<<

Federal Register / Vol. 85, No. 85 / Friday, 1, 2020 / Notices 25433

part 34, of future issuances of securities Dated: 27, 2020. time on the specified comment date. and assumptions of liability. Nathaniel J. Davis, Sr., Protests may be considered, but Any person desiring to intervene or to Deputy Secretary. intervention is necessary to become a protest should file with the Federal [FR Doc. 2020–09315 Filed 4–30–20; 8:45 am] party to the proceeding. eFiling is encouraged. More detailed Energy Regulatory Commission, 888 BILLING CODE 6717–01–P First Street NE, Washington, DC 20426, information relating to filing requirements, interventions, protests, in accordance with Rules 211 and 214 service, and qualifying facilities filings of the Commission’s Rules of Practice DEPARTMENT OF ENERGY can be found at: http://www.ferc.gov/ and Procedure Federal Energy Regulatory docs-filing/efiling/filing-req.pdf. For (18 CFR 385.211 and 385.214). Commission other information, call (866) 208–3676 Anyone filing a motion to intervene or (toll free). For TTY, call (202) 502–8659. Combined Notice of Filings #2 protest must serve a copy of that Dated: , 2020. document on the Applicant. Take notice that the Commission Nathaniel J. Davis, Sr., Notice is hereby given that the received the following electric rate Deputy Secretary. deadline for filing protests with regard filings: [FR Doc. 2020–09312 Filed 4–30–20; 8:45 am] to the applicant’s request for blanket Docket Numbers: ER15–2013–010; BILLING CODE 6717–01–P authorization, under 18 CFR part 34, of ER12–2510–009; ER15–2014–005; future issuances of securities and ER10–2435–016; ER10–2440–012; assumptions of liability, is , ER10–2442–014; ER12–2512–009; DEPARTMENT OF ENERGY 2020. ER19–481–002; ER15–2018–005; ER18– The Commission encourages 2252–001; ER10–3286–013; ER15–2022– Federal Energy Regulatory electronic submission of protests and 005; ER10–3299–012; ER10–2444–016; Commission interventions in lieu of paper, using the ER10–2446–012; ER15–2026–005; [Project No. 2077–119] FERC Online links at http:// ER15–2020–008; ER10–2449–014; www.ferc.gov. To facilitate electronic ER19–2250–002. Great River Hydro, LLC; Notice of service, persons with internet access Applicants: Talen Energy Marketing, Application Accepted for Filing and LLC, Brandon Shores LLC, Brunner who will eFile a document and/or be Soliciting Comments, Motions To Island, LLC, Camden Plant Holding, listed as a contact for an intervenor Intervene, and Protests L.L.C., Dartmouth Power Associates must create and validate an Limited Partnership, Elmwood Park Take notice that the following eRegistration account using the Power, LLC, H.A. Wagner LLC, LMBE hydroelectric application has been filed eRegistration link. Select the eFiling Project Company LLC, Martins Creek, with the Commission and is available link to log on and submit the LLC, MC Project Company LLC, for public inspection: intervention or protests. Millennium Power Partners, LP, a. Application Type: Amendment of Persons unable to file electronically Montour, LLC, New Athens Generating License. may mail similar pleadings to the Company, LLC, Newark Bay b. Project No: 2077–119. Federal Energy Regulatory Commission, Cogeneration Partnership, L.P, c. Date Filed: 21, 2020. 888 First Street NE, Washington, DC Pedricktown Cogeneration Company LP, d. Applicant: Great River Hydro, LLC 20426. Hand delivered submissions in Susquehanna Nuclear, LLC, Talen (licensee). docketed proceedings should be Montana, LLC, York Generation e. Name of Project: Fifteen Mile Falls delivered to Health and Human Company LLC, TrailStone Energy Hydroelectric Project. Services, 12225 Wilkins Avenue, Marketing, LLC. f. Location: The project is located on Rockville, Maryland 20852. Description: Notification of Change in the Connecticut River, near the Town of Status of the Indicated MBR Sellers, et Littleton in Grafton County, New In addition to publishing the full text Hampshire, and Caledonia County, of this document in the Federal al. Filed Date: 4/27/20. Vermont. Register, the Commission provides all Accession Number: 20200427–5181. g. Filed Pursuant to: Federal Power interested persons an opportunity to Comments Due: 5 p.m. ET 5/18/20. Act, 16 U.S.C. 791a–825r. view and/or print the contents of this Docket Numbers: ER20–1136–001. h. Applicant Contact: John Ragonese, document via the internet through the Applicants: Idaho Power Company. FERC License Manager, Great River Commission’s Home Page (http:// Description: Tariff Amendment: Hydro, LLC, 40 Pleasant Street, Suite ferc.gov) using the ‘‘eLibrary’’ link. Amendment re Add Omitted Cancelled 102, Portsmouth, NH 03801; telephone: Enter the docket number excluding the Service Agreement to be effective 6/30/ (603) 498–2851; email: jragonese@ last three digits in the docket number 2020. greatriverhydro.com. field to access the document. At this Filed Date: 4/27/20. i. FERC Contact: Marybeth Gay, (202) time, the Commission has suspended Accession Number: 20200427–5120. 502–6125, [email protected]. access to the Commission’s Public Comments Due: 5 p.m. ET 5/18/20. j. Deadline for filing comments, Reference Room, due to the The filings are accessible in the motions to intervene, and protests: May proclamation declaring a National Commission’s eLibrary system by 27, 2020. Emergency concerning the Novel clicking on the links or querying the The Commission strongly encourages Coronavirus Disease (COVID–19), issued docket number. electronic filing. Please file comments, by the President on 13, 2020. For Any person desiring to intervene or motions to intervene, and protests using assistance, contact the Federal Energy protest in any of the above proceedings the Commission’s eFiling system at Regulatory Commission at must file in accordance with Rules 211 http://www.ferc.gov/docs-filing/ [email protected] or call and 214 of the Commission’s efiling.asp. Commenters can submit toll-free, (886) 208–3676 or TYY, (202) Regulations (18 CFR 385.211 and brief comments up to 6,000 characters, 502–8659. 385.214) on or before 5:00 p.m. Eastern without prior registration, using the

VerDate Sep<11>2014 08:07 May 01, 2020 Jkt 250001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\01MYN1.SGM 01MYN1 25434 Federal Register / Vol. 85, No. 85 / Friday, May 1, 2020 / Notices

eComment system at http:// l. In addition to publishing the full filing made by an intervenor must be www.ferc.gov/docs-filing/ text of this document in the Federal accompanied by proof of service on all ecomment.asp. You must include your Register, the Commission provides all persons listed in the service list name and contact information at the end interested persons an opportunity to prepared by the Commission in this of your comments. For assistance, view and/or print the contents of this proceeding, in accordance with 18 CFR please contact FERC Online Support at document via the internet through the 385.2010. [email protected], (866) Commission’s Home Page (http:// Dated: April 27, 2020. ferc.gov) using the ‘‘eLibrary’’ link. 208–3676 (toll free), or (202) 502–8659 Kimberly D. Bose, (TTY). Enter the docket number excluding the Secretary. The Commission’s Rules of Practice last three digits in the docket number and Procedure require all intervenors field to access the document. At this [FR Doc. 2020–09320 Filed 4–30–20; 8:45 am] filing documents with the Commission time, the Commission has suspended BILLING CODE 6717–01–P to serve a copy of that document on access to the Commission’s Public Reference Room, due to the each person whose name appears on the DEPARTMENT OF ENERGY official service list for the project. proclamation declaring a National Further, if an intervenor files comments Emergency concerning the Novel Federal Energy Regulatory Coronavirus Disease (COVID–19), issued or documents with the Commission Commission relating to the merits of an issue that by the President on , 2020. For may affect the responsibilities of a assistance, contact FERC at [Docket No. ER20–1648–000] particular resource agency, they must [email protected] or call Inter-Power/AhlCon Partners, L.P.; also serve a copy of the document on toll-free, (886) 208–3676 or TYY, (202) Supplemental Notice That Initial that resource agency. 502–8659. m. The Commission strongly Market-Based Rate Filing Includes k. Description of Request: The encourages electronic filings of Request for Blanket Section 204 licensee proposes to amend the license comments, protests and interventions in Authorization to allow for the construction and lieu of paper using the ‘‘eFiling’’ link at operation of an additional 4.7 MW unit This is a supplemental notice in the http://www.ferc.gov. Persons unable to at the Moore Development for the above-referenced proceeding of Inter- file electronically may mail similar primary purpose of providing the pleadings to the Federal Energy Power/AhlCon Partners, L.P.’s required minimum flow of 320 cubic Regulatory Commission, 888 First Street application for market-based rate feet per second (cfs), or inflow if less, NE, Washington, DC 20426. Hand authority, with an accompanying rate more efficiently than current operation. delivered submissions in docketed tariff, noting that such application The licensee proposes structural proceedings should be delivered to includes a request for blanket modifications to the Moore Health and Human Services, 12225 authorization, under 18 CFR part 34, of Development, including: (1) a new Wilkins Avenue, Rockville, Maryland future issuances of securities and modified intake with an accompanying 20852. assumptions of liability. trashrack and headgate providing flow n. Comments, Protests, or Motions to Any person desiring to intervene or to to a new penstock that would be Intervene: Anyone may submit protest should file with the Federal installed on the upstream face of the comments, a protest, or a motion to Energy Regulatory Commission, 888 dam in the original additional intake intervene in accordance with the First Street NE, Washington, DC 20426, location adjacent to the existing Unit 1 requirements of Rules of Practice and in accordance with Rules 211 and 214 intake; (2) a 7-foot-diameter steel pipe Procedure, 18 CFR 385.210, .211, .214, of the Commission’s Rules of Practice would exit the downstream face of the respectively. In determining the and Procedure (18 CFR 385.211 and dam on the Vermont side of the existing appropriate action to take, the 385.214). Anyone filing a motion to transmission substation (owned by New Commission will consider all protests or intervene or protest must serve a copy England Power Co., d.b.a. National other comments filed, but only those of that document on the Applicant. Grid); (3) a new 42 foot by 30 foot who file a motion to intervene in Notice is hereby given that the reinforced concrete powerhouse accordance with the Commission’s deadline for filing protests with regard constructed on the Vermont side of the Rules may become a party to the to the applicant’s request for blanket existing powerhouse; (4) a dissolved proceeding. Any comments, protests, or authorization, under 18 CFR part 34, of oxygen enhancement system consisting motions to intervene must be received future issuances of securities and of a pipe with aeration devices that on or before the specified comment date assumptions of liability, is May 18, discharge water into the new for the particular application. 2020. powerhouse tailrace, and; (5) a new o. Filing and Service of Documents: The Commission encourages tailrace channel would extend into the Any filing must (1) bear in all capital electronic submission of protests and existing tailrace bound by concrete or letters the title ‘‘COMMENTS’’, interventions in lieu of paper, using the sheet pile retaining walls on either side. ‘‘PROTEST’’, or ‘‘MOTION TO FERC Online links at http:// With the proposed modifications to the INTERVENE’’ as applicable; (2) set forth www.ferc.gov. To facilitate electronic Moore Development, the maximum in the heading the name of the applicant service, persons with internet access hydraulic capacity would be increased and the project number of the who will eFile a document and/or be by a maximum of 430 cfs, while the application to which the filing listed as a contact for an intervenor installed capacity would be increased responds; (3) furnish the name, address, must create and validate an from the current 154.8 MW to 159.5 and telephone number of the person eRegistration account using the MW. The licensee does not propose any commenting, protesting or intervening; eRegistration link. Select the eFiling changes to the project’s existing and (4) otherwise comply with the link to log on and submit the operating regime, with exception of requirements of 18 CFR 385.2001 intervention or protests. operating the Moore Unit 5 as the through 385.2005. All comments, Persons unable to file electronically priority unit to provide the minimum motions to intervene, or protests must may mail similar pleadings to the flow below the Moore Development. set forth their evidentiary basis. Any Federal Energy Regulatory Commission,

VerDate Sep<11>2014 08:07 May 01, 2020 Jkt 250001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\01MYN1.SGM 01MYN1