Best Practices for Assisting Transfers Checklist This Is an Agency Self
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Metro Rail Design Criteria Section 10 Operations
METRO RAIL DESIGN CRITERIA SECTION 10 OPERATIONS METRO RAIL DESIGN CRITERIA SECTION 10 / OPERATIONS TABLE OF CONTENTS 10.1 INTRODUCTION 1 10.2 DEFINITIONS 1 10.3 OPERATIONS AND MAINTENANCE PLAN 5 Metro Baseline 10- i Re-baseline: 06/15/10 METRO RAIL DESIGN CRITERIA SECTION 10 / OPERATIONS OPERATIONS 10.1 INTRODUCTION Transit Operations include such activities as scheduling, crew rostering, running and supervision of revenue trains and vehicles, fare collection, system security and system maintenance. This section describes the basic system wide operating and maintenance philosophies and methodologies set forth for the Metro Rail Projects, which shall be used by designer in preparation of an Operations and Maintenance Plan. An initial Operations and Maintenance Plan (OMP) is developed during the environmental phase and is based on ridership forecasts produced during this early planning phase of a project. From this initial Operations and Maintenance plan, headways are established that are to be evaluated by a rail operations simulation upon which design and operating headways can be established to confirm operational goals for light and heavy rail systems. The Operations and Maintenance Plan shall be developed in order to design effective, efficient and responsive transit system. The operations criteria and requirements established herein represent Metro’s Rail Operating Requirements / Criteria applicable to all rail projects and form the basis for the project-specific operational design decisions. They shall be utilized by designer during preparation of Operations and Maintenance Plan. Any proposed deviation to Design Criteria cited herein shall be approved by Metro, as represented by the Change Control Board, consisting of management responsible for project construction, engineering and management, as well as daily rail operations, planning, systems and vehicle maintenance with appropriate technical expertise and understanding. -
Headway and Speed Data Acquisition Using Video
TRANSPORTATION RESEARCH RECORD 1225 Headway and Speed Data Acquisition Using Video M. A. P. TayroR, W. YouNc, eNp R. G. THonlpsoN Accurate knowledge of vehicle speeds headways and on trallÌc ment (such as a freeway) before this study, so there was an networks is a fundamental part of transport systems modelling. excellent opportunity to evaluate the system and suggest mod- Video and recently developed automatic data-extraction tecñ- ifications to it. This equipment also made niques have the potential to provide a cheap, quick, easy, and it feasible to inves- accurate method of investigating traflic systems. This paper pre- tigate the relationship between vehicle speeds and location in sents two studies that use video-based equipment to investigate the car parks. character of vehicle speeds and headways. Investigation oÌ head- rvays on freeway traffic allows the potential of this technology in a high-speed environment to be determined. Its application to the THE VIDEO SYSTEM study ofspeeds in parking lots enabled its usefulneis in low-speed environments to be studied. The data obtained from the video was Using film equipment compared to traditional methods of collecting headway and speed to obtain a permanent record of vehicle data. movements is not a new concept. However, considerable recent developments have occurred in collecting data using video. Digital image-processing applications offer the potential to In particular, ARRB has developed a trailer-mounted video automate a large number of traffic surveys. It is, therefore, recording system (3). This relatively new equipment has until not surprising that considerable interest has been directed at recently experienced only a limited range of applications. -
Headway Adherence. Detection and Reduction of the Bus Bunching Effect
HEADWAY ADHERENCE. DETECTION AND REDUCTION OF THE BUS BUNCHING EFFECT Josep Mension Camps Director Central Services and Deputy Chief Officer of Bus Network. Transports Metropolitans de Barcelona (TMB). Miquel Estrada Romeu Associate Professor. Universitat Politècnica de Catalunya- BarcelonaTECH. 1. INTRODUCTION Transit systems should provide a good performance to compete against the wide usage of cars in metropolitan areas. The level of service of these systems relies on a proper temporal and spatial coverage provision (high frequencies, low stop spacings) as well as significant regularity and comfort. In this way, bus systems in densely populated cities usually operate at short headways (10 minutes or less). However, in these busy routes, any delay suffered by a single bus is propagated to the whole bus fleet. This fact causes vehicle bunching and unstable time-headways. In real bus lines, we usually see that two or more vehicles arrive together or in close succession, followed by a long gap between them. There are many sources of potential external disruptions in the service of one bus: illegal parking in the bus lane, failure in the doors opening system, traffic jams, etc. However, some intrinsic characteristics of transit systems and traffic management may also induce delays at specific vehicles such as traffic signal coordination and irregular passenger arrivals at stops. These facts make the bus motion unstable. Therefore, bus bunching is a common problem in the real operation of buses all over the world that must be addressed. The crucial issue is that bus bunching has a great impact on both users and agency cost. From a passenger perspective, the bus bunching phenomena increases the travel time of passengers (riding and waiting time) and worsens the vehicle occupancy. -
Making Headway, Capital Investments to Keep Transit Moving
CAPITAL INVESTMENT PLAN Making Headway Capital Investments to Keep Transit Moving 2019–2033 headway (/ˈhed wā/) noun 1. forward movement or progress, especially when the way is difficult. 2. the average interval between trains, streetcars, or buses. The shorter the headway, the more passengers carried per hour. Making Headway — Capital Investments to Keep Transit Moving January 2019 From the Chief Executive Officer In January 2018, the TTC published a new Corporate Plan that clearly laid out our priorities for the next five years. At the top of the list was transforming for financial sustainability. “Fiscal sustainability,” we said, “depends on our ability to fund what the TTC is being asked to deliver over the long term.” We committed to providing better budget information for improved long-term decision-making. Over the past 12 months, we have undertaken a massive, multi-department review of all of our assets. The result is this Capital Investment Plan. Toronto’s transit system is hailed as among the most multi- modal systems in the world, with seamless integration between buses, streetcars, Wheel-Trans and the subway. The TTC’s interdependent network of fleet, track, power, maintenance and other infrastructure moves more than half a billion people annually. Funding for critical maintenance and system improvements is necessary. Projects that have been approved are still awaiting funding. Line 2 Capacity Enhancement is unfunded. Buses past 2021 are unfunded. The expansion of Bloor-Yonge Station, which is needed to accommodate ridership growth even before planned transit expansion, is unfunded. The TTC Way, which was introduced in our Corporate Plan, establishes clear guidelines for how we at the TTC work with each other, with customers and with our partners, including our funding partners. -
Application of Holding and Crew Interventions to Improve Service Regularity on a High Frequency Rail Transit Line
Towards 3-Minutes: Application of Holding and Crew Interventions to Improve Service Regularity on a High Frequency Rail Transit Line by Gabriel Tzvi Wolofsky B.A.Sc. in Civil Engineering, University of Toronto (2017) Submitted to the Department of Urban Studies and Planning in partial fulfillment of the requirements for the degree of Master of Science in Transportation at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY June 2019 © 2019 Massachusetts Institute of Technology. All rights reserved. Signature of Author …..………..………………………………………………………………………….. Department of Urban Studies and Planning May 21, 2019 Certified by…………………………………………………………………………………………………. John P. Attanucci Research Associate, Center for Transportation and Logistics Thesis Supervisor Certified by…………………………………………………………………………………………………. Saeid Saidi Postdoctoral Associate, Institute for Data, Systems, and Society Thesis Supervisor Certified by…………………………………………………………………………………………………. Jinhua Zhao Associate Professor, Department of Urban Studies and Planning Thesis Supervisor Accepted by……………………………………………………………………………………………….... P. Christopher Zegras Associate Professor, Department of Urban Studies and Planning Committee Chair 2 Towards 3-Minutes: Application of Holding and Crew Interventions to Improve Service Regularity on a High Frequency Rail Transit Line by Gabriel Tzvi Wolofsky Submitted to the Department of Urban Studies and Planning on May 21, 2019 in partial fulfillment of the requirements for the degree of Masters of Science in Transportation Abstract Transit service regularity is an important factor in achieving reliable high frequency operations. This thesis explores aspects of headway and dwell time regularity and their impact on service provision on the MBTA Red Line, with specific reference to the agency’s objective of operating a future 3-minute trunk headway, and to issues of service irregularity faced today. Current operating practices are examined through analysis of historical train tracking and passenger fare card data. -
1995 Headway-Control.Pdf
A HEADWAY CONTROL STRATEGY FOR RECOVERING FROM TRANSIT VEHICLE DELAYS Peter G. Furth I ASCE Transportation Congress, San Diego October 24, 1995 Abstract Suppose a subway train is delayed due to, say, a medical emergency. What adjustments to the following trains' itineraries should be made in order for the schedule to recover from this initial delay? An optimization framework for finding the optimal schedule adjustments is devised. It accounts for the impact of those adjustments on ride time and waiting time, and has as its objective the minimization of total passenger time. Optimality conditions and a solution algorithm are developed. Realistic constraints such as a safety headway, vehicle capacity, and maximum delay at the start ofthe line are explicitly incorporated. Examples illustrate the main features of the optimal adjustment pattern. After adjustment, a train will follow its leader by the scheduled headway minus an amount called that train's schedule recovery. Because the optimal solution involves a tradeoff between minimizing the ride time impact, which is accomplished by immediately recovering from the initial delay, and the wait time impact, which is minimized by spreading the recovery over a large number of following trains, the optimal recovery pattern lies between these two extremes. In general, there is an S-shaped pattern to the recovery distribution: large recovery for the first one or two trains following the initially delayed train, then rapidly diminishing recoveries per train, and finally small recoveries for the last few trains. The location of the initial delay influences the recovery pattern. Delays that occur on a boarding section, where many waiting passengers will be affected, tend to benefit most from an optimal recovery as opposed to a policy of immediate recovery. -
The MBTA-Performance System
Performance Measurements Using Real-Time Open Data Feeds: The MBTA-performance system 2017 Fare Collection/Revenue Management & TransITech Conference Ritesh Warade, Associate Director, IBI Group April 2017 Introduction Boston MBTA’s challenge Agenda Approach The MBTA-performance system Questions? Multi-disciplinary professional services firm 2,500+ staff / 75+ offices including Boston Core expertise in transit / rail service planning and operations analysis Extensive experience in Transit Technology Increasing focus on Transit Data IBI’s Transit Data practice focuses on helping transit agencies: Manage their data end-to-end Provide high-quality information to passengers Analyze and measure the quality of service provided to and experienced by customers Boston MBTA’s Challenge Size: 5th Largest Agency in the US, 1.3 million Passengers Daily Multimodal: Subway, Light Rail, Bus, Boat, Commuter Rail Goal: Provision of Real-time Passenger Information Tied to the source of data Train Tracking Challenges Bus CAD/AVL Replicating for other modes / agencies Not real-time Approach Leverage Open Data Could We GTFS-realtime feeds Location Prediction Tracking Generation Bus CAD/AVL NextBus In-house Train Prediction Subway Tracking Engine MBTA- realtime GPS + In-house Track Prediction LRT Circuits Engine + TWC Customers Commuter GPS Transitime Rail GTFS Bus Google/ GTFS-RT Apps Subway MBTA- realtime LRT MBTA Apps / Customers API Website / Signs Commuter Rail GTFS JSON Website SMS/ API Email RSS Apps MBTA- alerts Google/A GTFS-RT pps MBTA MBTA Dispatchers API Apps Customers API Twitter GTFS GTFS-RT Trip Updates GTFS- realtime Vehicle Positions Service Alerts Provide real-time data to customers Updated frequently 5-15 seconds All modes / services Well documented GTFS- realtime Widely adopted Strong incentive to maintain Ensure up-time As systems change The MBTA-performance System Bus Google/ GTFS-RT Apps Subway MBTA- realtime LRT MBTA Apps / Customers API Website / Signs Commuter Rail GTFS Bus MBTA MBTA- Mgmt. -
Review of the G Line
Review of the G Line ,. July 10, 2013 NYC Transit G Line Review Executive Summary Executive Summary The attached report provides a comprehensive review of operations on the G line. Based on NYC Transit’s standard measures of On-Time Performance and Wait Assessment, the G performs well relative to the average subway line. At the same time, the G differs from other NYC Transit subway lines because the route is relatively short and never enters Manhattan, and thus serves primarily as a feeder/distributor with most riders transferring at least once before reaching their destinations. This review identifies a number of opportunities to improve operations on the G line, with recommendations chiefly intended to provide more even train headways and passenger loading, as well as to improve customer communication. Key Findings: While G ridership has grown significantly in recent years, it still remains relatively low compared to the rest of the system, and average passenger loads on the G are within service guidelines during both peak and off-peak hours. Scheduling the G train around the busier and more frequent F train causes uneven headways and passenger loads on the G, most significantly during the afternoon peak period, when G service is scheduled at the minimum guideline frequency of 6 trains per hour (an average 10-minute headway). G riders make twice as many transfers as the average subway rider; this high transfer rate is inconvenient for customers who must wait for multiple trains. Trains shorter than the platform length cause uncertainty about where the G train stops, contributing to uneven passenger loads. -
Dynamic Headway and Its Role in Future Railways Making the Transition from Scheduled to Demand-Response Services
FEATURED ARTICLES Creating Smart Rail Services Using Digital Technologies Dynamic Headway and Its Role in Future Railways Making the Transition from Scheduled to Demand-Response Services Dynamic Headway is the world’s first solution that off ers new rail transport value in the form of flexible rail services based on passenger demand. It analyzes demand condi- tions with data acquired from sensors installed in stations and trains, and automatically optimizes the number of train services in response to the analyzed demand. It provides value to passengers in the form of congestion alleviation and transport comfort, and to rail service operators in the form of improved service eff iciency. Hitachi is currently working on a proof of concept for the solution with Italian railway systems integrator, Ansaldo STS, and Denmark’s Copenhagen Metro. As part of these activities, Hitachi has assessed the customer value that Dynamic Headway will bring by using simulations to evaluate its quantitative and qualitative benefits. Hitachi will continue to develop and release solutions driven by digital technologies as it aims to help achieve a more comfortable society to live in through rail transport. Megumi Yamaguchi Daisuke Yagyu Michi Kariatsumari Masahito Kokubo Rieko Otsuka Keiji Kimura, Ph.D. data-driven eff orts to provide high value to all rail transport passengers and operators. Eff ective use of 1. Introduction data can provide passengers with greater levels of transport convenience and comfort, and rail service Th e striking rise of digital technologies in recent years operators with improved transport effi ciency per unit is on the verge of creating major changes in modern time. -
Time-Distance Diagrams: a Powerful Tool for Service Planning and Control
Journal of Public Transportation Time-Distance Diagrams: A Powerful Tool for Service Planning and Control Eric C. Broun National Transit Institute, Rutgers University Vukan R. Vuchic Department ofSystems Engineering, University ofPennsylvania Yong-Eun Shin Dong-Eui University, Pusan, Korea Abstract Graphical scheduling is an old technique that has been neglected, or never acquired, in many NorthAmerican transit agencies. It retains its advantages in basic schedule design and analysis as it eases the solution to problems that are difficult to solve analytically. Even information about simple routes is enhanced by the detailed operating characteristics inherent in detailed vehicle trajectories and by the relative ease with which accelerated service and service recovery strategies can be investigated. It also can be used to confirm and refine solutions that are generated by analytic methods. The methodology is reviewed in the context ofsuch planning applications. Graphical scheduling has additional advantages in operational control with the advent ofmodern /'IS technologies. By movement ofthe cursor on a terminal screen, detailed information about all activity along a route becomes available. It is possible to link the altering oftrajectories through clicking and dragging to the automatic issuance ofcontrol commands and updates ofpassenger information. These and other possible uses ofthe technique in an operational context are pre sented. Vol. 2, No. 2, 1999 2 Journal of Public Transportation Introduction Developmentand use of graphicalschedules for planningand supervisionof transitsystems operations is by no meansa newsubject. It is a time-provenmethod usedfor bothdevelopment and analysis of schedules.Yet, its use is far fromuniver sal. Whilemany transit and railway systems use graphicalschedules in theirdaily operationsfor multiplepurposes, the entireconcept and technique is virtuallyun knownin mostNorth American transit systems, including the largest ones. -
2018 Outlook for the Intercity Bus Industry in the United States
DRIVING DEMAND 2018 Outlook for the Intercity Bus Industry in the United States BY JOSEPH P. SCHWIETERMAN & BRIAN ANTOLIN | JANUARY 29, 2018 1 CHADDICK INSTITUTE FOR METROPOLITAN DEVELOPMENT AT DEPAUL UNIVERSITY | POLICY SERIES 2 ntercity bus lines rolled into 2018 with frequency additions on the busiest corridors), I renewed emphasis on route expansion, these additions suggest there is growing ending a period of considerable restraint—and optimism about the financial payoff of increasing targeted retrenchment—with respect to service capacity, which is likely to manifest itself in more offering. A late-year rise in fuel prices and a boost in the rate of economic growth paves the expansion this year. way for new service initiatives while major tech- oriented transformations push the sector in new Among the highlights was BoltBus adding stops directions. This report explores the intercity bus in Fresno, CA and Richmond, VA, and Megabus industry’s performance and competitive status. adding new routes to Annapolis, MD and Virginia Part I provides insights into what can be Beach, resuming a daily roundtrip to Omaha, and expected to affect the sector over the next adding new stops in Florida. Go Buses expanded several years based on a review of notable trends. Part II reviews the most significant beyond the Northeast by adding routes to Key service changes in various regions of the West Florida, while Jefferson Lines returned to country, while Part III looks to the future. Winnipeg—initiatives discussed further in Section III. I. SHORT-TERM OUTLOOK FOR THE In the Northeast, much of the impetus for growth was the heavily publicized termination of INTERCITY BUS INDUSTRY the Pool Agreement between Greyhound and Five trends stand out that illustrate the notable Peter Pan on September 27, 2017. -
New Haven Streetcar Assessment (2008)
NNEEWW HHAAVVEENN SSTTRREEEETTCCAARR AASSSSEESSSSMMEENNTT Appril 2008 Prepared by: I Stone Consulting & Design P.O. Box 306 324 Pennsylvania Avenue West Warren PA 16365 (814)726.9870 tel (814)726-9855 fax New Haven Streetcar Assessment April 2008 EXECUTIVE SUMMARY History Tuesday, March 4, 2008. The meeting had approximately 50 people in New Haven had an active streetcar system beginning in the 1850’s with attendance and the reaction to the proposed project was favorable. horse drawn streetcars operating on State and Chapel Streets. On June 13, 1892 the first electric streetcar ran and by 1894 almost all of the streetcar The routes generally connect the area south of Route 34 to the area north of routes had been converted to electric propulsion. In 1910 the Consolidated Route 34. Route A runs from Union Station to Grove Street and Route B Railway became part of the Connecticut Railway that operated all of the runs from Columbus Avenue to Munson Street. streetcars in the state. In 1931 the first streetcar route was converted to motor bus operation. On November 27, 1947 the big open streetcars made their farewell run to the Yale Bowl and the last electric streetcar ran in New Haven on September 25, 1948. Initial Process TranSystems has been retained by the South Central Regional Council of Governments (SCRCOG) to implement strategies developed as part of the SCRCOG Regional Transit Study. It was also requested that an assessment of the potential for a new electric streetcar system for the City of New Haven be conducted as part of this implementation study.