To Let /Ŷěƶɛƚƌŝăůindustrial

Total Page:16

File Type:pdf, Size:1020Kb

To Let /Ŷěƶɛƚƌŝăůindustrial 1-#J%*KE-,#?&'%To Let /ŶĚƵƐƚƌŝĂůIndustrial www.m7PropSearch.co.uk Re78-*/%,#9,-3%,*6#:8;0)*,<&'#()*&*% furbished warehouse/ Trade Counter Unit=>#?&23'%#?*,%%*@#?&23'%#1-A8@#?&23'%#B-08*6#7+=>#CBD 11 Glacier Buildings, Brunswick Business Park, Harrington Road, Liverpool, Merseyside L3 4BH E,-2#FFFF#?G#!#HFFFF#?G#E1I## *-#FFFF#?G#!#HFFFF#?G#E1I ͻ/ƐƚĞƋƵŝĚĞŵǀĞƚĞƌĞƐŝŶƚĞƌƉŽŶĞ͕ƋƵŝǀĞůŵĞŶƐĞďƌĞǀŝǀĞů ƚŽƚŽĞƐƚŝƵŶŝŽƌĂŶŶŽ͘ /ƐƚĞƋƵŝĚĞŵǀĞƚĞƌĞƐŝŶƚĞƌƉŽŶĞ͕ƋƵŝǀĞůŵĞŶƐĞďƌĞǀŝǀĞůƚŽƚŽ ͻhƚŽƌƚƵƌŚŽŶĞƐƚĞƉĞƌŵŝƐƐŽ͕ĐĂƵĚĂĞƋƵĞƉŝůŽƐƵƚĞƋƵŝŶĂĞ ĞƐƚŝƵŶŝŽƌĂŶŶŽ͘hƚŽƌƚƵƌŚŽŶĞƐƚĞƉĞƌŵŝƐƐŽ͕ĐĂƵĚĂĞƋƵĞƉŝůŽƐƵƚ 9,430 sq ft (876.05 sq m) ƉĂƵůĂƟŵǀĞůůŽƵŶƵŵ͕ĚĞŵŽĞƟĂŵƵŶƵŵ͕ĚƵŵĐĂĚĂƚ ĞƋƵŝŶĂĞƉĂƵůĂƟŵǀĞůůŽƵŶƵŵ͕ĚĞŵŽĞƟĂŵƵŶƵŵ͕ĚƵŵĐĂĚĂƚ • Modern Premises ĞůƵƐƵƐƌĂƟŽŶĞƌƵĞŶƟƐĂĐĞƌǀŝ͕ƋƵŝƌĞĚŝƚŝŶĨĂƐƚŽƐĞƚǀŝƌͲ ĞůƵƐƵƐƌĂƟŽŶĞƌƵĞŶƟƐĂĐĞƌǀŝ͕ƋƵŝƌĞĚŝƚŝŶĨĂƐƚŽƐĞƚǀŝƌƚƵƚĞŵ ƚƵƚĞŵĂĞƐƟŵĂƚĂŶŶŝƐŵŝƌĂƚƵƌƋƵĞŶŝŚŝůŶŝƐŝƋƵŽĚ͘ ĂĞƐƟŵĂƚĂŶŶŝƐŵŝƌĂƚƵƌƋƵĞŶŝŚŝůŶŝƐŝƋƵŽĚ>ŝďŝƟŶĂƐĂĐƌĂǀŝƚ͘ • Close City Centre/ Baltic triangle ͻŶŶŝƵƐĞƚƐĂƉŝŶĞƐĞƚĨŽƌƟƐĞƚĂůƚĞƌ,ŽŵĞƌƵƐ͕ƵƚĐƌŝƟĐŝ ŶŶŝƵƐĞƚƐĂƉŝŶĞƐĞƚĨŽƌƟƐĞƚĂůƚĞƌ,ŽŵĞƌƵƐ͕ƵƚĐƌŝƟĐŝĚŝĐƵŶƚ͕ ĚŝĐƵŶƚ͕ůĞǀŝƚĞƌĐƵƌĂƌĞǀŝĚĞƚƵƌ͕ƋƵŽƉƌŽŵŝƐƐĂĐĂĚĂŶƚĞƚ ůĞǀŝƚĞƌĐƵƌĂƌĞǀŝĚĞƚƵƌ͕ƋƵŽƉƌŽŵŝƐƐĂĐĂĚĂŶƚĞƚƐŽŵŶŝĂWLJƚŚĂŐͲ • Eaves height of 5.2m ƐŽŵŶŝĂWLJƚŚĂŐŽƌĞĂ͘ ŽƌĞĂ͘EĂĞǀŝƵƐŝŶŵĂŶŝďƵƐŶŽŶĞƐƚĞƚŵĞŶƟďƵƐŚĂĞƌĞƚƉĂĞŶĞ ƌĞĐĞŶƐ͍ • 500m from Brunswick station • Recently re furbished 1-#J%*KE-,#?&'%To Let /ŶĚƵƐƚƌŝĂůIndustrial www.m7PropSearch.co.uk 78-*/%,#9,-3%,*6#:8;0)*,<&'#()*&*% Brunswick Business Park =>#?&23'%#?*,%%*@#?&23'%#1-A8@#?&23'%#B-08*6#7+=>#CBD M6 M62 M61 M1 ROAD NCS LA ST EA M62 M60 M62 Baltic Triangle Anglican Catherdral M56 M56 A55 M6 A6 M6 Location The Glacier Buildings are situated at Brunswick Dock, accessed off Sefton Street, approximately one mile to the South of Liverpool City Centre. Sefton Street (A5036) is one of the main arterial routes into the City Centre providing a mix of leisure and residential uses and is in close proximity to the Baltic Triangle. Public Transport links are excellent with Brunswick Merseyrail Station located opposite the business park and a number of local bus routes servicing the area. Liverpool John Lennon Airport is located approximately 7 miles to the South. Description Legal Fees Unit 11 Glacier Buildings is a Re furbished warehouse/ Trade Counter unit All parties will be responsible for their own legal costs incurred in the benefitting from the following specification: transaction. • Self-contained site of approximately 2 acres • Modern Premises Business Rates • Close City Centre/ Baltic triangle We advise that all interested parties make enquires to the local council / • Eaves height of 5.2m rating authority. • Suitable for trade • 500m from Brunswick station • Recently re furbished Viewing / Further Information • New FRI lease • S/C cost of £2,125 p.a. Please contact the joint agents LM6 & B8RE: •E,-2#FFFF#?G#!#HFFFF#?G#E1I# Insurance Premium of £1,688 p.a. # • Rental of £52,000 p.a. ͻ/ƐƚĞƋƵŝĚĞŵǀĞƚĞƌĞƐŝŶƚĞƌƉŽŶĞ͕ƋƵŝǀĞůŵĞŶƐĞďƌĞǀŝǀĞů *-#FFFF#?G#!#HFFFF#?G#E1I Tony O’Keefe Thomas Marriott ƚŽƚŽĞƐƚŝƵŶŝŽƌĂŶŶŽ͘ Tel: 0151 541 2447 Tel: 01925 320 520 /ƐƚĞƋƵŝĚĞŵǀĞƚĞƌĞƐŝŶƚĞƌƉŽŶĞ͕ƋƵŝǀĞůŵĞŶƐĞďƌĞǀŝǀĞůƚŽƚŽ [email protected] [email protected] VAT ͻhƚŽƌƚƵƌŚŽŶĞƐƚĞƉĞƌŵŝƐƐŽ͕ĐĂƵĚĂĞƋƵĞƉŝůŽƐƵƚĞƋƵŝŶĂĞ ĞƐƚŝƵŶŝŽƌĂŶŶŽ͘hƚŽƌƚƵƌŚŽŶĞƐƚĞƉĞƌŵŝƐƐŽ͕ĐĂƵĚĂĞƋƵĞƉŝůŽƐƵƚ All prices are quoted exclusive of but may be liable to VAT at the prevailing ƉĂƵůĂƟŵǀĞůůŽƵŶƵŵ͕ĚĞŵŽĞƟĂŵƵŶƵŵ͕ĚƵŵĐĂĚĂƚ ĞƋƵŝŶĂĞƉĂƵůĂƟŵǀĞůůŽƵŶƵŵ͕ĚĞŵŽĞƟĂŵƵŶƵŵ͕ĚƵŵĐĂĚĂƚ rate. ĞůƵƐƵƐƌĂƟŽŶĞƌƵĞŶƟƐĂĐĞƌǀŝ͕ƋƵŝƌĞĚŝƚŝŶĨĂƐƚŽƐĞƚǀŝƌͲ ĞůƵƐƵƐƌĂƟŽŶĞƌƵĞŶƟƐĂĐĞƌǀŝ͕ƋƵŝƌĞĚŝƚŝŶĨĂƐƚŽƐĞƚǀŝƌƚƵƚĞŵ ƚƵƚĞŵĂĞƐƟŵĂƚĂŶŶŝƐŵŝƌĂƚƵƌƋƵĞŶŝŚŝůŶŝƐŝƋƵŽĚ͘ TermsĂĞƐƟŵĂƚĂŶŶŝƐŵŝƌĂƚƵƌƋƵĞŶŝŚŝůŶŝƐŝƋƵŽĚ>ŝďŝƟŶĂƐĂĐƌĂǀŝƚ͘ ͻŶŶŝƵƐĞƚƐĂƉŝŶĞƐĞƚĨŽƌƟƐĞƚĂůƚĞƌ,ŽŵĞƌƵƐ͕ƵƚĐƌŝƟĐŝ ŶŶŝƵƐĞƚƐĂƉŝŶĞƐĞƚĨŽƌƟƐĞƚĂůƚĞƌ,ŽŵĞƌƵƐ͕ƵƚĐƌŝƟĐŝĚŝĐƵŶƚ͕ The unit is available by way of a new full repairing and insuring lease on ĚŝĐƵŶƚ͕ůĞǀŝƚĞƌĐƵƌĂƌĞǀŝĚĞƚƵƌ͕ƋƵŽƉƌŽŵŝƐƐĂĐĂĚĂŶƚĞƚ termsůĞǀŝƚĞƌĐƵƌĂƌĞǀŝĚĞƚƵƌ͕ƋƵŽƉƌŽŵŝƐƐĂĐĂĚĂŶƚĞƚƐŽŵŶŝĂWLJƚŚĂŐ to be agreed with further details available upon request. Ͳ ƐŽŵŶŝĂWLJƚŚĂŐŽƌĞĂ͘ ŽƌĞĂ͘EĂĞǀŝƵƐŝŶŵĂŶŝďƵƐŶŽŶĞƐƚĞƚŵĞŶƟďƵƐŚĂĞƌĞƚƉĂĞŶĞ EPCƌĞĐĞŶƐ͍ An EPC Certificate is available upon request. Misrepresentation Act : All Agents and for the vendors or lessors of this property whose agents they are, give notice that (i) these particulars are produced in good faith, are set out as a general guide only and do not constitute any part of an offer or contract. They are believed to be correct but any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves as to the correctness of each of them. (ii) no person in the employment of all agents has any authority to make or give any representation or warranty in relation to this property. Designed by Richard Barber & Company 0161 833 0555. March 2019..
Recommended publications
  • (Public Pack)Agenda Document for Liverpool City Region Combined
    MEETING OF THE LIVERPOOL CITY REGION COMBINED AUTHORITY To: The Members of the Liverpool City Region Combined Authority Dear Member, You are requested to attend a meeting of the Liverpool City Region Combined Authority to be held on Friday, 28th June, 2019 at 1.00pm in the Authority Chamber - No.1 Mann Island, Liverpool, L3 1BP. If you have any queries regarding this meeting, please contact Trudy Bedford on telephone number (0151) 330 1330. Yours faithfully Chief Executive WEBCASTING NOTICE This meeting will be filmed by the Combined Authority for live and/or subsequent broadcast on the Combined Authority’s website. The whole of the meeting will be filmed, except where there are confidential or exempt items. If you make a representation to the meeting you will be deemed to have consented to being filmed. By entering the body of the Chamber you are also consenting to being filmed and to the possible use of those images and sound recordings for webcasting and/or training purposes. If you do not wish to have your image captured or if you have any queries regarding the webcasting of the meeting please contact the Democratic Services Officer on the above number or email [email protected] You should be aware that the Combined Authority is a Data Controller under the Data Protection Act. Data collected during this webcast will be retained in accordance with the Combined Authority’s published policy. (Established pursuant to section 103 of the Local Democracy, Economic Development and Construction Act 2009 as the Halton, Knowsley, Liverpool, St Helens, Sefton and Wirral Combined Authority) LIVERPOOL CITY REGION COMBINED AUTHORITY AGENDA 1.
    [Show full text]
  • Baltic Triangle Strategic Regeneration Framework
    The Baltic Triangle Strategic Regeneration Framework Supplementary Planning Document August 2020 CONTENTS 1 INTRODUCTION 2 2 THE VISION 20 Policy 1 - Vision & Strategic Objectives 24 3 STRATEGIC DESIGN CONSIDERATIONS 28 Key Spatial Drivers 30 Baltic Streets 34 Policy 2 - The Urban Grid 35 Policy 3 - Access & Movement 42 Policy 4 - Green Corridors 43 Policy 5 - Inclusive Access 44 Policy 6 - Train Station 45 Policy 7 - Parking 47 Baltic Spaces 48 Policy 8 - Public Open Space 49 Baltic Places 58 Policy 9 - Areas of Change 58 Policy 10 - Heritage & Conservation 69 Policy 11 - Commercial, Creative and Digital Uses 73 Policy 12 - Residential Development 74 Policy 13 - Inclusive Design 74 Policy 14 - Agent of Change 76 Policy 15 - Night-time Opening Hours 76 Policy 16 - Meanwhile Uses 77 4 DESIGN GUIDELINES 78 Block Development Guidelines 81 The Baltic Triangle Street Framework 82 Policy 17 - Street Framework 85 Tall Buildings & Roof Extensions 104 Policy 18 - Tall Buildings 104 Policy 19 - Roof Extensions 105 5 DELIVERING REGENERATION 108 1 INTRODUCTION 1 / INTRODUCTION Liverpool City Council (LCC) have commissioned a team 1.2 Why is the SRF needed? led by LDA Design to deliver a Strategic Regeneration Framework (SRF) for the Baltic Triangle. Along with the The SRF is required to supplement local planning policy Council, this SRF has been developed collaboratively in order to respond to the unique challenges of the with local communities, businesses and stakeholders. Baltic Triangle and harness the extensive opportunities that the area possesses. The SRF will build on previous Through a detailed understanding of the urban, work to provide specific guidance related to the spatial environmental and socio-economic context of the Baltic growth of the area.
    [Show full text]
  • Liverpool Development Update
    LIVERPOOL DEVELOPMENT UPDATE October 2015 Welcome Welcome to the latest edition of Liverpool Development Update. If you need an indication of how far Liverpool has come from the dark days of the recession five years ago, you only have to look at the levels of investment pouring into the city today. Both 2014 and 2015 have seen significant jumps in construction activity both in the public and private sectors, with 2016 already looking to be on track to be as productive. I am particularly pleased to see developments creating premises which will allow businesses to start up and grow. Giving existing businesses the tools to help them grow and increase employment opportunities is just as important as creating space for new investments. In Liverpool, we are committed to making both happen. DPD Geopost, Novartis, and Eli Lily are all opening new facilities, while exciting new developments like “The Hangar” and “Invest:Speke” have attracted new tenants in advance of practical completion. With £784million worth of projects having completed since the start of this year, there remains £1.26 billion on site as at October 2015. The largest single project underway is the rebuild of the Royal Liverpool University Hospital, but I am happy to see that the City Centre residential market, so depressed for the last few years, has finally taken off again with several new schemes coming on stream. These will help to further establish the City Centre as a vibrant and colourful residential community. In the neighbourhoods, over £500 million worth of development activity FRONT COVER: is also underway.
    [Show full text]
  • Liverpool City Centre A1 15 Central Library D1 49 13 48 Knowsley Safari
    Hotels & Serviced Apartments Places of Interest A B C D E F 1 30 James Street and Carpathia Albert Dock B3 1 Champagne Bar & Restaurant B2 ACC Liverpool B4 2 49 2 62 Castle Street B2 Athenaeum C2 3 3 Adagio Apart Hotel D2 4 The Beatles Story B3 and A2 44 30 Aloft Hotel and NYL Restaurant & Bar B1 5 Beatles Legacy Statue A2 63 4 43 5 Base Serviced Apartments - Duke St D3 6 Blackburne House E3 50 66 15 50 7 Black-E Community Centre D4 Liverpool Hope University Base Serviced Apart’s - Cumberland St B1 46 21 (Creative Campus). 6 8 The Bluecoat C2 Everton FC. 7 Base Serviced Apart’s - Sir Thomas St C1 The British Music Experience A2 Aintree Racecourse. 59 16 Isla Gladstone Conservatory. 9 Southport. 8 Base Serviced Apart’s - The Dock C5 Liverpool FC. 10 Camp & Furnace C5 37 Another Place (Cast Iron 32 Human Sculptures). 9 The Block B4 Cains Brewery Village D5 11 1 1 BridgeStreet Liverpool ONE C2 57 16 15 10 12 Cavern Club B2 34 30 38 36 11 Britannia Adelphi D2 13 Cavern Walks C2 51 6 52 Croxteth Hall & Campanile C4 14 Chinese Arch D3 Country Park. 12 39 7 64 4 54 49 Knowsley Hall. 13 Crowne Plaza Liverpool City Centre A1 15 Central Library D1 Knowsley Safari. 48 63 St Helens. Days Inn B2 16 Empire Theatre D1 13 33 35 14 Epstein Theatre C2 Doubletree by Hilton & Spa Liverpool B1 17 15 40 18 Everyman Theatre E3 27 53 54 28 16 Dream Apartments B1 46 Exhibition Centre Liverpool B4 61 19 17 EPIC Apart Hotel - Seel Street C3 20 FACT D3 23 12 13 53 20 62 18 EPIC Apart Hotel - Duke Street C3 The Gateway Centre D1 21 25 19 EPIC Apart Hotel - Campbell
    [Show full text]
  • The Changing Face of Liverpool
    Evolving Cities The changing face of Liverpool gva.co.uk Evolving cities The UK’s cities are The Changing Face of Liverpool is one of our series of reports looking undergoing a renaissance. at how the UK’s key cities are evolving Large scale place making and the transformational change that schemes are dramatically is occurring, either in terms of the improving how they are scale of regeneration activity or a shift in perception. perceived, making them more desirable places to For each city, we identify the key locations where such change has live and work, and better occurred over the last 10 years, able to attract new people and the major developments that and businesses. continue to deliver it. We then explore the key large scale regeneration opportunities going forward. Liverpool today Liverpool is a story of The 20th century was a more and the UK. Encouragingly, the city Liverpool is once again a destination Square has played a major role mixed picture with periods of both has also seen a sustained period of regional, national and international in the improvement of Liverpool’s resurgence. Historically, prosperity and hardship. The 70s of population growth over the last significance. Liverpool ONE re-shaped commercial offering. It has become it has been a hugely and 80s in particular were a period decade following an extended the retail core, regenerated a whole the focal point for Liverpool’s significant city for the UK. of severe decline for Liverpool. As period of significant decline. quarter of the city and acted as a commercial district, exemplifying with other Northern industrial cities it huge catalyst for further investment high standards of architecture, In the early 19th century Urban regeneration has been suffered from Britain’s manufacturing and regeneration.
    [Show full text]
  • To Let 10,000 to 30,000 Sq Ft
    RECENTLY CLOSE CITY EAVES 500M FROM MODERN REFURBISHED CENTRE / BALTIC HEIGHT O F BRUNSWICK PREMISES TRIANGLE 5.2M STATION BRUNSWICK BUSINESS PARK HARRINGTON ROAD, LIVERPOOL, MERSEYSIDE L3 4BH TO LET INDUSTRIAL / WAREHOUSE / TRADE COUNTER 10,000 TO 30,000 SQ FT LOCATION M6 The Glacier Buildings are situated at Brunswick Dock, accessed off Sefton Street, M62 approximately one mile to the South of Liverpool City Centre. M61 M1 Sefton Street (A5036) is one of the main arterial routes into the City Centre providing a mix S ROAD NC LA ST EA M62 of leisure and residential uses and is in close proximity to the Baltic Triangle. M60 M62 Public Transport links are excellent with Brunswick Merseyrail Station located opposite the M56 M56 business park and a number of local bus routes servicing the area. Liverpool John Lennon Airport is located approximately 7 miles to the South. A55 M6 A6 DESCRIPTION Units 8 to 10 Glacier Buildings comprise a refurbished warehouse / trade counter unit, benefitting from the following specification: • Self-contained site of approximately 2 acres • Suitable for trade M6 • Modern Premises • 500m from Brunswick station • Close City Centre/ Baltic triangle • To be refurbished Brunswick Business Park • Eaves height of 5.2m • New FRI lease UNIT SQ FT SQ M 8 10,944 1,016.76 9/10 Warehouse 16,216 1,506.52 9/10 Offices 2,991 277.87 Baltic Triangle 9/10 Total 19,207 1,784.39 Anglican Catherdral Combined Total 30,151 2,801.15 VAT All prices are quoted exclusive of but may be liable to VAT at the prevailing rate.
    [Show full text]
  • LIVERPOOL DEVELOPMENT UPDATE October 2019
    LIVERPOOL DEVELOPMENT UPDATE October 2019 Welcome Welcome to the Autumn 2019 edition of the Liverpool Development Update. Our city is going through a period of exciting and rapid change. This is in large part fuelled by the £1bn a year investment drive which began in 2015 and looks set to continue through 2020. As a result we are seeing new homes; leisure, health and education facilities; as well as a mixture of offices/industrial and commercial space all creating new jobs to support this city’s growing economy and rising population. Since the Spring Development Update, much has happened in the city to accelerate the drive toward cleaner air for all and for a reduction in carbon emission to net zero by 2030. These are issues that could have a positive impact on developments across the city and we will look to highlight areas of best practice in future issues. Every scheme has its challenges, but as we develop our economy we have become more aware of the effect we have on the planet. FRONT COVER: Having recently declared a Climate Change Emergency we will be developing a strategy designed to reduce the impact of the city’s regeneration programme, as well as advance measures to develop a 1 low carbon economy. The decade ahead is going to shape the rest of this century in how we tackle climate change – and the only real way to 2 3 achieve that is for everyone to play their part. 1. PROPOSED: ARTIST’S CGI’S OF As we approach the end of the second decade of the 21st century, the PALL MALL EXCHANGE prospects for our city remain positive.
    [Show full text]
  • CA Transport Plan
    Liverpool City Region Combined Authority Combined Authority Transport Plan Facilitating Inclusive Economy June 4th 2019 Version 13 1 CONTENTS PREFACE 1. INTRODUCTION 2. ISSUES AND CHALLENGES 3. OUR OVERALL TRANSPORT STRATEGY 4. DELIVERING THE TRANSPORT PRIORITIES 5. NEXT STEPS APPENDICES 2 PREFACE BY THE METRO MAYOR AND LEAD MEMBER FOR TRANSPORT AND AIR QUALITY In development Metro Mayor Steve Rotheram Cllr Liam Robinson 3 1. INTRODUCTION 1.1 The role of this Combined Authority Transport Plan 1.1.1 This Combined Authority Transport Plan articulates the Liverpool City Region Combined Authority’s (LCRCA’s) vision for transport. It focuses on delivery over the short term. It links closely with the city region’s Transforming Cities Funding programme, which is part of the Strategic Investment Fund. 1.1.2 The plan provides a single source of information on adopted transport policy, based on current plans and priorities, summarised in the Appendix, and updated in light of the Metro Mayor’s vision and the Combined Authority’s investment priorities. It reflects new funding sources (e.g. the Strategic Investment Fund) and also the existence of new structures and priorities such as High Speed 2, Transport for the North and Northern Powerhouse Rail. 1.1.3 This plan also seeks to guide the commissioning of activities and allocation of funds. It acts as a focal point for the future direction of transport development and provides context and backdrop to future funding bids, whether from devolved funds managed by the combined authority itself or from external sources. 1.1.4 It also sets out key priorities that will be worked-up or promoted in the short term but which will be securing funding and be delivered beyond the timeframes of this plan.
    [Show full text]
  • Capturing Stories of Live Experience With
    C A P T U R I N G S T O R I E S O F L I V E D E X P E R I E N C E W I T H COMMUNITY REPORTING DELIVERED BY PEOPLE'S VOICE MEDIA 4TH - 8TH FEBRUARY 2019 www.communityreporter.net [email protected] COURSE OUTLINE Overview This 5-Day programme provides an introduction to Community Reporting and how it can be used to support the gathering, curating and mobilising of stories of lived experience. As part of the programme, participants will engage in storytelling activities, develop digital skills, learn about story analysis and visit and reflect on other digital inclusion projects. The programme will result in participants becoming Silver Members of the Institute of Community Reporters. Aim The programme aims to introduce participants to the Community Reporting methodology, enabling them to use insight storytelling techniques and pocket technology (i.e. smartphones and tablets) to tell, gather and share stories of lived experience and curate these into a packaged digital product (i.e. short video). Capturing stories of lived experience with Community Reporting Learning Outcomes 1. Identify the key aspects of the Community Reporting movement and methodology 2. Use Community Reporting storytelling practices to gather insight stories of lived experiences 3. Co-create a Responsible Storytelling Best Practice Guide 4. Develop digital skills in terms of media recording and editing skills, and sharing media content online 5. Analyse a set of stories using the Institute of Community Reporters curation methodology 6. Present the key findings as a packaged digital product (i.e.
    [Show full text]
  • Local Plan Viability Assessment
    LOCAL PLAN VIABILITY ASSESSMENT ______________________________________________________________________ PREPARED ON BEHALF OF LIVERPOOL CITY COUNCIL OCTOBER | 2018 TABLE OF CONTENTS _________________________________________________________ 1.0 INTRODUCTION ...................................................................................................... 1 2.0 PLANNING POLICY CONTEXT ..................................................................................... 3 3.0 METHODOLOGY ..................................................................................................... 16 4.0 OVERVIEW OF LIVERPOOL ...................................................................................... 35 5.0 FINANCIAL APPRAISAL ASSUMPTIONS ..................................................................... 77 6.0 VIABILITY TESTING RESULTS ................................................................................. 96 7.0 PLAN VIABILITY AND DELIVERY .............................................................................. 126 Appendices Appendix 1 Allocations Analysis Appendix 2 Planning Application Analysis Appendix 3 New Build Housing Sales/Asking Prices Appendix 4 Hotel Transactions Appendix 5 Commercial Land Sales Appendix 6 Site Allocations – Assumptions and Results Appendix 7 QS Construction Cost Report Appendix 8 Liverpool City Council Completions Data (Zone 1) 1.0 INTRODUCTION 1.0 INTRODUCTION ____________________________________________________________________ 1.01 Liverpool City Council (‘the Council’) approved the
    [Show full text]
  • BALTIC TRIANGLE Development Framework
    ALTIC TRIANGLE BALTIC TRIANGLE Development Framework September 2017 Baltic Triangle Development Framework | 1 DEVELOPMENT FRAMEWORK DRAFT COPY BALTIC TRIANGLE DEVELOPMENT FRAMEWORK The purpose of the Baltic Triangle Development Framework is to articulate a shared vision of what the area will be like in the future. It provides the overarching context for regeneration and establishes principles for development – sitting above the detailed site-level proposals. The strategy will coordinate the other various strands of work in the area to ensure synergies are created that deliver the best possible outcomes for the Baltic Triangle area. The status of this document is an informal framework for the City Council and its partners in regeneration. It will be used to demonstrate the aspirations for the area, help lever in funding, and guide the use of limited public sector resources. Baltic Triangle Development Framework | 1 A5758 A565 A59 Seaforth M58 Dock A5036 Port of Liverpool A59 A580 Pier A5058 Head BALTIC TRIANGLE A5047 M57 A57 M62 A561 ENTERPRISE ZONES: LIVERPOOL WATERS A562 LIVERPOOL CITY ENTERPRISE ZONE Port of MAYORAL DEVELOPMENT ZONES: Garston NORTH LIVERPOOL KNOWLEDGE QUARTER STONEBRIDGE CROSS CENTRAL LIVERPOOL SOUTH LIVERPOOL Liverpool John LIVERPOOL CITY CENTRE Lennon Airport Crown copyright and database rights 2017 Ordnance Survey 100018351 Baltic Triangle Development Framework | 2 HISTORIC DOWNTOWN M Lime Street M Station B A MAIN RETAIL AREA PIER M HEAD M Liverpool ONE CANNING DOCK ROPEWALKS SALTHOUSE ALBERT DOCK DOCK A DUKE’S
    [Show full text]
  • Liverpool City Centre Strategic Investment Framework Baseline Report
    Liverpool City Centre Strategic Investment Framework Baseline Report March 2012 Contents FOLLOW THE LINKS BELOW TO JUMP TO THE SELECTED SECTION 1 Baseline Report introduction 2 Literature Review – which captures the various relevant reports that have been prepared in relation to the City Centre over the last few years; 3 Benchmarking Study – an overview on a thematic basis of current trends and activities and how they might influence the development of the SIF; 4 Spatial Analysis – a description in plan and narrative of the current City Centre landscape from a physical perspective including a photographic record of the existing form of the City Centre; 5 Infrastructure Assessment – identifying the key component parts of the City Centre’s existing infrastructure, and an analysis of the Infrastructure Delivery plan which supports Liverpool City Council’s Core Strategy, a document which sits within the Local Development Framework; 6 Economic Review- an economic report on key economic and labour market indicators for Liverpool City Centre, the sub-region, the UK as a whole and the Global market conditions; 7 Funding and Delivery Mechanisms – an initial review of the funding and delivery issues; 8 Wider Impact Assessment – identification and assessment of the wider impact issues and their relationship to the SIF; 9 City Conversations Report- a record and analysis of the methodology and feedback derived from the ‘City Conversations’ process, the wide-reaching and informative consultation process used to inform the development of the SIF’s ideas and priorities. 1 Baseline Report Introduction Content and Purpose 1.1 The baseline review element of the Liverpool City Centre Strategic Investment Framework (SIF) process is contained within a series of baseline papers.
    [Show full text]