JALAN BUROH SERVICE RESERVOIR

ECAS was appointed the C&S Consultant for the provision of consultancy services for diversion of water pipes in Area and demolition of Service Reservoir. The contract included the completion of 605-meter NEWater pipe and 615-meter industrial water pipes at Jurong Industrial Waterworks including the diversion works to the existing pipeline. The contract also includes the completion of 1100 meter NEWater pipeline at Jalan Buroh Service Reservoir and the demolition of Jalan Buroh Service Reservoir and Instrument Station.

CLIENT: Public Utilities Board PROJECT VALUE: S$15M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2014 JTC 66/22KV SUBSTATION NEWATER STAMFORD DIVERSION AT BULIM CLEANTECH PARK INFRASTRUCTURE PLAN CANAL

The contract awarded includes the The NEWater Infrastructure Plan ECAS was appointed Accredited development of 66/22kV substations Extension Contract C4 which consists Checker for the construction of the at Cleantech Park (CTP) and of the design and construction of 2.2km long Stamford Diversion Canal Industrial Estate. It also involves a 3.3km of 6m internal diameter starting near the Road and consultancy services to come up with segmental tunnel and laying of Grange Road junction. standardized layouts and designs 1200mm/1600mm/2200mm diameter of 66/22kV substations that can be steel pipelines using pipe jacking or The Stamford Diversion Canal will used for multiple substation projects open-cut methods. transfer stormwater from the current at JTC estates. Stamford Canal along The construction was along Pioneer to River. The canal will The standardized designs reduced Road and off Highway. run underneath the roads of Grange the building footprint, was Road, Hoot Kiam Road, Irwell Bank economical to construct and fulfilled Road, and River Valley road before authorities’ requirements. discharging into . There will be demolition of the CLIENT: Public Utilities Board current canal and reconstructed to a wider canal under the Stamford S$140M PROJECT VALUE: Diversion Canal. Jurong Town Corporation CLIENT: ECAS’ ROLE: Accredited Checking S$15M PROJECT VALUE: COMPLETION DATE: 2014 Land Transport Authority ECAS’ ROLE: Consulting Services CLIENT: S$51M COMPLETION DATE: 2015 PROJECT VALUE: ECAS’ ROLE: Accredited Checking

COMPLETION DATE: 2015

www.ecas.com.sg