US 101 Connected Communities Transit Projects (Committed)

Completion Project Cost Background Comments Project Type Sub‐Type Lead Agency ID Description Source Year ($1,000’s) on Final Draft ‐ Need TTAC input

Transit/Passenger Rail Other Capital Projects Camarillo ST‐5070 Las Posas Park and Ride Parking Lot Expansion 2024 $320 2019‐2024 CIP Project is not included in the FTIP. Construction funding is programmed in Transit/Passenger Rail Passenger Rail Camarillo ST‐14‐05 Undercrossing 2024 $8,826 2019‐2024 CIP 2022/2023 Transit/Passenger Rail Other Capital Projects Oxnard ‐ Route 23 Bus Stop Installation (Ventura Rd) 2024 $588 2019 ‐ 24 CIP Project is currently underway. Transit/Passenger Rail Other Capital Projects Thousand Oaks CI 5473 Electric Vehicle (EV) Charging Infrastructure 2021 $1,500 2019‐24 CIP Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN030612 DIAL‐A‐RIDE SERVICE ‐ CAPITAL LEASE By 2029 $788 2019 FTIP On‐going Project Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN101104 DIAL‐A‐RIDE VEHICLE CAPITAL LEASE AND MAINTENANCE By 2029 $857 2019 FTIP On‐going Project

PURCHASE 5 BUSES FOR EXPANSION AND OPERATING ASSISTANCE DEMONSTRATION Transit/Passenger Rail Vehicle Purchase/Lease VEN151101 By 2029 $6,428 2019 FTIP Project is currently underway FOR VENTURA ROAD BUS LINE INCLUDING PUBLIC OUTREACH.

Project is currently underway ‐‐ only 2 buses purchased for expansion. The Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN151102 PURCHASE 4 CNG BUSES FOR EXPANSION By 2029 $2,468 2019 FTIP remainder of funds is to be used for VEN170702 EV Replacement buses Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN150603 ADA SERVICE ‐ PARATRANSIT CAPITAL By 2029 $500 2019 FTIP On‐going Project ‐‐ operations. Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN150604 TWO REPLACEMENT PARATRANSIT VEHICLE FOR CAMARILLO DIAL‐A‐RIDE By 2029 $181 2019 FTIP Project is complete. Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN150605 TWO EXPANSION PARATRANSIT VEHICLES By 2029 $250 2019 FTIP Project is complete. 1 vehicle has been purchased, funding for Transit/Passenger Rail Vehicle Purchase/Lease VCTC VEN150613 PURCHASE TWO TROLLEY‐LIKE BUSES FOR LOCAL CIRCULATOR SERVICE By 2029 $400 2019 FTIP 1 additional is remaining. Purchase two new EV buses for Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN170702 PURCHASE 1 REPLACEMENT CNG BUS By 2029 $593 2019 FTIP replacement. Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN170703 NEW BUS WASHER FOR By 2029 $94 2019 FTIP Project completion date is 12/31/2021.

PURCHASE TWO EXPANSION CUT‐AWAY PARATRANSIT VEHICLES FOR CAMARILLO Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170704 By 2029 $136 2019 FTIP Estimated project completion 12/31/2020. TRANSIT‐GAS

Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170705 PURCHASE ONE REPLACEMENT CUT‐AWAY BUS FOR CAMARILLO TRANSIT ‐ GAS By 2029 $90 2019 FTIP Estimated project completion 12/31/2020.

Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170706 PURCHASE ONE REPLACEMENT PARATRANSIT VEHICLE FOR CAMARILLO TRANSIT‐GAS By 2029 $48 2019 FTIP Project is complete. 1st bus delivered, est. completion Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170707 TWO EXPANSION PARATRANSIT VEHICLES FOR CAMARILLO TRANSIT ‐ GAS By 2029 $135 2019 FTIP 12/31/2021 Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170708 PURCHASE ONE (1) REPLACEMENT CUT‐AWAY BUS FOR CAMARILLO TRANSIT ‐ GAS By 2029 $108 2019 FTIP Est. Project completion 12/30/2021

Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170709 PURCHASE ONE REPLACEMENT PARATRANSIT VEHICLE FOR CAMARILLO TRANSIT ‐ GAS By 2029 $60 2019 FTIP Est. Project completion 12/30/2021

Transit/Passenger Rail Vehicle Purchase/Lease VCTC VEN171002 PURCHASE TWO (2) BUSES FOR REPLACEMENT FOR VCTC INTERCITY BUS SERVICE By 2029 $1,425 2019 FTIP Est. Project completion 2/24/2020

PURCHASE ONE (1) BUS FOR EXPANSION FOR VCTC INTERCITY BUS SERVICE, TO Transit/Passenger Rail Vehicle Purchase/Lease VCTC VEN171003 By 2029 $713 2019 FTIP Est. Project completion 12/25/2020 INCREASE THE SPARE RATIO Transit/Passenger Rail Vehicle Purchase/Lease SIMI VALLEY VEN981107 ADA SERVICE ‐ PARATRANSIT CAPITAL By 2029 $1,685 2019 FTIP Project is on‐going.

PREVENTIVE MAINTENANCE ‐ THOUSAND OAKS TRANSIT FIXED‐ROUTE AND DIAL‐A‐ Transit/Passenger Rail Capital Maintenance Thousand Oaks VEN030611 By 2029 $3,352 2019 FTIP Preventive Maintenance ‐ ongoing. RIDE VEHICLES AND FACILITIES INCLUDING TRANSIT CENTER AND BUS STOPS

Transit/Passenger Rail Capital Maintenance Gold Coast Transit VEN170104 MIDLIFE BUS REBUILD AND RESTORATION By 2029 $4,696 2019 FTIP Estimated Project completion 9/30/2020.

Transit/Passenger Rail Capital Maintenance Gold Coast Transit VEN64003 PREVENTIVE MAINTENANCE ‐ FIXED ROUTE & ADA By 2029 $9,595 2019 FTIP Preventive Maintenance ‐ ongoing.

IN VENTURA COUNTY VCTC INTERCITY CAPITAL LEASE/MAINTENANCE CONTRACT ‐ TDC Capital lease and maintenance funding Transit/Passenger Rail Capital Maintenance VCTC VEN54036 By 2029 $3,885 2019 FTIP OF $311 IN 18/19, $155 IN EACH OF19/20, 20/21 & 21/22 programmed in FTIP through 2023/2024.

AUTOMATIC VEHICLE LOCATOR SYSTEM UPGRADE, PASSENGER COUNTING, AND Automatic Vehicle Locator Project ‐ Transit/Passenger Rail Other Capital Projects VCTC VEN040405 By 2029 $3,046 2019 FTIP FAREBOX SYSTEM (TDC CREDITS OF $229 IN FY 18/19 FOR CMAQ. Estimated project completion 9/30/2020.

PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES ‐ Project is on‐going ‐ estimated project Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN057404 By 2029 $760 2019 FTIP REPLACE MAINTENANCE EQUIPMENT completion 12/30/24.

1 of 4 US 101 Connected Communities Transit Projects (Committed)

Completion Project Cost Background Comments Project Type Sub‐Type Lead Agency ID Description Source Year ($1,000’s) on Final Draft ‐ Need TTAC input

CONSTRUCT NEW TRANSIT MAINTENANCE AND OPERATIONS FACILITY (5309 INCLUDES Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN090501 EARMARK NUMBER E2009‐BUS091 AND FY10/11 STATE OF GOOD REPAIR By 2029 $52,100 2019 FTIP Project is complete. DISCRETIONARY FUNDS)

Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN101101 BUS STOP ENHANCEMENTS FOR THOUSAND OAKS TRANSIT. By 2029 $130 2019 FTIP Project Completion date is 10/30/23.

TRANSPORTATION CENTER FACILITY IMPROVEMENTS. EXPAND BUS BOARDING AREA, Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN120420 By 2029 $1,875 2019 FTIP Estimated Project completion is 12/30/22. CONSTRUCT ADA ACCESSIBLE SIDEWALK AND PEDESTRIAN PATHWAY IMPROVEMENTS.

Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN120105 REPLACE SERVICE, SUPERVISORY AND MAINTENANCE SUPPORT VEHICLES By 2029 $349 2019 FTIP Project is complete.

Transit/Passenger Rail Other Capital Projects City of Moorpark VEN121004 BUS SHELTER LIGHTING By 2029 $50 2019 FTIP Estimated Project completion 6/30/2021.

Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN150601 BUS STOP ENHANCEMENTS FOR GOLD COAST TRANSIT STOPS By 2029 $50 2019 FTIP Project has been removed.

PAYMENTS FOR CERTIFICATES OF PARTICIPATION FOR NEW OPERATIONS & Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN170108 By 2029 $4,600 2019 FTIP Estimated Project completion 2024. MAINTENANCE FACILITY

NEW TRANSIT TECHNOLOGIES INCLUDING NEW ELECTRONIC DISPATCH, AUTOMATED Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN170111 STOP ANNUNCIATORS, TRANSIT REPORTING SOFTWARE, AND PROJECTS TO BE By 2029 $251 2019 FTIP Estimated Project completion 2024. DETERMINED.

Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN170112 CITY WIDE REPLACEMENT OF BUS SHELTER AND BUS STOP AMENITIES. By 2029 $63 2019 FTIP Estimated Project completion 2019.

PAYMENTS FOR CERTIFICATES OF PARTICIPATION FOR NEW OPERATIONS & *Remove: duplicate Listing‐‐see above line Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN170108 By 2029 $4,600 2019 FTIP MAINTENANCE FACILITY 38.

IN VENTURA ON WELLS ROAD FROM CARLOS TO CITRUS ‐ WELLS CENTER BUS STOP City of San Project is underway and anticipated to be Transit/Passenger Rail Other Capital Projects VEN171006 IMRPOVEMENTS INCLUDING NEW SIDEWALK WITH RETAINING WALL, ACCESS RAMPS, By 2029 $350 2019 FTIP Buenaventura completed by 6/30/2020. ADDITIONAL BUS SHELTER, AND LANDSCAPING

Transit/Passenger Rail Other Capital Projects City of Oxnard VEN180301 IN OXNARD ON VENTURA ROAD TRANSIT LINE CONSTRUCT BUS STOP IMPROVEMENTS By 2029 $500 2019 FTIP Estimated Project completion 7/31/2020.

Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN171004 REBUILD 14 CNG BUSES INCLUDING ENGINE REPLACEMENT By 2029 $2,057 2019 FTIP Estimated Project completion 2024.

Transit/Passenger Rail Operating Assistance Camarillo VEN050401 OPERATING ASSISTANCE ‐ CAMARILLO AREA TRANSIT By 2029 $4,552 2019 FTIP Project is on‐going.

GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP ‐ ELDERLY & 5310 program for seniors and persons with DISABLED NEW FREEDOMS INITIATIVE (PROJECTS ARE CONSISTENT WITH 40 CFR PART disabilities‐‐some funding is designated for Transit/Passenger Rail Operating Assistance VCTC VEN051005 93.126, 127,128,EXEMPT TABLES 2&3‐ PURCHASE OF NEW BUSES TO REPLACE EXIST By 2029 $1,749 2019 FTIP areas outside the 101 corridor (Ojai, Simi VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 Valley etc…) USC). 5310 TDC = $70 IN 18/19, $35 EACH IN 19/20 ‐ 21/22.

Transit/Passenger Rail Operating Assistance Gold Coast Transit VEN131104 OPERATING ASSISTANCE By 2029 $10,500 2019 FTIP Project is on‐going. Transit/Passenger Rail Operating Assistance Camarillo VEN140801 ADA PARATRANSIT SERVICE IN CAMARILLO By 2029 $850 2019 FTIP Project is on‐going. Transit/Passenger Rail Operating Assistance VCTC VEN150602 OPERATING ASSISTANCE ‐ VCTC By 2029 $16,690 2019 FTIP Project is on‐going. Transit/Passenger Rail Operating Assistance Gold Coast Transit VEN54095 OPERATING ASSISTANCE ‐ ADA PARATRANSIT CAPITAL By 2029 $8,090 2019 FTIP Project is on‐going.

FARE COLLECTION PASSENGER COUNTING, AUTOMATIC VEHICLE LOCATOR DATA Transit/Passenger Rail Other Services VCTC VEN121001 By 2029 $1,278 2019 FTIP Project is on‐going. MANAGEMENT

FARE COLLECTION AND RIDERSHIP MONITORING AND AUTOMOTIC VEHICLE LOCATOR Transit/Passenger Rail Other Services VCTC VEN121002 EQUIPMENT AND MAINTENANCE (TDC CREDITS IN FY 16/17 IN THE AMOUNT OF $189 By 2029 $2,191 2019 FTIP Estimated Project completion 12/30/2019. AND FY 18/19 IN THE AMOUNTY OF $29.)

Transit/Passenger Rail Other Services Gold Coast Transit VEN131103 BUSINESS SYSTEMS UPGRADE INCLUDING SOFTWARE AND HARDWARE. By 2029 $1,000 2019 FTIP Project is on‐going.

2 of 4 US 101 Connected Communities Transit Projects (Committed)

Completion Project Cost Background Comments Project Type Sub‐Type Lead Agency ID Description Source Year ($1,000’s) on Final Draft ‐ Need TTAC input

Transit/Passenger Rail Other Services VCTC VEN54069 TRANSIT MOBILITY MANAGEMENT INFORMATION CENTER By 2029 $994 2019 FTIP Estimated Project completion 9/30/2024. Project is on‐going. To be discontinued as a Transit/Passenger Rail Planning & Marketing VCTC VEN081001 ELDERLY/DISABLED PLANNING INCLUDING PATRON DISABILITY EVALUATION By 2029 $1,452 2019 FTIP federally funded task anticipated completion 6/30/2020. Transit/Passenger Rail Planning & Marketing Thousand Oaks VEN110602 TRANSIT PLANNING AND OUTREACH EDUCATION FOR THOUSAND OAKS TRANSIT By 2029 $1,249 2019 FTIP Project is on‐going. Transit/Passenger Rail Planning & Marketing Thousand Oaks VEN130806 TRANSIT PLANNING By 2029 $950 2019 FTIP Project is on‐going. Transit/Passenger Rail Planning & Marketing VCTC VEN34348 TRANSIT PROGRAMMING & PLANNING By 2029 $4,325 2019 FTIP Project is on‐going. Transit/Passenger Rail Planning & Marketing VCTC VEN54115 VCTC BUS SYSTEM PLANNING By 2029 $2,097 2019 FTIP Project is on‐going. Transit/Passenger Rail Planning & Marketing Gold Coast Transit VEN990602 TRANSIT PLANNING & PROGRAMMING (PLANNING: PROGRAM SUPPORT & ADM) By 2029 $625 2019 FTIP Project is on‐going.

MARKETING & PASSENGER AWARENESS ACTIVITIES (PLANNING: PROGRAM SUPPORT & Transit/Passenger Rail Planning & Marketing Gold Coast Transit VEN54057 By 2029 $625 2019 FTIP Project is on‐going. ADM)

TRANSIT OUTREACH ACTIVITIES (TRANSP DEVEL CREDITS OF $69 IN FY 18/19, 19/20, Transit/Passenger Rail Planning & Marketing VCTC VEN54070 By 2029 $2,400 2019 FTIP Project is on‐going. 20/21 & 21/22)

THREE YEAR DEMONSTRATION EXPRESS BUS SERVICE ‐ EAST/WEST COUNTY Transit/Passenger Rail Demonstration Project VCTC VEN150608 CONNECTOR SERVING SIMI VALLEY, MOORPARK, CAMARILLO, AND VENTURA (TDC IN By 2029 $1,100 2019 FTIP Project began in 2017. FY 16/17 IN THE AMOUNT OF $550)

THREE‐YEAR DEMONSTRATION SERVICE BUS ROUTE FROM NYLAND ACRES IN OXNARD Transit/Passenger Rail Demonstration Project ‐ VEN150609 By 2029 $2,317 2019 FTIP Estimated Project completion 11/10/2020. TO WELLS CENTER IN VENTURA

Transit/Passenger Rail Passenger Rail Camarillo VEN061000 CAMARILLO RAIL STATION AND BUS MAINTENANCE By 2029 $3,750 2019 FTIP Project is on‐going.

POSITIVE TRAIN CONTROL SYSTEM ‐ VENTURA COUNTY FUNDING SHARE OF FIVE‐ Transit/Passenger Rail Passenger Rail SCRRA VEN090117 By 2029 $2,480 2019 FTIP Project is complete. COUNTY PROJECT ALSO IN L.A., ORANGE, RIVERSIDE AND SAN BERNARDINO COUNTIES

RAILROAD SEALED CORRIDOR AND QUITE ZONE ‐ INSTALL A FOUR‐QUADRANT GATE Transit/Passenger Rail Passenger Rail Camarillo VEN170603 SYSTEM FOR THE RAILROAD CROSSINGS AT UPLAND ROAD AND AT ADOLOFO ROAD By 2029 $4,000 2019 FTIP Project has been removed. TDC IN 18/19 = $80.

SYSTEMWIDE PREVENTIVE MAINTENANCE FOR METROLINK . SYSTEM‐WIDE PREVENTIVE MAINTENANCE FOR METROLINK COMMUTER RAIL Transit/Passenger Rail Passenger Rail SCRRA VEN171001 By 2029 $34,911 2019 FTIP Project is on‐going. INCLUDING ROLLING STOCK FACILITIES, GUIDEWAYS ETC... (TDC CREDITS OF $2,612 IN 18/19, $1,457 IN EACH OF YEARS 19/20, 20/21 & 21/22.

SYSTEMWIDE REHABILITATION AND RENOVATION INCLUDING THE PURCHASE OF REPLACEMENT LOCOMOTIVES WITH TIER‐4 TECHNOLOGY, TRACK, SIGNALS, Transit/Passenger Rail Passenger Rail SCRRA VEN990609 By 2029 $20,367 2019 FTIP Project is on‐going. PLATFORMS, POWER SYSTEMS, FACILITIES, ROLLING STOCK, EQUIPMENT, SIGNAGE (TOLL CREDITS OF $1,974 IN 18/19, $700 IN EACH OF YEARS 9/20, 20/21 & 21/22)

VENTURA COUNTY SEACLIFF SIDING UPGRADE AND EXTENSION (PPNO 2089)(EA Transit/Passenger Rail Passenger Rail Caltrans VEN141202 By 2029 $23,520 2019 FTIP Estimated Project completion 2024. RA04CA)

CAMARILLO METROLINK STATION PEDESTRIAN UNDERCROSSING. TRANSPORTATION Transit/Passenger Rail Passenger Rail Camarillo VEN120603 By 2029 $1,916 2019 FTIP Estimated Project completion 2023. DEVELOPMENT CREDIT Exact Match OF $200 IN FY 18/19.

3 of 4 US 101 Connected Communities Transit Projects (Committed)

Completion Project Cost Background Comments Project Type Sub‐Type Lead Agency ID Description Source Year ($1,000’s) on Final Draft ‐ Need TTAC input

GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP ‐ JOBS ACCESS REVERSE COMMUTE PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3‐ PURCHASE OF NEW BUSES TO REPLACE Jobs Access‐Reverse Commute Projects‐on‐ Transit/Passenger Rail Multi‐Purpose/Grouped Projects Various VEN070202 By 2029 $378 2019 FTIP EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS going. 23&49 USC) 18/19 TDC = $27, 19/20 TDC = $18 AND FY 20/21 = $12, AND FY 21/22 TDC = $12.

4 of 4 US 101 Connected Communities Non-Transit Projects (Financially Constrained)

Completion Project Cost Project Type Sub‐Type Lead Agency ID Description Source Comments Year ($1,000’s) Arterial Active Transportation Camarillo 5A0725 CENTRAL AVE FROM US‐101 TO CITY LIMITS (1700 FEET) ADD BIKE LANE. 2020 $2,000 2020 RTP

Active ALONG SP BRANCH RAIL LINE MONTALVO COUNTY LINE SANTA PAULA Active Transportation VCTC 5N011 2024 $48,618 2020 RTP Transportation BRANCH RECREATIONAL TRAIL

Active MISC. TRANSPORTATION ENHANCEMENTS COUNTYWIDE COUNTYWIDE ACTIVE Active Transportation VCTC 5O0703 2037 $14,379 2020 RTP Transportation TRANSPORTATION PROGRAM PROJECTS

Capacity VICTORIA AVENUE WIDENING IMPROVEMENT ‐ B GONZALES ROAD OXNARD CITY Arterial Oxnard 5A0726 2030 $8,437 2020 RTP Enhancement LIMITS WIDEN FROM FOUR LANES TO SIX LANES (TOTAL OF BOTH DIRECTIONS)

Capacity IN OXNARD COLONIA RD/CAMINO DEL SOL OXNARD BOULEVARD (RT 1) TO Arterial Oxnard VEN34095 2021 $10,269 2020 RTP Enhancement ENTRADA DR CONSTRUCT 4 LANES Capacity OLIVAS PARK DRIVE PERKIN AVE AUTO CENTER DRIVE CONSTRUCT 4‐LANE (TOTAL Arterial Ventura 5A0723 2020 $22,000 2020 RTP Enhancement OF BOTH DIRECTIONS) EXTENSION Capacity SANTA CLARA AVENUE WIDENING IMPROVEMENT N/O OXNARD CITY LIMITS SR 118 Arterial Ventura County 5A0719 2030 $27,000 2020 RTP Enhancement WIDEN FROM TWO TO FOUR LANES (FROM 1 TO 2 LANES EACH DIRECTION) HARBOR BOULEVARD WIDENING IMPROVEMENT OXNARD CITY LIMITS VENTURA Capacity Arterial Ventura County 5A0720 CITY LIMITS WIDEN FROM TWO LANES TO FOUR LANES, INCLUDING REPLACEMENT 2030 $60,000 2020 RTP Enhancement OR WIDENING OF EXISTING BRIDGE Capacity PLEASANT VALLEY ROAD WIDENING IMPROVEMENT DODGE RD LAS POSAS ROAD Arterial Ventura County 5A0721 2030 $596,123 2020 RTP Enhancement WIDEN FROM TWO TO FOUR LANES (TOTAL OF BOTH DIRECTIONS)

VICTORIA AVENUE WIDENING IMPROVEMENT ‐ AT GONZALES ROAD VENTURA CITY Capacity Arterial Ventura County 5A0722 LIMITS WIDEN FROM FOUR LANES TO SIX LANES (TOTAL OF BOTH DIRECTIONS ‐ 2025 $16,500 2020 RTP Enhancement INCLUDING BRIDGE) Capacity LOS ANGELES AVENUE ROUTE 232 SANTA CLARA AVENUE WIDEN FROM 2 LANES TO Arterial Ventura County 5160008 2030 $42,000 2020 RTP Enhancement 4 LANES Capacity CENTRAL AVENUE CAMARILLO CITY LIMIT SANTA CLARA AVENUE WIDEN FROM 2 Arterial Ventura County 5160009 2030 $6,400 2020 RTP Enhancement LANES TO 4 LANES Capacity OLIVAS PARK DRIVE TELEPHONE ROAD VICTORIA AVENUE WIDEN FROM 2 TO 4 Arterial Ventura County 5160004 2028 $8,345 2020 RTP Enhancement LANES ROSE AVE AT SR‐34 Arterial Grade Separation Oxnard 5G0404 (E. FIFTH ST) SR 34 CONSTRUCT 4 LANE GRADE SEPARATION WITH LEFT TURN 2020 $27,000 2020 RTP POCKETS GONZALES RD SR‐1 (OXNARD BLVD) UPRR TRACKS CONSTRUCT 6 LANE IN BOTH Arterial Grade Separation Oxnard 5G0405 DIRECTIONS GRADE SEPARATION AT SR‐1 (OXNARD BLVD) AND UPRR TRACKS WITH 2022 $21,001 2020 RTP LEFT TURN POCKETS GRADE SEPARATION COUNTYWIDE COUNTYWIDE GRADE SEPARATION Arterial Grade Separation VCTC 5GL04 2025 $147,271 2020 RTP IMPROVEMENTS VINEYARD AVE OXNARD BLVD SAINT MARY’S DRIVE CONSTRUCT 6 LANE ITOTAL OF Arterial Grade Separation Oxnard 5G0403 2020 $20,000 2020 RTP BOTH DIRECTIONS) GRADE SEPARATION OVER UPRR TRACKS VENTURA FREEWAY LOS ANGELES/ VENTURA COUNTY LINE SR‐33 US 101 ADD ONE Freeway HOV Lanes VCTC 5160001 2029 $700,000 2020 RTP HOV LANE IN EACH DIRECTION. IN OXNARD AT DEL NORTE BOULEVARD ‐ IMPROVE INTERCHANGE, WIDEN DEL Interchange VEN051006‐ NORTE BRIDGE OVER 101 (FROM VENTURA BLVD TO RTE 101 SB RAMPS) FROM 2 TO Freeway Oxnard 2020 $56,700 2020 RTP Improvement VEN051006 4 LANES PLUS LEFT‐TURN LANE. ADD NB LOOP ONRAMPS AND REALIGN AND IMPROVE OTHER RAMPS. Intersection HARBOR BLVD AT GOZALES ROAD GONZALES ROAD ADD 2ND SOUTHBOUND Arterial Ventura County 5A0708 2030 $2,600 2020 RTP Improvement THROUGH LANE AND 2ND NORTHBOUND THROUGH LANE Intersection Arterial VCTC 5ITS04 ITS COUNTYWIDE COUNTYWIDE MISC. ITS PROJECT IMPLEMENTATION 2039 $83,876 2020 RTP Improvement Intersection SR‐33 STANLEY AVENUE STANLEY AVENUE SR‐33 (Stanley Ave.) NEW TWO‐LANE Arterial Ventura 5A0701 2037 $18,000 2020 RTP Improvement FREEWAY BRIDGE FOR SB TRAFFIC TDM COUNTYWIDE COUNTYWIDE MISC. TDM (NON‐MOTORIZED, TELECOMMUTE, TDM TDM VCTC 5TDL04 2039 $31,453 2020 RTP ETC.)

1 of 1 US 101 Connected Communities Transit Projects (Financially Constrained) Completion Project Cost Project Type Sub-Type Lead Agency ID Description Source Year ($1,000’s) Transit/Passenger METROLINK COMMUTER RAIL IN VENTURA COUNTY VENTURA COUNTY METROLINK COMMUTER RAIL SERVICE Passenger Rail VCTC/SCRRA 2025 $95,700 2020 RTP Rail 5CR104 IMPROVEMENTS Transit/Passenger MULTIMODAL TRANSPORTATION CENTER IN DOWNTOWN VENTURA SERVICE CENTER, PARKING, LAYOVER, Transit VCTC 2026 $50,000 2020 RTP Rail 5TC0701 AND RETAIL SPACE FOR RAIL, BUS, AND BICYCLE COMMUTERS. Transit/Passenger Transit VCTC 2039 $31,453 2020 RTP Rail 5TL04 COUNTYWIDE TRANSIT SERVICE EXPANSION Transit/Passenger Transit VCTC 2039 $52,423 2020 RTP Rail 5TL0702 TRANSIT PLANNING & ADMINISTRATION Transit/Passenger Transit VCTC 2039 $47,180 2020 RTP Rail 5TL0703 COUNTYWIDE BUS EXPANSIONS (INCLUDES PARATRANSIT) Transit/Passenger Transit VCTC 2039 $31,453 2020 RTP Rail 5TL0706 COUNTYWIDE NEW TRANSIT FACILITIES & IMPROVEMENTS Transit/Passenger Transit VCTC 2039 $15,727 2020 RTP Rail 5TL0707 COUNTYWIDE MISC. TRANSIT ITEMS

THE SOUTHERN OPTIMIZED RAIL EXPANSION (SCORE) PROGRAM EXPANDS CAPACITY OF THE ENTIRE METROLINK SYSTEM TO ACCOMMODATE SERVICE THAT IS MORE REGULAR AND FREQUENT, THROUGHOUT THE ENTIRE SERVICE DAY (FROM MORNING TO LATE EVENING). CAPITAL INVESTMENTS INCLUDE Transit/Passenger Passenger Rail VARIOUS AGENCIES 720001 ADDITIONAL TRACK (E.G., SIDINGS, DOUBLE TRACK, TRIPLE TRACK, AND QUADRUPLE TRACK 2035 $10,540 2020 RTP Rail SEGMENTS), IMPROVED SIGNALING, EXPANDED AND LOWER EMISSIONS FLEET, UPGRADED AND ENLARGED MAINTENANCE FACILITIES, GRADE CROSSING TREATMENTS AND SEPARATIONS, FENCING AND SAFETY FEATURES, FEATURES TO SUPPORT READINESS FOR QUIET ZONES, AND REQUIRED ASSET REHABILITATION TO SUSTAIN CAPACITY. Transit/Passenger Passenger Rail VARIOUS AGENCIES 720002 2035 $3,212 2020 RTP Rail SCORE PROGRAM OPERATING COSTS FOR 2035‐2045 Transit/Passenger Transit VARIOUS AGENCIES 7120002 2045 $2,500 2020 RTP Rail ADDITIONAL O&M AND PRESERVATION ‐ TRANSIT Transit/Passenger Transit VARIOUS AGENCIES 7120007 2045 $6,000 2020 RTP Rail EXPAND BUS SERVICE: HIGH QUALITY TRANSIT CORRIDORS Transit/Passenger Transit VARIOUS AGENCIES 7120012 2045 $1,000 2020 RTP Rail CARB ZERO EMISSION BUS ACCELERATION

1 of 1 US 101 Connected Communities Strategic Projects County System RTP ID Route Name From To Description Lead Agency Study Area? VENTURA COUNTY VENTURA PASSENGER RAIL S5120002 SANTA PAULA BRANCH LINE MONTALVO L.A. COUNTY LINE RAIL IMPROVEMENTS TRANSPORTATION Yes COMMISSION VENTURA PASSENGER RAIL S5200T003 METROLINK COMMUTER RAIL IN VENTURA COUNTY IN VENTURA COUNTY METROLINK SERVICE EXPANSION PROGRAM VCTC/SCRRA Yes BEACH+TOWN ‐ CAP OVER US‐101 THREE BLOCKS WHERE US‐101 CUTS VENTURA STATE HIGHWAY S5121001 US‐101 DOWNTOWN VENTURA OFF DOWNTOWN VENTURA FROM THE NEARBY BEACH AND PIER. VARIOUS AGENCIES Yes EXTENSIVE DEVELOPMENT ON THE SPACE CREATED BY THE CAP.

1 of 1