EIB EARLY RECOVERY PROGRAMME Renovation of public facilities in , Prymorsk and Mariupol

The European Investment Bank, the EU’s bank, has provided the government of with a loan of EUR 200 million under the Early Recovery Programme (ERP). These funds are used for the repair of medical institutions, schools and kindergartens, and residential, administrative and public buildings in nine oblasts of Ukraine: the Ukrainian government-controlled areas in Donetsk and Luhansk oblasts, Kharkiv, Dnipropetrovsk, , Poltava, Odesa, Kherson, and Kyiv oblasts. The United Nations Development Programme (UNDP) helps to control the transparency of its implementation. As of September 2019, a total of 269 sub-projects for the repair of 262 facilities, with a total cost of EUR 179.14 million have been selected under the programme. In particular, under the ERP the EIB provided EUR 34.6 million for repairs to 35 public facilities in Melitopol and Prymorsk in , and in Mariupol in Donetsk Oblast. Repairs at four of them were completed in September 2019. Five more will be opened by the end of 2019. The remaining 26 facilities will be completed by the middle of 2021.

Melitopol 15 objects Prymorsk 3 objects Mariupol 17 objects Zaporizhzhia Oblast Zaporizhzhia Oblast Donetsk Oblast

Kindergarten №8 Railway Culture "Zirochka" Palace City Perinatal Administrative building of Executive Centre Sports School №3 Committee of Mariupol city council Gymnasium №9 10 School №15 Central District Centre for Social School №7 8 Hospital 12 Kindergarten №41 Rehabilitation of Children School №7 City Hospital №1 7 13 main hospital building 32 "Barvinok" with Disabilities 6 Central District 1 14 28 Palace of Сulture 15 Hospital 16 Kindergarten №47 17 Mariupol City polyclinic building Emergency Hospital, 26 25 29 "Berizka" 2 18 31 City cardiology department 19 Maternity 24 11 Family hostel 30 Psychiatric Music School №1 Hospital 23 3 Infectious Diseases Kindergarten №106 20 Hospital №7 Hospital 31 22 35 4 "Gorobynka" 27 City School №1 5 Oncological Primary Healthсare Korolenko Central Library 34 Dispensary Kindergarten №114 Centre №1 First building 21 "Kalynonka" Primary Healthсare 9 Centre for Social Centre №1 Second building Kindergarten №110 School №8 "Svitliachok" Rehabilitation of Territorial Medical Children with Disabilities School №15 Association for Health of Nursery Children and Women Kindergarten №32 "Dyvosvit"

Facilities to be opened in September 2019 Facilities to be completed by the end of 2019 Facilities to be completed by the end of 2020 Facilities to be completed by the middle of 2021 Melitopol Zaporizhzhia Oblast Prymorsk Zaporizhzhia Oblast 1 Kindergarten №41 "Barvinok" 6 School №7 11 Music School №1 Major repairs and insulation of a façade, replacement Major repairs and insulation of a façade, replacement of Major repairs to the building, including thermal insulation of roof, of windows with energy efficient ones, insulation of a windows with energy efficient ones, insulation of a roof, facade and basement, replacement of windows and doors, interior 16 Central District Hospital roof, installation of an in-house heating unit and installation of an in-house heating unit finishing, renovation of stage, heating, installation of electrical, water, Polyclinic recuperators Loan provided by EIB: €301,184 sanitation, ventilation systems, and provision of fire safety equipment Major repairs to a polyclinic Loan provided by EIB: €180,896 Total budget: €361,420 Loan provided by EIB: €645,867 | Total budget: €775,040 building, including reconstruction of Total budget: €217,076 Address: Melitopol, 400a Interkulturna St. Address: Melitopol, 135 Hetmanska St. the foundation, brick partitions and Address: Melitopol, 136а Gogolia St. Status: Work scheduled for completion by the end 2020 Status: Work scheduled for completion in March 2021 outbuilding, interior finishing, Status: Completed in September 2019 12 Sports School №3 installation of doors, insulation of 7 Gymnasium №9 the roof, flooring, installation of Major repairs to the building, including thermal insulation of roof, façade Major repairs and insulation of a façade, replacement of staircases, insulation of the facade, 2 Kindergarten №47 "Berizka" insulation, arrangement of dining room and cloakroom, re-planning of windows with energy efficient ones, insulation of a roof, installation of heating systems, Major repairs and insulation of a façade, replacement of premises, interior finishing, provision of equipment in gyms, provision of installation of an in-house heating unit and recuperators sewerage and electrical networks, windows with energy efficient ones, insulation of a roof, access for people with disabilities, installation of internal water supply and installation of an in-house heating unit and recuperators Loan provided by EIB: €122,285 installation of two elevators, sewage systems, installation of electric water heaters, replacement of purchase of some furniture and Loan provided by EIB: €143,175 Total budget: €146,742 internal heating system, installation of ventilation system, replacement of technical equipment Total budget: €171,810 Address: Melitopol, 9а Gagarina St. internal water supply, power supply and electrical lighting systems, Loan provided by EIB: €1,276,878 Address: Melitopol, 141 Interkulturna St. Status: Work scheduled for completion by the end 2020 installation of automatic fire alarm, landscaping and installation and Total budget: €1,532,253 Status: Completed in September 2019 equipping of multi-purpose sports ground Address: Prymorsk, 74 Morska St. 8 Railway Culture Palace Loan provided by EIB: €1,472,391 | Total budget: €1,766,869 Status: Completed in September Major repairs to the building, including thermal Address: Melitopol, 199 Lomonosova St. 3 School №1 2019 Major repairs and insulation of a façade, replacement insulation of roof, exterior finishing, replacement of Status: Work scheduled for completion in March 2021 of windows for energy efficient ones, insulation of a windows and doors, thermal insulation of basement, 13 Central District Hospital roof, installation of an in-house heating unit reinforcement of foundation, interior finishing, School №15 17 Major repairs to the building, including thermal insulation of roof and Major repairs to the main hospital Loan provided by EIB: €308,064 installation of heating, electrical, water, sanitation systems, provision of furniture (chairs for auditoriums), replacement of roof covering, facade and plinth thermal insulation, building, including thermal Total budget: €369,677 access for people with disabilities replacement of windows and doors, interior finishing, provision of insulation of external walls and Address: Melitopol, 13 Yaroslava Mudroho St. Loan provided by EIB: €1,247,224 access for people with disabilities, replacement of internal water supply foundations, replacement of Status: Work scheduled for completion by the end of Total budget: €1,496,668 and sewage systems, replacement of heating, power supply and windows and doors, laying of 2019 lighting systems, installation of automatic fire alarm system, paving Address: Melitopol, 61 Tchaikovsky St. landscaping, and provision of equipment Loan provided by EIB: €442,373 Status: Work scheduled for completion in March 2021 4 Primary Health Care Centre №1 Loan provided by EIB: €1,938,332 | Total budget: €2,325,998 Total budget: €530,847 First building: major repairs to the façade and roof of 9 School №8 Address: Melitopol, 54 Hryzodubovoyi St. Address: Prymorsk, 74 Morska St. the public facility, and its entranceways, providing Status: Work scheduled for completion in March 2021 Status: Work scheduled for access for people with disabilities, and laying of paving Major repairs to the building, including thermal insulation of façade, replacement of pitched roof, completion in December 2019 Loan provided by EIB: €185,830 14 Infectious Diseases Hospital windows and doors, interior finishing, installation of Total budget: €222,996 Major repairs to the building, including: interior finishing, replacement of 18 Family Hostel heating, electrical, water, sanitation systems, and lifting doors, insulation of roof, facade and basement, repair of entranceways, Address: Melitopol, 7 Ivana Aleksieieva St. Reconstruction of an device for people with disabilities replacement of water supply, sewage, heating and ventilation systems, Status: Work scheduled for completion by the end of apartment-type family hostel, Loan provided by EIB: €700,337 installation of fire alarm system, provision of medical equipment and 2019 including dismantling and Total budget: €840,405 instruments, and landscaping partitioning; installation of stairs, Address: Melitopol, 147 Mikhail Oratovsky St. Loan provided by EIB: €1,417,015 | Total budget: €1,700,418 Primary Health Care Centre №1 balconies, roofing, flooring, interior 5 Status: Work scheduled for completion in March 2021 Address: Melitopol, 48 Kiziyarska St. Second building: major repairs to the building decoration, ceilings, replacement of Status: Work scheduled for completion in March 2021 including finishing of interior, floors, ceilings, 10 Kindergarten №8 "Zirochka" windows and doors, façade replacement of doors, repair and insulation of insulation, installation of heating, Major repairs to the building, including thermal insulation 15 Maternity Hospital foundations, repairs to entranceways, paving, roof, ventilation, interior lighting, water of roof and façade, replacement of windows and doors, Full reconstruction of building, including interior finishing, replacement indoor water supply and sewerage systems, and sewerage systems, landscape interior finishing, installation of heating, electrical, water, of doors, insulation of the facade and basement, restoration of replacement of sinks and toilets, and of lighting, power design, etc. sanitation and provision of playground equipment entranceway, repairs to elevators, replacement of water supply, supply, heating and ventilation systems Loan provided by EIB: €789,031 (children's summer pavilions, small outbuildings) sewage, heating, and ventilation systems, installation of ventilation Loan provided by EIB: €161,419 Total budget: €946,838 Loan provided by EIB: €760,100 equipment, replacement of internal electrical wiring, grounding of Total budget: €193,703 Address: Prymorsk, 80 Morska St. Total budget: €912,120 buildings, and installation of fire alarm and alerts system Address: Melitopol, 46 Khmelnytskoho Av. Loan provided by EIB: €1,805,362 | Total budget: €2,166,434 Status: Work scheduled for Address: Melitopol, 26/1 Hvardyiyska St. Status: Work scheduled for completion by the end of Address: Melitopol, 37 Kiziyarska St. completion by the end of 2019 Status: Work scheduled for completion in March 2021 2019 Status: Work scheduled for completion in March 2021 Mariupol Donetsk Oblast 19 Mariupol City Emergency 23 Kindergarten №106 "Gorobynka" 27 Territorial Medical Association for 32 City Perinatal Centre Hospital, cardiology Major repairs and insulation of façade, reconstruction Health of Children and Women Major repairs and insulation of façade, thermal insulation of of roof, finishing of interior, reinforcing of existing basement, replacement of windows and doors, Repairs and insulation of façade, reconstruction of roof, department structures, installation of ventilation, heating, water reconstruction of roof, repairs to balconies and canopy, interior finishing, installation of ventilation, heating, water Major repairs, including replacement of supply, sewerage, lighting, power supply, and fire access provided for people with disabilities, installation of supply, sewerage, lighting, power supply, and fire alarm doors, power supply and district heating alarm systems, landscaping, installation of playground, indoor heating unit systems, and landscaping systems, arranging of sanitary facilities, and provision of furniture for kindergarten, and Loan provided by EIB: €538,973 Loan provided by EIB: €1,467,496 and ventilation systems, replacement of equipment for kitchen, first-aid post, and laundry Total budget: €646,768 two hospital elevators Total budget: €1,760,995.33 Loan provided by EIB: €1,280,632 Address: Mariupol, 1 Metalurgiyna St. Address: Mariupol, 80 Myru Av. Loan provided by EIB: €205,427 Total budget: €1,536,757 Status: Work scheduled for completion by the end 2020 Status: Work scheduled for completion by the end 2020 Total budget: €246,512 Address: Mariupol, 25a Kuprina St. Address: Mariupol, 20a Bakhmutska St. Status: Work scheduled for completion by the end 2020 28 City Hospital №1 33 City Psychiatric Hospital №7 Status: Completed in September 2019 Major repairs and insulation of façade, repair and Repairs and insulation of façade, roof space insulation, Nursery Kindergarten №32 reinforcement of walls, replacement of windows and doors, 24 entrance reconstruction, interior finishing, installation of 20 Korolenko Central Library reconstruction of roof, re[airs to balconies, construction of "Dyvosvit" heating, water supply, sewerage, lighting, power supply, Major repairs, including demolition work, canopies construction, installation of lightning protection, and Major repairs and insulation of façade, reconstruction and fire alarm systems, and landscaping roof repairs, roof thermal insulation, heat distribution and metering stations of roof, interior finishing, reinforcement of existing hydro insulation, façade thermal Loan provided by EIB: €1,544,544 structures, installation of ventilation, heating, water Loan provided by EIB: €580,504 insulation, electrical wiring work, heating Total budget: €1,853,452.33 supply, sewerage, lighting, power supply, and fire Total budget: €696,605 system repairs, repair to guttering and Address: Mariupol, 2 Radina M.V. St. alarm systems, landscaping, and provision of Address: 4 Pashkovskoho Street, Mariupol drains Status: Work scheduled for completion by the end 2020 equipment for playgrounds, kitchen and laundry Status: Work scheduled for completion by the end 2020 Loan provided by EIB: €189,851 Loan provided by EIB: €1,551,373 Total budget: €227,821 Palace of Сulture Total budget: €1,861,647 29 34 Kindergarten №110 "Svitliachok" Address: Mariupol, 93-b Myru Av. Repairs to parts of façade, interior finishing, installation of Major repairs and insulation of façade, reconstruction of roof, Address: Mariupol, 38a Pashkovkogo St. lighting, power supply, indoor and external water supply Status: The work is scheduled for replacement of windows and doors, interior finishing, Status: Work scheduled for completion by the end 2020 and sewerage systems, installation of stage lighting, completion in October 2019 reinforcement of existing structures, access provided for people acoustic, and stage equipment, fire alarm system, and with disabilities, installation of ventilation, heating, water supply, 25 School №7 landscaping 21 School №15 sewerage, lighting, power supply, fire alarm systems, installation Major repairs and insulation of façade, reconstruction Major repairs and insulation of façade, Loan provided by EIB: €2,574,953 of radio and telephone networks, grounding, lightning of roof, installation of windows, internal and external replacement of windows and doors, and Total budget: €3,089,943.93 protection, landscaping, installation of playgrounds and water supply and sewerage systems, interior finishing, reconstruction of roof Address: Mariupol, 150 Metalurgiv Av. provision of equipment for kitchen and laundry, fencing of installation of heating, lighting, power supply, fire Loan provided by EIB: €636,126 Status: Work scheduled for completion by the middle 2021 territory, and construction of roads and walkways alarm and ventilation systems, landscaping, and Total budget: €763,351.67 Loan provided by EIB: €1,724,295 provision of kitchen equipment Administrative building of Executive Address: Mariupol, 12 Novorosiyska St. Loan provided by EIB: €2,260,784 30 Total budget: €2,069,154 Status: Work scheduled for completion Total budget: €2,712,940.67 Committee of Mariupol city council Address: Mariupol, 13a Bakhchyvandzhy St. by the end 2020 Address: Mariupol, 7 Levanevskoho St. Major repairs and insulation of façade, reconstruction of roof, Status: Work scheduled for completion by the end 2020 Status: Work scheduled for completion by the end reinforcement of existing structures, interior finishing, 22 Centre for Social 2020 installation of heating, water supply, sewerage, ventilation, 35 Kindergarten №114 "Kalynonka" Rehabilitation of Children power supply, and fire alarm systems Major repairs and insulation of façade, reconstruction of roof, 26 Centre for Social Rehabilitation of Loan provided by EIB: €3,256,183 replacement of windows and doors, interior finishing, with Disabilities Total budget: €3,907,419.33 reinforcement of existing structures, provision of access for Major repairs and insulation of façade, Children with Disabilities Address: Mariupol, 70 Myru Av. people with disabilities, installation of ventilation, heating, water reconstruction of roof, finishing of Major repairs and insulation of façade, reconstruction of supply, sewerage, lighting, power supply, and fire alarm Status: Work scheduled for completion by the middle 2021 interior, installation of heating, water roof, interior finishing, installation of heating, water systems, installation of radio and telephone networks, supply, sewerage, lighting, power supply, sewerage, lighting, power supply, and ventilation 31 City Oncological Dispensary grounding, lightning protection, landscaping, playgrounds and supply, and fire alarm systems, and systems, landscaping, and installation of playground Major repairs and insulation of façade, replacement of equipment for kitchen, laundry, territory fencing, and landscaping Loan provided by EIB: €470,692 windows and doors, reconstruction of roof, repairs to construction of roads and walkways. Loan provided by EIB: €625,798 Total budget: €564,829.87 balconies Loan provided by EIB: €1,537,241 Total budget: €750,958 Address: Mariupol, 18 9th Aviation Division St. Loan provided by EIB: €265,864 Total budget: €1,844,689 Address: Mariupol, 20а Meotydy Street Status: Work scheduled for completion by the middle Total budget: €319,037 Address: Mariupol, 6 Volhohradska St. Status: Work scheduled for completion 2020 Address: Mariupol, 80 Myru Av. Status: Work scheduled for completion by the end 2020 by the end 2020 Status: Work scheduled for completion by the end 2020