Regional Connector Existing Conditions Report

Total Page:16

File Type:pdf, Size:1020Kb

Regional Connector Existing Conditions Report JULY 2016 METRO DOWNTOWN & REGIONAL CONNECTOR EXISTING CONDITIONS REPORT EXECUTIVE SUMMARY ACKNOWLEDGEMENTS Prepared by the Los Angeles Department of Planning Los Angeles City Hall - 6th Floor 200 N. Spring Street Los Angeles, CA 90012 (213) 978 -1170 www.planning.lacity.org Community Planning and Transit Neighborhood Planning Staff Patricia Diefenderfer, Senior City Planner Bryan Eck, City Planner Tal Harari, Planning Assistant Clare Kelley, Planning Assistant Geographic Information Systems Staff Charles Lee, GIS Supervisor II Scott Jackson, GIS Specialist This project was funded by Metro’s Round 3 TOD Planning Grant Program EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 i TABLE OF CONTENTS INTRODUCTION : BACKGROUND 1 INTRODUCTION : METHODOLOGY 2-3 AERIAL : ALL STATIONS 4 DEMOGRAPHICS : ALL STATIONS 5 The complete Existing Conditions Report contains additional information including: ECONOMIC PROFILE : ALL STATIONS 6 • aerial maps • building footprints LAND USE PATTERNS : ALL STATIONS 7 • demographics • economic profile TRANSIT PATTERNS : ALL STATIONS 8 • general plan land use • zoning HOUSING : ALL STATIONS 9 • existing land use • transit service • traffic patterns APPENDIX : ALL STATIONS 10 • street designations • housing • opportunity sites • historic resources • public service & amenities • planning overlays To view the complete report, please visit www.dtla2040.org. Image Source: Los Angeles County Metropolitan Transportation Authority (Metro) EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 ii INTRODUCTION | background In 2012, The City of Los Angeles Department of City Planning (LADCP), in partnership with Metro, launched The 1.9 mile Regional Connector alignment will allow passengers to seamlessly transfer an effort to create several Transit Neighborhood Plans to develop livable community and employment between the Gold, Blue, Expo, Red and Purple heavy raill subway lines, and bypass Downtown centers around the region’s expanding transit network. The plan focuses on neighborhoods surrounding Los Angeles Union Station, by constructing three new Metro stations and connecting travel a total of 25 future and existing transit stations Citywide. corridors through the center of Downtown. To prepare for development trends that accompany these transit stations, Metro has provided a grant The alignment crosses several distinct communities within Downtown, including the historic to the LADCP to create regulatory tools to guide future land use around the rail stations. This report Little Tokyo community, the concentration of federal, state and local government offices in details the existing conditions of three future and four existing stations within Downtown, and focused the Civic Center, the cultural entertainment center in Bunker Hill, the dense commercial core on the Regional Connector Transit Project. It is designed to be a resource for Metro, the LADCP staff, and in the Financial District, as well as the residential and retail uses in the Historic Core. community stakeholders. Image Source: Cory Gruenfeld EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 1 INTRODUCTION | methodology Metro Station Future Regional Connector Metro Red/Purple Lines Metro Gold Line Metro Blue Line Metro Expo Line 1/2 Mile Radius Community Plan Area Boundaries 2nd PLACE/ HOPE ST. CIVIC CENTER WESTLAKE STATION COMMUNITY PLAN AREA STATION 2nd ST./ 7th/METRO BROADWAY CENTER STATION STATION CENTRAL CITY NORTH COMMUNITY PLAN AREA 1st STREET/ PERSHING CENTRAL AVE. SQUARE STATION STATION CENTRAL CITY PICO/CHICK COMMUNITY PLAN AREA HEARN STATION SOUTH LA COMMUNITY PLAN AREA SOUTHEAST LA COMMUNITY PLAN AREA EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 2 INTRODUCTION | methodology This existing conditions report includes information on current land uses, housing, demographics, Due to the proximity of the stations and irregularity of the census tracts, some tracts are in multiple station areas and thus economic conditions, and livability patterns. were included in the analysis of each station. The study areas around the three new, and four existing stations were established by choosing a group The demographic data in this report comes from the United States Census Bureau and the maps come from the of census tracts to represent each station area. The basic radius of a half-mile is used to represent a Department of City Planning Systems & GIS Division unless otherwise noted. For more information on the data analysis typical threshold of willingness to walk to a transit stop. Census tracts were chosen if they, in part or in and sources, please see the detailed methodology in the Appendix. whole, were located within this half-mile radius from the intersection nearest to the station entrance. FUTURE STATIONS census tracts 2nd PLACE/HOPE STREET 2nd STREET/BROADWAY AVE. 1st STREET/CENTRAL AVE. 2073.01 2062 2060.2 2073/02 2071.02 2060.31 2075.01 2073.01 2062 2075.02 2073.02 2063 2077.1 2074 2071.02 2080 2075.02 2073.01 2092 2080 2073.02 2092 2074 EXISTING STATIONS census tracts CIVIC CENTER STATION 7th STREET/METRO CENTER PERSHING SQUARE PICO/CHICK HEARN 2062 2073.01 2063 2077.1 2071.02 2073.02 2073.01 2079 2071.02 2075.02 2073.02 2100.1 2073.01 2077.1 2074 2240.1 2073.02 2079 2075.02 2240.2 2074 2092 2077.1 2242 2075.01 2093 2075.02 EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 3 Metro Station Future Regional Connector AERIAL | all stations Metro Red/Purple Lines Metro Blue Line Metro Expo Line Metro Gols Line 1/4 Mile Radius 1/2 Mile Radius 2nd PLACE/HOPE 2nd STREET/BROADWAY 1st STREET/CENTRAL CIVIC CENTER 7th STREET/METRO PERSHING SQUARE PICO/CHICK HEARN Image Source: Sterling Davis Image Source: Metro Image Source: Tal Harari Image Source: Kent Kanouse Image Source: Flickr Image Source:: Flickr Image Source: Frederick Dennstedt Image Source: Metro Image Source: Flickr Image Source: Prayitno Image Source: Flickr Image Source: Flickr Image Source: Steve Lyon Image Source:: South Park Business Improvement DIstrict EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 4 DEMOGRAPHICS | all stations 2nd PLACE/HOPE 2nd STREET/BROADWAY 1st STREET/CENTRAL CIVIC CENTER 7th STREET/METRO PERSHING SQUARE PICO/CHICK HEARN TOTAL POPULATION TOTAL POPULATION TOTAL POPULATION TOTAL POPULATION TOTAL POPULATION TOTAL POPULATION TOTAL POPULATION 15,242 9,895 6,230 10,323 12,548 12,788 9,620 54% 46% 57% 43% 63% 37% 57% 43% 65% 54% 58% 42% 53% 47% TOP 3 AGE GROUPS TOP 3 AGE GROUPS TOP 3 AGE GROUPS TOP 3 AGE GROUPS TOP 3 AGE GROUPS TOP 3 AGE GROUPS TOP 3 AGE GROUPS 25-29 yrs 24% 25-29 yrs 14% 25-29 yrs 11% 25-29 yrs 13% 25-29 yrs 18% 25-29 yrs 22% 30-34 yrs 10% 30-34 yrs 18% 35-39 yrs 11% 30-34 yrs 11% 30-34 yrs 10% 30-34 yrs 17% 35-39 yrs 18% 20-24 yrs 9% 35-39 yrs 17% 30-34 yrs 10% 35-39 yrs 11% 35-39 yrs 10% 35-39 yrs 14% 30-34 yrs 17% 25-29 yrs 8% EDUCATIONAL EDUCATIONAL EDUCATIONAL EDUCATIONAL EDUCATIONAL EDUCATIONAL EDUCATIONAL ATTAINMENT ATTAINMENT ATTAINMENT ATTAINMENT ATTAINMENT ATTAINMENT ATTAINMENT Graduate Some College, 9% Degree, 19% Some College, 16% Some College, Bachelor's Degree, 19% Some College, 15% Some Bachelor's 17% Associate's Associate's College, Degree, 21% Bachelor's Degree, Degree, 4% Degree, 4% Associate's Bachelor's 18% 24% Bachelor's Bachelor's < 9th Grade, 9% Degree, 4% Degree, 22% Some College, 19% Associate's Degree, 20% Degree, 23% Bachelor's Degree, 5% HS Graduate, Degree, 30% Associate's 14% < High School HS Graduate, 16% Degree, 5% Graduate, 8% HS Graduate, Associate's Degree, 3% Graduate Degree, 15% Graduate 17% Graduate Degree, 14% Graduate HS Graduate, Degree, 12% Degree, 17% Graduate Degree, 18% Graduate Degree, HS < High School 12% HS Graduate, < High School 9% Graduate, … HS Graduate, 14% Graduate, 14% 14% Graduate, 12% < High School Graduate, < 9th Grade, < 9th Grade, 11% Associate's 17% < High School < 9th Grade, < 9th Grade, 7% Some College, < 9th Grade, 20% < High School 8% Degree, 5% 11% 15% Graduate, 12% Graduate, 11% < High School < 9th Grade, 20% Graduate, 9% EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 EXISTING CONDITIONS REPORT | DOWNTOWN LOS ANGELES | LADCP TRANSIT NEIGHBORHOOD PLANNING | JULY 2016 5 ECONOMIC PROFILE | all stations 2nd PLACE/HOPE 2nd STREET/BROADWAY 1st STREET/CENTRAL CIVIC CENTER 7th STREET/METRO PERSHING SQUARE PICO/CHICK HEARN 7,993 4,348 1,980 4,199 6,136 6,776 1,980 EMPLOYED EMPLOYED EMPLOYED EMPLOYED EMPLOYED EMPLOYED EMPLOYED WORKERS WORKERS WORKERS WORKERS WORKERS WORKERS WORKERS 198,022 JOBS 169,628 60,179 158,082 101,383 87,255 60,179 JOBS JOBS JOBS JOBS JOBS JOBS AVG COMMUTE TIME AVG COMMUTE TIME AVG COMMUTE TIME AVG COMMUTE TIME AVG COMMUTE TIME AVG COMMUTE TIME AVG COMMUTE TIME 27 minutes 27 minutes 28 minutes 27 minutes 26 minutes 27 minutes 28 minutes JOB DENSITY JOB DENSITY JOB DENSITY JOB DENSITY JOB DENSITY JOB DENSITY JOB DENSITY 396 Jobs/Acre
Recommended publications
  • Volume I Restoration of Historic Streetcar Service
    VOLUME I ENVIRONMENTAL ASSESSMENT RESTORATION OF HISTORIC STREETCAR SERVICE IN DOWNTOWN LOS ANGELES J U LY 2 0 1 8 City of Los Angeles Department of Public Works, Bureau of Engineering Table of Contents Contents EXECUTIVE SUMMARY ............................................................................................................................................. ES-1 ES.1 Introduction ........................................................................................................................................................... ES-1 ES.2 Purpose and Need ............................................................................................................................................... ES-1 ES.3 Background ............................................................................................................................................................ ES-2 ES.4 7th Street Alignment Alternative ................................................................................................................... ES-3 ES.5 Safety ........................................................................................................................................................................ ES-7 ES.6 Construction .......................................................................................................................................................... ES-7 ES.7 Operations and Ridership ...............................................................................................................................
    [Show full text]
  • An Evaluation of Projected Versus Actual Ridership on Los Angeles’ Metro Rail Lines
    AN EVALUATION OF PROJECTED VERSUS ACTUAL RIDERSHIP ON LOS ANGELES’ METRO RAIL LINES A Thesis Presented to the Faculty of California State Polytechnic University, Pomona In Partial Fulfillment Of the Requirements for the Degree Master In Urban and Regional Planning By Lyle D. Janicek 2019 SIGNATURE PAGE THESIS: AN EVALUATION OF PROJECTED VERSUS ACTUAL RIDERSHIP ON LOS ANGELES’ METRO RAIL LINES AUTHOR: Lyle D. Janicek DATE SUBMITTED: Spring 2019 Dept. of Urban and Regional Planning Dr. Richard W. Willson Thesis Committee Chair Urban and Regional Planning Dr. Dohyung Kim Urban and Regional Planning Dr. Gwen Urey Urban and Regional Planning ii ACKNOWLEDGEMENTS This work would not have been possible without the support of the Department of Urban and Regional Planning at California State Polytechnic University, Pomona. I am especially indebted to Dr. Rick Willson, Dr. Dohyung Kim, and Dr. Gwen Urey of the Department of Urban and Regional Planning, who have been supportive of my career goals and who worked actively to provide me with educational opportunities to pursue those goals. I am grateful to all of those with whom I have had the pleasure to work during this and other related projects with my time at Cal Poly Pomona. Each of the members of my Thesis Committee has provided me extensive personal and professional guidance and taught me a great deal about both scientific research and life in general. Nobody has been more supportive to me in the pursuit of this project than the members of my family. I would like to thank my parents Larry and Laurie Janicek, whose love and guidance are with me in whatever I pursue.
    [Show full text]
  • Art Leahy, Chief Executive Officer
    ART LEAHY, CHIEF EXECUTIVE OFFICER Art Leahy was appointed as Metrolink’s Chief Executive Officer and began in April 2015. He brings more than 40 years of public transportation leadership and experience to Metrolink. One of the nation’s leading transit officials, Art Leahy served as chief executive officer of the Los Angeles County Metropolitan Transportation Authority (Metro) for six years. During that time, he guided implementation of one of the largest public works programs in United States history, securing billions in federal and state dollars to help finance construction of dozens of transit and highway projects. He led the completion of numerous projects funded by Los Angeles County’s Measure R. Metro has transit and highway projects valued at more than $14 billion, eclipsing that of any other transportation agency in the nation. This includes an unprecedented five new rail projects under construction, including phase 2 of the Expo Line extension to Santa Monica and the Metro Gold Line Foothill Extension to Azusa, as well as the Crenshaw/LAX Transit Project, the Regional Connector in downtown Los Angeles, and the first phase of the Westside Purple Line subway extension to Wilshire and La Cienega. Leahy also launched a $1.2-billion overhaul of the Metro Blue Line and guided the purchase of a new fleet of rail cars. And he helped transform the iconic Union Station into the hub of the region’s expanding bus and rail transit network and led the agency’s acquisition of the 75-year-old iconic facility. Though Metrolink is a separate transportation agency from Metro, the two agencies work collaboratively on multiple fronts to provide effective and efficient public transportation options for people throughout the region.
    [Show full text]
  • Powerpoint Template
    The Challenges of Planning and Executing Major Underground Transit Programs in Los Angeles Bryan Pennington, Senior Executive Officer, Program Management • Nation’s third largest transportation system • FY2018 Budget of $6.1 billion • Over 9,000 employees • Nation’s largest clean-air fleet (over 2,200 CNG buses) • 450 miles of Metro Rapid Bus System • 131.7 miles of Metro Rail (113 stations) • Average Weekday Boardings (Bus & Rail) – 1.2 million • 513 miles of freeway HOV lanes 2 • New rail and bus rapid transit projects • New highway projects • Enhanced bus and rail service • Local street, signal, bike/pedestrian improvements • Affordable fares for seniors, students and persons with disabilities • Maintenance/replacement of aging system • Bike and pedestrian connections to transit facilities 3 4 5 6 7 • New rail and Bus Rapid Transit (BRT) capital projects • Rail yards, rail cars, and start-up buses for new BRT lines • Includes 2% for system-wide connectivity projects such as airports, countywide BRT, regional rail and Union Station 8 Directions Walk to Blue Line and travel to Union Station Southwest Chief to Los Angeles Union Station 9 • Rail transit projects • Crenshaw LAX Transit Project • Regional Connector Transit Project • Westside Purple Line Extension Project • Critical success factors • Financial considerations/risk management • Contract strategy • Lessons learned • Future underground construction • Concluding remarks • Questions and answers 10 11 •Los Angeles Basin •Faults •Hydrocarbons •Groundwater •Seismicity •Methane and Hydrogen Sulfide 12 •Crenshaw LAX Transit Project •Regional Connector Transit Project •Westside Purple Line Extension Project • Section 1 • Section 2 • Section 3 13 • 13.7 km Light Rail • 8 Stations • Aerial Grade Separations, Below Grade, At-Grade Construction • Maintenance Facility Yard • $1.3 Billion Construction Contract Awarded to Walsh / Shea J.V.
    [Show full text]
  • View Annual Update
    Go Metro Los Angeles County Metropolitan Transportation Authority Metro is unique among the nation’s transportation agencies. It serves as transportation planner and coordinator, designer, builder and operator for one of the country’s largest, most populous counties. More than 9.6 million people – one-third of California’s residents – live, work, and play within its 1,433-square-mile service area. Besides operating over 2,000 peak-hour buses on an average weekday, Metro also designed, built and now operates 87 miles of Metro Rail service. The Metro Rail system consists of the Metro Red/Purple Line subway system, and the Metro Blue, Expo, Green and Gold Lines. In total, the Metro Rail system serves 80 rail stations stretching from Long Beach to Downtown Los Angeles, Hollywood and the San Fernando Valley, from Culver City to East Los Angeles and Pasadena, from Norwalk to El Segundo, and all points in between. Under construction is the Expo Line Phase II which will stretch from Culver City to Santa Monica and the 11-mile Gold Line Foothill Extension from Pasadena to Azusa. In addition to operating its own service, Metro funds 16 municipal bus operators and funds a wide array of transportation projects, including bikeways and pedestrian facilities, local roads and highway improvements, goods movement, Metrolink commuter rail, and the popular Freeway Service Patrol and Call Boxes. Recognizing that no one form of transit can solve urban congestion problems, Metro’s multimodal approach uses a variety of transportation alternatives to meet the needs of the highly diverse populations in the region.
    [Show full text]
  • Keeping Southern California's Future on Track
    Keeping Southern California’s 25Future on Track CONTENTS Message from the Board Chair .........................1 CEO’s Message .....................................................3 A Quarter Century of Moving People: The Metrolink Story .............................................5 How It All Began ................................................19 Metrolink’s Top Priority: Safety .......................27 WHO WE ARE Environment ........................................................31 Metrolink is Southern California’s regional commuter rail service in its Metrolink Relieves Driving Stress ...................35 25th year of operation. Metrolink is governed by The Southern California Regional Rail Authority (SCRRA), Board Members Past and Present ..................40 a joint powers authority made up of an 11-member board representing Metrolink Pioneering Staff the transportation commissions of Still on Board ......................................................47 Los Angeles, Orange, Riverside, San Bernardino and Ventura counties. Metrolink Employees Metrolink operates seven routes Put Customers First ...........................................48 through a six-county, 538-route-mile network with 60 stations. Facts at a Glance ...............................................50 For more information, including how to ride, go to www.metrolinktrains.com MISSION STATEMENT Our mission is to provide safe, efficient, dependable and on-time transportation service that offers outstanding customer experience and enhances quality of life. For
    [Show full text]
  • Regional Connector Transit Corridor FY19 Project Profile
    Regional Connector Transit Corridor Los Angeles California (December 2017) The Los Angeles County Metropolitan Transportation Authority (LACMTA) is constructing a 1.9 mile double track light rail transit line in downtown Los Angeles, with 3 new underground stations and the procurement of 4 light rail vehicles. The project will begin at the existing 7th Street/Metro Center Station and will provide connections via a new underground alignment to the existing Metro Blue, Exposition, and Gold Lines. The alignment will extend north underground from the 7th Street/Metro Center Station following Flower Street, curving east under the 2nd Street roadway tunnel and 2nd Street, and continuing east under the intersection of 1st and Alameda Streets, surfacing to connect to the Metro Gold Line tracks within 1st Street at grade to the east and north of Temple Street toward Union Station. In the opening year of 2021 as well as the forecast year of 2035, service will be provided using three-car train consists in the peak period with service every 2.5 minutes. Service will be provided every five minutes during off- peak periods. The hours of operation will be 5:00 a.m. to 12:00 a.m. weekdays and weekends. Estimated daily linked trips on the Project using current year inputs are 58,580. This number is expected to grow to 100,980 daily linked trips by 2035. The total project cost under the Full Funding Grant Agreement (FFGA) is $1,402.93 million. The Section 5309 New Starts funding share is $669.90 million. Status Following completion of an alternatives analysis in January 2009, and the publication of a Draft Environmental Impact Statement (EIS) in September 2010, the LACMTA Board selected the locally preferred alternative in October 2010.
    [Show full text]
  • Motion (De Leon
    ;::»UBUC WORKS MOT I O N The Los Angeles County Metropolitan Transportation Authority (Metro) is currently constructing the Regional Connector Transit CorridorProject in downtown Los Angeles. This Project is a 1.9- mile underground light rail transit line that will extend from the Gold Line Little Tokyo Station to the 7th St. Metro Center. The Project will construct three new stations: Little Tokyo I Arts District Station at 1st Street and Central Avenue, The Historic Broadway Station at 2nd Street and Broadway, and the Grand Av Arts I Bunker Hill Station at 2nd Place and Hope Street. The Project is forecasted to be completed in 2022. In order to allow Metro to continue work for the development of the Grand Av Arts I Bunker Hill Station, Metro needs to acquire two parcels of land and additional permissions to begin construction on the station plaza and a pedestrian bridge at this site. I THEREFORE MOVE that the Bureau of Engineering be authorized to negotiate and execute with the Los Angeles County Metropolitan Transportation Authority (Metro) for the sale, transfer, conveyance, release and quitclaim for the fair market value or other comparable exchange of the City-owned portion(approximately 15,611 square feet)of property adjacent to FlowerStreet between Hope Street and Second Street to be vacated for the Metro Station Plaza. I FURTHER MOVE that the Bureau of Engineering be authorized to negotiate and execute with Metro for the sale, transfer, conveyance, release and quitclaim for the fair market value or other comparable exchange of the City-owned portion (approximately 15,843 square feet) of property bound by General Thaddeus Kosciuszko Way (GTK), Flower Street, Hope Street and Third Street for tree planting associated with the Regional Connector Transit Corridor Project.
    [Show full text]
  • Regional Connector Transit Corridor
    metro.net/works Regional Connector Transit Corridor Alternatives Factsheet Long Beach september 2010 Metro is analyzing three light rail transit These alternatives–Fully Underground LRT, At-Grade ( ) Emphasis LRT and Underground Emphasis LRT–are LRT alternatives to connect the 7th Street being fully evaluated in the environmental phase of the Metro Center and Union Station, linking Regional Connector Transit Corridor project. the Metro Gold, Blue and future Expo Lines In 2007 Metro initiated an Alternatives Analysis (AA) study through downtown Los Angeles. which identified and analyzed 36 routes for the Regional Connector. After technical analysis and extensive community input, the study yielded two “build” alternatives which utilized STADIUM WAY STADIUM WAY COLLEGE COLLEGE ADOBE ADOBE MISSION MISSION descriptionsDEPOT of alternativesCESAR E. CHAVEZ DEPOT CESAR E. CHAVEZ NEW NEW CLARA CLARA VIGNES VIGNES LYON LYON BAUCHET BAUCHET RAMIREZ RAMIREZ LOS ANGELES RIVER LOS ANGELES RIVER DUCOMMON DUCOMMON GAREY GAREY TEMPLE TEMPLE DUCOMMON DUCOMMON DEWAP DEWAP TRACTION TRACTION Broadway Los Angeles Street Station Option Station Option PL HEWITT HEWITT CROCKER TOWNE CROCKER TOWNE COLYTOW COLYTOW SEATON SEATON STANFORD GLADYS STANFORD GLADYS 6TH 6TH CERES CERES Metro Rail Lines Proposed Metro Rail Lines Proposed and Stations Underground Stations and Stations Underground LRT Optional Stations Proposed Transfer Stations Existing Tunnel PL Underground Stations PL LOS ANGELES ST Roadways Transfer Station LOS ANGELES ST SANTEE SANTEE WALL Existing
    [Show full text]
  • GUIDE to DOWNTOWN LA Innovation, Sustainability and California DTLA Is One of the Key Roots Are Core to Califia Farms
    GUIDE TO DOWNTOWN LA Innovation, sustainability and California roots are core to Califia Farms. Our new DTLA is one of the key offices reflect this onein both of the their country’s design and financial epicenters of Southern in their location in California, which is very desirable to most exciting creative incubator : DTLA Arts District. employees and other businesses… districts The synergies of this location are Greg Steltenpohl important to our human capital and CEO of Califia Farms the future growth of our firm both nationally and internationally. Stanley Iezman CEO of American Realty Advisors As our organization grows, we feel there will be an intrinsic benefit to immersing in the progressive culture of Downtown Los Angeles… Our new location will afford This strategic moveattract will allow the usbest to expandtalent in our this operations dynamic us a better opportunity to and continue to identify market trends where market…As our company embarks on a new phase of rapid they happen. growth, all of us at Evite remain focused on our mission of bringing people together face-to-face. Truman Kim , Chief Executive Officer of Evite Chairman & Chief Executive Victor Cho of K-Swiss Global Brands When looking for new offices, we took many factors into consideration, including square footage, location and commutes… But above all, we wanted an exciting space that enables us to preserve our unique company cultures, while promoting greater collaboration across divisions. Stephen Cooper CEO of Warner Music Group 2 Downtown Center Business Improvement
    [Show full text]
  • California High Speed Rail: A-Transformative Investment in California's Future
    CALIFORNIA HIGH-SPEED RAIL A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE 1 HIGH-SPEED RAIL: MORE THAN A TRANSPORTATION PROGRAM • California is 8th Largest Economy in the World • Comparable to Northeast Corridor in Terms of Distance, Population and Complexity • It is a Transformative Investment • Connecting all California Population Centers 2 CONTROVERSY IS NOTHING NEW • Transformative Projects Have Never Been Easy • Golden Gate Bridge: • “Upside-Down Rat Trap that will Mar the Beauty of the Bay” • 2,000+ Lawsuits • BART – Once Called the Train to Nowhere • Calif. State Water System, University of Calif. System • Single-Vote Margins • Where Would We be Without Them? 3 WHY HIGH-SPEED RAIL IN CALIFORNIA? • Curbs Congestion –LAX to SFO is the Busiest Short-Haul Market in US –1 in 6 Flights out of LA Heads to Bay Area –Six of Top 30 Congested Urban Areas in US Located in California • Population Growth Estimated to Reach 50 Million by 2030 • Air Quality/Sustainability –Meets Goals of AB 32/SB 375 • Alternatives are Costly –2-3 Times More Expensive 4 RESULTS FOR CALIFORNIA • Reduction in Vehicle Miles Traveled (VMT) – By 2040, the system will reduce vehicle miles by almost 10 million miles every day – By 2030, the reduction in VMT would be like removing one 500- mile lane of cars • Daily Number of Flights Diverted – Starting in 2030, the state will see a daily reduction of 93 to 171 flights – By 2040, the state will see a daily reduction of 97 to 180 flights • Statewide Air Quality Improvement – Tons of volatile organic compounds reduced
    [Show full text]
  • Regionl Connector Transit Corridor Draft DEIS/DEIR
    Chapter 2 ALTERNATIVES CONSIDERED This chapter discusses how the alternatives studied in this DEIS/DEIR were developed. All of the proposed build alternatives meet the purpose and need outlined in Chapter 1.0. Chapter 2.0 includes a detailed discussion of the alternatives identified for additional study and alternatives that were analyzed and subsequently eliminated from consideration. These alternative analyses were performed in compliance with the National Environmental Policy Act (NEPA), the California Environmental Quality Act (CEQA), the Safe, Accountable, Flexible, Efficient Transportation Equity Act – A Legacy for Users (SAFETEA-LU), and all applicable associated guidance. Depending on which alternative is selected, the Regional Connector Transit Corridor project could involve construction and operation of a 1.6 to 1.9 mile light rail transit (LRT) connector that would link the Metro Blue Line, Metro Gold Line, and future Metro Expo Line into a single consolidated system. All proposed build alternatives would begin underground at the existing Metro Blue Line (and future Metro Expo Line) platform at 7th Street/Metro Center Station and extend in a northeastern direction to a new junction with the Metro Gold Line near Alameda Street. Figure 2-1 shows all of the possible LRT routes and stations identified for study in this DEIS/DEIR. A final decision has not yet been made regarding the route of the Regional Connector Transit Corridor. Metro will consider all reasonable alternatives before making a final selection of a locally preferred alternative (LPA) that provides improved transit service in the Regional Connector Transit Corridor. In addition to the LRT alternatives, a No Build Alternative and a Transportation System Management (TSM) Alternative are being studied.
    [Show full text]