Alexandria Transit Company Board of Directors Meeting

Total Page:16

File Type:pdf, Size:1020Kb

Alexandria Transit Company Board of Directors Meeting Alexandria Transit Company Board of Directors Meeting Wednesday, December 11th, 2019 5:30 p.m. Alexandria City Hall, 301 King Street Meeting Agenda ITEM DESCRIPTION PAGE # PRESENTER #1 Public Comment N/A All Special Recognition – Chairman will present a special Board Member Recognition and Resolution Chairman Kaplan #2 Consideration of Meeting Minutes Approval a) November 13, 2019 2-4 All #3 Board Member Announcements & Presentations a) Chairman’s Report Chairman Kaplan N/A b) T&ES Directors Report Board Members c) Any Others #4 General Manager’s Report a) Management Report b) Performance Report 5-11 Mr. Baker c) Operating Report d) GM’s Summary Report #5 Financial Report a) October Financial Update b) October Balance Sheet 12-16 Mr. Davis c) October Summary Income Statement d) October Budget vs. Actual (BVA) #6 New Business a) General Managers FY21 Proposed Budget 17-21 Baker/Davis b) ATV Network Final Report and Recommendations 22-31 Baker/Barna #7 Next Meeting Date & Adjournment The next regular meeting will take place Wednesday, January 8th, 2019 at 5:30 p.m., 32 All Alexandria City Hall, Council Workroom 2nd Floor. ATC Board Agenda Detail Agenda Item #: 2 Item Title: Meeting Minutes Contact: Fatima Ahmed, Clerk to the Board Attachments: None Customer Impact: None Board Action: Consideration of Approval Alexandria Transit Company (ATC) BOARD OF DIRECTORS MEETING MINUTES OCTOBER 23, 2019 A meeting of the Board of Directors of the Alexandria Transit Company was held on Wednesday, November 13th, 2019 at the Alexandria City Hall Council Chambers, 301 King Street, Alexandria, VA 22314. Board members present were David Kaplan, Kerry Donley, Ian Greaves, Matt Harris, Jim Kapsis, Steve Klejst and Yon Lambert. Richard Lawrence was excused from attending. Staff members and visitors attending were: Josh Baker, Raymond Mui, Fatima Ahmed, Martin Barna, Evan Davis, Whitney Code, Diana Conteras, Tristan Cunningham, Jim Maslanka, Alicia Wright, Lisa Henty, Steve Sindiong, Ashley Labadie and Karen Levy. There were 54 visitors/guest speakers present. The board holds meetings every second Wednesday from September to June and all are welcome to attend. Board Meeting The Chairman called the meeting to order at 5:37 pm, followed by round table introductions. Agenda Item #1– Alexandria Transit Vision Plan Public Hearing (5:46 pm) #1a – ATV Update and Presentation Martin Barna, Director of Planning presented the draft recommendation of the network. • The ATV Project Team is seeking final input from the Board on investment levels and route decisions so that the final ATV Network design can be presented to the Board in December o The Board provided the following guidance for the ATV, relating to the Seminary/Janneys Alternative: • To look at the AT2 direct impact, the AT2 segment needs to be resolved and the intent is to minimize fiscal impacts to any extent possible. • Determine the service that needs to be removed (i.e. other regular routes) or provide specific cost to retain similar service to the existing AT2 • There are activity centers that are impacted by the AT2 and the Board desires to ensure some level of service as opposed to none. #1b – Public Hearing (6:32 pm) The Chairman called 27 speakers whom all provided comments and feedback on the draft recommendation. Any remaining speakers desiring to speak were offered opportunity to do so. #1c – Public Comment for Non-ATV-Matters (7:56 pm) There was no public comment • A Motion by Kerry Donley with Second by Matt Harris was made to close the public comment period. o The motion carried unanimously Page | 2 Agenda Item #6a – ATV Final Report Guidance, Budget Scenarios and Consideration Discussion The Chairman of the Board called Evan Davis, Director of Finance & Administration to present the FY2021 Budget Supplemental & Reduction Scenarios. • The service levels and net subsidy impact for 4% and 8% growth was discussed with the Board and feedback was solicited. Following extensive discussion, the Board issued direction to staff to return with final recommendations at the December meeting. Further, such recommendations must include the replacement for the AT2 service segment or provide alternatives for maintaining the service in a cost neutral manner. • Mr. Davis presented the following information pertaining to budget Reduction Options in alignment with the direction of the City Manager to present 2.5% reduction scenarios • Following the presentation by Mr. Davis, the Board issued guidance that staff to focus on option #2 with the least service cuts and to implement exterior bus advertising . Specific instructions were presented for Mr. Davis to return with specific fiscal amounts attached to each scenario . Further discussion was carried pertaining to exterior bus advertising on DASH, following this the Board provided direction to the General Manager to further explore bus advertising and return with a proposed advertising program at a future date irrespective of any direction in the budget process. • Following presentation by Mr. Davis of supplemental budget proposals, the following guidance was provided: • Priority shall be applied to state of good repair (capital) projects above those of the ATV or any other priorities. Agenda Item #2 – Consideration of Meeting Minutes Approval (9:01 pm) Approval of Minutes: • A Motion by Yon Lambert with Second by Matt Harris was made to approve the minutes of the prior meeting as amended, changing the executive session and adjournment time to 7:55pm and 8:05pm respectively. o The motion carried unanimously Agenda Item #3 – Reports, Updates and Other Business Item #3a – Chairman’s Report (9:03pm) • The chairman recognized Meredith MacNab and Robert MacNab who were present, announcing Meredith MacNab has resigned from the Board, and that further Ms. MacNab will be recognized at the December Board Meeting. • The chairman reported that 1 application has been received for the board vacancy, with 3 other applicants expressing interest in the position. Further, he encouraged anyone present who may have an interest in serving to contact Fatima Ahmed to submit an application. o The Chairman asked the Secretary to send the announcement to the Board members so that they can share it on their social media. Further, he asked that staff re-advertise the position. Item #3b –T&ES Directors Report (9:09 pm) Yon Lambert provided a brief review of his written report, which was shared with the board in advance. There was no further discussion. Staff Reports Agenda Item #4 – General Manager’s Report (9:10 pm) Josh Baker provided a brief review of his written report, which was shared with the board in advance. There was no further discussion. Agenda Item #5 - Financial Report (9:12 pm) Evan Davis provided a brief review of his written report, which was shared with the board in advance. There was no further discussion. Page | 3 Agenda Item #6a– ATV Final Report Guidance, Budget Scenarios and Considerations Discussion Noted above. Agenda Item #6b – First Transit Safety & Security Manager Contract (9:16 pm) In response to the previous meetings concerns and questions, the General Manager provided written answers and briefly discussed the following key points: • Description of Position and the justification of purpose • Impacts on the budget, assessment of budget implication • Implication of Federal Funding, if any. Could this position participate? • Accountability relationship and the reporting of this position • Compare the contract extension for First Transit against the current contract/budget Kerry Donley moved for approval of this contract with Second by Yon Lambert. o The motion carried unanimously Agenda Item #6c – General Managers Customer Advisory Committees (9:31 pm) The General Manager presented a proposed resolution by the Board to support and adopt the formation of Customer Advisory Committee(s). The resolution was discussed as included in the packet. • A Motion by Yon Lambert with Second by Steven Klejst was offered to adopt the resolution as written in the Board packet. o The motion carried unanimously The Chairman expressed appreciation to the General Manager for reflecting the input from the Board and for pursuing this important advocacy project. Agenda Item #8 – Next Meeting Date & Adjournment (9:45 pm) • Adjournment at 9:45 pm: A Motion was offered by Kerry Donley with Second by Yon Lambert to adjourn the meeting. o The motion was carried unanimously. The next regular monthly meeting of the Alexandria Transit Company Board of Directors is December 11th, 2019 at 5:30 pm in the City Council Workroom, 301 King Street, Alexandria, VA 22314 Page | 4 ATC Board Agenda Detail Agenda Item #: 4 Item Title: DASH General Manager’s Report Contact: Josh Baker, General Manager Attachments: None Customer Impact: None Board Action: None/FYI 4a Summary: Management Report FOR THE MONTH OF OCTOBER 2019 A. RIDERSHIP: Total system ridership for the month decreased by 5.9% from last October, with 344,003 total passengers. Without the King Street Trolley, total ridership decreased by 5.8% from last October, with 280,006 passengers. October Total Average Daily October KST - Average Daily Ridership Boardings (Excluding Trolley) 3,500 14,000 3,000 12,000 2,500 10,000 2,000 8,000 1,500 6,000 Boardings Boardings 1,000 4,000 2,000 500 0 0 Weekday Saturday Sunday Weekday Saturday Sunday 2018 12,148 4,034 2,475 2018 1,978 3,007 2,400 2019 11,510 3,405 2,443 2019 1,852 3,016 2,042 % Change -5.3% -15.6% -1.3% % Change -6.3% 0.3% -14.9% B. SAFETY: DASH experienced no preventable accidents during the month of October. Page | 5 4b Summary: Performance Report (System-Wide Ridership October 2019) DASH Monthly Systemwide Ridership (FY2017-FY2020) 400,000 Major Service Disruption Event * (Safetrack, Govt Shutdown, etc) 350,000 * 300,000 * * * * * * 250,000 * * 200,000 4 Metrorail Stations 150,000 Total Monthly Riders 100,000 Boardings at 50,000 0 Avg.
Recommended publications
  • Ceo Report November 2015 Our Mission
    CEO REPORT NOVEMBER 2015 OUR MISSION The Virginia Railway Express, a joint project of the Northern Virginia Transportation Commission and the Potomac Rappahannock Transportation Commission, will provide safe, cost effective, accessible, reliable, convenient, and customer responsive commuter-oriented rail passenger service. VRE contributes to the economic vitality of its member jurisdictions as an integral part of a balanced, intermodal regional transportation system. MESSAGE FROM THE CEO – DOUG ALLEN This fall, VRE has been completing major improvement and safety projects including final preparation for the opening of Spotsylvania Station. This will become the new end-of-the-line station on the Fredericksburg Line and the first extension of VRE service since operations began in 1992. Commencement of VRE service in Spotsylvania will begin the morning of November 16. The station has 1,500 parking spaces and should considerably ease parking congestion at the Fredericksburg Station. To provide increased capacity on the Fredericksburg Line, an additional morning and evening train is planned to begin operating prior to the end of 2015. The station would not have been possible without the vision, dedication and leadership of Gary Skinner, VRE’s current Vice-Chairman and Spotsylvania County Supervisor. In anticipation of the commencement of VRE service at the Spotsylvania Station, VRE staff, Spotsylvania County Fire and Rescue, CSX and the Federal Railroad Administration have been involved to provide first responders a number of training OUR opportunities to ensure they are not only prepared in the event of an emergency, but know how to ensure their own safety if called upon. A full-scale emergency simulation at the new Spotsylvania Station platform occurred on October 31.
    [Show full text]
  • Alexandria, VA Alexandria Permit #482 Gazette Packet Attention Postmaster: Time-Sensitive Material
    PRSRT STD U.S. Postage PAID Alexandria, VA Alexandria Permit #482 Gazette Packet Attention Postmaster: Time-sensitive material. Address Service Requested To: 1604 King St., Alexandria, VA 22314 25 Cents Vol. CCXXIV, No. 49 Serving Alexandria for over 200 years • A Connection Newspaper December 4, 2008 Reform Isn’t A Call In the Bag City’s plan to ban To Serve plastic bags will Mayor uses Unity face obstacles Breakfast to in Richmond. advocate for By Michael Lee Pope service to Gazette Packet community. Photos by Photos t’s an age old question: By Michael Lee Pope IPaper or plastic? But Gazette Packet Councilman Tim Lovain says it’s also an existential Louise Krafft hen Mike Mackey first predicament, threatening Wbegan mentoring, he the future of the planet. The told a capacity crowd first-term councilman has huddled into the Mark Center proposed that Alexandria Hilton for the fifth annual Unity /Gazette ban plastic bags, following Breakfast last week, he was not the lead of countries such as sure who was more nervous — the Ireland, 7-year-old named Tommy or him- “We need Bangladesh, Brianna Parrott adds a jeweled snow flake to the window display at Artcraft in Old self. Yet despite their reservations, South Africa, Town. both soldiered through their Thailand and weekly afternoon reading sessions to get Taiwan. He first at Jefferson-Houston Elementary people proposed the School. After a while, the sessions idea in an Alex- ‘Black Friday’ Not Black Enough seemed less intimidating and in- into a andria Gazette creasingly familiar. Packet op ed Sunday’s bleak weather “His smile went from Capitol different published in Hill to City Hall,” said Mackey, the May, and now rained on merchants’ city’s gang-prevention coordinator.
    [Show full text]
  • Authorization to Issue a GEC VII Task Order for Design Services for Alexandria Station Improvements
    Agenda Item 10-A Action Item To: Chair Cristol and the VRE Operations Board From: Doug Allen Date: January 18, 2019 Re: Authorization to Issue a GEC VII Task Order for Design Services for Alexandria Station Improvements Recommendation: The VRE Operations Board is asked to authorize the Chief Executive Officer to issue a GEC VII Task Order to HDR Engineering, Inc. for Design Services: Alexandria Station Improvements in the amount of $812,000, plus a 10% contingency of $81,200, for a total not to exceed $893,200. Summary: The Alexandria Station Improvements project will remove the existing at-grade pedestrian crossing of two tracks and construct major renovations of platforms to provide ADA-compliant access to both the station (west) platform and the center (east) platform. The scope of services for this task order covers the design of these improvements. Background: Alexandria Union Station, which serves both VRE and Amtrak trains, requires significant investment to improve passenger safety and accessibility as well as operational flexibility. VRE has three primary objectives at Alexandria: 1) eliminate the existing at-grade crossing while ensuring safe and ADA-compliant access to the center platform; 2) modify both the center and station platform heights to achieve FRA- and CSXT-required clearances, meet ADA requirements, and eliminate the need for step boxes; and 3) allow passenger trains to serve the station on any of three tracks. The original Alexandria Station Pedestrian Tunnel project planned to achieve the objective of eliminating the at-grade pedestrian crossing by constructing a new pedestrian tunnel underneath the rail right-of-way, parallel to the existing century-old tunnel.
    [Show full text]
  • Transaction 2040 Summary
    TransAction 2040 Plan Projects and National Capital Region Transportation Planning Board Constrained Long Range Plan Projects Corridor 1 – Dulles/VA 7 Corridor 3 – VA 28 2011-2040 CLRP Projects 2011-2040 CLRP Projects Projects Capital Cost Estimates (in Millions) Projects Capital Cost Estimates (in Millions) Highway Highway 340 Construct Battlefield Parkway from U.S. 15 South of Leesburg to U.S. 15 Bypass north ..........................................$45.0 Construct interchanges along VA 28 between I-66 and VA 7 and widen to 8 lanes ............................................... $100.0 Widen Dulles Access Road from 4 to 6 lanes from Dulles Airport to VA 123 .................................................................$40.0 Reconstruct VA 28 adjacent to its existing alignment and construct overpass of Widen U.S. 15 to 4 lanes from Evergreen Mill Road to south city line of Leesburg ...................................................... $9.3 Norfolk-Southern Railroad B Line and an overpass of/interchange with Wellington Road ..............................$24.9 Construct an interchange on U.S. 15 Bypass at Edwards Ferry Road ..............................................................................$27.0 Widen Wellington Road to 4 lanes from Godwin Drive to VA 28 (Nokesville Road) ...................................................$15.7 Construct an interchange on VA 7 at VA 659 (Belmont Ridge Road) ...............................................................................$72.0 Trails Widen VA 7 to 6 lanes from Seven Corners
    [Show full text]
  • Ceo Report July 2016 Our Mission
    CEO REPORT JULY 2016 OUR MISSION The Virginia Railway Express, a joint project of the Northern Virginia Transportation Commission and the Potomac Rappahannock Transportation Commission, will provide safe, cost-effective, accessible, reliable, convenient, and customer responsive commuter-oriented rail passenger service. VRE contributes to the economic vitality of its member jurisdictions as an integral part of a balanced, intermodal regional transportation system. OUR MISSIONTABLE OF CONTENTS CEO REPORT | JULY 2016 2 Success at a Glance 3 On-Time Performance 5 Ridership 6 Summonses 7 Train Utilization 8 Parking Utilization 9 Financial Report 10 Capital Projects Updates – Manassas Park Station Parking Expansion – Rolling Road Platform Extension – Spotsylvania Stationv – Gainesville-Haymarket Extension – Midday Storage Facility – Long Bridge Feasibility and Environmental Studies – Fredericksburg to Crossroads Third Track – Quantico Station Improvements – Lorton Platform Extension – Penta-Platforms – Arkendale to Powell’s Creek Third Track Project – Alexandria Pedestrian Tunnel Project – Lifecycle Overhaul and Upgrade Facility – L’Enfant (North) Storage Track Wayside Power 14 Facilities Update 15 Upcoming Procurements 16 Projects Progress Report Virginia Railway Express | 1500 King Street, Suite 202 | Alexandria, VA 22314 | 703.684.1001 | www.vre.org JULY 2016 | TABLE OF CONTENTS 1 SUCCESS % K % AT 70 80 A GLANCE 10 80 % % 1 9 0 5 0 6 9 K % 0 % 0 % K 7 % 5 0 ▲ 5 1 1 ▲ 0 0 0 2 0 % 0 % % % K 0 0 0 PARKING AVERAGE DAIL Y ON-TIME UTILIZATION RIDERSHIP PERFORMANCE The total number of parking spaces The average number of boardings each Percentage of trains that arrive at used in the VRE system during the operating day inclusive of Amtrak Step-Up their destination within five minutes month, divided by the total number of boardings but excluding “S” schedule of the schedule.
    [Show full text]
  • CAROLINIAN Train Time Schedule & Line Route
    CAROLINIAN train time schedule & line map CAROLINIAN Charlotte Amtrak Station View In Website Mode The CAROLINIAN train line (Charlotte Amtrak Station) has 2 routes. For regular weekdays, their operation hours are: (1) Charlotte Amtrak Station: 7:25 AM (2) NY Moynihan Train Hall at Penn Station: 6:45 AM Use the Moovit App to ƒnd the closest CAROLINIAN train station near you and ƒnd out when is the next CAROLINIAN train arriving. Direction: Charlotte Amtrak Station CAROLINIAN train Time Schedule 24 stops Charlotte Amtrak Station Route Timetable: VIEW LINE SCHEDULE Sunday 7:17 AM Monday 7:25 AM NY Moynihan Train Hall at Penn Station 258 W 31 St, Manhattan Tuesday 7:25 AM Newark Wednesday 7:25 AM Raymond Plaza West, Newark Thursday 7:25 AM Trenton Amtrak Station Friday 7:25 AM 16 Wallenberg Avenue, Trenton Saturday 7:17 AM Philadelphia Wilmington South French Street, Wilmington CAROLINIAN train Info Baltimore Penn Station Direction: Charlotte Amtrak Station 1500 North Charles Street, Baltimore Stops: 24 Trip Duration: 811 min Union Station Line Summary: NY Moynihan Train Hall at Penn 50 Massachusetts Avenue Ne, Washington Station, Newark, Trenton Amtrak Station, Philadelphia, Wilmington, Baltimore Penn Station, Alexandria Union Station, Alexandria, Quantico, Fredericksburg, 110 Callahan Drive, Alexandria Richmond Staples Mill Road Amtrak Station, Petersburg Amtrak Station, Rocky Mount, Wilson, Quantico Selma, Raleigh Union Station, Cary, Durham Amtrak 550 Railroad Ave, Quantico Station, Burlington Amtrak Station, Greensboro, High Point,
    [Show full text]
  • All Action and Information Items
    Virginia Railway Express Operations Board Resolution 3-05-2020 Resolution Finding Need to Conduct May 15, 2020 Meeting Electronically WHEREAS, on March 12, 2020, the Governor of Virginia declared a state of emergency in Virginia in response to the spread of novel coronavirus, or COVID-19, a communicable disease of public health threat as so declared by the State Health Commissioner on February 7, 2020 (“COVID-19”); and, WHEREAS, in subsequent Executive Orders, particularly Executive Order Nos. 53 and 55, as amended, the Governor of Virginia, among other measures designed to ensure safe physical distancing between individuals, prohibited public and private in person gatherings of 10 or more individuals and ordered all individuals in Virginia to remain at their place of residence, with limited exceptions, to mitigate the impacts of COVID-19 and prevent its spread; and, WHEREAS, the Virginia Railway Express Operations Board finds that it has a responsibility to demonstrate to the public, through the Board’s conduct, the importance of maintaining proper physical distance from others and to avoid gathering in public where the risks of infection are highest, and to take measures that promote physical distancing in order to protect the public health and mitigate the impacts and spread of COVID-19, including, among others, conducting meetings electronically whenever possible; and, WHEREAS, on April 22, 2020, the Virginia General Assembly adopted, and the Governor signed, budget bill amendments to HB 29 that expressly authorize “any public body, including any state, local, [or] regional body” to “meet by electronic communication means without a quorum of the public body .
    [Show full text]
  • The Tragic Case of <I>Hines V. Garrett</I>
    Catholic University Law Review Volume 66 Issue 2 Winter 2016 Article 6 3-23-2017 Rape on the Washington Southern: The Tragic Case of Hines v. Garrett Michael I. Krauss Follow this and additional works at: https://scholarship.law.edu/lawreview Part of the Law and Gender Commons, Legal History Commons, and the Torts Commons Recommended Citation Michael I. Krauss, Rape on the Washington Southern: The Tragic Case of Hines v. Garrett, 66 Cath. U. L. Rev. 245 (2017). Available at: https://scholarship.law.edu/lawreview/vol66/iss2/6 This Article is brought to you for free and open access by CUA Law Scholarship Repository. It has been accepted for inclusion in Catholic University Law Review by an authorized editor of CUA Law Scholarship Repository. For more information, please contact [email protected]. Rape on the Washington Southern: The Tragic Case of Hines v. Garrett Cover Page Footnote Professor of Law, Antonin Scalia Law School at George Mason University. Thanks are due to William H. Jones, George Mason University School of Law Class of 2011 for substantial research on an earlier draft of this paper, and to Keith Underkoffler, George Mason University School of Law Class of 2017, for work on this version. This paper has been a long time in the making, and I also thank George Mason students and faculty for their input. It is estimated that 12.4% of Virginia women will be forcibly raped during their lifetime. Only one rape in six will be reported to authorities. See D. Kilpatrick & K. Ruggiero, Rape in Virginia: A Report to the Commonwealth, National Violence Against Women Prevention Research Center, Medical University of South Carolina (2003) 6–7.
    [Show full text]
  • The Alexandria Union Station by Al Cox, Ala
    WINTER 1996 Vol. 1, No. 1 The Alexandria Union Station by Al Cox, AlA The Alexandria regional trans- Union Station is portation. significant as However, with the most visible the recent remaining growth of example of the commuter rail, dominant Union Station is passenger and now being freight trans- redeveloped as portation part of a multi- system in the modal transpor- city of Alexan- tation center to dria between Union Station, ca. 1906. showing the original west portico serve Alexan- 1851 and the historic photo courtesy William E. Griffm. Jr. dria for the next 1930s. century. Unfortunately, physical evi- mobile manufacturing plants Transportation has played a dence of the railroad’s influ- and breweries up until the late central role in the growth and ence on the growth and devel- 1960s. development of Alexandria opment of Alexandria is since its inception. Located a rapidly disappearing. Al- Reasons for the railroads few miles below the falls of though the Wilkes Street decline are varied. Replace- the Potomac River, the city tunnel and Hooff s Run bridge ment of Alexandria’s industrial provided the northernmost port are protected, very soon none base with a service economy to access the rich interior of the railroad roundhouses or and the widespread use of farmlands of Virginia. The switching yards will remain to trucks, automobiles and Potomac River put Alexandria illustrate Alexandria’s 18th- airlines has radically altered in the mainstream of world 19th century history as North- local freight and passenger commerce and by the mid-18th ern Virginia’s industrial and transportation systems since century, Alexandria had transportation center.
    [Show full text]
  • Alexandria Library, Special Collections Subject Index to Northern Virginia History Magazines
    Alexandria Library, Special Collections Subject Index to Northern Virginia History Magazines SUBJECT TITLE MAG DATE VOL ABBEY MAUSOLEUM LAND OF MARIA SYPHAX & ABBEY MAUSOLEUM AHM OCT 1984 VOL 7 #4 ABINGDON ABINDGON MANOR RUINS: FIGHT TO SAVE AHM OCT 1996 V 10 #4 ABINGDON OF ALEXANDER HUNTER, ET. AL. AHM OCT 1999 V 11 #3 AMONG OUR ARCHIVES AHM OCT 1979 VOL 6 #3 ARLINGTON'S LOCAL & NATIONAL HERITAGE AHM OCT 1957 VOL 1 #1 LOST HERITAGE: EARLY HOMES THAT HAVE DISAPPEARED NVH FEB 1987 VOL 9 #1 VIVIAN THOMAS FORD, ABINGDON'S LAST LIVING RESIDENT AHM OCT 2003 V 12 #3 ABOLITION SAMUEL M. JANNEY: QUAKER CRUSADER NVH FEB 1981 VOL 3 #3 ADAMS FAMILY SOME 18TH CENTURY PROFILES, PT. 1 AHM OCT 1977 VOL 6 #1 AESCULAPIAN HOTEL HISTORY OF SUNSET HILLS FARM FHM 1958-59 VOL 6 AFRICAN-AMERICANS BLACK HISTORY IN FAIRFAX COUNTY FXC SUM 1977 VOL 1 #3 BRIEF HISTORY & RECOLLECTIONS OF GLENCARLYN AHM OCT 1970 VOL 4 #2 DIRECTOR'S CHAIR (GUM SPRINGS) AAVN JAN 1988 VOL 6 #1 GUM SPRINGS COMMUNITY FXC SPR 1980 VOL 4 #2 GUM SPRINGS: TRIUMPH OF BLACK COMMUNITY FXC 1989 V 12 #4 NEW MT. VERNON MEMORIAL: MORE THAN GW'S SLAVES FXC NOV 1983 VOL 7 #4 SOME ARL. AREA PEOPLE: THEIR MOMENTS & INFLUENCE AHM OCT 1970 VOL 4 #1 SOME BLACK HISTORY IN ARLINGTON COUNTY AHM OCT 1973 VOL 5 #1 UNDERGROUND RAILROAD ADVISORY COM. MEETING AAVN FEB 1995 V 13 #2 AFRICAN-AMERICANS-ALEXANDRIA ARCHAEOLOGY OF ALEXANDRIA'S QUAKER COMMUNITY AAVN MAR 2003 V 21 #2 AFRICAN-AMERICANS-ARCHAEOLOGY BLACK BAPTIST CEMETERY ARCHAEOLOGICAL INVEST AAVN AUG 1991 VOL 9 #8 CEMETERY DISCOVERIES AAVN FEB 1992 V 10 #2
    [Show full text]
  • NORTHEAST REGIONAL Train Time Schedule & Line Route
    NORTHEAST REGIONAL train time schedule & line map NORTHEAST REGIONAL Boston View In Website Mode The NORTHEAST REGIONAL train line (Boston) has 8 routes. For regular weekdays, their operation hours are: (1) Boston: 4:45 AM - 4:50 PM (2) NY Moynihan Train Hall at Penn Station: 6:15 AM - 5:55 PM (3) Newport News: 11:35 AM - 9:30 PM (4) Norfolk: 6:10 AM - 9:20 AM (5) Richmond Staples Mill Road Amtrak Station: 3:05 PM (6) Roanoke: 8:15 AM (7) Springƒeld: 2:55 PM (8) Washington Union Station: 5:50 AM - 5:35 PM Use the Moovit App to ƒnd the closest NORTHEAST REGIONAL train station near you and ƒnd out when is the next NORTHEAST REGIONAL train arriving. Direction: Boston NORTHEAST REGIONAL train Time Schedule 32 stops Boston Route Timetable: VIEW LINE SCHEDULE Sunday 6:10 AM - 5:15 PM Monday 4:45 AM - 4:50 PM Newport News 9304 Warwick Blvd, Newport News Tuesday 4:45 AM - 4:50 PM Williamsburg Amtrak Station Wednesday 4:45 AM - 4:50 PM 440 N Boundary St, Williamsburg Thursday 4:45 AM - 4:50 PM Richmond Main Street Amtrak Station Friday 4:45 AM - 4:50 PM 1500 E Main St, Richmond Saturday 6:10 AM - 4:50 PM Richmond Staples Mill Road Amtrak Station 7519 Staples Mill Rd, Dumbarton Ashland Amtrak North Railroad Avenue, Ashland NORTHEAST REGIONAL train Info Direction: Boston Fredericksburg Stops: 32 200 Lafayette Blvd, Fredericksburg Trip Duration: 518 min Line Summary: Newport News, Williamsburg Amtrak Quantico Station, Richmond Main Street Amtrak Station, 550 Railroad Ave, Quantico Richmond Staples Mill Road Amtrak Station, Ashland Amtrak, Fredericksburg,
    [Show full text]
  • Ceo Report | Feb
    VIRGINIA RAILWAY EXPRESS 1500 KING STREET | SUITE 202 | ALEXANDRIA, VA 22314 703.684.1001 | WWW.VRE.ORG 2 ON TIME PERFORMANCE TABLE OF 3 RIDERSHIP UPDATE CONTENTS 3 MONTHLY CITATIONS UPDATE CEO REPORT | FEB. 2015 4 RIDERSHIP CHART 5 ON TIME PERFORMANCE GRAPHS 6 TRAIN UTILIZATION 7 PARKING UTILIZATION 8 BICYCLE COUNTS 8 FINANCIAL REPORT 10 RAIL OPERATIONS SAFETY & SECURITY UPDATE 10 CAPITAL PROJECTS SPOTSYLVANIA STATION COMMONWEALTH TRANSPORTATION OFFICIALS VISIT VRE LORTON STATION IMPROVEMENTS ALEXANDRIA UNION STATION PEDESTRIAN TUNNEL CROSSROADS LIFE-CYCLE OVERHAUL AND UPGRADE FACILITY FACILITIES PROJECTS UPDATE 14 PROCUREMENT UPCOMING PROJECTS 16 PROGRESS REPORT/PROJECTS UNDERWAY ON TIME PERFORMANCE REASON FOR DELAYS 1% On Time Performance (OTP) for January 2015 was 95 percent, slightly lower than 96 percent the previous 1% month. The Manassas Line operated at 94 percent OTP 12% while the Fredericksburg Line was 95 percent. Train interference and restricted speed orders were the primary causes of reduced overall OTP. Typical passenger handling 23% 44% and schedule issues were the remaining principal causes of delays. In January, VRE operated 583 trains with 31 trains 19% “Other” includes those arriving over five minutes late to their final destination. trains that were delayed due to late turns, weather There were 18 late trains on the Manassas Line and 13 and maintenance of way late trains on the Fredericksburg Line. issues, etc. Train Interference - 37 Mechanical Failure - 1 Signal/Switch Failure - 0 Schedule – 10 Passenger Handling - 16 Other - 1 Restricted Speed - 19 Note: There were a total of 82 delays during the month of December but only 31 late trains.
    [Show full text]