metro.net/regionalconnector Regional Connector Transit Project
Overview
The Regional Connector Project will extend from Metro and regional destinations by providing continuous service Rail’s Little Tokyo/Arts District Station to the 7th St/Metro between these lines, as well as providing connectors to Center in downtown Los Angeles, allowing passengers other rail lines at 7th St/Metro Center, greatly improving the to access the Gold, Blue, Expo, Red and Purple lines. The connectivity of the region’s transportation network. 1.9-mile addition will serve Little Tokyo, the Arts District, This new Metro Rail extension will o=er an alternative Civic Center, the Historic Core, Broadway, Grand Av, Bunker transportation option to congested roadways, provide Hill, Flower St and the Financial District. significant environmental benefits and spur economic The new Metro Rail extension will also provide a one-seat development throughout the County. Through improved ride for travel across LA County. Passengers will be able to connectivity, riders will be better able to use the entire travel between Azusa and Long Beach and between East Metro Rail system, municipal bus lines and other regional Los Angeles and Santa Monica without transferring lines. transportation services. The Regional Connector will improve access to both local
october 2016 Project at a Glance Contact Us
> A 1.9-mile underground light rail system connecting For additional project information, to ask questions or Metro Rail’s Gold Line to the 7th St/Metro Center provide comments, please use the following contact tools. > Direct connection between Azusa and Long Beach 213.922.7277 and between East Los Angeles and Santa Monica [email protected] > Three new stations: STADIUM WAY • 1st St/Central Av metro.net/regionalconnector • 2nd St/Broadway @metroconnector • 2nd Pl/Hope St metroregionalconnector
> All stations will provide safe and convenient customer To learn about the role and responsibilities of the interfaces and site connectivity and will reflect Regional Connector CommunityADOBE Leadership Council, COLLEGE Metro’s systemwide state-of-the art design standards DEPOT please visit metro.netNEW /regionalconnector or e-mail > Life-of-Project Budget: $1.55 billion us at [email protected] > Forecasted opening: 2021
AV
Regional Connector Transit Project
BAUCHET
Existing Metro Rail DEWAP & Station
CLARA
Regional Connector VIGNES CESAR E. CHAVEZ & Station (under construction) LYON 2nd St/ RAMIREZ Metro Silver Line Hope & Station
Amtrak/Metrolink Civic Center/ Grand Park
FIGUEROA Subject to Change 13-2059 ©2013 LACMTA
DUCOMMONBlue continues along DUCOMMON current GoldGAREY Line
route to Pasadena. RIVER ANGELES LOS 2nd St/ Broadway
TEMPLE
1st St/ Central Línea y estación de Metro existente
Conector Regional y estación (bajo construcción) Gold continues along current Expo Gold continues along Metro PLSilver Line Line route to Santa Monica. current route to East LA. y estación
Amtrak/Metrolink Blue continues along current TRACTION CROCKER route to Long Beach. Sujeto a cambios 13-2059 ©2013 LACMTA TOWNE
STANFORD
GLADYS PL
OLYMPIC MOLINO
HEWITT
COLYTOW PL
SEATON
LOS ANGELES ST
SANTEE CERES please recycle this material. 17-0790dd ©2016 lacmta
WALL
6TH
PICO
SAN PEDRO