Venue Governors' Hall St Thomas' Hospital Westminster Bridge Road

Total Page:16

File Type:pdf, Size:1020Kb

Venue Governors' Hall St Thomas' Hospital Westminster Bridge Road Venue Governors’ Hall St Thomas’ Hospital Westminster Bridge Road London SE1 7EH Travelling to St Thomas’ (Governors Hall is located within St Thomas’ Hospital, South Wing, enter by the Main Entrance) Tube The nearest tube stations are: Westminster - District, Circle and Jubilee lines (10 minutes' walk) Waterloo - Bakerloo, Jubilee and Northern lines (15 minutes' walk) Lambeth North - Bakerloo line (15 minutes' walk) Train Waterloo and Waterloo East are the nearest railway stations, and a 10 - 15 minutes' walk away. Victoria and Charing Cross are 20 – 30 minutes' walk away. Bus Allow 15 - 20 minutes to get from the bus stop to where you need to be in the hospital. The following bus routes serve St Thomas': 12, 53, 148, 159, 211, 453, C10 - stop at Westminster Bridge Road 77, 507, N44 - stop at Lambeth Palace Road 3, 344, C10, N3 - stop at Lambeth Road (15 minutes' walk) 76, 341, 381, RV1 - stop at York Road Parking St Thomas' Hospital is located in the Congestion Charging zone. Please use public transport whenever possible. Parking for patients and visitors is very limited and there is often a queue The car park is 'pay on exit', which means you need to pay and get your exit ticket before returning to your car. If you pay by cash, please have the correct change. You can also pay by credit or debit card Parking charges: The car park is open 24 hours a day. Charges are: £3.00 per hour Charging exceptions: Disabled patients are given free parking in the main car park upon production of their blue badge registered in their name along with an appointment card. For more information on getting to St Thomas’ please visit: http://www.guysandstthomas.nhs.uk/patients-and-visitors/getting-here/travel-st-thomas.aspx#na .
Recommended publications
  • London Borough of Lambeth
    LONDON BOROUGH OF LAMBETH LAMBETH ROAD AND WESTMINSTER BRIDGE ROAD EXPERIMENTAL CHANGES TO BUS LANES AND WAITING AND LOADING RESTRICTIONS (NOTE: This notice is about experimental changes to the hours of operation of certain bus lanes in Lambeth Road and Westminster Bridge Road and the hours of operation of the waiting and loading restrictions within those bus lanes. Objections may be made to the changes being continued on a permanent basis – see paragraph 7.) 1. NOTICE IS HEREBY GIVEN that the Council of the London Borough of Lambeth ('the Council'), with the agreement of Transport for London, on 25th October 2017 made the Lambeth (Waiting and Loading Restriction) (No. 1) Experimental Traffic Order 2017 and the Lambeth (Bus Priority) (Lambeth Road and Westminster Bridge Road) Experimental Traffic Order 2017 under sections 9 and 10 of the Road Traffic Regulation Act 1984. The Orders will come into force on 6th November 2017. 2. The general effect of the Orders will be to extend the operational hours of the following bus lanes and bans on waiting and loading by vehicles, so that they will operate between 7am and 7pm on Mondays to Sundays inclusive:- (A) the bus lanes in -: (1) Lambeth Road, (a) on the north side, between Pratt Walk and Kennington Road; and (b) on the south side, between Lambeth Walk and the entrance to China Walk Estate situated adjacent to Ferrybridge House; and (c) on the south side, between Sail Street and the roundabout at the junction of Lambeth Road, Albert Embankment, Lambeth Bridge and Lambeth Palace Road; (2) Westminster Bridge Road, (a) on the north-east side, between Lower Marsh and Baylis Road; (b) on the south-west side, between King Edward Walk and Kennington Road; and (c) on the south-west side, between Kennington Road and a point 31 metres north-west of Upper Marsh; (B) the ban on waiting and loading by vehicles in the bus lanes referred to in sub-paragraph 2(A) above, except in lengths where no waiting 'at any time' restrictions currently apply or where there are inset parking places or a taxi rank outside No.
    [Show full text]
  • St. George's Circus Conservation Area Appraisal
    St. George’s Circus Conservation area appraisal Regeneration department November 2005 www.southwark.gov.uk St. George’s Circus conservation area Regeneration department Contents 1.0 Introduction 5 2.0 The origins and development of the area 10 3.0 Influence of uses on plan form and building types 16 4.0 Archaeological significance 17 5.0 Architectural and historic qualities 18 6.0 The contribution made by key unlisted buildings 21 7.0 Local materials and details 22 8.0 Contribution made by green spaces, hedges or trees 23 9.0 Setting of the areas significant views and landmarks 24 10.0 Negative factors – loss intrusion or damage 25 11.0 Neutral areas 26 12.0 Design guidance 27 12.1 Consulting the Council 27 12.2 Materials 27 12.3 Maintenance 27 12.4 New/Re-development 28 12.5 Windows and Doors 28 12.6 Roofs 29 12.7 Stucco/Render 30 12.8 Brickwork 31 12.9 Shopfronts 31 12.10 Extensions 32 12.11 Street Improvements 32 Listed Buildings 33 Useful Contacts 33 Further Reading 34 St. George’s Circus conservation area Regeneration department 1.0 Introduction 1.1 The purpose of this Conservation Area Character appraisal and Design Guidance Statement is to set out a definitive statement of the character of the St. George’s Circus conservation area based on national criteria and to give a clear indication of the Borough Council’s approach to its preservation and enhancement. • To produce guidance for property owners and occupiers, developers and architects considering development works within the area; • To aid Council officers in assessing the merits of proposals for development and to be used at Planning Appeals or inquiries • To satisfy the requirement of the Government’s Planning Policy Guidance Note 15 (PPG 15), which recommends that all Local Authorities make assessments of the special character and appearance of all conservation areas within their boundaries.
    [Show full text]
  • Trader Terms and Conditions 2019 - 2020
    Trader Terms and conditions 2019 - 2020 1 Contents Trader information ........................................................................................................................................... 3 Requirements to trade ..................................................................................................................................... 4 Compliance Documents ................................................................................................................................ 4 Regulations and Conditions .............................................................................................................................. 5 Opening hours ............................................................................................................................................... 5 Deposit and Payments .................................................................................................................................. 6 Pitch & Canopy .............................................................................................................................................. 6 Fees ............................................................................................................................................................... 7 Customer payment method ......................................................................................................................... 7 Policy for augmenting menus ......................................................................................................................
    [Show full text]
  • Lambeth Transport Plan 2011
    0 Contents 1 Introduction .............................................................................................................. 7 1.1 Background ................................................................................................. 7 1.2 How Lambeth’s Transport Plan has been developed.................................. 7 1.3 Structure of Lambeth’s Transport Plan (LTP).............................................. 9 2 Key Policy Influences .................................................................................... 11 2.1 National Policy........................................................................................... 11 2.1.1 Transport White Paper ...................................................................... 11 2.1.2 Traffic Management Act 2004 ........................................................... 11 2.2 London-wide policy.................................................................................... 12 2.2.1 Mayor’s Transport Strategy ............................................................... 12 2.3 Sub-regional policy.................................................................................... 15 2.4 Local Priorities........................................................................................... 16 2.4.1 Corporate Plan 2009-2012 ................................................................ 16 2.4.2 Our 2020 Vision - Lambeth's Sustainable Community Strategy........ 17 2.4.3 Local Area Agreement......................................................................
    [Show full text]
  • Lambeth Bridge and the Location of the Southbound Bus Stop on Lambeth Palace Road Has Been Moved Back to Its Existing Location
    Appendix B: Likely journey time impacts following changes to the design post consultation Summary of changes from 2017 consultation Following consultation feedback in 2017 several turning movements have now been retained eastbound onto Lambeth Bridge and the location of the southbound bus stop on Lambeth Palace Road has been moved back to its existing location. The following turning movements are now allowed at all times of day for all vehicles: Millbank North to Lambeth Bridge and Millbank South to Lambeth Bridge. The shared pedestrian and cycle areas have been reviewed and removed where it is safe for cyclists to use the carriageway. Shared use remains between Millbank South and Horseferry Road. There is also a carriageway level cycle lane through the footway between Millbank North and Lambeth Bridge. These alterations to the design in response to consultation feedback have resulted in some changes to the modelled journey times. Please note journey times are not directly comparable to the 2017 consultation. This is due to the modelled area being extended to ensure all journey times changes are captured by the modelling assessment. The tables below compare future modelled journey times with and without the Lambeth Bridge scheme. Both models include demand changes associated with committed developments and population growth, and planned changes to the road network. This allows us to isolate other changes on the network and present the predicted impact of the Lambeth Bridge scheme. 39 Revised Journey Times: Buses Future Journey Time without
    [Show full text]
  • Albert Embankment Conservation Area Conservation Area Character
    AlbertAlbert EmbankmentEmbankment Conservation Area Character Appraisal, 2017 Conservation Area Conservation Area Character Appraisal May 2017 Albert Embankment Conservation Area Character Appraisal, 2017 Lambeth river front in the 1750s. The construction of the Albert Embankment. 2 Albert Embankment Conservation Area Character Appraisal, 2017 CONTENTS PAGE CONSERVATION AREA CONTEXT MAP 4 CONSERVATION AREA MAP 5 INTRODUCTION 6 1. PLANNING FRAMEWORK 7 2. CONSERVATION AREA APPRAISAL 7 2.2 Geology 9 2.4 Historic Development 9 2.22 City Context 14 2.24 Spatial Analysis 15 2.75 Character Areas 29 2.103 Major Open Spaces 35 2.106 Trees 36 2.107 Building Materials and Details 36 2.111 Signs 37 2.112 Advertisements 37 2.113 Activities and Uses 37 2.114 Boundary Treatments 37 2.116 Public Realm 38 2.124 Public Art / Memorials 40 2.130 Designated Heritage Assets 42 2.133 Non Designated Heritage Assets 42 2.137 Positive Contributors 44 2.138 Views 44 2.151 Capacity for Change 48 2.152 Enhancement Opportunities 48 2.161 Appraisal Conclusion 50 APPENDICES 51 Appendix 1— WWHS Approaches map 51 Appendix 2— Statutory Listed Buildings 52 Appendix 3— Archaeological Priority Area No. 2 53 3 Albert Embankment Conservation Area Character Appraisal, 2017 CONSERVATION AREA CONTEXT MAP Whitehall CA CA 38 Westminster Abbey and CA 40 Parliament Square CA CA 10 Smith CA 50 Square CA Millbank CA CA 08 CA 56 Pimlico CA CA 32 08 – Kennington CA, 10 – Lambeth Palace CA, 32 – Vauxhall CA, 38 – South Bank CA, 40 – Lower Marsh CA, 50 – Lambeth Walk and China Walk CA, 56 – Vauxhall Gardens Estate CA.
    [Show full text]
  • Southwark Street London SE1 Development Opportunity Freehold for Sale
    Southwark Street London SE1 Development Opportunity Freehold for Sale www.81southwarkst.co.uk 24 Retail Retail Canvey Street 5 Zoar Street Retail Retail 12 Retail 110 Retail 11a Investment Summary Location Bankside Health Club Retail Southwark Street Bankside 1 Retail - Southbank location opposite the 81 Southwark Street is well located Retail Blue Fin Building on the south side of Southwark95 91 Street in the heart of the vibrant 93 - Short walk of Southwark, London 89 Bridge and Blackfriars Stations Bankside area. It is well connected, Offices being equidistant from Southwark 83 - Existing building – 7,349 sq ft NIA and London Bridge Stations Southwark Street - Planning consent granted for (Northern and Jubilee lines and Offices redevelopment to provide a new Network South-East and Thames5-13 building of 10,053 sq ft NIA Link). Following the development 71-79 5-11 - Short term income of £99,500 per of Blackfriars Station and the new Offices annum until 1st February 2016 entrance on the south side of the river, there is also access to the - Seeking offers in excess of Surry House District and Circle lines. Lavington Street £5.5 million Ewer Street - £748 per sq ft on current net The Southbank is now recognised as Offices Offices internal areas a major cultural centre within London 25 - No VAT and is home to Borough Market, the Tate Modern, the Globe Theatre, the Offices National Theatre, the Royal Festival Offices Offices Hall and the Southbank Centre. Offices Offices Offices James Forbes House Offices Offices Offices Blackfriars Bridge Blackfriars Station Blackfriars Station Blackfriars Blue Fin The Modern Tate Paul’s St.
    [Show full text]
  • Waterloo Guided Walks
    WATERLOO GUIDED WALKS Waterloo is a historic and a fascinating neighbourhood, full of surprises, which can be discovered on these self-guided walks. Choose one or two routes through this historic part of South London, or add all four together to make one big circuit. Each section takes about 30 minutes without stops. WWW.WEAREWATERLOO.CO.UK @wearewaterloouk We are working with the Cross River Partnership through their Mayor’s Air Quality Funded programme Clean Air Better Business (CABB) to deliver air quality improvements and encourage active travel for workers, residents and visitors to the area. VICTORIAN WATERLOO Walk through the main iron gate (you are welcome to visit or attend a service) and skirt the church to the right, leaving by the gate hidden in the hedge right behind the building. Follow Secker Street left and right, In medieval times this area was desolate Lambeth Marsh, which only really came to life with the crossing Cornwall Road to Theed Street completion of Westminster Bridge in 1750. Then around a century later the first railways arrived, running above ground level on mighty brick viaducts. Start in Waterloo Station, under the four-faced clock suspended from the roof at the centre of the concourse, a popular meeting 4 spot for travellers for almost 80 years. Theed Street, Windmill Walk and Roupell Street This is one of London’s most atmospheric quarters, much fi lmed, with its nineteenth-century terraces, elegant streetlamps and steeply pitched roofs. The gallery on the corner of Theed Street was once a cello factory and the musical motif continues as you walk: the gate signed ‘The Warehouse’ is home to the London Festival Orchestra, which became independent in the 1980s and performs at major venues and festivals.
    [Show full text]
  • A Simple Guide to Finding Your Way
    A simple guide to finding your way Before your appointment When you get to the hospital When you get to the wing Read your appointment letter and Look up the wing you need to Find the lift or stairs you need to go make sure you know what hospital go to using the directory in the to using the directory outside the to go to. Always bring the letter main entrance. Wings are colour- wing entrance. Lifts and stairs are 1 with you. 2 coded (purple, green, orange, 3 labelled with a letter (A, B, C, D…) blue, pink, red). Go to the correct hospital Go to the correct stairs or lift Go to the correct wing EastEast EastWing EastWing Wing Wing Guy’sGuy’s andGuy’s Stand Guy’sThomas’ and St Thomas’ Stand Thomas’ St Thomas’ NHS FoundationNHS FoundationNHS Trust FoundationNHS FoundationTrust Trust Trust East Wing Guy’s and St Thomas’ GassiotGassiotGassiotGassiot House House House House LambethLambethLambethLambeth Wing Wing Wing Wing NHS Foundation Trust Gassiot House Lambeth Wing NorthNorthNorth WingNorth Wing Wing Wing SouthSouthSouth WingSouth Wing Wing Wing North Wing South Wing South Wing ( Emergency( EmergencyDepartment( Emergency Department (A&E)( Emergency Department (A&E) Department (A&E) (A&E) ( Emergency Department (A&E) Outpatients Dental Services Blood Test Centre Dental Centre D Children’s Sleep Centre Children’s Dentistry Elizabeth Day Unit Orthodontics Eye Department Eye Emergency Kings College London South Wing Radiotherapy Twin Research £ £ £ £ Ground Floor Wards Adamson Centre (SLaM) Lane Fox Reception Facilities on the NetworkNetwork
    [Show full text]
  • 1607054FUL 1607055LB Lambeth Palace.Pdf
    ADDRESS: Lambeth Palace, Lambeth Palace Road, London, SE1 7JU Application Number: 16/07054/FUL Case Officer: Luke Farmer Ward: Bishops Date Received: 09/12/2016 Proposal: Erection of a building up to 9-storeys in height to provide a library and archive (Use Class D1) including new public library entrance via Lambeth Palace Road, together with creation of a new pond, landscaping works, removal and relocation of existing trees plus realignment of existing path. Installation of double height gate and services access via Lambeth Palace Road together with associated highways works, plus removal of a section of a modern, Grade II listed wall along Lambeth Palace Road within the curtilage of a Grade I listed building. (Planning Permission and Listed Building Consent ref: 16/07055/LB received). Drawing numbers: 100; 101E; 102E; 103E; 120; 121; 130; 140; 160; 161; 170; 180; 200; 201G; 202H; 205; 215A; 216A; 217; 218; 219; 220; 235; 236; 237; 238; 239; 260H; 261H; 268B; 271E; 273C; 276C; 280; 281; 282; 283; 500; 501; 505; 506; 507; 508; LPA-LD-100; LPA-LD-200; LPA-LD-205; LPA-LD-401; LPA-LD-402; LPA-LD-500; LPA-LD-501; LPA-LD-502; LPA-LD-503; LPA-LD-504; LPA-LD-505; LPA-LD-506; LPA-LD-507; LPA-LD-508; LPA-LD-509; LPA-LD-510; LPA-LD-511; LPA-LD-512; SK 183. Documents: Design and Access Statement; Planning Statement; Townscape, Visual Impact and Heritage Statement; Transport Assessment; Travel Plan (November 2016); Construction Logistics Plan; TfL Clarifications Report Rev. A; GLA Response on Living Roofs; Air Quality Statement; Archaeological Evaluation Report; BREEAM Ecologist’s Report; Flood Risk Assessment and SuDS Drainage Statement; Noise Impact Assessment; Arboricultural Impact Assessment; Arboricultural Method Statement; Accommodation Schedule; BREEAM New Construction 2014 Scoresheet; Ecology Report; Sustainability and Energy Statement; External Lighting Planning Assessment; Daylight, Sunlight and Overshadowing Report; Statement of Community Involvement.
    [Show full text]
  • Lambeth Bridge North and South
    Lambeth Bridge north and south Response to issues commonly raised March 2020 [Type text] Contents Background ............................................................................................................ 3 Healthy Streets approach ....................................................................................... 3 Vision Zero ............................................................................................................. 4 Survey results ......................................................................................................... 4 Conclusion.............................................................................................................. 5 Next steps .............................................................................................................. 7 Response to issues commonly raised .................................................................... 8 1. Current road layout ............................................................................................. 8 2. The new road layout ........................................................................................... 9 3. Cycling...............................................................................................................13 4. Traffic impacts ...................................................................................................19 5. Environment ......................................................................................................21 6. Buses ................................................................................................................22
    [Show full text]
  • Lighting Proposals for the Tunnels
    WESTMINSTER BRIDGE ROAD REGENERATION PROJECT WESTMINSTER BRIDGE ROAD REGENERATION PROJECT THE WESTMINSTER BRIDGE ROAD B UPPER MARSH/CARLISLE LANE/ C LIGHTING PROPOSALS D HERCULES ROAD & BAYLIS ROAD REGENERATION PROJECT LOWER MARSH CROSSING FOR THE TUNNELS (LAMBETH QUIETWAYS SCHEME) YOUR 05 VOICE MATTERS 04 RAISED TABLE ACROSS WESTMINSTER BRIDGE ROAD WIDER CROSSING ACROSS WESTMINSTER BRIDGE ROAD This would improve the pedestrian and cycle route across Westminster The Westminster Bridge Road project, which is This would improve the important Bridge Road and would be more in These proposals for creative lighting in the three main tunnels look to We are working in partnership with the Lambeth Quietways Scheme, pedestrian route from Lower Marsh keeping with the recently improved being delivered by Lambeth Council in partnership to Carlisle Lane and Upper Marsh. public realm on Lower Marsh. improve the pedestrian experience, creating attractive and interesting delivering improvements to cycle facilities and the public realm along with a number of local groups, involves refurbishment tunnels which would become distinctive to the area. This aims to improve Baylis Road and Hercules Road. At this stage we are seeking views on the and improvement to the area of Westminster Bridge Road perceptions of safety in the tunnels whilst also creating a unique sense of principles of these schemes so that we can input ideas into future design work. from the Addington Street roundabout to the borough 06 character. boundary at Morley Street. IMPROVED SIGNALISED Once these views are understood, proposals will be made available for public CYCLE FACILITIES The proposals for the Westminster Bridge Road tunnel include the opportunity for community involvement in the consultation at a later date.
    [Show full text]