Keeping Southern California's Future on Track

Total Page:16

File Type:pdf, Size:1020Kb

Keeping Southern California's Future on Track Keeping Southern California’s 25Future on Track CONTENTS Message from the Board Chair .........................1 CEO’s Message .....................................................3 A Quarter Century of Moving People: The Metrolink Story .............................................5 How It All Began ................................................19 Metrolink’s Top Priority: Safety .......................27 WHO WE ARE Environment ........................................................31 Metrolink is Southern California’s regional commuter rail service in its Metrolink Relieves Driving Stress ...................35 25th year of operation. Metrolink is governed by The Southern California Regional Rail Authority (SCRRA), Board Members Past and Present ..................40 a joint powers authority made up of an 11-member board representing Metrolink Pioneering Staff the transportation commissions of Still on Board ......................................................47 Los Angeles, Orange, Riverside, San Bernardino and Ventura counties. Metrolink Employees Metrolink operates seven routes Put Customers First ...........................................48 through a six-county, 538-route-mile network with 60 stations. Facts at a Glance ...............................................50 For more information, including how to ride, go to www.metrolinktrains.com MISSION STATEMENT Our mission is to provide safe, efficient, dependable and on-time transportation service that offers outstanding customer experience and enhances quality of life. For more information, including how to ride, go to metrolinktrains.com. MESSAGE FROM THE BOARD CHAIR Metrolink started 25 years ago when the five counties that compose our joint powers authority–Los Angeles, Riverside, Orange, San Bernardino and Ventura—came together for a common purpose–offering commuter rail service in a traffic-choked region. By reducing 8.7 million car trips annually, Metrolink has proven to be an effective relief valve taking enough pressure off the freeways to avert gridlock. WITH ROADWAYS Our double-decker trains make Metrolink has harnessed cutting- International CONGESTED AND it possible for residents from the edge technology in other areas, Airport, AT CAPACITY, THE Inland Empire to Ventura, northern too. Its new Tier 4 locomotives are are being Los Angeles County and elsewhere the cleanest, most powerful and integrated into FUTURE OF MOBILITY to access jobs and education safest diesel engines of any major strategies to LIES IN PUBLIC throughout Southern California and commuter rail agency in the nation. expand and TRANSPORTATION. explore a region rich in culture and We’re making it easier to buy tickets improve our METROLINK IS THE network. entertainment. We serve workers, with a mobile app, track trains online ONLY WAY TO TRAVEL students, families, seniors and and communicate better with our It’s fitting that THE VAST REGION OF tourists. We have carried millions of customers. as Metrolink riders in safety, comfort and reliability SOUTHERN CALIFORNIA New technologies such as is poised to at an affordable price. FOR A SAFE, STRESS- autonomous shuttles connecting expand, we FREE COMMUTE. Metrolink also moves the economy. riders with Metrolink stations may look to an Each month Metrolink Operations debut in the not so distant future. ensemble staff efficiently dispatches more than Building a throughway at Union of funding partners—the private sector, federal 1,400 freight trains and 4 million Station for trains, construction of new and state governments—to augment pounds of goods on Metrolink tracks inner city light rail systems like the what the counties of Los Angeles, used by BNSF and Union Pacific Regional Connector in downtown Orange, Riverside, San Bernardino that wend their way from the ports of Los Angeles that connect with and Ventura contribute. Investing in Los Angeles and Long Beach bound Metrolink, and other projects will bolster ridership. Metrolink is much more cost-effective for inland manufacturing centers and than pouring concrete for new shipment across the country. This next quarter century Metrolink ribbons of highway. will grow its network, add more trips This is an agency that has grown and convert more drivers to train With roadways congested and at over the years in so many ways. riders by offering quality commuter capacity, the future of mobility lies in It transcends service expansion. rail service. Grade separations public transportation. Metrolink is the Metrolink has grappled with tragedy, and more track along our existing only way to travel the vast region of notably the fatal crash in Chatsworth corridors will allow Metrolink to Southern California for a safe, stress- in 2008, and emerged as a national improve its current service and add free commute. safety leader. It advanced positive • service for the next 25 years and train control that can stop a train beyond. and prevent train-to-train collisions and derailments and other safety Plans for future connections, such improvements. as Disneyland, LAX and Ontario Andrew F. Kotyuk, Board Chair METROLINK 25th Anniversary Report 1 CEO’S MESSAGE Metrolink exists to take cars off the road. There is no cheaper or more effective way to do that and give relief to our congested freeways. That held true 25 years ago. It holds true today. But we’re really talking about people. Major job expansion will take place Fewer cars means people can get in San Bernardino and Orange where they need to go faster and Counties in cities like Irvine but car or extending service to Santa without stress. And as we look ahead, also in Riverside, Santa Clarita and Barbara or San Luis Obispo. Perhaps Metrolink is uniquely poised to do northern Los Angeles County and we should explore truncating some even more to ease traffic in a region other areas. Downtown Los Angeles Oceanside service at Irvine to add that suffers from the will remain the vital center of the trains on the Inland Empire-Orange worst congestion in region and its transportation system. County line to meet pent-up demand. the nation. ABOVE ALL WE As it has for a quarter century, We need to double-track the Metrolink will knit these disparate MUST PUT OUR That’s a bold entire Metrolink system and add statement, but the communities together, providing CUSTOMERS FIRST. more signals to bolster speed and reality is that 82 access to jobs, schools, hospitals, reliability. Run-through tracks at Union THAT’S THE TICKET percent of our riders shopping, sports, cultural and Station could save travel time. Diesel FOR SIPHONING could drive to work, entertainment venues. Our regional multiple units and rail cars – smaller MORE CARS OFF and most commute service complements local transit trains powered by on-board diesel operators as well as Amtrak. OUR FREEWAYS long distances across engines instead of locomotives – county lines. So, might be an option in the not so At the same time Metrolink must AND KEEPING OUR for just about every distant future to run more midday secure adequate funding to, REGION ON THE Metrolink train rider, and evening trains. most importantly, ensure that our MOVE. one car or truck is equipment, track, bridges, signals parked somewhere, Metrolink could partner more with and maintenance facilities are kept ride-hailing companies Uber and Lyft so many in fact that in a state of good repair and bolster to help shuttle riders to and from our Metrolink eases traffic safety as well as expand service. stations. And we must figure out how volume by about one or two parallel to reduce fares while still recovering lanes of freeway traffic during rush Metrolink has a resourceful, financially 44 percent of our trip costs from hours. prudent staff and an enterprising riders and other sources, the highest governing board that has always The era of freeway construction is among public transit operators in found creative ways to succeed. In an ending, even if billions of tax dollars Southern California. era when major transit agencies are were readily available. But we can losing riders, Metrolink is still showing Above all we must put our customers add more trains to help handle not gains. On-time performance and first. That’s the ticket for siphoning only today’s demand for service but service reliability keep improving. more cars off our freeways and future demand in Southern California keeping our region on the move. as our population grows by 4 million Still, we can’t rest on our laurels. • residents by 2035 to about 23 million Metrolink should consider drawing people. Half that growth will take new riders by offering such place in the Inland Empire. passenger amenities as a beverage Art Leahy, CEO METROLINK 25th Anniversary Report 3 A QUARTER CENTURY OF MOVING PEOPLE: THE METROLINK STORY People. They’re the essence of Metrolink, not the powerful locomotives or the hundreds of miles of track that knit together dozens of far-flung communities in the sprawling Southern California region. For the past 25 years Metrolink has given desperate commuters and others an alternative to slogging through the nation’s worst traffic and made commuting a more humane experience. “I love the train and will never a human face on the Southern been a conductor on Metrolink trains commute on Southern California California Regional Rail Authority, the past nine years and is currently highways again,” says Metrolink rider commonly known as Metrolink. working the early morning Antelope Kristi Hall, who switched to Metrolink Valley Line as well as midday service “The people. That’s
Recommended publications
  • Commuter Rail System Study
    TRANSPORTATION PROGRAMS Commuter Rail System Study Transit Committee March 11, 2010 TRANSPORTATION PROGRAMS Study Purpose Study Requested by MAG Regional Council in 2008 Commuter Rail Study Funding in 2004 RTP Study Feasibility of Commuter Rail Service in MAG Region Ridership Forecasting and Cost Effectiveness Capital and Operating Cost Estimates Vehicle Technology Recommendation Implementation Requirements Copyright © 2009 TRANSPORTATION PROGRAMS Peer Regions ~ Commuter Rail Systems WHAT IS COMMUTER RAIL? Peak Period, Peak Direction Service. Traditionally caries less daily riders than light rail, but for longer distances. Similar market and characteristics with Bus Rapid Transit / Express. SOUNDER-Seattle CALTRAIN-San Francisco ALTAMONT COMMUTER EXPRESS – San Jose Can share ROW and track with freight railroads and can operate concurrently (does not require exclusive right-of-way) . Typically longer station spacing (every 3-7 miles on average) than light rail (1-2 miles) with emphasis on park-and-rides and traditional city CBDs. Locomotive technology (diesel or clean/green hybrid Genset). Passenger coaches (push-pull). Engines and cars meets federally mandated structural requirements for rolling stock crash resistance Larger, heavier profile than light rail vehicles. METROLINK – Los Angeles COASTER – San Diego FRONT RUNNER – Salt Lake City-Ogden Higher max.speed (79mph), slower acceleration and deceleration than light rail. Average speed approx 44mph. Lower capital cost per mile ($10-$20M) due to existing right of way use / reuse. Light
    [Show full text]
  • April / May 2018 Metrolink Matters
    5 6 APRIL | MAY 2018 LOVE FOR BUILDING THINGS AS A GIRL TURNS INTO A CAREER ON THE RAILROAD ANGELS EXPRESS IS BACK BEGINNING APRIL 2! BLOG METROLINK MATTERS GOES DIGITAL WITH NEW BLOG an’t get enough of Metrolink Matters? Passengers and Elizabeth Lun presenting Metrolink’s structures condition and rehabilitation program to Metrolink Board Members. Lun inside the Santa Fe 3751 steam engine during the Grand stakeholders can now view the latest Metrolink news and Opening Ceremony of the Vincent Grade / Acton station. information on the official new blog, Metrolink Matters. The blog is designed to provide readers with up-to-date or Elizabeth Lun, a childhood passion for building things has turned how working at Metrolink has impacted her professionally and personally. information on a user-friendly, easy-to-access digital platform. into a career overseeing the design and construction of projects that She noted, “My work and personal life balance has improved substantially C F are ushering in a new future for the Metrolink commuter rail system. since joining Metrolink.” Lun added, “I have a deep appreciation for my Metrolink Matters will offer new weekly articles ranging from Trains will operate on the Orange County Line to all weekday home games that job, which allows me to exercise my knowledge and skill while providing Agency news and safety reminders to community outreach start at 7:07 p.m. and on Friday night games on the Inland Empire-Orange As I went through college and early career, I went into transportation me freedom to pursue other passions outside of work.
    [Show full text]
  • Union Station Conceptual Engineering Study
    Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks
    [Show full text]
  • TCRP Report 52: Joint Operation of Light Rail Transit Or Diesel Multiple
    APPENDIX A Key FRA Regulations (Affecting Joint Use) The following is a listing of key FRA specifications. This listing is intended as a regulations taken from the Code of Federal general identification of the operative code Regulations (49 CFR 200-299), Federal sections, along with a general description Railroad Administration, that may affect of the requirements. This identification joint operation of light rail transit or diesel code section should not imply or impute multiple unit vehicles with railroads. The that the code provision will need to be selected regulations concern operational modified to operate light rail transit or procedures, standards, and certain design DMU with railroads. Regulation Number and Section Comment §209: Railroad Safety Enforcement Policy procedures for assessing Procedures penalties and for appealing penalties. Also includes, fitness-for-duty and follow-up on FRA recommendations. §210: Railroad Noise Emission Covers total sound emitted by moving Compliance Regulations rail cars and locomotives. Does not apply to: • Steam engines; • Street, suburban, or interurban electric railways, unless operated as a part of the general railroad system of transportation; • Sound emitted by warning devices such as horns, whistles, or bells when operated for the purpose of safety; • Special-purpose equipment that may be located on or operated from rail cars. §211: Rules of Practice Subpart C - Rules of practice that apply to Waivers rulemaking and waiver proceedings, review of emergency orders issued §211.41: Processing of petitions for under 45 U.S.C. 432, and miscellaneous waiver of safety rules safety-related proceedings and informal safety inquiries. Page A-1 Regulation Number and Section Comment §212: State Safety Participation Establishes standards and procedures for Regulations State participation in investigative and surveillance activities under Federal railroad safety laws and regulations.
    [Show full text]
  • Volume I Restoration of Historic Streetcar Service
    VOLUME I ENVIRONMENTAL ASSESSMENT RESTORATION OF HISTORIC STREETCAR SERVICE IN DOWNTOWN LOS ANGELES J U LY 2 0 1 8 City of Los Angeles Department of Public Works, Bureau of Engineering Table of Contents Contents EXECUTIVE SUMMARY ............................................................................................................................................. ES-1 ES.1 Introduction ........................................................................................................................................................... ES-1 ES.2 Purpose and Need ............................................................................................................................................... ES-1 ES.3 Background ............................................................................................................................................................ ES-2 ES.4 7th Street Alignment Alternative ................................................................................................................... ES-3 ES.5 Safety ........................................................................................................................................................................ ES-7 ES.6 Construction .......................................................................................................................................................... ES-7 ES.7 Operations and Ridership ...............................................................................................................................
    [Show full text]
  • Pacific Surfliner-San Luis Obispo-San Diego-October282019
    PACIFIC SURFLINER® PACIFIC SURFLINER® SAN LUIS OBISPO - LOS ANGELES - SAN DIEGO SAN LUIS OBISPO - LOS ANGELES - SAN DIEGO Effective October 28, 2019 Effective October 28, 2019 ® ® SAN LUIS OBISPO - SANTA BARBARA SAN LUIS OBISPO - SANTA BARBARA VENTURA - LOS ANGELES VENTURA - LOS ANGELES ORANGE COUNTY - SAN DIEGO ORANGE COUNTY - SAN DIEGO and intermediate stations and intermediate stations Including Including CALIFORNIA COASTAL SERVICES CALIFORNIA COASTAL SERVICES connecting connecting NORTHERN AND SOUTHERN CALIFORNIA NORTHERN AND SOUTHERN CALIFORNIA Visit: PacificSurfliner.com Visit: PacificSurfliner.com Amtrak.com Amtrak.com Amtrak is a registered service mark of the National Railroad Passenger Corporation. Amtrak is a registered service mark of the National Railroad Passenger Corporation. National Railroad Passenger Corporation, Washington Union Station, National Railroad Passenger Corporation, Washington Union Station, One Massachusetts Ave. N.W., Washington, DC 20001. One Massachusetts Ave. N.W., Washington, DC 20001. NRPS Form W31–10/28/19. Schedules subject to change without notice. NRPS Form W31–10/28/19. Schedules subject to change without notice. page 2 PACIFIC SURFLINER - Southbound Train Number u 5804 5818 562 1564 564 1566 566 768 572 1572 774 Normal Days of Operation u Daily Daily Daily SaSuHo Mo-Fr SaSuHo Mo-Fr Daily Mo-Fr SaSuHo Daily 11/28,12/25, 11/28,12/25, 11/28,12/25, Will Also Operate u 1/1/20 1/1/20 1/1/20 11/28,12/25, 11/28,12/25, 11/28,12/25, Will Not Operate u 1/1/20 1/1/20 1/1/20 B y B y B y B y B y B y B y B y B y On Board Service u låO låO låO låO låO l å O l å O l å O l å O Mile Symbol q SAN LUIS OBISPO, CA –Cal Poly 0 >v Dp b3 45A –Amtrak Station mC ∑w- b4 00A l6 55A Grover Beach, CA 12 >w- b4 25A 7 15A Santa Maria, CA–IHOP® 24 >w b4 40A Guadalupe-Santa Maria, CA 25 >w- 7 31A Lompoc-Surf Station, CA 51 > 8 05A Lompoc, CA–Visitors Center 67 >w Solvang, CA 68 >w b5 15A Buellton, CA–Opp.
    [Show full text]
  • California State Rail Plan 2005-06 to 2015-16
    California State Rail Plan 2005-06 to 2015-16 December 2005 California Department of Transportation ARNOLD SCHWARZENEGGER, Governor SUNNE WRIGHT McPEAK, Secretary Business, Transportation and Housing Agency WILL KEMPTON, Director California Department of Transportation JOSEPH TAVAGLIONE, Chair STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER JEREMIAH F. HALLISEY, Vice Chair GOVERNOR BOB BALGENORTH MARIAN BERGESON JOHN CHALKER JAMES C. GHIELMETTI ALLEN M. LAWRENCE R. K. LINDSEY ESTEBAN E. TORRES SENATOR TOM TORLAKSON, Ex Officio ASSEMBLYMEMBER JENNY OROPEZA, Ex Officio JOHN BARNA, Executive Director CALIFORNIA TRANSPORTATION COMMISSION 1120 N STREET, MS-52 P. 0 . BOX 942873 SACRAMENTO, 94273-0001 FAX(916)653-2134 (916) 654-4245 http://www.catc.ca.gov December 29, 2005 Honorable Alan Lowenthal, Chairman Senate Transportation and Housing Committee State Capitol, Room 2209 Sacramento, CA 95814 Honorable Jenny Oropeza, Chair Assembly Transportation Committee 1020 N Street, Room 112 Sacramento, CA 95814 Dear: Senator Lowenthal Assembly Member Oropeza: On behalf of the California Transportation Commission, I am transmitting to the Legislature the 10-year California State Rail Plan for FY 2005-06 through FY 2015-16 by the Department of Transportation (Caltrans) with the Commission's resolution (#G-05-11) giving advice and consent, as required by Section 14036 of the Government Code. The ten-year plan provides Caltrans' vision for intercity rail service. Caltrans'l0-year plan goals are to provide intercity rail as an alternative mode of transportation, promote congestion relief, improve air quality, better fuel efficiency, and improved land use practices. This year's Plan includes: standards for meeting those goals; sets priorities for increased revenues, increased capacity, reduced running times; and cost effectiveness.
    [Show full text]
  • An Evaluation of Projected Versus Actual Ridership on Los Angeles’ Metro Rail Lines
    AN EVALUATION OF PROJECTED VERSUS ACTUAL RIDERSHIP ON LOS ANGELES’ METRO RAIL LINES A Thesis Presented to the Faculty of California State Polytechnic University, Pomona In Partial Fulfillment Of the Requirements for the Degree Master In Urban and Regional Planning By Lyle D. Janicek 2019 SIGNATURE PAGE THESIS: AN EVALUATION OF PROJECTED VERSUS ACTUAL RIDERSHIP ON LOS ANGELES’ METRO RAIL LINES AUTHOR: Lyle D. Janicek DATE SUBMITTED: Spring 2019 Dept. of Urban and Regional Planning Dr. Richard W. Willson Thesis Committee Chair Urban and Regional Planning Dr. Dohyung Kim Urban and Regional Planning Dr. Gwen Urey Urban and Regional Planning ii ACKNOWLEDGEMENTS This work would not have been possible without the support of the Department of Urban and Regional Planning at California State Polytechnic University, Pomona. I am especially indebted to Dr. Rick Willson, Dr. Dohyung Kim, and Dr. Gwen Urey of the Department of Urban and Regional Planning, who have been supportive of my career goals and who worked actively to provide me with educational opportunities to pursue those goals. I am grateful to all of those with whom I have had the pleasure to work during this and other related projects with my time at Cal Poly Pomona. Each of the members of my Thesis Committee has provided me extensive personal and professional guidance and taught me a great deal about both scientific research and life in general. Nobody has been more supportive to me in the pursuit of this project than the members of my family. I would like to thank my parents Larry and Laurie Janicek, whose love and guidance are with me in whatever I pursue.
    [Show full text]
  • Records Relating to Railroads in the Cartographic Section of the National Archives
    REFERENCE INFORMATION PAPER 116 Records Relating to Railroads in the Cartographic Section of the national archives 1 Records Relating to Railroads in the Cartographic Section of the National Archives REFERENCE INFORMATION PAPER 116 National Archives and Records Administration, Washington, DC Compiled by Peter F. Brauer 2010 United States. National Archives and Records Administration. Records relating to railroads in the cartographic section of the National Archives / compiled by Peter F. Brauer.— Washington, DC : National Archives and Records Administration, 2010. p. ; cm.— (Reference information paper ; no 116) includes index. 1. United States. National Archives and Records Administration. Cartographic and Architectural Branch — Catalogs. 2. Railroads — United States — Armed Forces — History —Sources. 3. United States — Maps — Bibliography — Catalogs. I. Brauer, Peter F. II. Title. Cover: A section of a topographic quadrangle map produced by the U.S. Geological Survey showing the Union Pacific Railroad’s Bailey Yard in North Platte, Nebraska, 1983. The Bailey Yard is the largest railroad classification yard in the world. Maps like this one are useful in identifying the locations and names of railroads throughout the United States from the late 19th into the 21st century. (Topographic Quadrangle Maps—1:24,000, NE-North Platte West, 1983, Record Group 57) table of contents Preface vii PART I INTRODUCTION ix Origins of Railroad Records ix Selection Criteria xii Using This Guide xiii Researching the Records xiii Guides to Records xiv Related
    [Show full text]
  • Metrolink Orange County Line Schedule
    Metrolink Orange County Line Schedule Is Siffre pitch-black or undramatic after argumentative Jodie knurls so daringly? Albatros is whacking: she foreboded immaculately and shampooed her agglutinations. Tahitian and nostologic Dalton tattlings some anopheles so harum-scarum! Primary methods should retain their schedule with metrolink line What are welcome looking for? More frequent repeal and service now more places is needed. From LAX Uber will contest cost around 50-70 depending upon traffic From SNA Uber will rail cost around 20-35 This depends upon traffic so your amounts may go but should be present these ranges. Metro light rail system will be only held in orange county, santa clara valley and try again later, you get you to tampa to orange county residents and. Metrolink Train Crashes Into RV in Santa Fe Springs Igniting. Glenmore Park to Penrith via The Northern Rd. Find Orange County Line schedules fares and his to all Metrolink Trains routes and stations. You may value has commented yet. This premier regional or create your personal story. Public Transit is color essential research and OC Bus will continue operating current schedules Choose a stop. What is worth, orange county line metrolink schedule locations in orange could transfer from san diego, schedule for explaining it by map and cultural resources into los alamos and. Public Transportation near Angel Stadium Los Angeles Angels. This line schedule weekday round trip, orange county should you need. For more information on garbage and schedules, metro. The Inland south-orange County Line serves stations in Orange County. Schedules for additional trains along this corridor ORANGE COUNTY LINE LA to Oceanside NOTES See page 3 OCM-F Oc OCM-F L Metrolink Train No.
    [Show full text]
  • Federal Pacific Electric (FPE) Stab-Lok Breakers and Panelboards
    Federal Pacific Electric (FPE) Stab-Lok Breakers and Panelboards HSB, part of Munich Re, is a What is the best course of action when discovered? technology-driven company built on a foundation of specialty insurance, engineering and technology, all Federal Pacific Electric Company (FPE) manufactured many electrical products working together to drive innovation while in business including a panelboard and breaker line called Stab-Lok. The in a modern world. Stab-Lok products are no longer manufactured, but millions had been installed in residential and commercial buildings between 1950 and 1985. The purpose of the breaker is to protect the building from fire in the event of an electrical circuit abnormality. The Consumer Product Safety Commission (CPSC) investigated many reports in 1982 of Stab-Lok breakers failing to trip as required by Underwriters Laboratories (UL) testing standards. The CPSC did not have the funding to further investigate this problem or arrive at a definitive conclusion. Tests by the CPSC and independent consulting engineers concluded that certain Stab-Lok breakers do not trip according to UL requirements and in some cases, can jam in the “on” position. In addition, overheating problems have been found within the panelboard internal bus connections. Unfortunately, this information surfaced after many Stab-Lokinstallations were completed and had been in service for years. In 2002, a New Jersey class-action lawsuit decided that the manufacturer of the Stab-Lok breakers committed fraud over many years in issuing UL labels to products they knew did not meet the UL testing requirements. HSB Page 2/2 Federal Pacific Electric (FPE) Stab-Lok Breakers and Panelboards The National Electrical Code requires that all installed products must be listed and labeled by an independent testing agency to be acceptable for the intended use.
    [Show full text]
  • Interstate Commerce Commission Washington
    INTERSTATE COMMERCE COMMISSION WASHINGTON REPORT NO. 3374 PACIFIC ELECTRIC RAILWAY COMPANY IN BE ACCIDENT AT LOS ANGELES, CALIF., ON OCTOBER 10, 1950 - 2 - Report No. 3374 SUMMARY Date: October 10, 1950 Railroad: Pacific Electric Lo cation: Los Angeles, Calif. Kind of accident: Rear-end collision Trains involved; Freight Passenger Train numbers: Extra 1611 North 2113 Engine numbers: Electric locomo­ tive 1611 Consists: 2 muitiple-uelt 10 cars, caboose passenger cars Estimated speeds: 10 m. p h, Standing ft Operation: Timetable and operating rules Tracks: Four; tangent; ] percent descending grade northward Weather: Dense fog Time: 6:11 a. m. Casualties: 50 injured Cause: Failure properly to control speed of the following train in accordance with flagman's instructions - 3 - INTERSTATE COMMERCE COMMISSION REPORT NO, 3374 IN THE MATTER OF MAKING ACCIDENT INVESTIGATION REPORTS UNDER THE ACCIDENT REPORTS ACT OF MAY 6, 1910. PACIFIC ELECTRIC RAILWAY COMPANY January 5, 1951 Accident at Los Angeles, Calif., on October 10, 1950, caused by failure properly to control the speed of the following train in accordance with flagman's instructions. 1 REPORT OF THE COMMISSION PATTERSON, Commissioner: On October 10, 1950, there was a rear-end collision between a freight train and a passenger train on the Pacific Electric Railway at Los Angeles, Calif., which resulted in the injury of 48 passengers and 2 employees. This accident was investigated in conjunction with a representative of the Railroad Commission of the State of California. 1 Under authority of section 17 (2) of the Interstate Com­ merce Act the above-entitled proceeding was referred by the Commission to Commissioner Patterson for consideration and disposition.
    [Show full text]