure, slab track is simplified as an infinite long composite beam on the elastic foundation. Assuming that the dynamic response of the track structure subjected to periodic vehicle loads is periodic, the beam is truncated into a composite beam section with the length equal to a single vehicle by imposing periodic boundary conditions, a novel and efficient periodic model for evaluating track dynamic response was established. And then the spectral method was employed to solve the model, and the results were verified by finite element method (FEM). The calculation shows that the proposed model and method are of extremely high computational efficiency. Key words:High speed railway; Slab track; Spectral method; Periodic method

44 浅谈地铁车站岩溶处治文物古井保护技术

张岳

摘 要:随着城市建设的发展,在复杂地质条件下地铁的建设也越来越多,地铁建设中对周 边环境的影响也越来越突出,特别是对周边古文物的影响现象也尤为突出,文物的保存也越 来越困难[1]。因此在复杂地段施工时对施工方案的制定至关重要,利用瑞雷波探测技术方法 准确掌握、了解地下岩溶管道分布情况,在施工过程中通过控制注浆,封堵文物古井和车站 之间的岩溶管道,保留薛家井与车站以外的岩溶通道,保证周边文物古井水位正常。本文所 提到技术和方法对今后类似工程的施工提供一定的借鉴。

关键词:地铁施工;岩溶处治;古井保护;瑞雷波探测

Discussion on the Protection of the Karst Cultural Relics and Ancient Wells in the Subway Station

Zhang Yue

Abstract: With the development of city construction, the construction of subway under complex geological conditions are more and more, the impact on the surrounding environment has become increasingly prominent in the subway construction, especially the impact on the surrounding antiquities phenomenon is particularly prominent, preservation of cultural relics is more and more difficult. Therefore, in the construction area of the construction scheme of the complex formulation is very important, the use of Leibo Rui detection technology and accurate method to grasp and understand the distribution of underground karst pipes, through the control of grouting in the construction process, the karst pipeline between the station and the ancient cultural relics block, preserved karst channel outside the Xue family well and station, to ensure the normal water level of cultural relics surrounding ancient. The technology and methods mentioned in this paper will provide some reference for the construction of similar projects in the future. keywords: Subway construction; Treatment of Karst;Protection of ancient well;Detection of Rayleigh wave 作者简介:张岳,电话:18771550866,邮箱:[email protected]

45 城市复杂地段地铁深基坑咬合桩受力模拟分析

张岳

摘 要:现代城市地铁建设过程中,地铁车站紧邻高大建筑物、重要管线、河流等情况较多, 车站施工时必须确保深基坑周边建筑的安全,因此对深基坑围护结构体系在施工过程中受力 分析显得尤为重要。利用数值模拟软件对车站深基坑开挖过程中咬合桩的受力影响进行分析 [1],为施工前和施工过程中的风险控制提供正确决策,确保在建深基坑工程的安全。本文所 提到的模拟分析方法对今后深基坑类似工程的设计施工提供一定的借鉴。

关键词:地铁深基坑咬合桩;紧邻建筑物;开挖过程数值模拟;分析

Simulation Analysis on the Stress of Deep Foundation Pit Bitten Pile in Metro Complex Area

Zhang Yue

Abstract: The modern city subway construction, subway station next to the many tall buildings, rivers, pipelines, station construction must ensure that the construction of deep foundation pit surrounding the safety of the retaining structure of deep foundation pit system stress analysis is particularly important in the construction process. The numerical simulation software is used to analyze the force influence of the occluding pile during the excavation of the deep foundation pit of the station, [1], so as to provide the right decision for risk control before construction and in the construction process, and ensure the safety of the deep foundation pit under construction. The simulation analysis method mentioned in this paper will provide some reference for the design and construction of similar projects in deep foundation pit in the future. keywords:Subway deep foundation pit bitten pile; adjacent to building; numerical simulation of excavation process; analysis of the excavation process 作者简介:张岳,电话:18771550866,邮箱:[email protected]

46 Analysis of Force and Damage of Broad-Narrow Joint of CRTSⅡSlab Track

刘笑凯 西南交通大学 [email protected]

肖杰灵 西南交通大学 [email protected]

田沛丰 西南交通大学 [email protected]

Abstract : In order to study the rules of force and damage of broad-narrow joint under temperature rise, stress and damage parameters of broad joint and narrow joint under different conditions are calculated according to damaged plasticity model for concrete and cohesive zone model. Results indicated that the broad-narrow joint is in tension vertically and in compression longitudinally under temperature rise, which is the major cause of their damage. Through enhance the strength of the broad-narrow joint, the longitudinal force could be improved, but vertical force could not. Hence, compression damage could be reduced effectively, but tension damage could not. Through the increase of width of the broad-narrow joint, longitudinal and vertical force could be improved, so that compression damage and tension damage of broad-narrow joint could be reduced effectively. Key words:CRTS II slab track; broad-narrow joint; temperature rise; force; damage

47 Research on Dynamic Response and Influential Parameters of the Ballastless Track Including ACSL

符庆宏 东南大学 [email protected]

陈先华 东南大学 [email protected]

Abstract:Asphalt concrete sealing layer (ACSL) has turned out to be an excellent integral waterproofing structure in word-wide railways. However, there is still a lack of research on the dynamic response of ballastless track with ACSL and there is no systematical method to determine design parameters for the special track system. Finite element models (FEMs) are established in this research to study the dynamic characteristics and influential parameters of this structure based on Zhengzhou-Xuzhou high-speed railway in China. The FEMs are verified to be appropriate by field test results. Compared to the track with the traditional concrete waterproofing layer, the major dynamic response in the track model including ACSL are smaller. That means ASCL has a positive effect on improving mechanical properties of the ballastless track system because of the viscoelasticity of asphalt concrete (AC). According to the impact analysis for the thickness of ACSL, the recommended thickness is 10~15 cm. Considering the influence of construction cost and mechanical properties, the modulus of the upper roadbed layer should be 100MPa. Key words: High-speed railway;ACSL;Ballastless track;Dynamic characteristics; Influential parameters;Field tests; Numerical simulation

48 基于功率流方法和二维声场模型的轨道桥梁噪声预测研究

李奇 (同济大学桥梁工程系)

摘 要:运用力法基本原理建立车-轨-桥耦合频域分析变形协调方程,并计算系统振动功率 流;根据有限元-无限元法建立桥梁和钢轨的二维声振耦合模型,并计算场点声压。联合二 维声振耦合模型在单位振动功率下的声压结果和轮轨滚动激励下钢轨和桥梁的真实振动功 率预测其辐射噪声。分别采用现场实测和统计能量分析(SEA)对所提出的方法进行了验证, 结果表明二维声场方法和 SEA 方法均能较好预测桥梁噪声,但前者在钢轨噪声预测上更加合 理。

关键词:轨道交通桥梁;车-轨-桥耦合振动;噪声;功率流;有限元法

Noise Prediction for Rail Bridges Based on Power Flow Method and Two-Dimensional Sound Field Model

Li Qi

(Department of Bridge Engineering, Tongji University)

Abstract: The force method in the frequency domain is applied to establish the compatibility equation of the vehicle-rail-bridge coupled system and to obtain the vibration power flows of the system. The two-dimensional (2D) finite-infinite element method is used to develop the vibroacoustic model for the rail and bridge system and to gain the sound pressure of given field points. The radiated noise from the rail-bridge system is then calculated by combining the sound radiation results per unit vibration power calculated from the 2D vibroacoustic model and the real vibration power of the rail-bridge system subjected to wheel-rail rolling excitation. The above noise prediction method is validated by both the field measurement and the statistical energy analysis (SEA) method. It is found that the two-dimensional (2-D) vibroacoustic model and the SEA model can predict the bridge noise very well, while the former one is more reasonable in the prediction of rail noise. keywords:rail transit bridge; train-track-bridge vibration; noise; power flow; finite element method 作 者 简 介 : 李 奇 , 同 济 大 学 桥 梁 工 程 系 , 电 话 : 13764416395 , 邮 箱 : [email protected]

49 基于离散相模型的高速列车转向架积雪研究

高广军,王家斌 (中南大学交通运输工程学院)

摘 要:针对高寒动车组在冰雪天气运行时转向架表面严重的积雪结冰问题,本文采用了基 于 URANS Realizable k-ε湍流模型的数值仿真方法对转向架区域的空气流场展开研究。采 用 DPM 离散相模型模拟了雪粒子在流场内的运动轨迹、浓度分布和积雪分布。研究结果表明: 雪粒子主要集中在转向架下方运动,少量雪粒子在转向架的后侧牵引电机和车轴的迎风面以 及后端板处向上运动至转向架上方区域;转向架下部区域的大量雪粒子在气动力作用下直接 冲刷转向架底部设备造成了严重的积雪结冰,而转向架上方的雪粒子在重力作用下堆积在转 向架上表面,且转向架下表面积雪远多于上表面积雪。

关键词:高速列车;转向架;积雪结冰;离散相;数值模拟

A Study of Snow Accumulation on Bogie of a High-Speed Train Based on Discrete Phase Model

Gao Guang Jun,Wang Jia Bin

Abstract: The operation of high-speed trains in ice and snow weather results in a large amount of snow accumulation with ice on bogie, which will seriously damage the safety of high-speed trains. In this paper, the accumulated snow on the bogie has been investigated using the numerical simulation method based on URANS Realizable k-ε turbulence model. The Discrete Phase Model (DPM) was used to investigate the snow particles’ trajectories, concentration and accumulation distribution around bogie region. The results show that the snow particles mainly flow under the bogie, only a small amount of snow particles turn back to the region above the bogie at the rear equipment cabin cover and windward surface of rear motor and axel, which leads to few snow accumulation on the upper surface of bogie. Lots of snow particles below the bogie directly impact the equipment of bogie, causing the massive snow accumulation on the bottom surface of bogie; and the accumulation amount on the bottom surface of bogie is far more than it on the upper. keywords: High-speed train; Bogie; Snow accumulation; Discrete phase model; Numerical simulation 作 者 简 介 : 高 广 军 , 中 南 大 学 交 通 运 输 工 程 学 院 , 电 话 : 13875983049 , 邮 箱 : [email protected]

50 轮轨接触参数的动态识别方法及其应用研究

孙善超 (中国铁道科学研究院)

摘 要:在高速轮轨关系研究中,在线测量轮轨作用点的位置及轮轨接触参数对研究脱轨机 理和高速轮轨运行安全评估有十分重要的意义。基于车辆-轨道系统的特点,创新性的将轮 轨蠕滑理论应用到载荷辨识中,解决了轮轨接触力及接触点均为未知的不适定问题,构建了 非线性轮轨力载荷辨识模型。基于轮轨接触的特性,提出了轮轨力快速辨识流程,可以快速 高效地计算出轮轨垂向力。对该模型进行离散化,并基于弦截法对横向力非线性方程进行迭 代求解,可以快速辨识出轮对横移量,轮轨接触角。将辨识结果与正演模型对比,轮对横移 量及接触角的辨识精度均可以达到 0.71。本方法仅把加速度作为辨识输入,无需轨道不平 顺以及位移,速度等响应数据,并且可以快速高效的进行运算,因此本方法可以较为方便的 进行推广应用,既可以在检测车上进行识别,同时可以方便的在运营车辆上进行载荷识别, 满足运营列车安全综合评判的需要。

关键词:蠕滑理论;接触参数辨识;综合评判

Dynamic Identification of Wheel/Rail Contact Parameters and Its Application

Sun Shan Chao

Abstract: The wheel/rail contact parameters monitoring is very important to the derailment study and the safety assessment of high speed railway. For the purpose of the railway safety, based on the property of the vehicle/track system, using the theory of the vehicle dynamic, this paper establish an nonlinear wheel/rail contact force identification model by applying creep theory to load identification. The nonlinearmodel is discretized by Newmark- method, and is solved by chord section method. Therefore the lateral displacement of the wheelset relative to the track and the contact parameters are obtained. The identification results are compared with the simulation model and the verification results show that: the correlation coefficient of the lateral displacement of the wheelset and simulation displacement is 0.71. This model needs only acceleration of the vehicle, and no extra displacement and track irregularity are needed. This model can compute efficiently and can be used widely in inspection vehicle and operating vehicle for operating safely. keywords: Creep theory;Contact parameters load identification;Comprehensive Evaluation 作者简介:孙善超,中国铁道科学研究院,邮箱:[email protected]

51 Research on China High Speed Rail Passenger Revenue Management Based on Unconstrainted Demand

Shao Li Hua [email protected]

Abstract : Climate change and energy crisis have made rail transport more and more important. As of 2017, China's high-speed rail operation mileage reached 25,000 kilometers, passenger volume exceeded 1.2 billion passengers, four vertical and four horizontal high-speed rail network has been basically completed. Increasing competitiveness and expanding market share have become urgent problems to be solved in railway transportation. This paper analyzes the existing problems of high-speed railway passenger transport, analyzes the feasibility of introducing high-speed railway passenger revenue management. In the prediction of the demand of high speed railway passenger revenue management, there are "missing data" which lead to the fact that the real demand of passengers can not be fully reflected. In this paper, the concept of unconstrained demand in the aviation industry is introduced into the passenger transportation of high-speed railways, then constructed an unconstrained model of passenger demand for high-speed railways and adopted the EM-demand maximization algorithm to solve this problem. The gray neural network prediction method is based on unconstrained demand forecast, then obtained the demand forecast of different OD. According to the prediction results, the ticket allocation method based on O&D stock control is put forward. At the same time, the precise pre-division model and the fuzzy pre-division model are established, designing the PSO particle swarm optimization algorithm to solve the problem. Finally, an example is given to show that the ticket distribution method based on O&D nesting can bring some economic benefits to the railway department while meeting the travel demand of passengers. Key words : high-speed rail passenger transport; unconstrainted demand; revenue management; O&D ticket allocation

52 浅谈强岩溶地区钻孔灌注桩成孔质量控制技术

龙中皇 (中铁二十四局集团南昌铁路工程有限公司)

摘 要:随着我国工程的不断发展,西南地区强岩溶地质环境下的工程项目也在不断的增加, 尤其是地下桩工生产方面工作难度在不断的增大,为保证强岩溶地质环境下桩基施工成孔质 量,本文将通过桩基成孔检测、钻机设备、地质环境、遇岩溶处治等方面对桩基成孔质量进 行分析,制定相应的技术措施,确保强岩溶地区桩基成孔质量,为今后类似地质条件下的桩 基施工提供一定的借鉴作用。

关键词:强岩溶;富水;钻孔灌注桩;成孔

Discussion on Quality Control Technology of Bored Pile in Strong Karst Area

Long Zhong Huang

Abstract: With the continuous development of engineering in our country, the engineering projects under the strong karst geological environment in southwest China are also increasing, especially the difficulty of underground piling production is increasing. In order to ensure the hole quality of pile foundation construction under the strong karst geological environment, this paper will analyze the pile foundation hole formation quality through pile foundation hole formation detection, drilling machine equipment, geological environment, karst treatment and so on. The corresponding technical measures are made to ensure the hole forming quality of pile foundation in strong karst area, which can provide some reference for pile foundation construction under similar geological conditions in the future. keywords:strong karst;rich water;cast;hole formation 作者简介:龙中皇,中铁二十四局集团南昌铁路工程有限公司,电话:18370226089,邮箱: [email protected]

53 高速铁路司机安全性评价与管理研究 ——基于能力和健康双维视角

叶龙,单湘媛 (北京交通大学)

摘 要:安全是保证“交通让世界更美好”的第一道防线。高速铁路司机作为高铁人才队伍 的骨干力量,对于高铁的安全运行起着至关重要的作用。如何评价高速铁路司机的安全性已 成为铁路企业亟需解决的问题。本文在梳理国内外铁路司机安全性评价研究的基础上,通过 实地调研,创新性地提出综合能力和健康两个视角的高速铁路司机安全性评价,结合高速铁 路司机职业生涯特点,建立了基于能力和健康双维视角的高速铁路司机职业生涯全过程安全 性评价模型,为高速铁路司机选拔、上岗、在岗、调岗和退役等阶段的安全管理工作提出了 科学化建议。

关键词:高速铁路司机;安全性评价;安全性管理;能力;健康

Research on Safety Evaluation and Management of High-Speed Railway Drivers

Ye Long,Dan Xiang Yuan

(Beijing Jiaotong University)

Abstract: Safety is the first defense line to ensure that “Better Transport, Better Word”. High-speed railway drivers, as the backbone of high-speed trains, play a crucial role in the safe operation of high-speed railways. How to evaluate the safety of high-speed railway drivers has become an urgent issue for railway enterprises. This paper reviews the safety evaluation of high-speed railway drivers at home and abroad, and puts forward to evaluate the safety of high-speed railway drivers on ability and health. Based on the features of the career, the paper builds the safety evaluation model of high-speed railway drivers, which is composed of selection model, induction model, on-the-job model, changing job model, and retirement model. keywords:high-speed railway drivers; safety evaluation; safety management; ability; health 作者简介:叶龙,北京交通大学,电话:18810025620,邮箱:[email protected]

54 Research on Railway Passenger Transportation Risks Evaluation Using LEC and Grey System Theory

MataraCaroline Southwest Jiaotong University [email protected]

Cheng Xueqing Southwest Jiaotong University [email protected]

Abstract:Railway passenger transportation involves a number of indeterminate risks on the passengers which can be brought about as result of the interaction of different complex elements within the railway system. In order to attain higher safety levels, managing these risks and reducing their effects is an essential requirement in passenger transportation services. In the pursuit to identify main railway passenger risks for Kenya railway transportation, this paper evaluates railway passenger risks by analyzing expert scoring results of railway passenger hazards based on the likelihood exposure consequences(LEC) method and grey system theory. A risk index degree is constructed for the 80 comprehensive hazards which were identified for the Kenya railway passenger transportation system. The hazards include eight risk factors (human (employees’, drivers’ and passengers’), equipment and infrastructure management, safety management, fire control management, environmental factors and operation risk factors). Grey relational analysis is used for analyzing and determining the extent of the influences among the risk factors in the system and their respective risk degree. The construction of the risk degree index provides the theoretical basis for the railway passengers’ risks management for the Kenya railway system and provides guidance for future risks investigation. Key words:railway passenger risks, risk assessment, grey relational analysis, risk degree

55 Can Line Extension Planning Mitigate Capacity Mismatch on Existing Rail Network?

王子甲 北京交通大学 [email protected]

刘海旭 北京交通大学 [email protected]

朱亚迪 北京交通大学 [email protected]

Abstract:Operational planning in China is perhaps more important today than ever before owing to the ongoing expansion of urban rail in the country. As urban rail networks becomes large and complex, new lines added to them significantly alter both their topologies and operational characteristics. The appraisal of alternative lines from the perspective of operation while planning is crucial. This study develops a method based on data embedded in the transit smartcards used in existing networks and the forecasted demands for new lines to assess the effects of planning for the addition of new lines on overcrowding in urban rail networks. Using the card data and forecasted demand, transfer demand at interchange stations and section load between stations can be estimated through the route choice model, and hence the influence of new lines on the operation of the network can be analyzed. The proposed method was applied to the case of a line extension to a network in Beijing, and the results revealed the reason for overcrowding on the original line: severe capacity mismatch due to poor planning. Moreover, the new extension effectively prevented overcrowding by shifting passengers’route choices with fewer interchanges. Approximately 63% of passengers desiring an interchange on the target line altered their interchange from the station that had acted as bottleneck to the new interchange. Thus, a capacity mismatch was avoided, and the headway of the feeding line was reduced from 6 min to 3.5 min. Hence, the capacity mismatch problem no longer occurred. Key words:Urban rail transit; planning scheme; operation; crowding mitigation

56 基于货物运到期限的直通列车接续研究

李晟东,倪少权,徐长安 (西南交通大学交通运输与物流学院)

摘 要:货物运到期限是铁路对货主关于货物运输时间的承诺,在直通列车运行线接续中, 考虑运到期限并加以保证,对提升铁路货物运输质量与竞争力有重要意义。本文基于流线结 合的思想,研究了直通列车运行线接续的两种情况,单技术站接续和多运行区段接续。在运 到期限的条件下,同时考虑作业时间标准等约束,针对两种情况分别构建了 0-1 规划模型, 最后基于既有文献算例,利用优化求解器求解模型。

关键词:铁路运输;运到期限;接续;直通列车;运行线

Study on Connecting of Through Train Based on Freight Delivery Time Frame

Li Sheng Dong,Ni Shao Quan,Xu Chang An

Abstract: The freight delivery time frame is the promise about the transport time of goods that railway make to shipper. It is of great significance to improve the quality and competitiveness of railway freight transportation by considering the delivery time frame and ensuring it in the connecting of the through train. Based on the thought of streamline combination, this paper studied two cases of the connecting of through train, including connecting at single technology station and connecting on multi running section. Under the conditions of the delivery time frame and operation time standard, 0-1 programming models were constructed for these two cases. Finally, based on the existing literature example, the optimization solver was used to solve the models. keywords:railway transportation; delivery time frame; connecting; through train; train path 作者简介:李晟东,西南交通大学交通运输与物流学院,电话:15681109773,邮箱: [email protected]

57 城市轨道交通客流预测中的相似日选择研究

光志瑞, 张月坤 (北京市轨道交通指挥中心)

摘 要:合理选择历史相似日能够有效提高城市轨道交通客流预测的精度。本文提出了适用 于不同客流预测需求的相似日选择方法:首先,定义了日期的客流模式,使相似日选择过程 转化为模式识别过程;其次,考虑到不同客流预测需求,将相似日分为“总量相当型”和“变 化相同型”两类;再次,依据不同类型提出了“前向逐日检索”和“双向定位检索”两种相 似日选择算法策略;然后,考虑各因素的不同特点,结合实际客流数据,采用定量转化、归 一化、构造函数法等方法,分别计算了温度、风力、天气情况、星期类型、节假日属性、日 期距离等因素的相似度,构建了含参数的累乘函数,计算日期相似度;最后,结合北京城市 轨道交通客流数据对模型进行了拟合及验证,结果表明本文提出的相似日选择模型准确可靠, 对提高客流预测精度具有重要价值。

关键词:城市轨道交通客流预测;相似日选择;气象因素;星期类型;构造函数法

Study on the Selection of Similar Days in the Passenger Flow Prediction of Urban Rail Transit

Guang Zhi Rui,Zhang Yue Kun

Abstract: Choosing reasonable historical similar days is an effective way to improve the prediction accuracy of urban rail transit passenger flow. The paper proposed a method of choosing similar days to meet different demands of the passenger flow prediction. First of all, the passenger flow pattern of the date is defined, thus the process of choosing similar days has transferred into the process of pattern recognition. Secondly, similar days, after considering different demands of passenger flow forecast, are divided into two categories. And then, according to the above classification, two kinds of similar day selection algorithms are proposed respectively: one is "Forward day by day retrieval”, and the other is "Forward and backward positioning retrieval". Next, after considering the different characteristics of influencing factors , the paper proposed methods of quantitative transformation, normalization, and function construction to calculate the similarity degree of each influencing factor, such as temperature, wind force, weather condition, week attribute, holiday attribute and date distance. On this basis, the date similarity function, which contains the similarity of each factor, is constructed by a parameter dependent

58 multiplicative function. Finally, calibrated and validated by the historical passenger flow data collected by AFC system of Beijing Metro, the similar day selection model proposed in this paper is accurate and reliable, and of great value for improving the prediction accuracy of passenger flow. keywords:passenger flow prediction of urban rail trasit; the selection of similar days; weather factors; week attribute; function construction method 作 者 简 介 : 光 志 瑞 , 北 京 市 轨 道 交 通 指 挥 中 心 , 电 话 : 18612483816 , 邮 编 [email protected]

59 基于模糊事故树的铁路客运安全风险评估方法研究

孙东冶 1, 贾元华 1,陈滋顶 2,于帅 1,赵李萍 3 (1.北京交通大学,交通运输学院;2.国家铁路局,运输监督管理司;3.北京交通大学,经济管理学院)

摘 要:应用传统的事故树模型结合定量分析中的模糊集理论对铁路旅客运输安全进行风险 评估。首先,通过影响因素分析找出铁路客运安全风险的关键因素并构建铁路旅客运输安全 风险事故树;然后,引入直觉梯形模糊数(ITFNs)来描述基本事件发生的风险概率,降低由 先验知识缺乏带来的不确定性,进而基于直觉梯形模糊糊的重心排序法提出一种基本事件的 模糊概率重要度计算方法;最后,通过案例分析说明该方法能够有效量化铁路旅客运输过程 中的安全风险,确定关键风险因素,对提高铁路企业的旅客运输安全风险管理水平具有一定 的实际意义。

关键词:铁路旅客运输;模糊事故树;直觉梯形模糊数;模糊集成算子;风险评估

Research on Railway Passenger Traffic Safety Risk Assessment Method Based on Fuzzy Fault Tree

Sun Dong Ye,Jia Yuan Hua,Chen Zi Ding,Yu Shuai,Zhao li Ping

Abstract: Employing the traditional fault tree model combined with fuzzy set theory of quantitative analysis to carry out railway passenger transport safety risk assessment. First, through the analysis of the influencing factors to find the key factors influencing the railway passenger traffic safety risk and to establish railway passenger transportation safety risk accident tree; Then, in order to solve the uncertain characteristic due to the incompleteness of the prior information and the complexity of decision environments, Introduce the intuitionistic trapezoidal fuzzy number (ITFNs) to represent the probability of basic events in fault tree model. Based on the Arithmetic operations and Ranking criterion of ITFNs, A new fuzzy probability importance degree calculation method is proposed. By calculating and sorting the fuzzy probability importance of each basic event, conduct the quantitative assessment of security risks in the process of railway passenger transportation, find out the key risk points, and puts forward preventive measures. Finally, an example to validate this method has some practical value for railway passenger transportation risk assessment. keywords:Railway passenger transportation; fuzzy fault tree; intuitionistic trapezoidal fuzzy

60 number; Fuzzy integration operator; risk assessment 作 者 简 介 : 孙 东 冶 , 北 京 交 通 大 学 , 交 通 运 输 学 院 , 电 话 : 15313583745 , 邮 箱 : [email protected]

61 地铁区间联络通道临界风速的数值模拟分析

李云飞

摘 要:地铁长区间隧道中列车停驶火灾发生事故时如何保证乘客安全疏散已经成为地铁系 统安全运营迫切需要解决的一个关键问题,联络通道中临界风速的确认是对区间隧道人员疏 散的关键保障。本文结合地铁区间隧道内部结构的特殊性和国内外相关规范的内容,分析了 以数值模拟软件 FDS 进行模拟的理论基础,探讨了在列车阻塞工况下,如何确定联络通道临 界风速,指出了主隧道中,不同通风风速下联络通道相应的临界风速变化规律。

关键词:区间隧道;联络通道;火灾;临界风速

The Numerical Simulation and Analysis of the Critical Velocity in Cross-Passage of Metro Tunnel

Li Yun Fei

Abstract: It is a key issue that how to ensure the safety evacuation of passengers in the event of accidental train fire in a long metro tunnel,which has become an urgent problem to be solved in the safe operation of the subway system. Moreover the cross-passage connecting two tunnels will made the smoke control more complicated when passengers escape from the fire through the cross-passage, a reasonable critical velocity of cross-passage play a key role in passengers escape. Based in the numerical simulation, this paper analyzes the feasibility of FDS and control with long metro tunnels, combining with the particularity of the internal structure of metro tunnels and the contents of relevant norms at home and abroad. we discussed how to ensure the critical velocity of cross-passage in consider of the train blocking and calculated the variation of it corresponding to different ventilation velocity in the main tunnel. keywords:metro tunnel; cross-passage; fire; the critical velocity 作者简介:李云飞,电话:18811519527,邮箱:[email protected]

62 A Simple Model for Vertical Stress Attenuation of Ballasted Subgrade in High-Speed Railway

方明镜 武汉理工大学 [email protected]

陈豪 武汉理工大学 [email protected]

Abstract:Analysis of railway subgrade refers to static stress and dynamic stress, and the design of ordinary railway subgrade with lower train speeds usually transfers dynamic stress to static. For high-speed railway, the dynamic analysis is the requirement to acquire the magnitude and distribution of dynamic stress along the depth of subgrade. This paper integrated some relative research, and analytically put forward a simple calculation model with five sleepers for conventional ballasted railway track. In this model, the rectangle distribution loads by a single sleeper and the concentrated loads of two close sleepers. By comparing the data produced from this simple model to the field test data from Qinghuangdao-Shenyang passenger dedicated line, the proposed model was validated for the reliability. The model can be taken as a reference model to make a quick determination of the stress attenuation features in ballasted trackbed and subgrade. Key words : High-Speed railway; railway substructure; asphalt concrete; dynamic stress; attenuation

63 川道带状城市轨道交通客流特征研究

彭辉, 裴彦, 邵婷婷 (长安大学公路学院)

摘 要:为研究川道带状城市特殊地形下轨道交通的客流特性,提高轨道客流预测精度,对 比平原大城市的轨道客流比例、客流增长规律、客流强度等特征,分析了此类城市的地理特 征和交通特征,构建了一种轨道交通客运量计算模型。模型通过广义费用竞争关系分析轨道 承运最短出行距离,结合城市居民出行距离分布计算轨道客运量。以典型城市西宁市为案例, 根据 2016 年交通调查数据分析研究,研究结果表明:川道带状城市中,轨道交通客流量占 公共交通的比例高于平原大城市,可达到 60%;轨道交通客流量在初期上升快,客流效果明 显;在相同人均轨道线路长度下,轨道客流强度比平原城市更高。

关键词:交通工程;城市轨道;川道带状城市;客流特征

Research on Passenger Flow Characteristics of Urban Rail Transit in Valley Linear City

Peng Hui,Pei Yan,Shao Ting Ting

(School of Highway Chang 'an University)

Abstract: In order to study the passenger flow characteristics of rail transit in the special terrain of valley linear city, improve the prediction accuracy of the railway passenger traffic and compare the urban rail transit passenger volume ratio, passenger growth regular patterns and passenger intensity with in the large plain city, the paper analyzes the spatial and geographical characteristics of these cities and constructs a rail transit passenger traffic calculation model. The model analysis the shortest travel distance of urban rail transit by generalized costs and calculates the urban rail transit passenger volume by the travel distance distribution of urban residents. Taking Xining, a typical valley linear city, as an example and according to the 2016 traffic survey data,the results show that: in valley linear city,the proportion of urban rail transit passenger volume in public transportation is higher than that in large plain cities and can reach 60%; passenger flow increased rapidly in the early period and effect of passenger flow is obvious; in the same per length of urban rail transit, the rail passenger flow intensity is higher than that in the plain city. keywords:traffic engineering; urban rail transit; valley linear city; passenger flow characteristics 作者简介:彭辉,长安大学公路学院,电话:15256910591,邮箱:[email protected]

64 BIM 技术在地铁车站工程建设中的应用

王少民

摘 要:近年来,我国已进入了城市轨道交通的快速发展期,随着 BIM 技术深入推广,该技 术的应用已经从传统民用建筑行业转换为轨道交通行业,该技术使得地铁工程建设模式发生 了翻天覆地的变化,对地铁工程建设发展也有着积极影响。现阶段,在地铁工程项目招标、 规划、设计、施工、运维等众多阶段都可以看到 BIM 技术的应用,并且发挥出了不可忽视 的重要作用。为了进一步推进 BIM 技术应用到地下工程的建设中,本文基于施工单位以实际 地铁车站建模为例,介绍了 BIM 的技术发展现状,分析总结了 BIM 实施策划和 BIM 模型应用, 最后作者对 BIM 技术在轨道交通行业的发展前景进行了展望,为今后地铁车站 BIM 技术应用 奠定了一定的基础。

关键词:BIM 技术;地铁车站;建设;应用

The Application of BIM Technology on the Construction of the Metro Station Projects

Wang Shao Min

Abstract: In recent years,China has entered into the rapid developing period of Urban Metro Transit.With the further promotion of BIM,the application of this technology has been converted from the traditional civil construction industry to the rail transportation industry, it has changed the pattern of subway engineering construction thoroughly while having a positive impact on the development of subway engineering. At the present time, BIM is being used during the life cycle of subway engineering such as the tendering and bidding,planning,design,construction,and operation, BIM technology plays an important role. In order to push the application of BIM technology to the construction of underground engineering projects, In this paper,basing on the actual Metro station model, give an introduction to the development of BIM technology, Analyzed and summarized the implementation plan of BIM and the application of BIM’s model.Finally, the authors give a further view to the prospect of the BIM and the metro transportation industry. This paper will give some reference to the application of BIM in the metro station industry in the future. keywords:BIM technology; Metro projects; application; construction 作者简介:王少民,电话:13836012643,邮箱:[email protected]

65 中低运量城市轨道交通适应性分析及在天津的应用探讨

杜国先 (天津市城市规划设计研究院)

摘 要:通过分析国内城市轨道交通发展趋势,阐述中低运量轨道交通在未来轨道交通发展 中的重要作用。详述常见中低运量轨道制式的优缺点并进行平行比较,以供各城市在制式比 选过程中作为参考。结合天津实例,探讨中低运量轨道在天津的适用性。

关键词:轨道交通;线网层次;中低运量轨道;制式比选

Applicability Analysis on Small and Medium Carrying-Capacity Urban Rail Transit

Dong Guo Xian

Abstract: By analyzing the development trend of urban rail transit in domestic cities, this paper expounds the important role of small and medium carrying-capacity urban rail transit in the future development of rail transit. In detail, the advantages and disadvantages of the common small and medium carrying-capacity urban rail system are discussed, and the parallel comparison is made for each city to be used as a reference in the selection process. Based on the actual cases, the applicability of the small and medium carrying-capacity urban rail transit in Tianjin is discussed. keywords:rail transit; line network level; small and medium carrying-capacity rail transit; system comparison 作者简介:杜国先,天津市城市规划设计研究院,电话:15022746675,邮箱:[email protected]

66 现代有轨电车网络化运营规划研究

吕圣华 (上海市城市建设设计研究总院(集团)有限公司)

摘 要:本文总结了国内外有轨电车的发展概况,并在单条线路长度、通道客运能力、节点 互通控制等约束条件的基础上,对公交网络化运营组织规划流程进行改进,得出了有轨电车 网络化运营组织规划设计方法。

关键词:有轨电车;线网;网络化运营

Study of Network Operation Organization of Tram

Lv Sheng Hua

(Shanghai Urban Construction Design& Research Institute(Group) Co.,Ltd)

Abstract: This paper summarizes the development situation of tram at home and abroad, and improves the planning process of bus network operation, obtains the planning and design methods of tram network operation organization, based on a single line length, channel capacity, node intercommunication control and other constraints. keywords: Tram;Network;Network Operation Organization 作者简介:吕圣华,上海市城市建设设计研究总院(集团)有限公司,电话:18616926296, 邮箱:[email protected]

67 复杂艰险山区铁路减灾选线与案例

朱颖

摘 要:根据山区铁路建设经验,本文将山区铁路选线技术的发展历程,划分为地形选线、 地质选线、减灾选线三个阶段,指出减灾选线是复杂艰险山区铁路建设发展的必然。本文提 出了复杂艰险山区减灾选线的理念,并对减灾选线理论、方法、技术等进行论述,提出了减 灾选线涉及的一套理论,一套方法,三项技术,基本构成了减灾选线理论与技术体系。最后 以渝利铁路岩溶地区、成兰铁路高烈度地震区为案例,介绍了减灾选线理念的实际应用。

关键词:防灾减灾;铁路选线;选线案例;山区

Technology and Case of Hazards-Reduction Railway Selection in Complicated Mountainous Region

Zhu Ying

Abstract: Based on the experience of railway construction in mountainous region, this paper divides the development process of railway selection technology in mountainous region into three stages: terrain, geological and hazards-reduction railway selection, and points out that the hazards-reduction railway selection is inevitable trend for railway construction in complicated mountainous region. Then, this paper puts forward the concept of hazards-reduction railway selection in complicated mountainous region, and discusses the theory, method and technology of the hazards-reduction railway selection. A set of theories, a set of methods and three kinds of techniques are put forward, which basically constitute the theory and technical framework of hazards-reduction railway selection. At last, taking the karst area of Chongqin-Lichuan Railway and the high intensity seismic area of -Lanzhou Railway as examples, the practical application of hazards-reduction railway selection is introduced. keywords: hazards reduction; railway selection; railway selection case; mountain region 作者简介:朱颖,电话:15908171626,邮箱:[email protected]

68 城市轨道交通客流运行仿真系统开发研究

陈建春

摘 要:利用城市轨道交通的实际客流运营数据,仿真和分析整个轨道交通网的客流运行状 态,不管对于城轨交通的运营管理还是规划设计都具有十分重要的作用。本文结合实际开发 的城轨交通客流仿真系统(UTPS),介绍城市轨道交通网的数据组织、最佳路径搜索、客流 输送能力、客流路径分配、仿真模型建立、客流仿真、仿真结果分析等各个环节的主要内容, 并利用北京市城市轨道交通网的实际旅客刷卡数据进行了仿真,验证系统的有效性。

关键词:城市轨道交通;客流分析;计算机仿真;软件系统

Research on Passenger Flow Simulation System of Urban Rail Transit (UTPS)

Chen Jian Chun

Abstract: Using the actual passenger flow data of urban rail transit, simulating and analyzing the passenger flow status of the whole rail transit network is very important for urban rail transit operation management or planning and design. This combination of Urban Rail Transit Passenger flow Simulation System is developed (UTPS), the City Rail Transit network data organization, optimal route searching, passenger transport capacity, passenger flow path distribution, building the simulation model of passenger flow simulation, analysis of simulation results and other aspects of the main content, and simulated by using the actual data of Beijing passenger card city rail transit network, verify the effectiveness of the system. keywords: urban rail transit; passenger flow analysis; computer simulation; software system 作者简介:陈建春,电话:13501387120,邮箱:[email protected]

69 高速铁路无线干扰检测方法研究及应用

马良德

摘 要:对传统频谱干扰检测、实时频谱干扰检测、扫频干扰检测的原理和特点进行了对比 分析,并在此基础上研究了基于服务质量的在线干扰检测方法,重点对无线干扰分析和识别 技术进行了研究。根据该方法研制的检测系统在实际应用中取得了良好效果。

关键词:无线干扰;检测;铁路数字移动通信系统

Research and Application of Wireless Interference Detection Method for High-Speed Railway

Ma Liang De

Abstract: The principle and characteristics of traditional spectrum interference detection, real-time spectrum interference detection and sweep frequency interference detection are compared and analyzed. On this basis, the online interference detection method based on service quality is studied, and the wireless interference identification and analysis technology is studied emphatically. The detection system developed by this method has achieved good results in practical application. keywords:wireless interference; inspection; GSM-R 作者简介:马良德,电话:13501058475,邮箱:[email protected]

70 A Conditional Frailty Survival Model for Recurrent Rail Defects

Faeze Ghofrani [email protected]

Qing He [email protected]

Reza Mohammadi [email protected]

Ming Ni [email protected]

Abhishek Pathak [email protected]

Amjad Aref [email protected]

Abstract : This study aims to provide a robust strategy for predicting the time to the recurrence of rail defects at the same location by using the conditional frailty cox model. The model is built based on a US Class I railroad data from 2011 to 2016. The results show that the recurrence of a defect is highly correlated with different factors such as type of a rail defects, the location of that defect, train speed at the location of a defect, number of rail inspections between two successive defects, number of geometry defects in the last three years in the location of a defect and the type of remedy action. According to these results, several possible measures, such as applying more frequent rail inspections, reducing the train speed limit after the first occurrence of a rail defect, etc. can be considered to reduce the chance of recurrence of a defect on the same location. The results of this study are useful for railroads to develop effective strategies for track corrective maintenance to prohibit the recurrence of rail defects. Key words:Rail Defects; Corrective Maintenance; Recurrent Survival Analysis; Conditional Frailty Model

71 基于围岩洛德角及破坏接近度的地铁大拱脚脚趾合理角度研究

李雄伟 (四川省交通运输厅公路规划勘察设计研究院)

摘 要:地铁大拱脚结构车站经常由于拱脚及侧墙附近围岩失稳而破坏,而其脚趾角度直接 决定着拱顶荷载传递到拱脚围岩的方向,从而影响到拱脚及侧墙附近围岩应力状态和稳定性。 目前有关大拱脚脚趾角度对拱脚及侧墙附近围岩稳定性影响及如何设计等问题的相关研究 未见报道。本文针对这个问题,首先从洛德角入手,分析了在 ANSYS 软件中拱脚及侧墙附近 围岩适合的 DP 屈服准则;然后依托重庆轨道环线民安大道大拱脚车站,利用 ANSYS 软件, 建立了三维数值模型,分析了在不同脚趾角度下的拱脚及侧墙附近围岩破坏损伤程度,得到 了拱脚及侧墙附近围岩破坏接近度与脚趾角度的变化关系;最后利用破坏接近度函数,得到 重庆轨道环线民安大道大拱脚车站的脚趾角度等于 41°时,拱脚及侧墙附近围岩破坏损伤 程度最小。研究成果可为类似大拱脚结构的脚趾角度设计提供理论依据和参考。

关键词:大拱脚;围岩稳定性;破坏接近度;D-P 系列屈服准则;洛德角;脚趾角度

Study on Reasonable Angle of Subway Arch Feet’sToe Angle Based on Surrounding Rock of Lode Angle and Failure Approach Index

Li Xiong Wei

Abstract: The station of subway arch footfrequently dues to instability of the arch foot and sidewall’s surrounding rockto destroy. Toe angle can directly change the direction ofvault’s load transmiting force to the surrounding rock of the arch foot, thus toe angle can impact the stress state and the stability of the arch foot and sidewall ’ s surrounding rock. Now, the toe angle of large arch footimpact on the stability of the arch foot and sidewall ’ s surrounding rock and the related research of the toe anglehowto be designedhas not reported.Aiming at the problem.The paperanalyzed the suitable DP yield criterion of the arch foot and sidewall’s surrounding rock in the ANSYS,first of all, from the perspective of the lode angle, then relied on the station of large arch feet at the Ming-An avenue of Chongqing orbit ring.The three-dimensional finite element model is established by ANSYS.The paper analyzed the failure and damage index of the arch foot and sidewall’s surrounding rockunder the different toe Angle. The paper obtained the relationship between the failure approach index of the arch foot and sidewall’s surrounding rock and the toe angle.Finally, the result can minimize the degree to the arch foot and sidewall’s surrounding rock

72 of the failure and damagewhen the toe angle equal 41°by the function of failure approach index at the Ming-An avenue of Chongqing orbit ring. It can provide the academic basis and the certain reference for the design of the toe angle of large arch foot’s structureto other similar researches. keywords:large arch foot; stability of surrounding rock; failure approach index; Drucker-Prager yield criterions; lode angle; toe angle 作者简介: 李雄伟,四川省交通运输厅公路规划勘察设计研究院电话:18980768793,邮箱: [email protected]

73 考虑时变客流的城际高铁列车开行方案优化方法

张威 1, 秦进 1, 申纯燕 1, 赵成 2 (1.中南大学交通运输工程学院; 2.广深铁路股份有限公司深圳北车站)

摘 要:列车开行方案是有效利用铁路运输能力和提升城际铁路服务质量的重要组织手段。 基于城际铁路客流具有明显的时变特性,将时空网络方法引入列车开行方案决策,以在优化 方法中适当增加考虑客流出行时间信息,从而能更加全面的评价所得方案优越性。在此基础 上,以最小化包括列车运行时间、旅客旅行时间、旅客出发时间偏差惩罚时间和未上车旅客 惩罚时间等的总成本为目标,以时空网络客流及列车流守恒、车站发车时间间隔、列车定员、 列车运行总数等多种条件为约束,建立基于时空网络的城际铁路列车开行方案优化模型。结 合问题特点设计了双层模拟退火算法,其中内层算法优化列车停站方案,外层算法优化列车 起讫点、开行频率和发车时间。最后通过算例的计算分析,证明所提出方法能为城际铁路列 车开行方案提供科学决策依据。

关键词:城际铁路;列车开行方案;时空网络;优化模型;模拟退火算法

Train Planning Optimization for the Intercity Railway with Time-varying Demand

Zhang Wei,Qin Jin,Shen Chun Yan,Zhao Cheng

Abstract: The train plan is an important means to effectively utilize railway transportation facilities and to improve service quality of intercity railway. Based on the characteristics of time-varying demand, the space-time network method is involved into the train planning of intercity high-speed railway. The information of passengers’ departure time is considered in the optimization method and we can evaluate the train plan more comprehensively. Then upon the objective of minimizing the train running time, passengers travel time, penalty time of departure deviation and penalty time of passengers who didn’t board trains, a train planning optimization model is built. And a set of constraints including passenger flow and train flow conservation in time-space network, the station departure time interval, train capacity and total number of trains is necessary. A double layer simulated annealing algorithm is designed based on the characteristics of the problem. The inner layer algorithm optimizes train stop plan, the outer algorithm optimizes origin-destination stations, frequency and departure time of trains. Finally, through the calculation and analysis of the example, proves that the proposed method can provide scientific decision for train planning of

74 intercity high-speed railway. keywords:intercity railroad;train planning;time-space network; optimization model; simulated annealing algorithm 作者简介: 张威,中南大学交通运输工程学院,电话:15116280786,邮箱:[email protected]

75 铁路综合枢纽城市时空可达性研究

刘芳林 (南京市城市与交通规划设计研究院股份有限公司)

摘 要:“四纵四横”高铁网建成后,研究基于列车时刻表数据,通过提取两两枢纽城市间 的最短高铁出行时间和发车班次,测算了全国 19 个铁路枢纽城市时空可达性水平。研究证 明,高铁枢纽城市外部时空可达性不仅仅受制于枢纽在路网中的位置和枢纽间的连通性,还 受制于城市外部因素即铁路局列车时刻表的制定。

关键词:高速铁路;铁路综合枢纽;四纵四横;时空可达性

Study on the Space-Time Reachability of Railroad Comprehensive Hub City

Liu Fang Lin

(Nanjing Institute of City & Transportation Planning Co.,Ltd.)

Abstract: After the "four vertical and four horizontal" high-speed rail network was built, based on the timetable data of trains, the study calculated the time-space accessibility of the 19 railway hub cities across the country by extracting the shortest high-speed rail travel time and departure schedule between the two cities. Studies have shown that the external space-time accessibility of high-speed rail hub cities is not only restricted by the location of the hub in the road network and the connectivity between the hubs, but also by the external factors of the city, that is, the establishment of train timetables for the railway bureau. keywords: high-speed railway; railroad comprehensive hub; four vertical and four horizontal; space-time accessibility 作者简介: 刘芳林,南京市城市与交通规划设计研究院股份有限公司,电话:18761678330, 邮箱:[email protected]

76 轨道交通不同型式桥上声屏障的降噪效果研究

赵秋晨, 李小珍, 李满, 周飞聪 (西南交通大学)

摘 要:城市轨道交通对沿线居民的噪声污染日益受到关注,在线路两侧设置声屏障是降低 轮轨噪声的有效措施。本文以某钢箱叠合梁为研究背景,基于统计能量法,利用噪声分析软 件 VAone 分别建立直立式、半封闭式和全封闭式声屏障的统计能量模型。对比无声屏障情况 下和分别设置三种不同型式声屏障后场点的轮轨噪声等效连续声级,以选取适合实际需求的 声屏障类型。结果表明,采用直立声屏障或半封闭声屏障仅对近轨侧降噪效果较好,而远轨 侧总声级不降反增,对于近轨侧,声屏障对桥梁两侧与桥面高程相近的位置降噪效果较好, 但随高度升高降噪效果越来越差。与此相比,全封闭式声屏障与未采取降噪措施时相比,主 楼场点噪声等效连续声级声压级可降低 15 dB(A)左右,可满足工程需要。

关键词:声屏障;统计能量法;降噪效果

Noise Reduction Effects of Different Sound Barriers on Rail Transit Bridge

Zhao Qiu Chen,Li Xiao Zhen,Li Man,Zhou Fei Cong

Abstract: Noise pollutions produced by urban rail transit impact on residents along the line, which has drawn more and more attention. Setting sound barriers on both sides of the line is an effective measure to reduce the wheel-rail noise. Based on the statistical energy analysis method, the paper chooses a steel box composite bridge as research back ground, and establishes statistical energy model of vertical, semi-closed and fully-closed sound barrier by the noise analysis software VA one. Compare the equivalent continuous sound pressure level of field points, when there is no barrier and the one of the three different types of sound barriers is installed, to select the appropriate type of sound barrier for practical needs. Results show that the use of vertical sound barrier or semi-closed sound barrier can only effect on near-rail side noise reduction, while the total sound level on the far-rail side will increase instead of decreasing. For the near-rail side, the sound barrier has better noise reduction effect on where has same elevation as bridge deck on both sides of the bridge, but the effects get worse when the height increases. By contrast ,compared with the none noise reduction treatment , the equivalent continuous noise sound pressure level of the main building site can be reduced by about 15 dB (A),and fully-closed sound barrier can meet

77 well with engineering needs. keywords:sound barrier; statistical energy analysis; noise reduction effect 作者简介: 赵秋晨,西南交通大学,电话:15708412649,邮箱:[email protected]

78 基于磨耗数据因子分析模型的上海地铁 08C02、08CO3 型电动列车轮

缘厚度异常增大的原因分析及解决方案探讨

徐志成 (上海地铁维护保障有限公司车辆分公司)

摘 要:随着上海轨道交通的高速发展,运营里程的不断加大,列车和轨道等相关设备的维 护保养任务也急剧加重。基于上海地铁八号线车辆轮对磨耗的实际测量数据,以及大量 08C02、08C03 车型轮对 Sd 超上限的故障现象,从一线数据收集的角度分析了上海地铁八 号线 Sd 超上限的现象,通过数据相关性的理论分析开发出基于主要影响因子的轮对磨耗趋 势预测,参考广州地铁线路的仿真结论联合八号线的磨耗分析,采用新的车轮旋修策略,并 最终评估上海地铁八号线 08C02、08CO3 型电动列车在 30 模板旋修策略下的效益。

关键词:Sd 超上限;相关性分析;影响因子;30 模板旋修策略

Analyses the Phenomenon of Sd Over-Limit of Shanghai Metro Line 8

Xu Zhi Cheng

Abstract: With the rapid development of the Shanghai rail transport and the continuous increase in the operating mileages, the task of maintaining trains, rails and other related equipment has risen sharply. Based on the actual measuring data of wheel wear of line 8 trains of Shanghai Metro and much failure phenomenon of Sd over-limit of wheel of 08C02 and 08C03, this thesis analyses the phenomenon of Sd over-limit of Shanghai Metro line 8 according to the direct data collected and predicts the trends of wheel wear caused by main influence factors by analyzing data-related theories. Besides, this thesis also refers to simulating conclusion of lines and combines it with wear analysis of Shanghai Line 8, adopts new strategy of wheel worn repairing and finally evaluates the efficiency of electric trains 08C02 and 08C03 of Shanghai Metro line 8 under 30-model wheel worn repairing strategy. keywords:Sd over-limit, correlation analysis, influence factors, 30-model wheel worn repairing strategy 作者简介: 徐志成,上海地铁维护保障有限公司车辆分公司,电话:13052027366,邮箱: [email protected]

79 有轨电车网络结构及其特性研究

黎冬平 (上海市城市建设设计研究总院(集团)有限公司)

摘 要:有轨电车线网是由多条有轨电车相互衔接的网络,网络结构对有轨电车效益影响较 大。分析了有轨电车线网的技术特性,提出基于功能定位的有轨电车网络结构类型,包括单 线型、环线型、穿插网络型、独立网络型等,并结合工程实例阐明其在公共交通网络中的特 性及规划要求,为科学编制有轨电车线网规划提供思路。

关键词:有轨电车;网络结构;特性

Structure and Characteristics Analysis of Tram Network

Li Dong Ping

Abstract: The network of tram is composed of many modern streetcar lines, which impact greatly for the benefits of tram. The technical characteristics of tram network was analyzed, then, the paper proposed thestructures of tram network, including a single-line, loop type, interspersed with network-based, independent network type, etc. The characteristics and network planning requirements were clarified with examples of public traffic, which provided a reasonable idea of the preparation of the tram network planning. keywords:tram, network structure, characteristics 作者简介: 黎冬平,上海市城市建设设计研究总院(集团)有限公司,电话:15901862739, 邮箱:[email protected]

80 城市轨道交通车站相对重要度分析方法

李昕晏, 陈宽民, 张宇亭, 魏杰 (长安大学)

摘 要:随着我国各大城市轨道交通的建设与发展,其网络结构日趋复杂,很难直观判定某 一车站(包括换乘站)相对于其它所有车站的重要程度。本文综合考虑轨道交通车站的网络 结构特征、客流强度特征、车站属性特征,通过节点度、节点接近中心性、节点介数、车站 客流强度、车站交通环境及其所在区位 6 个指标。采用层次分析法计算得各层指标值,再利 用理想点法评价各站点在全网中的重要程度。最后以西安现运营轨道交通网络为例,对各车 站进行了重要程度排序,对网络化运营下的轨道交通管理具有一定参考意义。

关键词:城市轨道交通;网络结构;车站重要度;综合评价模型

Analysis Method of Important Degree of Urban Rail Transit Station

Li Xin Yan,Chen Kuan Min,Zhang Ting Ting,Wei Jie

(Chang'an University)

Abstract: With the construction and development of rail transit in major cities in China, its network structure has become more and more complex, it is difficult to intuitively determine the importance of a station (including transfer stations) relative to all other stations. This paper comprehensively considers the network structure characteristics, passenger flow intensity characteristics, and station attribute characteristics of the rail transit station, and adopts 6 indicators: node degree, node proximity, node intension, station passenger flow intensity, station traffic environment and location. The analytic hierarchy process is used to calculate the index values of each layer, and then the ideal point method is used to evaluate the importance of each site (except for the first and last station) in the entire network. Finally, taking the rail transit network in Xi’an as an example, the importance rank of each station (except the first and the last station) has been sorted out, which has certain reference significance for the rail transit management under the networked operation. keywords:urban rail transit, network structure, station importance, comprehensive evaluation model 作者简介: 李昕晏,长安大学,电话:18792707897,邮箱:[email protected]

81 城轨车辆弹性车轮发展及研究现状

杨阳,丁军君,李芾,李金城,牛悦丞 (西南交通大学)

摘 要: 随着生活水平的提高,对车辆乘坐舒适性提出了更高的要求。弹性车轮具有降低轮 轨噪声、隔离高频振动及提高乘坐舒适性的优点,逐渐在城轨车辆上使用。论文对国外具有 代表性的 BVV 、BONATRANS 等公司生产的弹性车轮及国内早期和目前投入商业运用的弹性车 轮结构进行论述。并对弹性车轮降噪减振性能、轮轨作用力及动力学性能、结构强度及疲劳 寿命、轮轨磨耗等方面的研究进行综述。

关键词:弹性车轮;结构组成;降噪减振;动力学性能;轮轨磨耗

Development and Research Status of Resilient Wheels for Urban Rail Vehicles

Yang Yang, Ding Jun-jun, Li Fu, Li Jin-cheng, Niu Yue-cheng

Abstract: With the improvement of living standards, higher requirements are placed on the ride comfort of vehicles. The resilient wheels have the advantages of reducing wheel-rail noise, isolating high-frequency vibrations and improving ride comfort, and are gradually used on urban rail vehicles. The resilient wheels produced by companies such as BVV, BONATRANS, etc., which are representative of foreign countries, and the elastic wheel structures that have been put into commercial use in the country in the early days are discussed. The research on the vibration damping performance of elastic wheels, wheel and rail forces and dynamic performance, structural strength and fatigue life, wheel and rail wear and other aspects are reviewed. 作者简介: 杨阳,西南交通大学,电话:18482136475,邮箱:[email protected]

82 盾构法结合 PBA 工法扩建地铁车站关键节点静力试验

刘义

摘 要:为了解决盾构法结合 PBA 工法扩建地铁车站施工过程中开口环盾构隧道管片与车站 主体结构的连接问题,提出了两种节点的连接形式。采用 1:1 足尺结构模型对两种连接节点 进行了静力试验,并分别对连接节点在双向荷载作用下混凝土应变、钢筋应变以及节点破坏 模式进行了研究。研究结果表明,钢板加抗剪键连接节点有更高的刚度和承载能力,但接驳 器节点的延性性能更好。

关键词:连接节点;足尺模型;静力试验

Static Test of Node of the Subway Station Construction by Combining the Shield Method and PBA Method

Liu Yi

Abstract: In order to implement the connection of the open-loop shield segment and subway main body which construction by combining the shield method and PBA method, two types nodes are put forward. The static model tests of 1:1 full scale nodes were conducted. The stress of concrete and steel bar, the damage patterns of the nodes under the horizontal and vertical loads were studied. The results indicate that the joint connection method of embedding steel and shear bond has greater rigidity and load ability than the embedding connector. But the joint of embedding connector has better ductility than the embedding steel and shear one. keywords:nodes; full scale model; static tests 作者简介: 刘义,电话:15652356831,邮箱:[email protected]

83 Research on Urban Rail Transport Operation Subsidy

汪晴 中南大学 [email protected]

邓连波 中南大学 [email protected]

Abstract:Operational subsidy is a significant supplement of urban rail transit operators’ benefits from operation. Fare and operational subsidy strategy is not only an economic problem, but also even more of a problem of management and optimisation of operational organisation. This study aims to optimise operational subsidy strategy of urban rail transit lanes combined with train operation plans in the basic of elastic demand. In light of the efficiency principle of urban rail transit government subsidy and benefits to passengers and operation operators, an objective function of maximising benefits of average passenger subsidy is constructed. At the same time, a solution algorithm based on simulated annealing is designed. Taking metro line 2 in ChangSha, China as an example, we conduct an analysis of the optimisation result of the objective function in the case of mileage fare type. Key words:urban rail transit line; operational subsidy; elastic demand; simulated annealing algorithm

84 高速铁路钢轨预打磨策略及伤损发展特征

周宇,张聪聪 (同济大学)

摘 要:针对高速铁路预打磨钢轨进行磨耗和疲劳裂纹萌生仿真预测和现场跟踪试验,对预 打磨钢轨的实施效果、伤损类型和发展特征进行了分析。分析结果表明,实施特殊型面的新 轨预打磨能有效地控制轮轨接触点的位置和接触宽度,获得较好的轮轨关系。预打磨后的钢 轨在运营中主要受磨耗影响,磨耗呈线性增加的趋势,外轨磨耗分布在轨头-10°~ 60°范 围,内轨磨耗分布在轨头中心±10°范围。运营大约 1 年左右,部分地段的外轨预打磨型面 被磨耗所改变,轮轨接触状态恶化,高速铁路预防性打磨周期可以在 1~1.5 年内实施。

关键词:钢轨;磨耗;滚动接触疲劳裂纹;预打磨;预防性打磨

Research on Rail Pre-grinding Strategy&Growth Characteristics of Rail Defects in High-speed Railway

Zhou Yu,Zhang Cong Cong

Abstract: The development of pre-grinding new rail in high-speed railway was researched by simulation of wear and rolling contact fatigue (RCF) crack and field test. The effect of pre-grinding, defects of rail and their growth characteristics were analyzed. The results show the pre-grinding rail with special designed profile can control wheel/rail contact location and width of contact band to get excellent wheel/rail interaction. The main defect of pre-grinding rail is wear which had linear growth trend with the accumulation of operation time. The distribution of wear around the railhead in high and low rails was -10°~ 60° and ±10°respectively. After about 1 year operation, the special profile of high rail was changed by wear which deteriorated the wheel/rail contact condition and caused two-point contact in the high rail. It is recommended the preventive grinding interval is 1~1.5 years. keywords:Rail, wear, rolling contact fatigue crack, pre-grinding, preventive grinding 作者简介: 周宇,同济大学,电话:13818906532,邮箱:[email protected]

85 Effects of Pire Deformation on Train Operations Within High Speed Railway Bridge

张骁 同济大学 [email protected]

肖军华 同济大学 [email protected]

张德 同济大学 [email protected]

Abstract : The deformation of a bridge foundation (i.e. pier) of high-speed railway with ballastless track may cause additional irregularities, thereby impacting train operation. By using a unit-slab ballastless track-bridge system as the research object, this study built an interaction model with finite elements and train-track dynamics. The additional rail deformation caused by the vertical or lateral deformation of bridge piers were calculated by the finite element model, meanwhile the impacts for train operation due to the additional rail deformation were analysed by the train-track dynamic model. It was found that: 1) the lateral deformation of a single pier should be the most concern for the management and control of high speed railway. Specifically, the indices chosen for the evaluation of train operation were primarily affected by the magnitude of lateral deformation, but slightly affected by the vertical settlement when a pier suffered settlement and lateral deformation concurrently; 2) The impacts of length of concrete beams are also analysed. As for the situation that a high speed train passing a bridge built by 32m standard span concrete beams at 350 km/h, it will be within the limits of the safety and comfort indexes if the pier vertical settlement doesn’t exceed 20mm. However, if the pier lateral deformation exceeds 15mm, the safety index for high-speed train will exceed the limit value. Key words:High-speed railway, ballastless track, vertical/lateral deformation of bridge pier, safety and comfort of train operation

86 考虑客户等级的铁路集装箱舱位控制策略研究

黄帅勋, 张小强 (西南交通大学)

摘 要:铁路集装箱运输的客户多为具有稳定货源的大客户,根据年货运量不同划分不同的 客户等级。本文基于嵌套控制理论,考虑了多种客户等级,并以各 OD 每一种客户等级的预 订限制为决策变量,以铁路公司的期望总收益最大为目标,建立了带约束的非线性整数规划 模型,并设计改进的遗传算法进行求解。最后通过算例对模型和算法进行了验证,算例结果 表明模型和算法是可行的。

关键词:舱位控制;嵌套控制;集装箱运输;客户等级;遗传算法

Research on Capacity Control for Railway Containers with Customer Rating

Huang Shuai Xun,Zhang Xiao Qiang

Abstract: Most of the clients in railway container transportation are large customers with stable demands, and the customers are divided into different grades according to their annual freight volume. Based on the nested control mechanism, the paper considered different customer grades. The booking limits of every customer grade in each itinerary are determined as decision variables and the object is to maximize railway company ’ s expect profit. To feature the problem a constrained nonlinear integer programming model was established and an improved genetic algorithm is designed to solve the problem. Finally, a numerical example is given to validate the model and the algorithm. The results show that the model and the algorithm are feasible. keywords:Capacity control; Nested control; Railway container transportation; Customer grade; Genetic algorithm 作者简介: 黄帅勋,西南交通大学,电话:15708453768,邮箱:[email protected]

87 地铁安全事故分析及安全管理研究

黄震,傅鹤林 (中南大学)

摘 要:越来越多的发展中国家开始步入了新的地下网络交通时代,地铁安全管理因此所面 临挑战非常巨大。本文搜集了全球 48 个城市的 243 起地铁安全事故,统计结果发现地铁安 全事故的数量并不会随着社会的发展而减少,且地铁安全事故受伤人数与事故数量之间呈正 相关变化。列车中断运行事故是地铁安全事故的主要类型,其次是火灾事故、列车脱轨与碰 撞事故和恐怖袭击。地铁安全管理作为城市智能化发展的重要组成部分,是大城市健康发展 的重要环节,而大数据的扩张和物联网技术的发展对地铁安全智能管理技术的可行性起着重 要的作用。基于此,介绍了高新技术应用于地铁安全智能管理的前景,探讨了地铁安全智能 管理的新发展方向,提出了智能化地铁安全管理系统结构模型。在大数据背景下,本研究可 为今后研究和开发智能地铁安全管理技术提供参考。

关键词:地铁;安全事故;智能管理;大数据;物联网

Analyse the Metro Safety Accident and Safety Management

Huang Zhen,Fu He Lin

Abstract: An increasing number of developing countries step into the new underground network traffic era, where metro safety management faces great challenges. This paper collects 243 metro safety incidents in 48 cities around the world. The statistical results show that the number of metro safety accidents does not decrease with the development of society, and there is a positive correlation between the number of accidents and the number of people injured in the accidents. Interrupted train operation accidents are the main type of metro safety accidents, followed by fire accidents, train derailment and impact accidents, and terrorist attacks. As a major component of smart city development, metro safety management is an important part of the healthy development of large cities. The expansion of big data and the development of the IoT technology play an important role in the feasibility of smart metro safety management. In this paper, the prospect of big data applications to smart metro safety management is described. A new development direction of smart metro safety management is discussed, and a system structure model of smart metro safety management is proposed. In the context of big data, this study provides a reference for researchers and industry to the research on and development of smart metro safety management in the future. keywords:metro; safety accident; smart management; big data; IoT 作者简介: 黄震,中南大学,电话:15675863764,邮箱:[email protected]

88 应急条件下货运机车运用计划恢复

郭文博 1,汤霖 1, 张瀚驰 2, 宋朝玉 3 (1.兰州交通大学交通运输学院;2.中国铁路北京局集团有限公司唐山货运中心;3.中国铁路北京局集团有限公司丰台货运中心)

摘 要:我国铁路网络庞大但运能紧张,为降低突发事件带来的影响,减少铁路部门生产成 本,提高运输效率,本文在研究既有相关文献基础上,对突发事件下机车运用应急恢复问题 进行探讨分析(对后续机车周转波及影响以及前后列车关联约束分析)。针对多机型的机车 交路,综合考虑机车整备检修、已定条件机车数量、机车交路接续时间标准、以及夜间维修 天窗等约束条件,构建了应急条件下机车运用计划的恢复模型。根据问题复杂性特征以及所 设计求解模型结构,为提高求解质量和效率,结合贪婪算法与模拟退火算法在计算性能上各 自的优势,提出一种贪婪模拟退火算法进行求解。最后以朔黄铁路机车运用为例经过测试, 证明本文提出的模型以及算法可行有效,可为应急条件下机车运用计划恢复研究提供理论支 持。

关键词:应急恢复;机车运用;贪婪算法;模拟退火算法

Recovery of Freight Locomotive Schedule in Emergency Condition

Guo Wen Bo1, Tang Lin1,Zhang Han Chi2,Song Zhao Yu3

(1. School of Traffic and Transportation, Lanzhou Jiaotong University;2. China Beijing Railway Administration Tangshan Freight

Center;3. China Beijing Railway Administration Fengtai Freight Center)

Abstract: Although the railway network is huge in our country, which cannot matches the requirements of transportation. In order to reduce the cost of railway departments in emergency events recovery and improve transportation efficiency,based on the related papers recently, the paper analyzed the problem of locomotive scheduling under emergency recovery (for the subsequent locomotive before and after the flow ripple effects and associated constraints example analysis). For multi-type locomotives routing, which was considered the constraints of locomotive servicing maintenance condition, number, routing connect time standards and maintenance skylight, the recovery model of locomotive schedule was rebuilt under the condition of emergency. Aim at the complexing characteristics and structure of the model. In order to improve the solution quality and efficiency, greedy algorithm combining with simulated annealing algorithm in computing performance on their advantages were used. The paper put forward a kind of greed-simulated annealing algorithm to solve the Shuo-Huang railway locomotive utilization scheduling. Finally,

89 experiments were made by Shuo-Huang actual operation data, and it proved that model and the algorithm were verified and effective, which can be provided for emergency recovery of locomotive rescheduling. keywords:emergency recovery; locomotive operation; greedy algorithm; simulated annealing algorithm 作 者 简 介 : 郭 文 博 , 兰 州 交 通 大 学 交 通 运 输 学 院 , 电 话 : 13028700293 , 邮 箱 : [email protected]

90 Time Effect of Pile-Soil-Geogrid-Cushion Interaction of RPCF under High-Speed Railway Embankments

王长丹 同济大学 [email protected]

Abstract:Centrifuge model tests were used to simulate pile-raft composite foundation and pile-geogrid composite foundation with different pile spacing for researching the time effect of negative skin friction of rigid piles in high-speed railways. The research results show that it is feasible to simulate the skin friction distribution of pile by centrifugal model test. The negative skin friction has a significant impact on the bearing capacity of composite foundation. Pile-raft composite foundation has higher bearing capacity compared to pile-geogrid composite foundation to reduce the effect of negative skin friction on piles. Both the foundation settlement and negative skin friction have significant time effect. The distribution of skin friction can be simplified as a triangle along the pile. The neutral point position moves deeper in the post-construction stage at larger pile spacing. The maximum negative skin friction usually takes place at the top zone of the piles. For pile-geogrid composite foundation, the setting of pile-cap affects the position of neutral point in the post-construction stage. Reinforced cushion with geotextile may promote the better performance of cushion for transmitting the loads to piles and surrounding soils. Arching effect in the cushion of the composite foundation is a progressive process. The compression of the rigid piles contributes less than 20% to 25% of the total settlement while the penetration of the piles and the compression of the bearing stratum below the pile tips contribute more than 70% of the total settlement. Some effective measures to reduce the settlement of soils need to be taken into consideration to improve the bearing capacity of pile foundation. Key words : Embankment engineering; Negative skin friction; Rigid pile composite foundation; Pile-cushion interaction; Centrifuge model test; Time effect

91 道路边坡灾害整治新技术及应用

张玉芳,魏少伟, 李健, 关岩鹏 (中国铁道科学研究院铁道建筑研究所)

摘 要:目前,我国道路滑坡灾害的整治技术以支挡、锚固为主。传统锚固工程中存在安全 耐久性隐患大以及快速高效技术缺乏两大难题。针对这两大技术瓶颈,提出了快速耐久公路 边坡灾害防治新技术。其中,“预制锚头”、“双锚固段”、“复合型”3 种锚索新结构, 突破了预应力损失与突发破坏等长期困扰工程应用的技术瓶颈,攻克了锚索安全耐久性难题; 2 种钢花管控制注浆支挡加固新技术,解决了“注浆+微型桩”、“注浆+锚固”的设计及施 工应用技术难题,克服了传统支挡加固工程工期长、见效慢、施工安全隐患大的不足,为边 坡灾害应急抢险快速整治提供了新手段。

关键词:道路边坡灾害;新型锚索结构;钢花管控制注浆技术

New Technology and Application of Road Slope Disaster Prevention

Zhang Shao Fang,Wei Shao Wei,Li Jian,Guan Yan Peng

(Railway Engineering Research Institute,China Academy of Railway Sciences)

Abstract: At present, the disposal measure of road landslide disaster in our country is mainly reinforcing and anchoring. There are two major problems in the traditional reinforcing and anchoring project:“the hidden trouble about the safety and durability”and“the lack of the rapid and efficient retaining technology ” . Aiming at these two problems, a new technology for controlling the road slope disaster is put forward. Among them, the new structure of three kinds of anchor cables“, precast anchor head, double anchor section and the compound”, broke through the technical bottleneck that has long been troubling engineering application such as the loss of prestressing force and the sudden failure of the anchorage engineering. It overcomes the problems about the safety and durability of the anchor cable. The two kinds of grouting reinforcement technology by steel floral tube solve the design and application of technical problems about the "grouting + micro-pile" and "grouting + anchoring". It overcomes the problems such as the long construction period of the traditional retaining project, the slow retaining effect, the biggish hidden dangers of the safety in construction and provides a new means for emergency rescue and rapid remediation of slope disasters.

92 keywords:road slpoe disaster; new structure of anchor cables; grouting reinforcement technology by steel floral tube 作者简介:张玉芳,中国铁道科学研究院铁道建筑研究所,电话:13802246376,邮箱: [email protected]

93 高速铁路车站咽喉区与到发线综合运用优化

刘杰,殷勇,闫旭,贺绍锐 (西南交通大学)

摘 要:文章研究了接发列车的到发线分配和咽喉区进路选择问题,在满足到发线使用规则 的条件下,以作业计划稳定性强和接发车进路条件优为目标,构建到发线与车站咽喉区运用 多目标优化模型。采用改进的带精英策略的非支配排序遗传算法(NSGA-II)对模型进行求解, 算法能有效保存优秀个体和降低计算复杂度。最后以某高速铁路车站为例,采用 MATLAB 编 程得到模型的 Pareto 最优解集,从解集中选择一个解,将其结果与原始到发线方案进行对 比,结果表明,采用该模型和算法能有效改进车站咽喉区与到发线的综合运用方案。

关键词:铁路运输;综合优化;改进的带精英策略的非支配排序遗传算法( NSGA-II);到发 线;咽喉区;高速铁路车站;Pareto 最优解

Optimize the Utilization of Arrival-departure Tracks and Throat Area in High Speed Railway Station

Liu Jie ,Yin Yong,Yan Xu,He Shao Rui

Abstract: This paper studied the arrival and departure track distribution and throat area of the train route choice problem, Under the condition of satisfying the application rules of the line, the multi-objective optimization model is built to arrival and departure track and the throat area of the station, aiming at the stability of the operation plan and the optimal route condition of the incoming train. it was solved based on non-dominated sorting genetic algorithm-II (NSGA-II). The algorithm can effectively save the outstanding individuals and reduce the computational complexity. Finally, taking a high speed railway station as an example, MATLAB software was programmed to obtain Pareto optimal solutions, a optimization scheme was chosen to compared and analyzed with the original scheme, The results show that the model and the algorithm can effectively improve the comprehensive application scheme of the throat area and the arrival and departure lines of the station. keywords:Railway transportation; Comprehensive optimization; Non-dominated sorting genetic algorithm-II (NSGA-II);Arrival-departure tracks; Throat area; High speed railway station; Pareto optimal solution 作者简介: 刘杰,西南交通大学,电话:18283617496,邮箱:[email protected]

94 Numerical Analysis of Ballast-TDA Mixture under Cyclic Loading

Peyman Aela Beijing Jiaotong University | Beijing Jiaotong University [email protected]

井国庆 北京交通大学 [email protected]

付豪 北京交通大学 [email protected]

Abstract:This study investigates the application of tire derived aggregate (TDA) mixed with ballast material as an approach for improvement of the ballast track performance. In order to assess the TDA influence on the ballast layer, a series of ballast box tests were conducted on the mixture of ballast aggregates and 0, 5, 10 and 15% of TDA with the same gradation of the ballast size distribution. On the other hand, a series of numerical analysis was performed with the use of EDEM with the aim of the discrete element method simulation of the TDA-ballast mixture. Based on results, the settlement of numerical modeling and experimental tests were compared. While experimental results indicate that increasing TDAs percentage increases the damping ratio as well as the settlement of samples. Which is in a good agreement with the settlement of samples obtained from numerical analyses. In conclusion, the more use of TDAs mixed with ballast aggregates, the more settlement occurs which it can cause a disturbance to the interlocking of ballast particles. Key words : Ballast; tire derived aggregate (TDA); ballast box test; ballast settlement; EDEM.

95 高速铁路快捷货物运输组织研究

徐君翔 (西南交通大学)

摘 要:近年来,我国社会经济不断发展,人们生活水平也日益提高,这种高速化的经济生 活为新时期的发展带来了新的问题,人们对物质生活需求也越来越大,要求的质量也越来越 高,越来越重视运输的时效性和快速性。随着高速铁路的发展在近几年更是迅猛,中国铁路 总公司最新推出的货改方案都为满足现今社会的这种运输需求提供了充分的条件和准备了 坚实的基础。本文就是基于此问题的条件下,为了在我国实现高速铁路快捷货物运输模式, 在符合理论条件和大胆开拓创新性设想的情况下为了在我国实现高速铁路快捷货物运输模 式,在符合理论条件和大胆开拓创新性设想的情况下对我国高速铁路快捷货物运输组织的可 行性分析和我国高速铁路货物运输组织保障措施等问题的具体分析,为未来真正开展高铁快 捷货物运输业务提供理论依据。

关键词:高速铁路;快捷货物; 可行性分析; 运输组织

Research on High-Speed Railway Express Freight Transportation Organization

Xu Jun Xiang

Abstract: In recent years, with the rapid development of our social economy, people’s life quality is increasingly improved day by day. This high speed of economic life brings new problems to this new developing period, that is people’s material life demanding is becoming more higher than before, and requirements for the quality also become more higher, people take more attention to the efficiency of the transportation and quickness. However, with the rapid development of the high-speed railway in recent years, been cross horizontal high-speed rail network has been gradually improved, this increase the goods to Chinese railway corporation scheme to meet the transportation demanding of modern society, and also provides a good condition and preparation for a solid foundation. This paper is based on the condition of this issue, in order to realize quickly the high-speed railway transportation mode in our country to analyze the feasible analysis of high speed railway fast freight transportation organization in our country and high speed railway fast freight transportation organization safeguard measures analysis. This paper is used to the future to

96 carry out the real high-speed rail cargo transport business to provide a theoretical basis. keywords:High-Speed railway; Express freight transportation; Feasibility analysis; transportation organization 作者简介: 徐君翔,西南交通大学,电话:15828468419,邮箱:[email protected]

97 Numerical Analysis of CFG Pile Settlement in Soft Rock Foundation of High-Speed Railway

王威 华东交通大学 [email protected]

陆思逵 华东交通大学 [email protected]

杨成忠 华东交通大学 [email protected]

罗坤 华东交通大学 [email protected]

Abstract:The increasing speed of high-speed railway has improved the requirements for the stability of high-speed railway subgrade. To ensure the quality of laying ballastless track on the subgrade, subgrade settlement deformation must be strictly controlled, especially to solve the settlement deformation problem existing in soft ground. Currently, CFG pile is the main pile type for soft soil foundation treatment of high-speed railway. However, there are few studies on the consolidation of soft rock foundation with CFG pile. Therefore, it is necessary to study the settlement law of soft rock foundation with CFG pile under high-speed train load. In this study, the numerical simulation was used to analyze the settlement deformation of soft rock foundation under high-speed railway with CFG pile. Then, the influence of different factors on the settlement of soft rock is analyzed through the change of vehicle speed, pile length, cushion thickness and material stiffness. Finally, the suggestions of using CFG pile to improve the strength of soft rock is given, which will provide some reference value for the settlement prediction of similar projects in the future. Key words:High-speed railway, Subgrade settlement, CFG pile composite foundation, Soft rock, Numerical simulation

98 抛石路基的非稳态非热平衡渗流模型及数值算法研究

王美琪

摘 要:基于渗流力学与多孔介质的气固传热理论,分析了抛石路基内部的质量守恒、动量 守恒与非热平衡能量守恒状态,考虑气固非热平衡、热弥散与变物性因素,建立了抛石路基 内部的非稳态流热耦合模型。在有限差分法的基础上,通过对所建模型及求解区域进行离散 化,融合双变量三对角矩阵算法、交替方向隐式方法和高斯-赛德尔迭代法,提出了一种用 于求解抛石路基多孔介质模型的离散数值算法,为求解抛石路基中的流热耦合问题提供参考。

关键词:抛石路基;多孔介质;数值算法

Research on Unsteady Nonthermal Equilibrium Seepage Model and Numerical Algorithm of Riprap Subgrade

Wang Mei Qi

Abstract: n-thermal equilibrium energy conservation inside the riprap subgrade are analyzed. Considering the factors of gas-solid non-thermal equilibrium, thermal dispersion and variable physical property, the unsteady fluid-thermal coupling model inside the riprap subgrade is established. On the basis of finite difference method, the established model and the solution region are discretized. At the same time, Bivariate Tridiagonal Matrix Algorithm is coalesced to the Alternating Direction Implicit Method and the Gauss-Saidel Iteration Method to put forward a discrete numerical algorithm which is used to solve the porous media model of riprap subgrade. The paper provides reference for solving the problem of fluid thermal coupling of riprap subgrade. keywords:Riprap Subgrade; Porous Media; Numerical Algorithm 作者简介: 王美琪,电话:13223435755,邮箱:[email protected]

99 Study on Chloride Diffusion Model and Life Prediction of Concrete Box Girder Bridge

马俊军 兰州交通大学土木工程学院 [email protected]

蔺鹏臻 兰州交通大学土木工程学院 [email protected]

Abstract:In order to simulate the erosion process of chloride ion in concrete box girder accurately, and obtain the concentration of chloride ion at arbitrary position at any time in the cross section and the prediction of durability life of the structure. Based on Fick's second law, a cellular automata model of concrete chloride ion diffusion was established based on the principle of 2D cellular automaton, which take the effect of material and age on the diffusion effect of chloride ion into account. According to the cellular automata model of chloride ion diffusion in the box girder, taking a box beam as an example, a MATLAB calculation program was compiled to analyse the diffusion rules of chloride ions in the cross section and to predict the durability life of the structure. The results of the study show that: Compared with the analytical solution of chloride ion concentration, the cellular automata model established in this paper can simulate the chloride ion diffusion process of concrete box girder effectively, and the calculation accuracy is high. According to the different forms of chamfered sections, chloride ions show different diffusion rules, and the time required for different concentrations of chloride ions to reach the critical concentration of steel corrosion is different. By comparing with the analytic solution of life prediction, it is proved that the model can effectively predict the durability life of concrete structures. The model is used to predict the service life of concrete box girder with chloride salt eroded environment, and the results show that the structure will reach the design limit of structure durability in service for 34 years. Key words:concrete box girder;cellular automata;chloride ion diffusion;life prediction; numerical analysis

100 Rail Condition Monitoring Using ABA Measurements: Defect Detection in the Netherlands and Romania

Jurjen Hendriks [email protected]

Jan Moraal [email protected]

Ivan Ramirez [email protected]

Rolf Dollevoet [email protected]

Zili Li [email protected]

Alfredo Nunez [email protected]

Abstract:In this paper we discuss rail condition monitoring based on axle box acceleration (ABA) measurements. We present three case studies. The first one in The Netherlands, the detection of local defects with different severity levels (squat A, squat B and squat C) is analysed. The second case from the Faurei testing ring in Romania, the detection of rail defects over the whole testing ring is presented and examples of responses at a local defect (wheel-burn) is discussed with measurements at 80km/h (conventional speed measurement) and 200km/h (high speed measurement). In the third case, ABA measurements were obtained during operation in a train with passengers in the railway line near Brasov, Bartolomeu-Zărneşti. Examples of the defects and validations are discussed. Key words : Railway infrastructure, axle box acceleration, rail condition monitoring, rail maintenance

101 Structure of Compacted Maryland Clay and Suction Profiles

Yuan Sheng yang The University of Newcastle [email protected]

刘先峰 southwest jiaotong university [email protected]

buzziOlivier The University of Newcastle [email protected]

Abstract:This study investigates suction profiles and structures of a compacted expansive clay (Maryland clay) in the compaction plane. Suction was monitored during the compaction, and it followed the main mechanical wetting path. This study showed that there was difference between the suction measured during the compaction and after unloading. The difference becomes more significant as degree of saturation increasing. The pore structures of compacted samples on the dry-side of optimum water content generally were all bi-modal structure, otherwise on the wet-side of optimum water were mono-modal structure. The intra-aggregate pore was independent on the maximum compaction stress, but its density and dominant entrance pore size gradually increased as water content increasing. For the inter-aggregate pore, its density and dominant entrance pore size decreased as maximum compaction stress increasing. | This study investigates suction profiles and structures of a compacted expansive clay (Maryland clay) in the compaction plane. Suction was monitored during the compaction, and it followed the main mechanical wetting path. This study showed that there was difference between the suction measured during the compaction and after unloading. The difference becomes more significant as degree of saturation increasing. The pore structures of compacted samples on the dry-side of optimum water content generally were all bi-modal structure, otherwise on the wet-side of optimum water were mono-modal structure. The intra-aggregate pore was independent on the maximum compaction stress, but its density and dominant entrance pore size gradually increased as water content increasing. For the inter-aggregate pore, its density and dominant entrance pore size decreased as maximum compaction stress increasing. Key words:compacted expansive soil, suction mapping | compacted expansive soil, suction mapping

102 新形势下天津机场城市轨道交通衔接研究

周欣荣 (天津市城市规划设计研究院)

摘 要:京津冀协同发展提出建设世界级机场群,天津滨海机场作为区域型枢纽,需要构建 功能全面、层次分明的轨道交通集疏运系统。本文总结了世界上典型的枢纽型机场在轨道交 通衔接的建设经验,结合天津滨海机场主要客流腹地及现有的轨道交通集疏运条件,提出了 相应的优化建议,实现天津滨海机场与天津双城主中心以及重要对外枢纽的轨道交通便捷衔 接,对支撑天津滨海机场区域型枢纽地位提供保障。

关键词:世界级机场群;区域型枢纽;轨道交通衔接系统;主中心;对外枢纽

Research in Rail Trainsit Connection System for Tianjin Binhai Airport under The New Situation

Zhou Xin Rong

Abstract: Coordinated development of the Beijing, Tianjin, and Hebei region put forward to build world-class airports, Tianjin Binhai Airport as a regional hub, need to build a fully functional, structured rail transit connection system. This paper summarizes the experience of the construction of rail transit system in the world's typical regional hub airport. With the hinterland of Tianjin Binhai Airport and the existing transportation condition, it put forward the corresponding optimization suggestion, realize the convenient connection between Tianjin Binhai Airport and the main center of Tianjin twin cities as well as important external hub, to guarantee the support status of Tianjin Binhai Airport hub. keywords:world-class airports, regional hub, rail transit connection system, main center, external hub 作者简介: 周欣荣,天津市城市规划设计研究院,电话:13821896164,邮箱:[email protected]

103 Hybrid Simulation to Investigate the Dynamic Behavior of Track Transition Zones

石灿 西南交通大学牵引动力国家重点实验室 [email protected]

赵春发 西南交通大学牵引动力国家重点实验室 [email protected]

张徐 广州工业大学 [email protected]

Abstract:The transition zone is a place where severe track settlement may occur, usually requires considerably more interventions to maintain the service quality and safety. Although lots of researches have been carried out, an overall consensus on the internal factors that trigger the deterioration of the tracks at transition zone is still under investigations. To further probe into the deterioration of track geometries in transition zone, a field test was carried out to measure the wheel-rail force, rail seat loads and track component’s dynamic response in Sui-Yu railway line. Moreover, a numerical model that couples Discrete Element Method (DEM) with Finite Difference Method (FDM) is proposed to survey dynamic behaviors of the transitions. The results show that: the results of model calculation are consistent well with the experimental results. Key words : Discrete element method, Hybrid simulation, Transition zone, Field measurements, Dynamic response

104 浅析地铁深基坑紧邻高层建筑施工控制技术

涂文良 (中铁二十四局集团南昌铁路工程有限公司)

摘 要:特殊地质环境下,城市地铁车站深基坑紧邻周边高层建筑施工时,施工过程中动态 安全风险极高,为了保障地铁车站深基坑施工过程中周边高层建筑物及深基坑自身的安全, 本文以贵阳轨道交通 1 号线延安路站施工为例,重点介绍强岩溶、高富水地铁车站深基坑施 工过程及紧邻高层建筑物的技术处理方案。本文的控制技术为今后类似工程施工提供了技术 支撑和借鉴依据。

关键词:特殊地质环境;地铁;深基坑;紧邻;高层建筑物

Shallow of Subway Deep Foundation Pit Adjacent to High-Rise Building Construction Control Technology

Tu Wen Liang

Abstract: In special geological environment, when the deep foundation pit of urban metro station is close to the surrounding high-rise building, the dynamic safety risk during construction is very high. In order to ensure the safety of surrounding high-rise buildings and deep foundation pit during the construction of subway station deep foundation pit Taking the construction of Yan'an Road Station on Line 1 of Guiyang Rail Transit Line as an example, this paper mainly introduces the construction process of deep foundation pit of strong karst and Gaofu water metro stations and the technical treatment scheme of high-rise buildings. The control technology of this article provides technical support and reference for similar projects in the future. keywords:Special geological environment; subway; Deep foundation pit; Immediately;High-rise buildings 作者简介: 涂文良,中铁二十四局集团南昌铁路工程有限公司,电话:18007910926,邮箱: [email protected]

105 基于多智能体技术的铁路冷链物流园区信息系统架构解析

徐学才 1,孙逊 2, 兰建华 2,段力 1 (1 华中科技大学 ;2.中铁第四勘测设计院集团有限公司)

摘 要:基于多智能体系统相关理论以及铁路冷链物流的特征,构建基于多智能体技术的分 布式铁路冷链物流园区信息系统架构,根据系统的整体架构及各个应用系统的特性,对战略 控制层主要的智能体内部结构进行分析设计,为构建智能化、实时信息化的铁路冷链物流园 区信息平台提供理论基础。

关键词:多智能体;铁路冷链物流园区;信息平台

Structure Analysis on Information System of Railway Cold Chain Logistics Park Based on Multi-Agents

Xu Xue Cai, Sun Xun,Lan Jian Hua,Duan Li

Abstract: Based on the related theories of multi-agent system and features of railway cold chain logistics, the distributed information system of railway cold chain logistics park is constructed based on multi-agent technology. In accordance with the system framework and characteristics of each application system, the internal structures of main agents within strategic control layer are analyzed and designed, all of which provide theoretical foundation for intelligent and real-time informationization of information platform established in railway cold chain logistics park. keywords:Multi-Agent; Railway Cold Chain Logistics Park; Information Platform 作者简介: 徐学才,华中科技大学,电话:18986155430,邮箱:[email protected]

106 紧邻既有隧道衬砌开裂分析及处治研究

方恩权

摘 要 : 西 南 地 区 某 隧 道 在 施 工 期 结 束 后 出 现 较 为 严 重 的 开 裂 现 象 , 其 中 里 程 DK268+430~DK268+537 衬砌结构右边墙出现一条长度超百米的纵向结构性裂缝。针对此现象, 本文通过数值模拟方法分析了隧道二次衬砌破坏的具体原因。分析结果表明,倾斜状岩层与 既有邻近高铁隧道是造成二次衬砌裂损的的主要原因。通过对开裂原因的具体分析和结构安 全性的综合考虑,拟定采用拆除重构的补强手段加固破损段,对重构段二次衬砌内力的监测 结果显示,整治收到良好效果,衬砌结构安全性得到较大提升。

关键词:倾斜岩层;既有隧道;开裂;加固

The Analysis and Treatment of Lining Cracks under the Influence of Adjacent Existing Tunnel

Fang En Quan

Abstract: A tunnel locates in Southwest China, which appeared severe cracking phenomenon after the end of the construction period and the wall on the right side of lining structure from DK268+430 to DK268+537. A vertical structural cracks more than one hundred meters in length. In view of the phenomenon, this article analyzed the specific causes that made tunnel secondary lining damaged. The results show that the main causes of the secondary lining crack damage include inclined strata and the existing adjacent high-speed rail tunnel. The demolition reconstruction reinforcement measure to reinforce the damaged section is selected by detailed analysis of causes of cracking and considering the safety of structure. The monitored internal force of the reconstruction secondary lining shows that the regulation received good results and the tunnel structure security has been improved a lot. keywords:inclined strata, existing tunnel, crack, reinforcement 作者简介: 方恩权,电话:13570565792,邮箱:[email protected]

107 空间变异性对高铁复合地基工后沉降的影响分析

张洁 (同济大学地下建筑与工程系)

摘 要:复合地基具有工期短、造价低的优点,因此很多高速铁路采用复合地基来减小路基 的工后沉降。受土层性质以及桩体参数不确定性的影响,高铁复合地基沉降也具有不确定性。 为了考虑土层及桩体的不确定性对复合地基沉降的影响,随机场理论被用来准确的模拟土层 及桩体的空间变异性,结合有限差分模型,建立了高铁复合地基的随机有限差分模型。分析 了土层及桩体的空间变异性对施工期间复合地基沉降的影响。为了分析高铁复合地基的可靠 性,计算得到了高铁复合地基加固的路基工后沉降,最后分析了空间变异性对高铁复合地基 工后沉降和失效概率的影响。

关键词:随机场;高速铁路;复合地基;沉降

Effects of Spatial Variability on Settlement of Composite Foundation of High Speed Railway

Zhang Jie

Abstract: Composite foundation is often utilized to reduce the post-construction settlement of high speed railway embankments constructed on the soft soil. Due to the uncertainties in the properties of the soft soil and mixed columns, the settlement of the composite foundation is also uncertain. To consider the influence of the spatial variability on the settlement, the finite difference method is used to predict the settlement of an embankment supported by the DM columns. Both spatial variability and complex interaction between soil and columns can be considered by the random field finite difference method. Sensitive analysis is conducted to the random variables investigated in this study. Effect of the spatial variability on the settlement happened during the construction period is studied, and the effect of the spatial variability on the maximum post-construction settlement is also investigated. keywords: Random field, high-speed railway, composite foundation, settlement 作 者 简 介 : 张 洁 , 同 济 大 学 地 下 建 筑 与 工 程 系 , 电 话 : 18801736218 , 邮 箱 : [email protected]

108 Dynamic Behaviors of Railway’s Base Course Materials Subjected to Long-Term Low-Level Cyclic Loading

闫穆涵 [email protected]

Abstract : The aim of this research was to develop a practical method for estimating the dynamic elastic modulus and accumulated plastic strain of a railway ’ s base course materials subjected to increasing long-term, low-level cyclic loading. For this purpose, two series of cyclic triaxial tests, one with single-stage and the other with multi-stage loading were performed. It was found that the accumulated plastic strain increased as the number of cycles and amplitude of the loading increased, but that the permanent strain decreased as the confining pressure becomes higher, and appeared to be closely related to the stress history. Considering the effect of the stress state, an empirical model was proposed to predict the accumulated plastic strain. Then, the model was modified on the basis of the time hardening approach. In this way, permanent deformations in various stress stages were accumulated using an equivalent number of load cycles. There was good agreement between the predicted and measured deformation. Key words: Base course materials, Dynamic elastic modulus, Accumulated plastic strain, Multi-stage loading, Low-level cyclic triaxial load tests, Empirical model, Time hardening approach

109 Local Vibration and Structure Noise Analysis of U - Beam Based on FE-SEA Hybrid Method

罗文俊 华东交通大学 [email protected]

程龙 华东交通大学 [email protected]

Abstract:The prediction model of FE bridge structure and FE-SEA hybrid bridge structure is established by using a frequency-dividing strategy. The frequency domain and characteristics of the vibration and structural noise of the U-beam within the 1.25Hz~250Hz frequency range, when subjected to a vertical wheel-rail interaction force,were analyzed. Then some relevant conclusions are acquired that: (1) Under the action of wheel/rail force, the frequency with the maximum amplitude in the spectrum of vibration and structure noise of a U-beam is mainly concentrated in the range of 31.5~80Hz. (2)The structure noise at the far-field point and under the bridge point is mainly affected by the sound pressure of the bottom plate. Therefore, the bottom plate should be the main object for noise reduction. (3)And the sound pressure level of the field also has a large peak value, at the low frequency about 4Hz. The method used in this paper can greatly improve the running efficiency while guaranteeing a better precision, which can provide reference for the vibration and noise reduction of the bridge in the actual project. Key words:U beam; vibration; structural noise; rate of acoustic contribution; FE-SEA hybrid method

110 城市轨道交通快慢车运输组织优化研究

李进龙,王红杰,李运隆,全超 (西南交通大学)

摘 要:随着城市规模扩大和居民出行需求增加,传统的城市轨道交通站站停方案已无法满 足乘客多样化的出行需求,快慢车方案得到越来越多的研究与实践。针对城市轨道交通快慢 车模式运输组织问题,在分析影响快慢车停站方案因素的基础上,以乘客时间节省和企业运 营成本节省最大化为优化目标,建立 0-1 整数规划模型,将所建模型运用到实际轨道交通线 路中,并设计遗传算法求解模型。结果表明,相比传统站站停方案,快慢车停站方案每年可 节省乘客出行时间效益 690 万元,节省企业能耗费用 219 万元和车底购置费 4200 万元。

关键词:城市交通;停站方案;遗传算法;快慢车模式;0-1 整数模型

Optimization Research on the Operation Organization of Express/Local Train in Urban Rail Transit

Li Jin Long,Wang Hong Jie,Li Yun Long,Quan Chao

Abstract: With the expansion of city scale and the growth of urban residents ’ travel demand, traditional operation which the metro train adopts all-stop scheme has been unable to meet the diverse needs of passengers. As a result, there are more and more research and practice on the express/local train system. Focusing on the operation organization of express/local train in urban rail transit, this paper analyzed the influencing factors of the express/local train stop schedule, established 0-1 integer programming model for the stop schedule plan of express/local train to maximize the comprehensive benefits and minimize the travelling time of the express/local train system, applied the model to an urban rail transit line combining with Matlab software by designing genetic algorithm. The result shows that the express/local train scheme can save 6.9 million yuan time benefit for passengers, 2.19 million yuan energy cost and 42 million yuan purchasing cost for operating enterprise compared with traditional all-stop scheme each year. keywords:urban traffic; train stop scheme; genetic algorithm; express/local train mode; 0-1 integer model 作者简介: 李进龙,西南交通大学,电话:18482184654,邮箱:[email protected]

111 基于遗传算法的北京地铁八通线跨站停车运行方案优化研究

杨守拙 (北京首都师范大学附属中学)

摘 要:北京地铁目前普遍采用站站停车方式会带来乘客损失时间多、局部区间过度拥挤、 车站滞留人员多而不得不采用车站进站限流等问题。本文以北京地铁八通线为研究对象,针 对其客流潮汐现象和集中分布明显的特点,提出采用跨站停车运行方式取代目前的站站停车 方式,以缩短乘客出行时间。在构建跨站停车运行方案数学模型的基础上,建立以节省乘客 出行时间为目标的优化函数,利用遗传算法对八通线跨站停车运行方案进行优化,仿真结果 验证了跨站停车运行方案的可行性与应用价值。

关键词:遗传算法;地铁八通线;跨站停车;运行方案优化研究

Research on the Skip-Stop Operation in Beijing Subway Batong Line Using Genetic Algorithm

Yang Shou Zhuo

Abstract: At present, the standard station stop schedule is generally adopted in Beijing Subway Line. It will bring many problems such as the time loss of passengers, the overcrowding of local areas, and the stagnant people. Thus sometimes the limit flow of the station was adopted. This paper based on the Beijing Subway Batong line, according to the passenger flow tide phenomenon and centralized distribution characteristic, a new train stop scheme is proposed. The new scheme uses skip-stop operation mode to replace the standard station stop schedule, and in order to shorten the travel time of the passengers. Based on the constructing mathematical model of skip-stop operation, the optimization function which using the saved passenger travel time as the goal was established. Then the skip-stop operation scheme was optimized by genetic algorithm, and the simulation results verified the feasibility and application value of the proposed skip-stop operation scheme. keywords:Beijing Subway Batong line; urban rail transit; skip-stop operation; genetic algorithm; standard station stop schedule 作 者 简 介 : 杨 守 拙 , 北 京 首 都 师 范 大 学 附 属 中 学 , 电 话 : 18613857478 , 邮 箱 : [email protected]

112 普通铁路客车车轮不圆顺与轮轨冲击振动关系研究

刘鹏飞 1,王开云 2,翟婉明 2 (1.石家庄铁道大学;2. 西南交通大学)

摘 要:针对 120km/h 级别普速客车,获得了车轮踏面存在严重缺陷时的车轮不圆顺,分析 了不圆顺谐波构成。基于车辆-轨道耦合动力学垂向模型,研究了不圆顺激扰下的轮轨冲击 振动,以动态轮重减载率为控制指标,确定了 200~600mm 波长范围内谐波波深限值,为车轮 的检修提供参考。

关键词:普通铁路;客车;车轮不圆顺

Relation Between Wheel Polygon and Wheel-rail Impact Vibration for Passenger Car in Ordinary Railway

Liu Peng Fei,Wang Kai Yun,Zhai Wan Ming

Abstract: For the 120km/h passenger car in ordinary railway, the wheel polygon data of wheels with serious defects are measured. And the Harmonic compositions are analyzed. Based on the vehicle-track vertical coupled dynamics model, the wheel-rail impact vibration excited by the out-of-round wheel are investigated. Taking the dynamic wheel-load reduction rate as the controlling index, the depth limits of harmonics with 200~600mm wave length are determined, which provides the reference of wheel maintenance. keywords:Ordinary railway; passenger car; wheel polygon 作者简介: 刘鹏飞,石家庄铁道大学,电话:13126194894,邮箱:[email protected]

113 Research on Psychologies and Behaviours of Subway Crowd under Special Events

潘福全 青岛理工大学 [email protected]

亓荣杰 青岛理工大学 [email protected]

张丽霞 青岛理工大学 [email protected]

泮海涛 青岛理工大学 [email protected] Abstract:In order to study the psychologies and behaviours of subway crowd under special events under special events, such as fire, major passenger flow, explosion, driving accident, terrorist attack, rain water pouring, earthquake and other special events, referring to the emergency evacuation survey questionnaire of shopping mall, student dormitory building, etc., this paper designs a questionnaire which contains the basic information of passengers, the knowledge of emergency evacuation, and the psychological and behavioural responses of passengers when special events occur. 555 valid questionnaires were obtained through online survey and on-site random survey, and the basic characteristics of the passengers, such as gender, age, and occupation, were statistically analyzed.. According to the correlation between the characteristics of sunway crowd and the reaction of the evacuation psychologies and behaviour under special events such as fire and major passenger flow, a statistical method was used to select the correlation variable group to carry out the chi-square test. The results showed that (1) the degree of education, gender, age, and security knowledge is significantly correlated with the psychological and behaviour responses of passengers, (2) most passengers show fear due to without experience of special event, and male passengers were more calm than female passengers, (3) the higher the degree of education, the choice of evacuation path in emergency evacuation is more dependent on subjective consciousness, and (4) the more the safety knowledge is mastered, such as know of station location and environment of safe exit, the more reasonable the evacuation route is to evacuate, which is beneficial to improve the evacuation efficiency. This study provides data support for subway evacuation research, subway safety knowledge promotion plan and formulation of reasonable and effective emergency evacuation plan. Key words:subway station;special event;emergency evacuation;psychology;behaviour

114 城市轨道交通车站设施设备布局优化方案研究

张庆瑜 (天津市城市规划设计研究院)

摘 要:随着我国轨道交通行业的快速发展,轨道交通车站内部客运设施设备与乘客交通量之 间的不匹配性日益加重。检票设备作为车站通行设备的重要瓶颈,其布局方法需考虑多种因 素。围绕进出站检票设备布局优化方案进行研究,通过对实际车站的调研,分析客运设备配 置情况,以车站客流特征及乘客的服务感受为基础,分析站厅形式、宽度及检票设备性能等 8 个因素对检票设备布局的影响,提出客运设备布局方案及其优缺点;在此基础上,运用排 队模型、Anylogic 仿真软件,对某实际车站现行方案及优化方案进行仿真评价,验证本文 提出方法的可靠性,为车站设施设备布局优化提供参考。

关键词:轨道交通车站;设施设备;布局;仿真

The Optimization Design for Facilities and Equipment Layout in Urban Rail Transit Stations

Zhang Qing Yu

Abstract: With the rapid development of rail transit industry, the mismatch between passenger transportation facilities and passenger traffic in rail transit stations is increasing. Ticket checking equipment is an important bottleneck for station passing equipment, and its layout method needs to consider various factors. The study is conducted on the layout optimization design of the ticket checking equipment for entry and exit stations. Through the investigation of actual stations, the configuration of passenger transportation equipment was analyzed. Based on the passenger-flow characteristics of the station and passengers' service experience, eight factors including the form of the hall and the performance of ticket checking equipment are analyzed. With regard to the layout of ticket inspection equipment, the passenger transportation equipment layout schemes and their advantages and disadvantages are proposed. Based on this, the queuing model and Anylogic simulation software are used to simulate and evaluate the current program and the optimization layout of an actual station to verify the reliability of the proposed method, to provide a reference for the layout optimization of station facilities and equipment. keywords: rail transit stations; Facilities and Equipment; Layout; simulate 作 者 简 介 : 张 庆 瑜 , 天 津 市 城 市 规 划 设 计 研 究 院 , 电 话 : 18222110806 , 邮 箱 : [email protected]

115 基于 WiFi 信息的轨道交通乘客出行识别

南斯睿,张辛煜, 李岩 (长安大学公路学院)

摘 要:为准确识别网络化运营环境下轨道交通乘客出行特征,设计了可采集 WiFi 信息的分 布式交通行为识别系统。轨道交通出行路径预测模型与实际出行路径存在偏差,利用信息检 测技术可有效获得轨道交通乘客出行路径。本文利用基于无线 Wi-Fi 的信息检测设备,获得 地铁站点乘客信息,对数据进行筛选分析,得出站台乘客出行时间分布,并对各站点间的检 测数据进行匹配得出检测数据匹配度及各站台间出行时间分布情况。可知该系统采样率高、 准确度高,能准确获取乘客的出行特征信息,可作为城市轨道交通系统客票清分、站点设计 的等精细化运营管理的依据。

关键词:出行特征;WiFi 信息;城市轨道交通

Passenger Travel Identification of Rail Transit Based on WiFi Information

Nan Si Rui,Zhang Xin Yu,Li Yan

Abstract: In order to accurately identify the passenger travel characteristics of rail transit under the networked Operation Environment, a distributed traffic behavior recognition system with WiFi information is designed. It exists a deviation between the travel route forecast model and the actual travel path, and the information detection technology can effectively obtain the passenger travel path of rail transit. This paper utilizes wireless Wi-Fi information detection equipment, obtains the subway station passenger information, carries on the screening analysis to the data, obtains the platform passenger travel time distribution, and obtains the detection data matching degree and the travel time distribution between each station. It is shown that the system has high sampling rate and high accuracy, and can obtain the passenger travel characteristic information accurately, which can be used as the basis of fine operation and management of ticket clearance and site design of urban rail transit system. keywords:travel characteristics; WiFi information; urban rail transit 作者简介: 南斯睿,长安大学公路学院,电话:17782569437,邮箱:[email protected]

116 Gradient Based Methods Used in Dynamic Transportation System Optimization: Review and Discussions

孙略添 北京交通大学交通运输学院 [email protected]

周学松 亚利桑那州立大学;北京交通发展研究院 [email protected]

Abstract : A transportation system consists of many spatially and temporally distributed demand and supply factors, each with different degrees of connections with each other. This paper aims to describe the inherent connections among various factors in the context of system optimization. Specifically, a computational graph based modelling framework is used in this paper to represent the topological structure of a transportation system to be optimized. The sequential optimization steps can be described as a feedforward process in the proposed computational graph framework and the estimation procedure can be described as a back propagation process. We can accordingly compute and capture how the marginal cost from different layers transfer between interconnected elements in a computational graph. We also review the gradient based methods to represent the marginal cost in an estimation process, by following the naturally inherent hierarchical structure in the representative transportation system. By reviewing the gradient methods used in a closely connected optimization (traffic assignment) and estimation (OD matrix estimation) transportation problems, we offer further insights on how different factors interact through the gradient mechanism within the computational graph modelling paradigm. Comparisons between the computational graphs with the commonly used neural network are provided to shed more lights on future large-scale transportation system optimization applications. Key words:transportation system; computational graph; gradient based method

117 浅析城市轨道交通中专用电话系统的应用

刘云龙 (中咨泰克交通工程集团有限公司)

摘 要:伴随城市轨道交通的快速发展,列车运营安全越来越受到人们广泛关注,列车能够 安全、高效的运营,其关键因素取决于通信、信号技术水平发展,专用电话就是保障列车安 全运营的一种重要通信手段。本文讲述了专用电话在地铁领域中的应用,结合北京昌平地铁 建设实际情况具体描述了专用电话系统设置方案、系统构成、组网方式、系统功能等方面, 希望对于轨道交通建设的专用电话系统能够提供参考和借鉴。

关键词:城市轨道交通;专用电话;双中心

The Application of Dedicated Dispatching System in Urban Rail Transit

Liu Yun Long

Abstract: Abstract: Along with the development of urban rail transit, its operation safety attracts more and more attention from the people. To keep the train running safely and efficiently depends on the communication and signaling system, among which, the dedicated dispatching system is a very important role in communication system. This paper mainly states the application of the dedicated dispatching system in urban rail transit, and makes a case study of Changping Metro in order to give a detailed description of the construction, deploy strategy, networking and function in dedicated dispatching system, thus hoping to provide useful reference for future application of the dedicated dispatching system in the urban rail transit. keywords:Urban Rail Transit;Dedicated Dispatching System;Dual center 作者简介: 刘云龙,中咨泰克交通工程集团有限公司,电话:18101086545,邮箱: [email protected]

118 大跨度桥建合一高架车站的振动舒适度分析

欧阳院平 (长江勘测规划设计研究院)

摘 要:城市轨道交通中桥建合一高架车站这一经济节能的结构形式得到了日益广泛的应用, 其建设规模也逐渐增大,这将引起车站结构一系列安全性评价参数的变化。列车通过车站时 会引起显著的动力响应,对站内人员的舒适性产生影响。振动舒适度作为评价大跨度轻柔结 构的基本参数,将在本文中作为研究桥建合一高架车站的控制参数。本文将结合武汉轨道交 通中施岗站的案例进行舒适度研究。

关键词:轨道交通;桥建合一;高架车站;动力特性;舒适度

Vibration Serviceability Assessment on Bridge-Architecture Unification of Rail Transit Station

Ou Yang Yuan Ping

Abstract: Application of "bridge-architecture unified" elevated station has been increasingly appealing in urban rail transportation in recent years for its excellent behavior in cost-control and energy-saving. The tendency of development of larger-span elevated stations is inevitable, leading to varied characteristics in structural evaluation. As a result, dynamic responses of station structure under train load tend to be more distinct, thus influencing the vibration comfort of pedestrians in the station. This paper presents a vibration serviceability assessment on the example of large-span Shigang station in WUHAN rail transit. keywords:Rail transit; Bridge-architecture unification; Elevated station; Dynamic characteristics; Seviceability 作者简介: 欧阳院平,长江勘测规划设计研究院,电话:15972067810,邮箱:[email protected]

119 基于多 Agent 仿真的单线铁路网络智能调度问题研究

朱子轩 (西南交通大学)

摘 要:为实现单线铁路网络智能调度,克服单线铁路网络智能调度中双方向列车在同一线 路上相对行驶中的智能冲突疏解及线路死锁防护机制等难点,基于多 Agent 通讯及协同机制 提出单线铁路网络智能调度仿真方法。在单线铁路网络拓扑结构基础上,分析单线铁路网络 中列车冲突判断条件、死锁判断条件,并提出列车冲突疏解及死锁防护机制。运用黑板结构 的多 Agent 通信机制,建立了单线铁路网络列车智能调度仿真模型。利用 Anylogic 将该仿 真模型运用于西南地区某实际单线铁路网络,仿真结果表明所提出冲突疏解、死锁防护机制 能够保证单线铁路网络列车运行调度决策有效性,表明多 Agent 仿真方法是实现单线铁路网 络智能调度的有效手段。

关键词:单线铁路网络;智能调度;多智能体仿真;冲突疏解;死锁防护

Research on Intelligent Dispatching Problem of Single-Track Railway Network Based on Multi-Agent

Zhu Zi Xuan

Abstract: In order to achieve the intelligent dispatch of single-track railway network, and overcome the difficulties of intelligent conflict resolution and track deadlock protection mechanism of crossing trains on the single-track railway in intelligent dispatch, a single-track railway network intelligent dispatch simulation method was proposed based on communication and coordination mechanism of multi-agent. On the basis of topological structure of single-track railway network, this paper analyzed the train conflict judgment conditions and deadlock judgment conditions of single-track railway network, and proposed the train conflict resolution and track deadlock protection mechanism. Using the blackboard communication mechanism of multi-agent, a train intelligent dispatch simulation model of single-track railway network was established. With the help of Anylogic, this simulation model was applied to an actual single-track railway network in Southwest China and the simulation results showed that the proposed conflict resolution and deadlock protection mechanism can guarantee the effectiveness of train operation dispatch on single-track railway network. It showed that multi-agent simulation is an effective method to achieve intelligent dispatch on single-track railway network.

120 keywords:Anylogic | single-track railway network; intelligent dispatching; multi-agent simulation; conflict resolution; deadlock protection; Anylogic 作者简介: 朱子轩,西南交通大学,邮箱:[email protected]

121 Detection and Transient Impact Characteristic of Ballastless Track with Mortar Defects

田秀淑 石家庄铁道大学 [email protected]

Abstract : In this paper, the transient characteristic of mortar void in ballastless track is studied. CRTS Ⅱ ballastless finite model is built by LS-DYNA. Calculation results show that, when there are defects in mortar layer, average mobility increase with the size. When the defect length is larger than 0.4m, sudden change of mobility value can be found in the curve. The SIR method is used to test high-speed railway entity model. Test results show that, defects can be identified by mobility value, mobility spectrum and time domain characteristics when the size of mortar void is larger than 0.4m. Key words:ballastless track; transient impact response; mobility; mortar void

122 基于遗传算法的铁路集装箱空重箱调配鲁棒优化研究

张小强 1, 吴珺 1, 李琳 2 (1.西南交通大学;2. 西南交通大学交通运输与物流学院)

摘 要:铁路集装箱运输业务,因其成本与适用性的优势,近年来发展迅猛。但是由于地区 经济发展水平以及自然资源分布等因素的影响,使得集装箱运输网络中货运需求与可用空箱 资源不匹配。如何应用最合理的策略优化空箱调运方案提高运输效率与收益成为当前亟需解 决的问题。本文提出应用价格杠杆调节货运需求实现空箱调度,提高企业运输收益。以铁路 运输企业效益最大化为目标建立基于软时间窗的铁路集装箱空重箱运输优化的基本模型,将 运输时间分成确定与非确定两类,通过等价变换和对偶变换,将目标函数中的鲁棒软时间窗 部分,转化为对应的线性规划,并应用遗传算法对模型进行求解。最后在算例分析中,选取 7 个集装箱车站为例进行定价和调运优化,结果验证了模型的可行性。

关键词:铁路运输;空重箱调配;遗传算法;集装箱运输;鲁棒优化

Research on Robust Optimization of Empty and Loaded Container Allocation of Railway Container

Zhang Xiao Qiang,Wu Jun,Li Lin

(Southwest Jiaotong Univercity)

Abstract: In recent years, railway container transport business is developing rapidly because of its cost and applicability. But it is constrained by the differences of regional development and natural resource distribution, which leads to the mismatch between freight demand and available empty container resource in container transportation network. Therefore, how to formulate the most reasonable strategy and optimize the empty container allocation scheme to improve the transport efficiency and revenue has become an urgent problem to be solved. In this article, the price leverage is applied to adjust the demand of empty containers and then to improve the transportation benefit of the enterprise. Then a basic model for transportation optimization of empty and loaded container allocation which is based on soft time window is established with the aim of maximizing the profits of railway operation enterprises, and with transportation time being classified into certain and uncertain time, through the equivalent transformation and the dual transformation, the robust soft time window in the objective function is converted into the corresponding linear programming, and the genetic algorithm is used to solve the model. Finally,

123 in the case study, seven container stations are chosen as an example to optimize the pricing and allocation, and the results of the analysis has verified the feasibility of this model. keywords:railway transportation; empty and loaded container allocation; genetic algorithm; container transportation; robust optimization 作者简介: 张小强,西南交通大学,电话:13880023676,邮箱:[email protected]

124 西安市小寨地铁换乘站流线的仿真与优化研究

王剑坡,张娜 (长安大学)

摘 要:城市轨道交通换乘站是基于两条及其以上轨道交通线路在该处设置客流集散点而形 成的。作为多条线路的交汇点,其起着重要的客流疏导作用,其布局及客流流线的设计将直 接影响换乘站的使用效率和服务水平。本研究通过对西安地铁 2、3 号线的换乘站点小寨站 的客流进行研究,明确该换乘站内客流流线组织存在的冲突与缺陷。同时,结合 Anylogic 交通仿真建模对存在的问题进行改善,进而给出切实可行的改进措施,实现换乘站服务水平 的提高。

关键词:轨道交通换乘站;小寨站;客流流线组织;Anylogic 交通仿真

Simulation and Optimization of the Passenger Streamline of Xiao-Zhai Subway Interchange Station

Wang Jian Po ,Zhang Na

(Chang'an University)

Abstract: The transfer station of rail transit is a passenger flow distribution point set on the basis of two or more track traffic lines. The transfer station, as the intersection point of multiple lines, plays an important role in dredging the passenger flow. At the same time, the layout of the transfer station and the design of the passenger flow line will directly affect the efficiency and service level of the transfer station. In this study, we studied the passenger flow in Xiaozhai transfer station of Xi'an Metro Line 2 and Line 3, Clarified the conflicts and defects in the organization of passenger flow lines. Though combining with Anylogic traffic simulation modeling, the existing problems are improved and the practical improvement measures are given. Thus, the service level of the transfer station is improved. keywords:the transfer station of rail transit; Xiaozhai station; organization of passenger flow; Anylogic traffic simulation 作者简介: 王剑坡,长安大学,电话:18450051723,邮箱:[email protected]

125 接触网定位悬挂的动态模板匹配运动跟踪算法

周伟, 陈琳, 廖翔昊 (中南大学交通运输工程学院)

摘 要:针对南疆既有铁路接触网定位悬挂风致偏移的视觉检测问题,提出了一种基于动态 模板灰度匹配的定位悬挂点运动识别算法。以定位悬挂点为目标匹配模板,建立目标模板像 素点与遍历区域等尺寸区间像素点之间的灰度方均根匹配算子,计算并绘制被识别区域的灰 度匹配算子三维曲面图,根据方均根匹配差异值最小原则确定目标像素坐标点;针对运动目 标的识别算法,考虑成像环境的多变性,采用时间序列的动态目标模板进行迭代更新,以确 保各帧序列图像的目标识别不受环境亮度和对比度的影响,算法从背景静态模板和动态目标 模板像素偏移的双参数进行同步识别,修正由于成像基准失稳所引起的检测误差;最终,采 用相机抖动情况下的给定目标运动路径视频对本算法进行了验证,其横向、垂向的检测结果 相对误差在 1.8%以内。结果表明,提出的动态模板匹配算法可实现强风复杂成像条件下的 接触网风致运动跟踪识别,在满足工程检测精度条件下为接触悬挂风振安全研究提供有效方 法。

关键词:铁路接触网;风致偏移;计算机视觉;滚动目标模板

Motion Tracking Algorithm for Catenary Suspension Based on Dynamic Template Matching

Zhou Wei,Chen Lin,Liao Xiang Hao

(School of Traffic & Transportation Engineering, Central South University)

Abstract: A dynamic image-grey template matching method was proposed to identify the catenary suspension point movements for wind-induced vibration issue of railway catenary system in Nanjiang wind area. The catenary positioning point was chosen as the target matching template, which was compared with equal-sized concerned area sequentially by using the proposed root mean square (RMS) matching operator regarding pixels grey. And 3-D contour map of grey-matching operator value at each sub-area in comparison with target template was obtained, where the target pixel coordinates were determined according to the minimum RMS matching operator value. Considering the complex imaging environment, the target template was updated by the detected target area after each matching, to make the target recognition algorithm immune to

126 both variable environment brightness and contrast. Furthermore, to eliminate detecting errors due to observing datum movement, both static background template and dynamic target template were identified simultaneously for acquiring the absolute motion of the target. Finally, validity of the proposed recognition algorithm was verified through camera observation when a target object is moving along a given path and camera vibrates during the process. The calculated target motion is in good accordance with the given theoretical motion, where the relative errors between them vary within 1.8%. Validation results indicate that the dynamic template matching method can realize wind-induced catenary motion recognition in complex imaging environment, and thus provide an effective methodology for wind vibration study of catenary suspension system on the basis of meeting the request of engineering precision. keywords: Railway catenary; sand distribution characteristic; train-set; Lanzhou-Xinjiang railway for passenger traffic 作 者 简 介 : 周 伟 , 中 南 大 学 交 通 运 输 工 程 学 院 , 电 话 : 13975126342 , 邮 箱 : [email protected]

127 Study on the Maximum Ceiling Temperature and Longitudinal Decay in a Sealing Tunnel Fire

Huang You Bo 北京工业大学 [email protected]

李炎锋 北京工业大学 [email protected]

董炳燕 河北工业大学 [email protected]

Abstract:Sealing the tunnel entrance is one of tactic for railway tunnel firefighting. In order to understand the effect of tunnel entrance sealing ratio on fire behavior, Computational Fluid Dynamics (CFD) is used to simulate tunnel fire with different heat release rates and sealing ratios varied from 0% to 100%. Both the maximum temperature and the temperature distributions along the tunnel ceiling were focused on and compared with previous experiment data and calculated values using the empirical model. Results show that the ceiling temperature increases with sealing ratio due to the heat accumulation inside the tunnel when the heat release rate is relatively small. Moreover, the longitudinal ceiling temperature decreases with sealing ratio increase and then tends to stability due to less oxygen supply when the heat release rate is relatively large. The maximum longitudinal temperature beneath tunnel ceiling decreases exponentially with the distance. The correlations determining the maximum temperature and temperature decay beneath the tunnel ceiling are proposed to modify the current model by taking the tunnel entrance sealing ratio into account. The predictions by the modified equations of this work agree well with the experimental and measured data. Key words:Tunnel fire; Sealing ratio; Maximum temperature; Longitudinal decay; Tunnel ceiling.

128 The Quantitative Analysis of the Superficial Abrasion and the Internal Damage of the Frog Rail

Dong Jiang Technical University of Dresden [email protected]

吴兵 苏州大学轨道交通学院 [email protected]

Abstract:Turnout is the essential equipment on the railway, which also belongs to one of the strongest demanded infrastructural facilities of railway on account of the more seriously frog rail failures, which are the results of the crack growth. So far the classification of the rail failures has been already qualitatively described in UIC Leaflet 712 R in details. Our research team is dedicated to the quantitative analysis of the superficial abrasion and the internal damage below the running surface in cooperation with Germany Railway Company (DB Netz AG) that provides us with a large amount of measured records. On the basis of the measurement, the damage degree of the running surface is calculated according to theories of the contact mechanics and strength of materials. The growth of the superficial abrasion experiences three stages with the different abrasion rates, while the internal damage below the running surface increases linear all the time. Finally, the interactions between the abrasion rate and the internal damage as well as the breakage on the running surface are briefly discussed for the service lifetime of the frog rails in combination of the determined dynamical loads. Key words : frog rail, dynamical loads, superficial abrasion, internal damage, breakage, quantitative analysis, lifetime

129 高速铁路土工格栅加筋土挡墙应力扩散特性研究

陆永港, 肖宏, 何斌 (北京交通大学)

摘 要:为了对静动荷载作用下的高速铁路土工格栅加筋土挡墙的应力扩散特性进行研究, 本文采用 Abaqus 有限元软件建立高速铁路土工格栅加筋土挡墙有限元模型,对静动荷载作 用下的加筋土挡墙的应力扩散特性进行系统深入的研究。研究结果表明,加筋土挡墙的应力 扩散角不是特定值,存在一定的范围,且应力扩散角随着筋带竖向间距的增大而减小,随着 筋带长度的增加而增大。

关键词:土工格栅加筋土挡墙;应力扩散特性;有限元数值模拟

Research on Stress Diffusion Characteristics of Geogrid Reinforced Earth Retaining Wall

Lu Yong Gang,Xiao Hong,He Bin

Abstract: The internal force and form of reinforced earth retaining wall of high speed railway will change under static loads, wall gravity, rail system and dynamic load of a moving train. In this paper, a systematic research was conducted in order to understand the stress distribution under static and dynamic loads. The research was conducted with finite element numerical simulation, the stress distribution angle of reinforced soil retaining wall were measured. The calculation results have shown that stress distribution angle of reinforced soil retaining wall is not a fixed value, but there is a range.The stress distribution angle decreases with the increase of the vertical spacing of the reinforcement, and increases with the increase of the length of reinforcement keywords:geogrid reinforced earth retaining wall; stress diffusion characteristics; finite element numerical simulation 作者简介: 陆永港,北京交通大学,邮箱:[email protected]

130 基于 SARIMA 模型的轨道交通短时进站客流量预测——以西安小寨站

为例

丁天, 张娜, 马景峰 (长安大学)

摘 要:本文详细分析了 2017 年 3 月 1 日—2017 年 3 月 31 日西安城市轨道交通的客流数据, 总结了以小时为统计单位的西安小寨站客流的波动规律,基于 Eviews 软件采用季节时间序 列(SARIMA)模型对西安城市轨道交通客流时间序列进行建模进行分析。通过满足要求的模 型预测西安城市轨道交通的客流预测,预测结果能准确描述一天之内流量的变化趋势。结果 表明,该模型适用于城市轨道交通客流的短期预测。根据预测结果,进一步分析了西安市的 城市轨道交通客流特征。为进一步优化进场设施的布置、组织进场流线型、高效安全的城市 轨道交通运营组织参考建议。

关键词: 短期客流量;时间序列;SARIAM 模型

Short - Time Passenger Entering Flow Forecasting of Xi’AN Subway Based on SARIMA

Ding Tian,Zhang Na,Ma Jing Feng

(Chang’an University) Abstract: This paper analyzes the passenger flow data from March 1, 2017 to March 31, 2017 of Xiaozhai metro station in Xi’AN Subway in detail, and summarizes the fluctuation regularity of passenger flow in Xiaozhai metro station using the seasonal time series (SARIMA) model in Eviews to analyze the time series of passenger flow in Xi’AN Subway. The predicted passenger flow of Xi’AN Subway is predicted by the model which meets the requirements. The prediction result can accurately describe the changing trend of passenger flow of Xi’AN Subway. It is shown that this model is suitable for short-term forecasting of the passenger flow in the subway. Based on the forecast results, the characteristics of the passenger flow in Xi ’ AN Subway are further analyzed. In order to further optimize the arrangement of incoming facilities, organize the incoming streamline and efficient and safe subway operation organization, suggestions according to the results can be made. keywords:short-term traffic; time series; SARIAM model 作者简介: 丁天,长安大学,电话:18709221561,邮箱:[email protected]

131 基于滑动无偏灰色马尔科夫模型的地铁客流预测

潘杰, 马超群, 马景峰, 王云 (长安大学)

摘 要:基于灰色理论和马尔科夫理论,建立传统的灰色预测模型和灰色马尔科夫预测模型, 对西安地铁客流量量的数据进行了分析预测;然后对原始数据序列滑动平均处理,再用无偏 GM(1,1)模型拟合系统的发展变化趋势,将修正后得到的模型与马尔科夫模型进行结合, 提出了改进的灰色马尔科夫模型预测方法。并用改进后的新模型对地铁客流的预测结果与传 统的灰色马尔科夫模型进行对比;仿真结果表明:改进后的灰色马尔科夫模型预测精度有了 进一步的提高并验证了算法的有效性。

关键词:灰色模型、马尔科夫模型、地铁客流、滑动平均、无偏 GM(1,1)

Metro Passenger Flow Forecasting Based on Sliding Unbiased Gray Markov Model

Pan Jie,Ma Chao Qun,Ma Jing Feng,Wang Yun

(Chang’an University)

Abstract: Based on gray theory and Markov theory, the traditional gray prediction model and gray Markov forecasting model are established to analyze and forecast the data of passenger volume of Xi'an Metro. Then the original data series are averagely processed by sliding, Partial GM (1,1) model fitting system development trends, the modified model and the Markov chain model are combined, put forward an improved gray Markov model prediction method. The forecast results of the subway passenger flow are compared with those of the traditional gray Markov model with the new improved model. The simulation results show that the prediction accuracy of the improved gray Markov model is further improved and the validity of the algorithm is verified. keywords:Gray model, Markov model, Subway passenger, Moving average, Unbiased GM (1,1) 作者简介: 潘杰,长安大学,电话:15829539791,邮箱:[email protected]

132 浅谈城市轨道交通中的无线覆盖系统

朱振涛 (中咨泰克交通工程集团有限公司)

摘 要:如今,城市轨道交通已成为解决交通拥堵的一种重要途径,而无线系统是轨道交通 系统中的重要组成部分,无线技术应用在城市轨道的多个系统中,如:信号、通信等系统, 本文主要论述地铁中的无线语音调度系统、商用无线系统的组成方案,并对系统建设的关键 指标进行分析,以及无线技术在地铁通信中的 PIS 系统、CCTV 系统、警用无线系统中的应 用。

关键词:无线语音调度系统;网络容量;覆盖方式;参数优化

Discussion On The Wireless Coverage System of Urban Rail Transit

Zhu Zhen Tao

Abstract: At present, the urban rail transit has become an important way to solve traffic congestion, in which wireless system plays an important role. What is more, wireless technology has also been applied in many subsystems of urban railways: signaling system, communication system and other systems. This paper discusses the technical networking of wireless audio dispatching system in the subway, analyses the key indicators of the system construction the composition of commercial wireless systems, as well as the application of wireless technology in PIS, CCTV, police wireless systems. keywords:wireless audio dispatching system; network capacity; coverage mode; parameter optimization 作者简介: 朱振涛,中咨泰克交通工程集团有限公司,电话:15010061618,邮箱: [email protected]

133 基于元胞自动机理论的智能高铁列车运行仿真研究

冯骁,何世伟,李玉斌

摘 要:元胞自动机理论是重要的微观仿真理论工具之一,但这一理论方法的潜力并没有在 铁路仿真领域得到更充分的挖掘。造成这一现象的部分原因是不恰当的仿真粒度选取。本文 重新选取了较为合理的仿真粒度,令其可以在仿真计算规模与仿真尺度之间达到平衡。在此 基础上本文对包含有多个车站的线路进行了模拟,并为每个车站设置了到发线。模拟结果说 明本文所选择的仿真粒度可以较好的对移动闭塞系统进行仿真,并避免了其他同类研究中的 部分不足。

关键词:移动闭塞系统;元胞自动机;高速铁路

Research on Intelligent High-Speed Train Operation Simulation Based on Cellular Automata Theory

Feng Xiao,He Shi Wei,Li Yu Bin

Abstract: Cellular automaton theory is one of the important tools for microscopic simulation, but the potential of this method has not been fully explored in the field of railway simulation. Part of the reason for this phenomenon is improper simulation granularity selection. This paper reselects a more reasonable simulation granularity, so that it can reach a balance between simulation calculation scale and simulation scale. On this basis, this paper simulates a route that includes multiple stations and sets up arrival and departure sidings for each station. The simulation results show that the simulation granularity selected in this paper can simulate the mobile blocking system better and avoid some of the deficiencies in other similar researches. keywords:Moving–block signaling system; Cellular automaton; High speed railway 作者简介: 冯骁,邮箱:[email protected]

134 摘挂列车调车作业计划整数规划模型研究

鲁工圆, 张博健, 李力, 彭其渊 (西南交通大学交通运输与物流学院)

摘 要:摘挂列车调车作业计划编制是货物列车运行组织中的经典问题之一。本文考虑平面 调车作业连挂、摘解等实际作业过程,以调车钩数及调移车辆数作为评价调车作业量的指标, 建立以调车作业量最少为目标的整数规划模型。所建立的模型以待编车列状态和目标车列编 组状态为输入参数,以模型求解的调车作业计划为输出。在调车作业计划编制实验中,所建 立的模型一方面能够在无需人为考虑对口位置的情况下,求解连挂钩数最少的调车作业计划, 与对口法相比能达到相同效果;另一方面能够在以调车钩数及调移车辆数为评价指标的条件 下,求解调车作业量最少的调车作业计划。计算结果表明,模型所求解的调车作业计划与对 口法编制计划相比达到了减少作业量的效果。

关键词:整数规划;摘挂列车;调车作业计划

Research on Integer Programming Model of Shunting Operation Plans for Trains Detaching and Attaching

Lu Gong Yuan,Zhang Bo Jian,Li Li,Peng Qi Yuan

Abstract: Shunting operation plans of trains detaching and attaching is one of the classic questions in the transportation organization of freight train. Considering the coupling and decoupling process of flat shunting operation,an 0-1 programming model was established to minimize the total trips of operational quantities. The model takes the initial status and the termination status of vehicle as input variables and takes the shunting operation plan as output. The shunting operation plan experiments showed that without considering the position of coupling by dispatchers, the solution of the model can get the minimum total trips of coupling just as effectively as with the orchestrating-suit method. Besides, the solution can get the number the minimum total operational quantities. The results show that compared to the orchestrating-suit method, the model can reduce the total operational quantities. keywords:Integer Programming;Trains Detaching and Attaching;Shunting Operation Plans 作者简介: 鲁工圆,西南交通大学交通运输与物流学院,电话:13880609100,邮箱: [email protected]

135