LOCAL TRANSPORTATION Haneda to KEK

Total Page:16

File Type:pdf, Size:1020Kb

LOCAL TRANSPORTATION Haneda to KEK Haneda to KEK KEK International Affairs Office +81-29-864-5134 LOCAL TRANSPORTATION Haneda to KEK 1. Taxi It takes about 3 hours from Haneda to KEK. The fare is around 32,000 yen including the high way fee. Some taxis accept major credit cards. Taxi stands are located on the ground floor (1F), outside of the building. FYI, the arrival lobby is on the 1st floor (2F) of the building. Map: Haneda Airport Please show the taxi driver the following notes for your destination. To KEK [In Japanese] Destination <行き先> Address 〒305-0801 茨城県つくば市大穂 1-1 1-1 Oho, Tsukuba, Ibaraki 305-0801 Japan 高エネルギー加速器研究機構 High Energy Accelerator Research Organization Haneda to KEK KEK International Affairs Office +81-29-864-5134 2. Bus It takes 2.5 hours or more depending on the traffic. From Haneda Airport International Terminal to Tsukuba Center Please purchase a ticket for "Tsukuba Center" from the “Bus Tickets Counter” at Arrival lobby(2F) or “Bus Ticket Vending Machine” on the ground floor (1F). The bus fare is 1,850 yen. Map: Haneda Airport International Terminal Terminal Bus Stop: Ground Floor (1F), outside of the building The buses to "Tsukuba Center " leaves from the #9 bus stop on the map. * Several buses to different destinations share the same bus stop. Please be sure to check the destination sign before you get on. Timetable: https://www2.kek.jp/rso/Access/pdf/HanedaAirport.pdf Get off the bus at the last stop, “Tsukuba Center”. Haneda to KEK KEK International Affairs Office +81-29-864-5134 From Tsukuba Center (Bus Terminal) to KEK The easiest way is to take a taxi. It takes 20 minutes. The fare is around 3,000 yen. Please show the taxi driver the following notes for your destination. [In Japanese] Destination <行き先> Address 〒305-0801 茨城県つくば市大穂 1-1 1-1 Oho, Tsukuba, Ibaraki 305-0801 Japan 高エネルギー加速器研究機構 High Energy Accelerator Research Organization Another option is to take a local bus. Please take the “Tsuku bus [Hokubu Shuttle] (つくバス-北部シャトル)” at No. 3 bus stop at Tsukuba Center. The fare is 300 yen. There is no pre-purchased ticket for “Tsuku-bus”. Please pay for it when you get off. The bus stop for KEK is “Koh-enerugi-kasokuki-kenkyu-kiko (⾼エネルギー加速器研究機構)”. Timetable: http://www2.kek.jp/rso/Access/pdf/NaritaAirport.pdf Haneda to KEK KEK International Affairs Office +81-29-864-5134 3. Train It takes about 2.5 hours. From Haneda Airport International Terminal to Tsukuba You will need to change trains twice. The instruction is as below. <Tickets> Tickets can be bought from ticket vending machines around the gates. However, we recommend purchasinga prepaid transportation IC card, “PASMO”, which can be used mainly around Tokyo area. It can be used for almost all trains and local buses. * How to get a PASMO * Where: Train ticketing counters / Train ticket vending machines Cost: 500 yen as deposit. And you top up from minimum 1,000yen till maximum 10,000 yen. Going to KEK costs about 3,000 yen each way. The deposit and the amount of money left in the IC card will be refunded when you return the card to the train ticketing counters. For more details, please refer to the following link. https://www.pasmo.co.jp/en/ (a) At Haneda Airport International Terminal Please take the Keikyu Line which is located on the first floor (2F Arrival lobby). And please take any trains EXCEPT for the ones are down for Kanazawabunko “金沢文庫”, Sengakuji “泉岳寺” or Shin-Zushi ”新逗子”. Then change the train at Shinagawa Station. <<For those who purchase a ticket>> Please purchase a connection ticket for “Akihabara” of JR line(580yen) from Keikyu lineʼs vending machine. Map: Haneda Airport International Terminal Haneda to KEK KEK International Affairs Office +81-29-864-5134 (b) At Shinagawa Station Please follow the “Transfer to JR Lines” signs on the platform, change to Yamanote Line “山手線” (Tokyo, Ueno direction) and get off at Akihabara Station. (c) At Akihabara Station Please go out of the JR Station, then follow the sign and go to the gates for Tsukuba Express Line “つくばエクスプレス”(See below).Take any train bound for Tsukuba and get off at the last stop Tsukuba Station. <Gates for Tsukuba Express line> From the Tsukuba Center (Bus Terminal) to KEK The easiest way is to take a taxi. It takes 20 minutes. The fare is around 3,000 yen. Please show the taxi driver the following notes for your destination. [In Japanese] Destination <行き先> Address 〒305-0801 茨城県つくば市大穂 1-1 1-1 Oho, Tsukuba, Ibaraki 305-0801 Japan 高エネルギー加速器研究機構 High Energy Accelerator Research Organization Another option is to take a local bus. Please take the “Tsuku bus [Hokubu Shuttle] (つくバス-北部シャトル)” at No. 3 bus stop at Tsukuba Center. The fare is 300 yen for KEK. There is no pre-purchased ticket for “Tsuku-bus”. Please pay for it when you get off. The bus stop for KEK is “Koh-enerugi-kasokuki-kenkyu-kiko (⾼エネルギー加速器研究機構)”. Haneda to KEK KEK International Affairs Office +81-29-864-5134 Timetable: http://www2.kek.jp/rso/Access/pdf/NaritaAirport.pdf Contact: KEK International Affairs Division [email protected] Office +81-29-864-5134 .
Recommended publications
  • Guide Map Tsukuba AIST
    Guide Map Tsukuba Center To Mt.Tsukuba AIST North High Energy Accelerator Research Organization 125 Higashi Odori 408 Nishii Odori University of Tsukuba University of Tsukuba Hospital Tsukuba Karima Kenkyu Gakuen To Mito Tsukuba Bus Terminal ess Tsukuba pr Ex a Tsuchiura Kita b Interchange u Bampaku Kinen Koen Tsuchiura k Ga u ku Joban Expressway s Tsukuba-Chuo en 408 T Interchange L in e AIST West AIST East To Mito AIST Central Sience Odori Inarimae Yatabe Interchange 354 Sakura Tsuchiura Sasagi Interchange To Tokyo Tsuchiura Tsukuba Junction 6 Tsukuba ushiku Interchange JR Joban Line To Ami 408 Arakawaoki Hitachino Ushiku To Ami To Ueno CAR: USING JOBAN EXPRESSWAY Take the Joban Expressway to Sakura Tsuchiura Interchange. Go left towards Tsukuba. At the second intersection (called “Sasagi”), turn right. At the third intersection (called “Namiki 2-chome”), turn left. Guide Map Tsukuba Center TRAIN: USING TSUKUBA EXRESS Take the express train from Akihabara (45 min) and get off at Tsukuba Station. Take exit A3. (1) Take the Kanto Tetsudo bus going to “Arakawaoki (West Entrance) via Namiki”, “South Loop-line via Tsukuba Uchu Center” or “Sakura New Town” from platform #4 at Tsukuba Bus Terminal. Get off at Namiki 2-chome. Walk for approximately 3 minutes to AIST Tsukuba Central. (2) Take a free AIST shuttle bus. Several NIMS shuttle buses go to AIST Tsukuba Central via NIMS and AIST Tsukuba East and you may take the buses at the same bus stop. Please note that the shuttle buses are small vehicles and they may not be able to carry all visitors.
    [Show full text]
  • Face Express, a New Facial Recognition Technology for Boarding Procedures at NRT and HND Is Coming Soon ! It’S Seamless and Contactless Experience !
    NEWS RELEASE 25 March 2021 Face Express, a new facial recognition technology for boarding procedures at NRT and HND is coming soon ! It’s seamless and contactless experience ! The operating companies of Narita International Airport (Narita International Airport Corporation - NAA) and Tokyo International Airport (Tokyo International Air Terminal Corporation - TIAT), will commence their trial for "Face Express”, a new boarding procedure using facial recognition technology, in April 2021. Once passengers register their facial image in Face Express, they will be able to access and proceed through subsequent procedures at the airport (check-in, baggage drop, security checkpoint entrance, boarding gate, etc.) without showing their passport and boarding pass. Its introduction will expedite seamless boarding procedures and, because most processing is touchless, it will also reduce the infection risks posed by person-to- person contact. The two airports will each commence their trial operation as below and prepare for a full launch in July. Start of trial operation : Tuesday, 13 April 2021 Participating airlines: All Nippon Airways, Japan Airlines (more airlines will participate later) Locations : [South Wing Terminal 1] Check-in Island C / Gates 51 to 57A [ Terminal 2 ]Check-in Island K / Gates 61 to 66, 71, 81 to 83, 91 to 93 • Service details are available at the following URL: https://www.narita-airport.jp/en/faceexpress/ Start of trial operation : Tuesday, 13 April 2021 Participating airlines: Airlines operating international flights at HND Locations: [Terminal 3] Check-in Islands D, E, G, H, I, J / All gates [Terminal 2*] Check-in Islands P, Q, T / All gates *All international counters are closed at present.
    [Show full text]
  • MEGAMIASTO TOKIO RAJMUND MYDEŁ 7 Miast Świata (UN World Urbanization Prospect), Wyróżniana Jest Ta Nowa Kategoria Wielkościo­ Wa Miejskich Form Osadniczych
    M EGAMI ASTO ТОКІО RAJMUND MYDEŁ Być małą kroplą w oceanie wiedzy, piękne marzenie Rajmund Mydeł M EGAMI ASTO ТОКІО RAJMUND MYDEŁ Kraków 2014 SPIS TREŚCI WPROWADZENIE............................................................................................................................................................ 7 1. PRZEDMIOT I CEL STUDIUM................................................................................................................................... 17 2 . KONCEPCJE PLANISTYCZNE ROZWOJU M EGAMI ASTA ORAZ PRZESTRZENNO-FUNKCJONALNE EFEKTY ICH REALIZACJI......................................................................................................................................... 29 3 . STRUKTURA WIELKOŚCIOWA MIAST ORAZ JEJ PRZESTRZENNE ZRÓŻNICOWANIE..........................lO l 4 . DEMOGRAFICZNO-SPOŁECZNY ORAZ FUNKCJONALNY OBRAZ M EGAMI ASTA I JEGO PRZESTRZENNA ZMIENNOŚĆ............................................................................................................... 121 5 . ROZWÓJ I PRZEMIANY PRZESTRZENNYCH UKŁADÓW RYNKU PRACY...................................................141 6. FUNKCJONOWANIE MEGAMIASTA ORAZ ZRÓŻNICOWANIE ŚRODKÓW TRANSPORTU W PRZEWOZACH PASAŻERSKICH.......................................................................................................................153 PODSUMOWANIE........................................................................................................................................................ 173 BIBLIOGRAFIA...............................................................................................................................................................177
    [Show full text]
  • Unifying Rail Transportation and Disaster Resilience in Tokyo
    University of Arkansas, Fayetteville ScholarWorks@UARK Architecture Undergraduate Honors Theses Architecture 5-2020 The Yamanote Loop: Unifying Rail Transportation and Disaster Resilience in Tokyo Mackenzie Wade Follow this and additional works at: https://scholarworks.uark.edu/archuht Part of the Urban, Community and Regional Planning Commons Citation Wade, M. (2020). The Yamanote Loop: Unifying Rail Transportation and Disaster Resilience in Tokyo. Architecture Undergraduate Honors Theses Retrieved from https://scholarworks.uark.edu/archuht/41 This Thesis is brought to you for free and open access by the Architecture at ScholarWorks@UARK. It has been accepted for inclusion in Architecture Undergraduate Honors Theses by an authorized administrator of ScholarWorks@UARK. For more information, please contact [email protected]. The Yamanote Loop: Unifying Rail Transportation and Disaster Resilience in Tokyo by Mackenzie T. Wade A capstone submitted to the University of Arkansas in partial fulfillment of the requirements of the Honors Program of the Department of Architecture in the Fay Jones School of Architecture + Design Department of Architecture Fay Jones School of Architecture + Design University of Arkansas May 2020 Capstone Committee: Dr. Noah Billig, Department of Landscape Architecture Dr. Kim Sexton, Department of Architecture Jim Coffman, Department of Landscape Architecture © 2020 by Mackenzie Wade All rights reserved. ACKNOWLEDGEMENTS I would like to acknowledge my honors committee, Dr. Noah Billig, Dr. Kim Sexton, and Professor Jim Coffman for both their interest and incredible guidance throughout this project. This capstone is dedicated to my family, Grammy, Mom, Dad, Kathy, Alyx, and Sam, for their unwavering love and support, and to my beloved grandfather, who is dearly missed.
    [Show full text]
  • 01 the Expansion Of
    The expansion of Edo I ntroduction With Tokugawa Ieyasu’s entry to Edo in 1590, development of In 1601, construction of the roads connecting Edo to regions the castle town was advanced. Among city construction projects around Japan began, and in 1604, Nihombashi was set as the undertaken since the establishment of the Edo Shogunate starting point of the roads. This was how the traffic network government in 1603 is the creation of urban land through between Edo and other regions, centering on the Gokaido (five The five major roads and post towns reclamation of the Toshimasusaki swale (currently the area from major roads of the Edo period), were built. Daimyo feudal lords Post towns were born along the five major roads of the Edo period, with post stations which provided lodgings and ex- Nihombashi Hamacho to Shimbashi) using soil generated by and middle- and lower-ranking samurai, hatamoto and gokenin, press messengers who transported goods. Naito-Shinjuku, Nihombashi Shinsen Edo meisho Nihon-bashi yukibare no zu (Famous Places in Edo, leveling the hillside of Kandayama. gathered in Edo, which grew as Japan’s center of politics, Shinagawa-shuku, Senju-shuku, and Itabashi-shuku were Newly Selected: Clear Weather after Snow at Nihombashi Bridge) From the collection of the the closest post towns to Edo, forming the general periphery National Diet Library. society, and culture. of Edo’s built-up area. Nihombashi, which was set as the origin of the five major roads (Tokaido, Koshu-kaido, Os- Prepared from Ino daizu saishikizu (Large Colored Map by hu-kaido, Nikko-kaido, Nakasendo), was bustling with people.
    [Show full text]
  • From Narita Airport We Have Not Arranged Any Formal Transportation to Tsukuba As There Are Good Public Options Available from Narita Airport and Tokyo Station
    Logistics for IESP Tsukuba On behalf of Japanese IESP Local Organizing Committee, we would like to thank you for accepting the invitation to the IESP Tsukuba Workshop. Where is Tsukuba? Tsukuba (or ``Tsukuba Science City'') is located about 60km north of Tokyo and about 40km northwest of the Narita International Airport. TRANSPORTATION: From Narita Airport We have not arranged any formal transportation to Tsukuba as there are good public options available from Narita Airport and Tokyo Station. If you are coming from Narita airport you should plan to take the Airport Liner (Natt’s) bus. It will take about 100 minutes and the cost is 2540 Yen. DO NOT take a taxi! It will cost ~$300.00 US. Bus schedule From Narita to Tsukuba Narita Airport Terminal 2 7.40 9.05 10.35 12.50 14.30 16.15 17.20 18.45 20.10 Narita Airport Terminal 1 7.45 9.10 10.40 12.55 14.35 16.20 17.25 18.50 20.15 Tsukuba Center 9.20 10.45 12.15 14.30 16.10 17.55 19.00 20.25 21.50 You need to buy a bus ticket (costs 2540 JPY) before riding the bus. You can buy a ticket at the bus ticket counter that is located right after you come out from the customs check. • Tsukuba Center is not the final stop of the bus; The buses go to Tsuchiura JR Station. You want to get off at the Tsukuba Center. • There are two terminals at Narita Airport. The buses go through the two terminals.
    [Show full text]
  • Air-Rail Links in Japan 35 Years Old and Healthier Than Ever Ryosuke Hirota
    Feature Railways and Air Transport Air-Rail Links in Japan 35 Years Old and Healthier than Ever Ryosuke Hirota tic and 860,000 international passengers. grown. Three airports: Haneda, Narita, Air-Rail Links in Japan Today In the same year, the monorail carried and Kansai International, each have two about 2.74 million people, including ARLs, using mostly conventional tracks During 1998, in many different parts of some non-flying passengers who used it (urban/suburban heavy rail, subways, or the world, getting to the airport became as a transit system. In 1978, airline traffic main line railways), while Haneda and easier due to construction of new air-rail in Japan grew to such an extent that a new Itami use monorails as one of their ARLs. links (ARLs). Three airports: Hong Kong airport serving Tokyo was opened for in- Japan was the first country to build a high- International Airport at Chek Lap Kok, ternational flights. This was the New To- speed train (the shinkansen), but the Copenhagen Airport at Kastrup, and Oslo kyo International Airport at Narita. honour of having the first high-speed train International Airport at Gardermoen, Haneda basically became Tokyo’s domes- serving an airport went to France when opened their first ARLs, while two other tic airport, but passenger traffic for both its TGV began linking Charles de Gaulle airports: London Heathrow and Haneda the airport and monorail continued to Airport to Paris. Unlike Frankfurt Airport Airport in Tokyo each gained a second rail grow. According to the ACI (Airports in Germany, Japan has no plans to bring link.
    [Show full text]
  • Practical Information
    Practical information 1) Access to KEK and URBAN Hotel At Narita Airport, when in the arrival lobby go to the right and look for "Keisei Limousine" stand, ask for a ticket to "Tsukuba center" (2450 yen, 100 minutes) bus terminal 8. At "Tsukuba center" take a taxi to "Ko Enerugi Kenkyu Kiko" (KEK) or to the URBAN Hotel. http://www.urbanhotel.co.jp/uhotel.html 2) KEK restaurant This is a self-service restaurant. Light meals and noodles are served. Location: Between the International Center and the Shokuin-Kaikan bldg. 1F (Ext. 2986) Monday - Friday Breakfast: 8:10 - 9:30, Lunch: 11:30 - 13:30, Supper:17:00 - 19:00 Open for breakfast (8:10-9:30) and lunch (11:30-13:30) on alternating Saturdays when cafetaria is closed. 3) KEK cafeteria Full-service restaurant. Alcoholic beverages are also served. Location: Shokuin - Kaikan bldg. 1F (Ext. 2987) Hours: Monday - Friday Breakfast: 8:00-9:30 (Last order: 9:15) Lunch: 11:30-13:30 (Last order: 13:15) Supper: 17:00-20:30 (Last order: 20:00) Open for breakfast (8:00-9:30/Last order: 9:15) and lunch (11:30-13:30/Last order: 13:15) on alternating Saturdays when restaurant is closed. 5) J-PARC visit Please fill the form "J-PARC visit form" last link on the right in the indico FJPPL welcome page and return it to : Shinji Iwami: [email protected] 6) ATF-STF tour: Due to several requests for both J-PARC and ATF-STF visits, the ATF-STF tour will be organized May 11th 17:40 19: 7) FJPPL offices and telephone * location: Building No.4 (called as "Yon-go-kan") room 404 and 405 (4th floor on the right hand side when coming out of the elevator.
    [Show full text]
  • Central Japan Railway Company (JR Central)
    20 Years After JNR Privatization Vol. 2 Central Japan Railway Company (JR Central) Company Foundation and Business During the last 20 years we have also made great efforts to strengthen our financial position; long-term liabilities Trends of ¥5.5 trillion inherited after the dissolution of the JR Central was established in April 1987 when Japanese Shinkansen Lease System in October 1991 have been National Railways (JNR) was broken up and privatized. paid down to ¥3.5 trillion at the end of FY2005. JR Central A principal role of the new company is to maintain and was listed on the Tokyo Stock Exchange in October 1997 develop the Tokaido Shinkansen, the main transport artery and the government sold all its remaining shares in the linking Tokyo, Nagoya and Osaka, as well as to provide company in April 2006. local transportation in the urban areas around Nagoya and Shizuoka. In the following 20 years, we have done Safe and Stable Transport our utmost to ensure customer satisfaction by providing Ensuring safe and stable transport is the fundamental convenient and comfortable services based on an principle of all JR Central operations. Based on the integrated approach to the railway business, and with recognition that safety is the most important duty of a safety and provision of a stable transport service as our transport business, we have improved and strengthened top priority. We have also worked to achieve efficient our safety facilities by consolidating and investing in our operations across all our business activities and to safety systems and taking systematic safety measures every maintain a healthy relationship between management year.
    [Show full text]
  • Development of 10000 Series Rolling Stock for Tokyo Monorail
    Hitachi Review Vol. 63 (2014), No. 10 641 Featured Articles Development of 10000 Series Rolling Stock for Tokyo Monorail Takuma Yamaguchi OVERVIEW: The 10000 Series rolling stock for the Tokyo Monorail is a Toru Nishino replacement for the 2000 Series that has been in use for the last 17 years. Naoji Ueki By adopting the latest technologies and a design in harmony with the surrounding area, the development has succeeded in building rolling stock Syuji Hirano that features: (1) expanded services (four-language multilingual information service utilizing the cars’ LCD displays, provision for oversize luggage, and barrier-free accessibility), (2) car design enhancements (exterior that harmonizes with surrounding area, Japanese-themed interior), (3) better environmental performance (use of LEDs for headlights and interior lighting, use of unpainted rolling stock), and (4) greater safety (installation of rolling stock information and control systems for driving control, indicator lights for doors that are opening and closing, barrier-free format for side display units, longer battery operation). INTRODUCTION From Monorail Hamamatsucho Station to Tennozu Isle Station, the monorail runs past central-city offices TOKYO Monorail celebrates its 50th anniversary this and residential buildings and offers views of Rainbow year, having commenced operation on September 17, Bridge and Odaiba. From Tennozu Isle Station and 1964 on the eve of the Tokyo Olympics. With the Ryutsu Center Station, it runs parallel to the Shutoko second Tokyo Olympics to take place in 2020 and Metropolitan Expressway, offering views of the Keihin an increasing number of international flights using Canal and nearby parkland as it passes by them at high Haneda Airport (Tokyo International Airport), Hitachi speed.
    [Show full text]
  • 'JR TOKYO Wide Pass' a New Pass to Replace the 'JR Kanto Area
    October 26, 2015 East Japan Railway Company Launch of the "JR TOKYO Wide Pass" A new pass to replace the "JR Kanto Area Pass" and allow access to even more areas!! JR East will launch the economical "JR TOKYO Wide Pass" for foreign tourists visiting Japan from November 19, 2015. The new "JR TOKYO Wide Pass" replaces the current "JR Kanto Area Pass" that provides unlimited access to reserved seating on limited express trains and Shinkansen within the Kanto area for a three-day period. The new "JR TOKYO Wide Pass" is even more convenient, as it also provides access to the Tokyo Waterfront Area Rapid Transit Rinkai Line as well as Echigo-Yuzawa Station and GALA Yuzawa Station which are popular with foreign tourists. "JR TOKYO Wide Pass" holders can enjoy Odaiba and Japanese snow resorts as well as areas popular with foreign tourists such as Mt. Fuji, Karuizawa and Nikko. 1. Launch of the "JR TOKYO Wide Pass" ◇ Sale period: On sale throughout the year, starting on November 19, 2015 ◇ Period of use: Can be used throughout the year, beginning on December 19, 2015 ◇ Validity period: Three consecutive days ◇ Where to purchase: ○JR EAST Travel Service Center Narita Airport Terminal 1 Station, Narita Airport Terminal 2・3 Station, Tokyo Monorail Haneda Airport International Terminal Station, Tokyo Station, Shinjuku Station ○JR Ticket Office (Midori-no-madoguchi) Narita Airport Terminal 1 Station, Narita Airport Terminal 2・3 Station ○Travel Service Center (View Plaza) Shinagawa Station, Shibuya Station, Ikebukuro Station, Ueno Station, Yokohama Station, Mito Station ◇ Prices: Adults (aged 12 and over) ¥10,000, children (aged 6 to 11) ¥5,000 ◇ Requirements: Customers who are foreign nationals with a foreign passport.
    [Show full text]
  • Construction of Ueno–Tokyo Line
    Special Feature Construction of Ueno–Tokyo Line JR East Construction Department Introduction to support through services between the Utsunomiya, Takasaki, Joban, and Tokaido lines (Fig. 1). The Council East Japan Railway Company (JR East) has a wide-ranging for Transport Policy Report No. 18 published in January operations area from Kanto and Koshin’etsu to Tohoku. When 2000, targeted opening of the Ueno–Tokyo Line (A1) by JR East was established in 1987, traffic conditions on most 2015. In November 2007, the Minister of Transport gave sections of conventional (narrow-gauge) lines in the Tokyo permission to change the basic plan to a plan for laying area, including major sections of lines radiating from central new tracks between Tokyo Station and Ueno Station and Tokyo (Tokaido, Chuo, Joban, Sobu lines), the Yamanote then permission was given in March 2008 to change the Line, etc., had morning rush-hour congestion rates in excess railway facilities. Construction started in May 2008 and was of 200%. As a result, enhancing transportation capacity completed in about 6 years. The line opened on 14 March to alleviate congestion was a major issue. Furthermore, 2015, following 5–month training run. with subsequent diversification of values accompanying social changes, users’ railway needs went beyond merely Expected Effects alleviating congestion to shorter travel times and improved comfort while travelling, etc., so problems related to Alleviating congestion on Yamanote and Keihin-Tohoku improving transportation in the Tokyo area also diversified. In lines this context, JR East has taken various initiatives to improve The sections between Ueno Station and Okachimachi the quality of railway services.
    [Show full text]