Attachment a 101 CC Project List 01082020.Xlsx

Attachment a 101 CC Project List 01082020.Xlsx

US 101 Connected Communities Transit Projects (Committed) Completion Project Cost Background Comments Project Type Sub‐Type Lead Agency ID Description Source Year ($1,000’s) on Final Draft ‐ Need TTAC input Transit/Passenger Rail Other Capital Projects Camarillo ST‐5070 Las Posas Park and Ride Parking Lot Expansion 2024 $320 2019‐2024 CIP Project is not included in the FTIP. Construction funding is programmed in Transit/Passenger Rail Passenger Rail Camarillo ST‐14‐05 Metrolink Undercrossing 2024 $8,826 2019‐2024 CIP 2022/2023 Transit/Passenger Rail Other Capital Projects Oxnard ‐ Route 23 Bus Stop Installation (Ventura Rd) 2024 $588 2019 ‐ 24 CIP Project is currently underway. Transit/Passenger Rail Other Capital Projects Thousand Oaks CI 5473 Electric Vehicle (EV) Charging Infrastructure 2021 $1,500 2019‐24 CIP Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN030612 DIAL‐A‐RIDE SERVICE ‐ CAPITAL LEASE By 2029 $788 2019 FTIP On‐going Project Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN101104 DIAL‐A‐RIDE VEHICLE CAPITAL LEASE AND MAINTENANCE By 2029 $857 2019 FTIP On‐going Project PURCHASE 5 BUSES FOR EXPANSION AND OPERATING ASSISTANCE DEMONSTRATION Transit/Passenger Rail Vehicle Purchase/Lease Gold Coast Transit VEN151101 By 2029 $6,428 2019 FTIP Project is currently underway FOR VENTURA ROAD BUS LINE INCLUDING PUBLIC OUTREACH. Project is currently underway ‐‐ only 2 buses purchased for expansion. The Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN151102 PURCHASE 4 CNG BUSES FOR EXPANSION By 2029 $2,468 2019 FTIP remainder of funds is to be used for VEN170702 EV Replacement buses Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN150603 ADA SERVICE ‐ PARATRANSIT CAPITAL By 2029 $500 2019 FTIP On‐going Project ‐‐ operations. Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN150604 TWO REPLACEMENT PARATRANSIT VEHICLE FOR CAMARILLO DIAL‐A‐RIDE By 2029 $181 2019 FTIP Project is complete. Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN150605 TWO EXPANSION PARATRANSIT VEHICLES By 2029 $250 2019 FTIP Project is complete. 1 vehicle has been purchased, funding for Transit/Passenger Rail Vehicle Purchase/Lease VCTC VEN150613 PURCHASE TWO TROLLEY‐LIKE BUSES FOR LOCAL CIRCULATOR SERVICE By 2029 $400 2019 FTIP 1 additional is remaining. Purchase two new EV buses for Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN170702 PURCHASE 1 REPLACEMENT CNG BUS By 2029 $593 2019 FTIP replacement. Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN170703 NEW BUS WASHER FOR THOUSAND OAKS TRANSIT By 2029 $94 2019 FTIP Project completion date is 12/31/2021. PURCHASE TWO EXPANSION CUT‐AWAY PARATRANSIT VEHICLES FOR CAMARILLO Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170704 By 2029 $136 2019 FTIP Estimated project completion 12/31/2020. TRANSIT‐GAS Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170705 PURCHASE ONE REPLACEMENT CUT‐AWAY BUS FOR CAMARILLO TRANSIT ‐ GAS By 2029 $90 2019 FTIP Estimated project completion 12/31/2020. Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170706 PURCHASE ONE REPLACEMENT PARATRANSIT VEHICLE FOR CAMARILLO TRANSIT‐GAS By 2029 $48 2019 FTIP Project is complete. 1st bus delivered, est. completion Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170707 TWO EXPANSION PARATRANSIT VEHICLES FOR CAMARILLO TRANSIT ‐ GAS By 2029 $135 2019 FTIP 12/31/2021 Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170708 PURCHASE ONE (1) REPLACEMENT CUT‐AWAY BUS FOR CAMARILLO TRANSIT ‐ GAS By 2029 $108 2019 FTIP Est. Project completion 12/30/2021 Transit/Passenger Rail Vehicle Purchase/Lease Camarillo VEN170709 PURCHASE ONE REPLACEMENT PARATRANSIT VEHICLE FOR CAMARILLO TRANSIT ‐ GAS By 2029 $60 2019 FTIP Est. Project completion 12/30/2021 Transit/Passenger Rail Vehicle Purchase/Lease VCTC VEN171002 PURCHASE TWO (2) BUSES FOR REPLACEMENT FOR VCTC INTERCITY BUS SERVICE By 2029 $1,425 2019 FTIP Est. Project completion 2/24/2020 PURCHASE ONE (1) BUS FOR EXPANSION FOR VCTC INTERCITY BUS SERVICE, TO Transit/Passenger Rail Vehicle Purchase/Lease VCTC VEN171003 By 2029 $713 2019 FTIP Est. Project completion 12/25/2020 INCREASE THE SPARE RATIO Transit/Passenger Rail Vehicle Purchase/Lease SIMI VALLEY VEN981107 ADA SERVICE ‐ PARATRANSIT CAPITAL By 2029 $1,685 2019 FTIP Project is on‐going. PREVENTIVE MAINTENANCE ‐ THOUSAND OAKS TRANSIT FIXED‐ROUTE AND DIAL‐A‐ Transit/Passenger Rail Capital Maintenance Thousand Oaks VEN030611 By 2029 $3,352 2019 FTIP Preventive Maintenance ‐ ongoing. RIDE VEHICLES AND FACILITIES INCLUDING TRANSIT CENTER AND BUS STOPS Transit/Passenger Rail Capital Maintenance Gold Coast Transit VEN170104 MIDLIFE BUS REBUILD AND RESTORATION By 2029 $4,696 2019 FTIP Estimated Project completion 9/30/2020. Transit/Passenger Rail Capital Maintenance Gold Coast Transit VEN64003 PREVENTIVE MAINTENANCE ‐ FIXED ROUTE & ADA By 2029 $9,595 2019 FTIP Preventive Maintenance ‐ ongoing. IN VENTURA COUNTY VCTC INTERCITY CAPITAL LEASE/MAINTENANCE CONTRACT ‐ TDC Capital lease and maintenance funding Transit/Passenger Rail Capital Maintenance VCTC VEN54036 By 2029 $3,885 2019 FTIP OF $311 IN 18/19, $155 IN EACH OF19/20, 20/21 & 21/22 programmed in FTIP through 2023/2024. AUTOMATIC VEHICLE LOCATOR SYSTEM UPGRADE, PASSENGER COUNTING, AND Automatic Vehicle Locator Project ‐ Transit/Passenger Rail Other Capital Projects VCTC VEN040405 By 2029 $3,046 2019 FTIP FAREBOX SYSTEM (TDC CREDITS OF $229 IN FY 18/19 FOR CMAQ. Estimated project completion 9/30/2020. PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES ‐ Project is on‐going ‐ estimated project Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN057404 By 2029 $760 2019 FTIP REPLACE MAINTENANCE EQUIPMENT completion 12/30/24. 1 of 4 US 101 Connected Communities Transit Projects (Committed) Completion Project Cost Background Comments Project Type Sub‐Type Lead Agency ID Description Source Year ($1,000’s) on Final Draft ‐ Need TTAC input CONSTRUCT NEW TRANSIT MAINTENANCE AND OPERATIONS FACILITY (5309 INCLUDES Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN090501 EARMARK NUMBER E2009‐BUS091 AND FY10/11 STATE OF GOOD REPAIR By 2029 $52,100 2019 FTIP Project is complete. DISCRETIONARY FUNDS) Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN101101 BUS STOP ENHANCEMENTS FOR THOUSAND OAKS TRANSIT. By 2029 $130 2019 FTIP Project Completion date is 10/30/23. TRANSPORTATION CENTER FACILITY IMPROVEMENTS. EXPAND BUS BOARDING AREA, Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN120420 By 2029 $1,875 2019 FTIP Estimated Project completion is 12/30/22. CONSTRUCT ADA ACCESSIBLE SIDEWALK AND PEDESTRIAN PATHWAY IMPROVEMENTS. Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN120105 REPLACE SERVICE, SUPERVISORY AND MAINTENANCE SUPPORT VEHICLES By 2029 $349 2019 FTIP Project is complete. Transit/Passenger Rail Other Capital Projects City of Moorpark VEN121004 BUS SHELTER LIGHTING By 2029 $50 2019 FTIP Estimated Project completion 6/30/2021. Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN150601 BUS STOP ENHANCEMENTS FOR GOLD COAST TRANSIT STOPS By 2029 $50 2019 FTIP Project has been removed. PAYMENTS FOR CERTIFICATES OF PARTICIPATION FOR NEW OPERATIONS & Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN170108 By 2029 $4,600 2019 FTIP Estimated Project completion 2024. MAINTENANCE FACILITY NEW TRANSIT TECHNOLOGIES INCLUDING NEW ELECTRONIC DISPATCH, AUTOMATED Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN170111 STOP ANNUNCIATORS, TRANSIT REPORTING SOFTWARE, AND PROJECTS TO BE By 2029 $251 2019 FTIP Estimated Project completion 2024. DETERMINED. Transit/Passenger Rail Other Capital Projects Thousand Oaks VEN170112 CITY WIDE REPLACEMENT OF BUS SHELTER AND BUS STOP AMENITIES. By 2029 $63 2019 FTIP Estimated Project completion 2019. PAYMENTS FOR CERTIFICATES OF PARTICIPATION FOR NEW OPERATIONS & *Remove: duplicate Listing‐‐see above line Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN170108 By 2029 $4,600 2019 FTIP MAINTENANCE FACILITY 38. IN VENTURA ON WELLS ROAD FROM CARLOS TO CITRUS ‐ WELLS CENTER BUS STOP City of San Project is underway and anticipated to be Transit/Passenger Rail Other Capital Projects VEN171006 IMRPOVEMENTS INCLUDING NEW SIDEWALK WITH RETAINING WALL, ACCESS RAMPS, By 2029 $350 2019 FTIP Buenaventura completed by 6/30/2020. ADDITIONAL BUS SHELTER, AND LANDSCAPING Transit/Passenger Rail Other Capital Projects City of Oxnard VEN180301 IN OXNARD ON VENTURA ROAD TRANSIT LINE CONSTRUCT BUS STOP IMPROVEMENTS By 2029 $500 2019 FTIP Estimated Project completion 7/31/2020. Transit/Passenger Rail Other Capital Projects Gold Coast Transit VEN171004 REBUILD 14 CNG BUSES INCLUDING ENGINE REPLACEMENT By 2029 $2,057 2019 FTIP Estimated Project completion 2024. Transit/Passenger Rail Operating Assistance Camarillo VEN050401 OPERATING ASSISTANCE ‐ CAMARILLO AREA TRANSIT By 2029 $4,552 2019 FTIP Project is on‐going. GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP ‐ ELDERLY & 5310 program for seniors and persons with DISABLED NEW FREEDOMS INITIATIVE (PROJECTS ARE CONSISTENT WITH 40 CFR PART disabilities‐‐some funding is designated for Transit/Passenger Rail Operating Assistance VCTC VEN051005 93.126, 127,128,EXEMPT TABLES 2&3‐ PURCHASE OF NEW BUSES TO REPLACE EXIST By 2029 $1,749 2019 FTIP areas outside the 101 corridor (Ojai, Simi VEH OR MINOR EXP; OPER ASST

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us