<<

21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050

FOR GREAT FALLS HIGH SCHOOL

Prepared by Darrell A. Swanson for the citizens Great Falls and for the students of Great Falls High School as an optional solution to the masterplan proposed by the GFPS School District. Darrell attended Longfellow School, Lincoln School, East Junior High School, GFHS (1965) and State University (Masters in Architecture-1973). September 1, 2016 © Copyright 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL

LOOKING EAST ✓ HERITAGE at GFHS is PRESERVED and ENHANCED!!! 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL

LOOKING EAST

■ A phased approach for physical expansion of the campus over the next 35 years and beyond. ■ The first phase could be a combination of infrastructure upgrades along with a build plan of any combination of new spaces that link to future expansion. ■ Future growth is anticipated and masterplanned. Spaces and structures are carefully located for logical expansion.. ■ Articulate Brick/Masonry is the predominate exterior material for new structures and historic type gridded windows tie the campus together. ■ Offers many opportunities for hands on student fund raising and learning experiences that are directly related to their educational interests. These include the numerous flag icons, thundering herd sculpture, Missouri boulder archway, and all student stair. They will continue the GFHS Heritage. 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL NEW CLIMATE ENCLOSED NEW FIELD NEW STEAM & C CONNECTOR HOUSE LOBBY BUILDING NEW THUNDERING HERD SCUPTURE

NEW ARCHWAY MADE OF BOULDERS

NEW ALL STUDENT STAIR LOOKING EAST ■ The new all student stair is under the Thundering Buffalo Herd archway built with boulders from the Missouri River. 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL MAIN CAMPUS

NEW HUB OVERALL SITE PLAN BUILDING AND STADIUM OVERLOOK ■ The existing IA PRACTICE Building is removed to FIELD KRANZ the heart of the PARK campus.

NEW STEAM & C BUILDING MEMORIAL STADIUM

SOUTH CAMPUS & FIELD HOUSE 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 MAIN FOR GREAT FALLS HIGH SCHOOL CAMPUS

NEW STADIUM EXISTING FLAG OVERLOOK OVER OVERALL SITE PLAN HUB NEW UPPER PLAZA OVER ■ Reduces traffic at historic structures MEMORIAL SHOPS and campus by relocating parking STADIUM and bus drop to where the historic HERITAGE is not affected. NEW LOWER PLAZA ■ Enhances the functional heart of the campus by placing service deliveries and screened secure storage at the perimeter and keeps truck and service traffic where it belongs. ■ Removes surface parking currently at the perimeter of the historic structures and upgrades the landscape at those areas as originally intended by the initial architectural design team and school board when Main Campus was constructed during 1930 SOUTH CAMPUS & FIELD HOUSE NEW DROP OFF AND PICK UP SERVICE NEW STEAM & C ENTRANCE & BUILDING DELIVERIES 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050

FOR GREAT FALLS HIGH SCHOOL MAIN CAMPUS EXISTING FLAG & NEW SENIOR COMPASS PLAZA STEPS

LEVEL 3401-SAME PARKING TO ELEVATION AS MAIN EAST FIELD HOUSE ENTRY & BLEACHERS BE REMOVED MAIN CAMPUS CAFETERIA NEW HUB ■ The centrally placed HUB BUILDING NEW FOOD facility is a multipurpose COURT space that facilitates many academic uses and NEW WALK provides food service to the campus and Memorial OF FAME Stadium from the upgraded kitchen and new food court NEW CLIMATE in the main campus. ENCLOSED ■ Strategically places climate NEW STUDENT CONNECTOR enclosed Campus Connector reduces steps STAIR & to and from all functional LOWER PLAZA spaces, handicapped parking, and common areas. NEW ■ Celebrates the many CONSTRUCTION successes by GFHS alumni & TECH COMPLEX with the new Walk of Fame placed between the HUB and Memorial Stadium.

NEW FIELD HOUSE NEW CLIMATE LOBBY ENCLOSED CONNECTOR NEW PARKING STRUCTURE UNDER BULDING 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL CONNECTOR MAIN CAMPUS NEW CONSTRUCTION & TECH COMPLEX NEW HUB BUILDING

NEW 300 CAR PARKING STRUCTURE UNDER BULDING NEW STUDENT STAIR & LOWER PLAZA

NEW FIELD HOUSE LOBBY LEVEL 3401-SAME ELEVATION AS MAIN FIELD HOUSE ENTRY & SOUTH CAMPUS & MAIN CAMPUS CAFETERIA FIELD HOUSE ■ The new 300 stall Parking STORAGE Structure is under the STEAM building and is climate enclosed. CONNECTOR ■ It is a short distance to all functional spaces. SERVICE ENTRY & EXIT ENTRANCE & FOR PARKING DELIVERIES STRUCTURE BELOW BELOW 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL

LOOKING EAST

Two new lanes for student vehicle and bus drop off/pick up for Academic Classrooms, Auditorium, & Stadium. NEW STEAM & C BUILDING

SOUTH CAMPUS & FIELD HOUSE

EXISTING FLAG & NEW COMPASS PLAZA

NEW DROP OFF NEW HUB AND PICK UP BUILDING UNDER STADIUM OVERLOOK 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 NEW UPPER FOR GREAT FALLS HIGH SCHOOL PLAZA

NEW ENTRANCE NEW HUB BUILDING TO AUDITORIUM UNDER STADIUM OVERLOOK NEW STEAM & C BUILDING

SENIOR STEPS SOUTH CAMPUS & FIELD HOUSE

NEW LOWER PLAZA EXISTING FLAG

LOOKING EAST ■ Minimizes physical connection to the historic structures to preserve their creative architectural HERITAGE, celebrates the sporting and academic successes of alumni with a Walk of Fame along the east facade of Memorial Stadium, and has the Commons/Hub/Dining located where it can centrally service the stadium and all academic spaces. ■ Places sunlit outdoor plazas that physically and visually tie together the Flag Courtyard, Senior Stair, East Entrances to Memorial Stadium, and the Main Entrance to the Fieldhouse. ■ The roof of the HUB facility is at the same elevation as the first floor of the main campus building. It provides direct access to the Auditorium through the new lobby door and the upper level of the Memorial Stadium bleachers. The plaza at this location overlooks the stadium field, flag court, and all campus structures ■ The new plaza above the HUB ins connected to the upper level plaza between Main Campus and STEAM & C building. 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL

■ The HUB, multipurpose space, & shops are day lighted by truncated domes.

■ The new upper level connector links the South Campus. NEW INSIDE CONNECTOR THROUGH SOUTH CAMPUS

LOOKING SOUTHWEST

NEW TRUNCATED DOME OVER HUB

NEW TRUNCATED DOME OVER SHOPS 21ST CENTURY CAMPUS

MASTERPLAN-YEAR 2050 NEW LOWER FOR GREAT FALLS HIGH SCHOOL PLAZA NEW HUB SOUTH CAMPUS & BUILDING AND FIELD HOUSE STADIUM OVERLOOK

NEW STEAM & C MEMORIAL BUILDING STADIUM

EXISTING FLAG

NEW UPPER PLAZA MAIN CAMPUS

EAST/WEST AXIS

LOOKING WEST • Maintains and respects the natural east/west axis along the 4th Avenue sidewalk boulevards. • Removes surface parking currently at the perimeter of the historic structures and upgrades the landscape at those areas as originally intended by the initial architectural design team and school board when Main Campus was constructed during 1930. 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL

NEW UPPER NEW SPORTS NEW CULINARY PLAZA FLAG ICON FLAG ICON EXISTING FLAG

NEW STEAM & C BUILDING

NEW STEAM & C NEW STEAM & C FLAG ICON FLAG ICON EAST/WEST AXIS EAST/WEST LOOKING WEST AXIS ▪ Maintains the natural north/south axis that starts at the existing flag by the senior stair and ends at a new icon placed on the roof of the new Field House entrance lobbies ▪ Respects the natural east/west axis along the 4th Avenue sidewalk boulevards. ▪ Removes surface parking currently at the perimeter of the historic structures and upgrades the landscape at those areas as originally intended by the initial architectural design team and school board when Main Campus was constructed during 1930. 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL NEW SPORTS FLAG ICON LOOKING SOUTH

NEW UPPER PLAZA ■ Maintains and respects the natural north/south axis that starts at the existing flag by the senior stair and ends at a new EXISTING FLAG Heritage icon placed on the roof of the new Field House entrance NEW STEAM & C lobbies. FLAG ICON ■ The Heritage icons are opportunities for students to learn and build.

NEW CULINARY FLAG ICON EAST/WEST AXIS NORTH/SOUTH AXIS NEW SPORTS FLAG ICON NEW LOWER PLAZA

LOOKING NORTHEAST 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL NEW STEAM & C NEW SPORTS BUILDING FLAG ICON NEW STEAM & C NEW FIELD FLAG ICON HOUSE LOBBY

LOOKING EAST

■ The new Field House Lobby ties the three levels of the South Campus together with the new enclosed connector NEW STEAM & C and The new indoor FLAG ICON connector through South Campus Building. It has has an elevator and connecting stair. ■ The shops are day lighted by truncated domes. NEW TRUNCATED DOME OVER SHOPS NEW STEAM & C BUILDING 21ST CENTURY CAMPUS

NEW STEAM & C MASTERPLAN-YEAR 2050 BUILDING FOR GREAT FALLS HIGH SCHOOL SENIOR MAIN STEPS CAMPUS

EAST BLEACHERS PARKING TO BE REMOVED NEW HUB BUILDING

NEW UPPER PLAZA

LOOKING SOUTHEAST NEW STUDENT STAIR & ■ Gridded windows similar to the Main Campus historic windows will be the LOWER PLAZA predominate exterior window for new structures on the campus NEW ■ Articulate Brick/Masonry is the FIELD HOUSE predominate exterior material for new LOBBY structures. ■ They will tie the campus structures together. NEW INDOOR CONNECTOR TO SOUTH CAMPUS OVERALL SITE PLAN NEW BISON NEW STEAM & C ARCHWAY & STAIR BUILDING MAIN CAMPUS 21ST CENTURY CAMPUS EXISTING FLAG MASTERPLAN-YEAR 2050 BELOW

SENIOR FOR GREAT FALLS HIGH SCHOOL STEPS NEW UPPER NEW PLAZA FIELD HOUSE LOBBY

NEW NEW TRUNCATED THUNDERING DOME HERD SCUPTURE

NEW ALLSTUDENT STAIR & LOWER PLAZA

NEW UPPER LOOKING EAST PLAZA ■ The new central student stairway is at the paths that intersect the heart of the campus. ■ The stair is under a Thundering Buffalo Herd archway built with boulders from the Missouri River. NEW STADIUM ■ It will be the landmark for students to meet and OVERLOOK gather. ■ The arched stairway and adjoining plazas will hold the NEW ENTRANCE entire student population for Great Falls High School TO AUDITORIUM HERITAGE photographs each year. NEW STUDENT STAIR & LEVEL 3415-SAME ELEVATION LOWER PLAZA NEW BISON AS MAIN FLOOR OF MAIN CAMPUS BELOW ARCHWAY 21ST CENTURY CAMPUS MASTERPLAN-YEAR 2050 FOR GREAT FALLS HIGH SCHOOL LEVEL 3415-SAME ELEVATION AS MAIN FLOOR OF MAIN GUEST CAMPUS PARKING STUDY HALL ■ Conveniently and centrally locates The LOBBY Science Technology, Engineering, Arts, Math, and Construction building where the existing senior parking lot is located. ■ The STEAM & C Study Lobby overlooks the Upper Plaza. ■ It links to the climate enclosed Connector below. MAIN CAMPUS NEW BISON ARCHWAY & STAIR NEW UPPER PLAZA OVER SHOPS

NEW STUDENT STAIR & LOWER PLAZA BELOW

NEW MAIN FLOOR MAIN FLOOR FIELD HOUSE NEW STEAM & C NEW STEAM & C LOBBY BUILDING BUILDING 21ST CENTUR CAMPUS

MAIN MASTERPLAN-YEAR 2050 CAMPUS ` NEW UPPER FOR GREAT FALLS HIGH SCHOOL PLAZA BELOW NEW TRUNCATED DOME OVER SHOPS BELOW GUEST PARKING LEVEL 3430-SAME ELEVATION AS 2ND FLOOR BELOW OF MAIN CAMPUS

■ The STEAM & C building is shaped by energy saving concepts. ■ The design integrates sustainable and energy efficiency solutions ■ The masterplan incorporates energy consumption goals to minimize use of all precious resources by earth sheltering, green roofs, passive solar energy, thermal heating, and wind energy.

LOOKING NORTH MAIN CAMPUS

2ND FLOOR NEW STEAM & C NEW STEAM & C BUILDING BUILDING