<<

Index

Index

A Component cooling 72 Acceptance 122, 152 ff Computer 24, 28, 31 Adjacent costs 134 Constant volume fl ow systems 68 Air conditioning 42 f., 68, 73 Construction 164 ff. Anglo-Saxon method 11 Construction materials 90, 93 Anti claim management 108, 165 Construction price index 135 Appointment list, deadline list 115 f., 130 Construction service contracts 104 8, 11, 24 ff., 29, 35, 42 Construction site equipment/ Architect competition 24 ff. facilities/setup 46 ff., 126 Construction site master plan 47 B Construction site preparation 46 Base plate 50 Contract management 103 Bill Of Quantity (BOQ) 41, 106, 140 Contractor 6, 98 Bonus 166 f. plans, automation plans 120 ff., 130 Agency 167 Conveyor systems 38, 61, 80 Building approval 35 Cooling ceiling 71 f., 89 Building authority 32 ff., 37 Coordinating 11, 15 Building automation 83 Core-outrigger system 55 Building density, urban density 23 Cost assessment 133 ff., 136 ff. Building envelope 56 ff. Cost management 131 ff., 142 ff. Building/construction site 20, 47 CostMonitor 138, 144 Building/ 19 Cost monitoring, cost control 132, 139 ff. Building partner management 167 Cubic capacity assessment 23 Building permission procedures 30, 32 Building site risk D (but also: construction site risk) 11 Deadlines, appointments, dates 104, 109, 111 ff., 118 f., 123, 130 C Decision-making hierarchy 98 f. CAD 31, 35 Decontamination 20 Calculation 110, 136 20, 46, 146, 150 Call for tender, tendering 11, 41, 140, 151 Design 11, 14, 29, 31, 34 Capacity 11 ff. Details 40 Cast-in-place concrete/ Developer 7 in-situ concrete construction 42, 51 f. Development costs 19 Catchment area 20 Development plan 19, 32 ff. Ceiling systems 86 DIN 276 133, 138f. Checks on people 128 Disposal 128, 150 Chillers 75 Documentation 102 ff., 140, 142, 145, 155 ff. 4 Drainage plan 39, 50 Cleaning costs 146, 148 Client, builder 4 ff., 7, 97, 131, 163 ff. E Client tasks 4, 168 Elevator 38, 50, 61, 76, 80 ff. Communication 21, 100, 155 ff. Energy costs 146, 149

170 Index

Energy optimization 149 High-rise facades 60 Energy pass 88 High-rise foundation 50 Energy requirement 88 ff., 149 High-tech and energy facades 60 Energy savings ordinance (EnEv) 88, 149 Environmental protection 20, 88 I Environmental stipulations 20 Implementation planning/ Error dedection 153 f. execution planning 8, 11, 14, 35 ff., 52 Error removal, malfunction removal 122, 153 f. Implementation strategies 12 Escalator 38, 81 f. Individual contractor/ Excavation 48 ff. sole entrepreneur 12 Individual planner 8, 12 f. F Indoor climate 88 ff. Facade 27, 29, 42 f., 57 ff., 147 19, 46, 88 Facade ventilation systems/devices 71 Investment 136 f. Feasibility study 24 Investment costs 136, 146 f. Fee, remuneration 103, 134, 163 ff. Investor competition 26 Fire extinguishing and protection devices 65 K Flat fee 9 ff., 167 96, 157 Flat roofs 56 f. Floor 84, 87, 148 L Formwork plan 35 ff., 50 Land mortgaging 19 FSAE (HOAI) 6, 41, 103, 162 responsibility 96 Funds fl ow 111 management 165 Lighting 79, 86 G Life cycle costs 165 Gant chart 114, 119, 122 Location analysis 19 General contractor 10 ff., 163 47, 111, 126 ff. General construction management 165 ff. Low voltage facility 78 f. General manager 7 General planner 8 f. M Geothermal heat 89, 149 Managerial function 98 Green Building 92, 149, 168 Masonry structure, Ground water 20, 49, 90 brickwork structure 51 General Terms and Conditions (GTC) 104, 106 Mega-Structure 54 f. Guaranteed Maximum Price (GMP) 167 Metra potential method 111 Milestone plan 110, 118 f. H Mixed construction 51 f. Heating 67, 72 Models 24, 31 Heat insulation 149 Multi-project room 157 Heat supply 67 High pressure induction N air conditioning systems 70 Network plan 109, 111 ff.

171 Index

O Regenerative energy 88 Old burdens 20 Regional council 32 f. Operating costs, costs of operation, Regular details, control details 40 operation costs 136 Reinforcement plan 35, 37, 50 Reinforcement with core 54 P Renaturation 93, 150 Parcel allocations 13, 165 Returns check, yield check 136 Partial general contractor 9 103 ff., 107, 165 Partition wall systems, Risk strategy 107 dividing wall systems 85 Roofs 56, 90, 147 Pellets 89 Room manual, building space Plan cost assessment 136 utilization book 11, 14 f., 30 Planning contracts 103 f. Run-up times, lead times 42, 120 Planning idea 6, 18, 24, 102 Planning lead time 11, 42 f. S Plot analysis 19 Sanitary technology, Potsdamer Platz 23 f., 26, 31, 47, 125 sanitary engineering 63 Power supply, electricity supply 77 Safety, security 83, 128 Prefabricated construction 52 Salary cost, salaries 90 Preliminary planning 27 Scale 35, 37 ff. Preservation of evidence procedure 21 Schedule planning, Process optimization 112, 162 appointment planning 112, 117 f., 120, 123 Process structure 109 ff., 117 Schematic design 29 ff. Programming 21 Sensitivity analysis 135, 164 Project control 163 f., 168 Service and maintenance costs 148 Project controlling 163, 168 Shell, shell works 35 ff., 42 f., 48 ff. Project communication management 155, 157 Simulation 27 f., 31, 92, 109, 111, 124 f. Project developer 7 Sloping roofs/slated roofs 57 Project duration, period 14 f., 132 Slot plan, gap plan 36, 38 4, 7, 96, 110, 164 Software 137 f., 142, 155 Project organization 97 ff. Solar energy 89 Project room 156 f. Staff function 98, 163 Project types 4 f. Steel construction 52 f. Property developer 11 Story framework 53 Public announcement 41 Structural design 11 Submission 41 Q Subsequent costs 148 151 ff. Supervision 152 Surface model/planimetric model 18, 23, 28, 137 R Sustainable design 146 Red point 46 Sustainability 88, 93, 146 ff. Recycling 93, 150

172 Index

T Target defi nition 4, 100, 109 Technical equipment, engineering equipment, building services equipment 36, 38, 62, 134 Telecommunications 20 Tenant management 158 Time calculation 110 Trades 9, 56, 61, 110, 139, 153 Traffi c regulation 46 Tube-in-Tube system 55 Tube system 54 f. Turnkey construction 13 Types of costs 164 Type of organization 8 f., 97

U 19 Update information service 102 User, occupant 7, 158

V Value engineering 162, 165 f. Variable volumefl ow system 69 Ventilator-convector 70 Verdingungsordnung zur Vergabe von Leistungen (VOB) 105 ff. Vergabe- und Vertragsordnung für Bauleistungen (VOL) 106 Ventilation 38, 42, 68, 71 Ventilation systems 68 Ventilation units, airconditioning units 68, 70 Vertical louver blinds, blinds 73

W Water consumption 90 Waste air, exhaust air 69 ff. 73 Waste water 63, 90 Workshop plan, basic building plan 35 ff.

173 Image Source

Image Sources

© Jevgenijs Dasko – Fotolia.com (Cover) Kroll Hamburg (P. 5) © 2003 goebel photo (P. 5) Hans-Georg Esch, Hennef (P. 5, 80) Albrecht Haag Fotografi e, Darmstadt (P. 5) Martin J. Duckek, Ulm (P. 5, 88, 91) Roland Halbe, Stuttgart (P. 5) Brigida Gonzalez, Stuttgart (P. 5) Vincent Mosch, Prof. Rudolf Schäfer (P. 5, 31, 49, 52, 60) Tom Filipi, Stuttgart (P. 5) Uwe Rau (P. 26) Projektgesellschaft Neue Messe GmbH & Co. KG (P. 26) Next Edit (P. 31) XQ Media, Cologne (P. 31) AOP Air shots Oliver Braitmaier, Stuttgart (P. 125, 127)

174 Notes

175 Notes

176