Pace's Bus on Shoulder Program to Expand

Total Page:16

File Type:pdf, Size:1020Kb

Pace's Bus on Shoulder Program to Expand Issue 2 PaceBus.com Spring, 2013 Pace’s Bus on Shoulder Program to Expand Since Pace’s Bus on changes would maximize Shoulder Program began positive impacts for the in 2011, ridership on Route highest number of riders. 755 and Route 855 have Many passenger suggestions increased dramatically as are included in this plan, passengers take advantage of which is effective May 6, faster, more reliable service 2013. between the southwest Route 755 will have new suburbs and Chicago. Pace morning and evening trips, is pleased to announce that minor timing adjustments service will be adjusted and and a new evening trip from increased on these routes Chicago Union Station that flexibility and convenience. between destinations to to attract and accommodate will also serve Bolingbrook, New, alternating, evening provide a faster ride. Minor additional riders, reduce Lemont, Lockport and Joliet express trips will provide adjustments to arrival and commute times and reduce Union Station upon request. direct service to I-55 Park- departure times of roughly overcrowding. 5-9 minutes will also occur. Route 855 will have new n-Ride locations. Between In December, 2012, Pace morning and evening trips, 4:15pm and 5:45pm, when For more information and surveyed customers to as well as a new midday buses operate every 10-15 new schedules, please visit investigate what service round trip to offer better minutes, trips will alternate PaceBus.com. New Pace Routes for Commuters Affected RTA RIDE FREE PROGRAM UPDATE by CTA Red Line Closure Begin May 6, 2013 For Qualifying Seniors and People with Disabilities During the CTA Red Line South 348, 349 and 354 conveniently construction, which is scheduled connect to the new express routes Effective July 1, 2012, Illinois Cares Rx was ter- to begin on Sunday, May 19, 2013, at the Harvey TC and/or Blue Island minated and the Circuit Breaker Property Tax Re- Pace will operate two temporary PnR. lief Grant was eliminated due to a lack of funding weekday express routes from Blue by the state. A new program, called the Benefit South suburban residents also Island and Harvey. Passengers have the option of connecting Access Program, has been established to qualify will be dropped off at State St. to CTA Route J14 Jeffery Jump individuals for the following benefits: and Roosevelt Rd. in Chicago thanks to new routing on Pace • Seniors Ride Free Permit (also referred to as where they may transfer to the Route 353. This route begins at CTA Red/Orange/Green Lines at the Seniors Free Transit Ride) the Pace Homewood Park-n-Ride the Roosevelt Road Station. • People with Disabilities Ride Free Permit and serves Calumet City, South (also referred to as the Persons with Disabilities Pace Route 924 will operate Holland, Dolton, and Riverdale weekdays only from the Pace before connecting with the CTA Ride Free Transit Ride) Harvey Transportation Center J14 at the CTA Stony Island / • Secretary of State License Plate Discount (Harvey TC) where commuters can 103rd Garage Terminal. This Seniors and people with disabilities who are en- park their vehicles all day for $1.50. routing change is permanent. rolled in the Illinois Department on Aging’s Ben- Pace Route 925 will operate On May 19, 2013, boarding efit Access Program are eligible to ride free on weekdays only from the Pace Blue locations at the CTA Red Line Pace, CTA and Metra fixed-route services. To be Island Park-n-Ride (Blue Island 95th/Dan Ryan Station will determined eligible for these benefits, you must PnR) where commuters can park change. Pace Route 381 will submit a Benefit Access Application to the Illinois their vehicles all day, free of charge. board/alight passengers on the Department on Aging on the Internet at www.state. east side of the bus terminal; Pace Pace Routes 385, 350, 364, 352, il.us/aging. Paper applications are not available. NEW PACE ROUTES continued on back Introducing Ventra: Pace’s and CTA’s New Way to Pay Pace and CTA will soon transition to ensures we’re staying in step with the Ventra™, a convenient new payment demands of our customers.” system that will let customers use a single fare card for regional transit Pace and CTA will continue to offer throughout Chicago and the suburbs. special fares and money-saving passes, With Ventra, traveling throughout the like the Commuter Club Card and the region will be easier and more efficient Campus Connection Pass, and will still than ever before. accept cash on buses. Customers will also eventually be able to use compatible Ventra will be available in summer 2013, mobile phones to pay for train and bus customers plenty of time to use old and will allow customers to pay for rides rides. The transit agencies retain full passes and make the transition to Ventra. with the same payment method they use control of their fare structures while In 2014, all CTA and Pace fare media, for everyday purchases. Customers can enabling customers to easily transfer including the Chicago Card and Chicago choose from the following contactless between both services using the same Card Plus, will be replaced with Ventra. payment methods: Ventra Cards, Ventra form of payment. Customers are encouraged to visit Tickets for single-ride and 1-day passes, ventrachicago.com for information and personal bank-issued debit and Ventra Cards and fare products will be and to sign up to receive updates as credit cards equipped with a contactless sold at vending machines in rail stations, Pace and CTA implement the new fare chip. Customers will simply “tap” any and will be made available at up to 2,500 payment system. of these contactless payment cards to retail locations throughout Chicago and quickly board trains and buses. the suburbs. Many of the locations will NEW PACE ROUTES continued from front be within blocks of Pace and CTA bus Route 352 will board/alight passengers “We are eager to provide this new stops and CTA rail stations. on the west side of the bus terminal; convenience to our customers because and Pace Routes 353, 359 and 395 will Ventra will be available to all customers it modernizes our fare system using board/alight passengers along Lafayette in summer 2013. During the second the latest technology,” said T.J. Ross, Avenue. Wayfinding signage and bus half of 2013, both new and existing Executive Director of Pace. “Remaining stop signs will help guide passengers to fare media will be accepted, giving current with emerging payment methods the appropriate boarding locations. Express Service to Popular Destinations; Relax and Leave the Driving To Pace! Pace operates express bus service to many events Service Departure Location(s) * Free parking and activities in the suburbs and Chicago. Express Allstate Arena Express CTA Blue Line Rosemont Station Services to Popular Destinations (ESPD) let riders $1.75 relax on a comfortable Pace bus on their way to Wrigley Field Express Pace Northwest Transportation Center* and from their favorite events. Riders of these $4.00 Yorktown Center in Lombard* U.S. Cellular Pace South Division, Markham express routes get the added bonuses of avoiding Field Express Metra SouthWest Service Palos Heights Station cost and hassles of driving in traffic and parking $4.00 (upper level near the station)* at a major venue. Metra SouthWest Service Oak Lawn Metra Station* Pace Old Chicago (Bolingbrook) Park-n-Ride* Exact fare ($4.00 or $1.75, depending on the route) Pace Burr Ridge Park-n-Ride* is required to board the bus each way. Call Pace’s Tinley Park Burlington Coat Factory (BCF) - North Lot* ESPD Line at 847-228-2416 or visit PaceBus.com for Toyota Park Express CTA Orange Line Midway Station departure location addresses and more information. $1.75 Great America Express Pace Northwest Transportation Center* $4.00 CTA Blue Line Rosemont Station What’s New? Soldier Field Express Pace Northwest Point - Elk Grove Park-n-Ride* $4.00 Pace Northwest Transportation Center* Pace RideShare Launches New Website Metra SouthWest Service Palos Heights Station Pace has upgraded to a new version of its carpool (upper level near the station)* and vanpool matching website at PaceRideShare. Metra SouthWest Service Oak Lawn Metra Station* Pace Old Chicago (Bolingbrook) Park-n-Ride* com. New features include improved map Pace Burr Ridge Park-n-Ride* displays, social media integration, ability to have Yorktown Center in Lombard* multiple commute profiles and much more! Log NU Ryan Field Express Pace Northwest Transportation Center* on to PaceRideshare.com today. $4.00 .
Recommended publications
  • Metra Increasing Service on 7 More Lines Enhanced Schedules to Take Effect July 12
    News Release Metra Media Relations 312-322-6776 FOR IMMEDIATE RELEASE Metra increasing service on 7 more lines Enhanced schedules to take effect July 12 CHICAGO (July 1, 2021) – Metra today posted schedules for expanded rush hour service to begin Monday, July 12 on seven additional lines to meet growing ridership. New schedules will take effect July 12 on the Heritage Corridor, Milwaukee District North and West, SouthWest Service, North Central Service and Union Pacific Northwest and West lines. On the same day, Metra will also launch previously announced new pilot schedules on the BNSF, Metra Electric and UP North lines that provide more off-peak options. A similar pilot schedule for the Rock Island Line is set to take effect on July 19. “My Metra is about listening to the needs of our riders. These new schedules are intended to help our customers transition back to a regular work commute providing them with more choices and flexibility,” said Metra CEO/Executive Director Jim Derwinski. “We expect ridership to continue to increase as the summer progresses and will continue to monitor conditions and make schedule adjustments that are responsive to our customers’ needs.” The new schedules can be viewed now at metrarail.com. In addition to new trains, there are minor adjustments to the timetables of some existing trains on some lines; customers are advised to review the new schedules to see if the timetables of their trains have changed. All the changes are highlighted on the new schedules. The guiding principles for Metra’s service restoration are to provide consistent and frequent service throughout the day; create easily understandable and memorable service patterns; implement new express service when possible in the peak travel periods; explore reverse-commute and new ridership markets; promote regional equity and create transfer opportunities within Metra and with other transit services.
    [Show full text]
  • Southeast Corridor Alternatives Analysis Locally Preferred Alternative Report
    SOUTHEAST CORRIDOR ALTERNATIVES ANALYSIS DOCUMENT #9 LOCALLY PREFERRED ALTERNATIVE REPORT PREPARED BY AUGUST 2011 METRA – SOUTHEAST CORRIDOR LOCALLY PREFERRED ALTERNATIVE REPORT ALTERNATIVES ANALYSIS DOCUMENTS 1. Detailed Work Scope 2. Purpose & Need 3. Initial Alternatives, Part I: Modes & Technologies 4. Evaluation Methodology 5. Initial Alternatives, Part I Screening and Part II: Conceptual Design 6. Screening of Initial Alternatives, Part II 7. Feasible Alternatives 8. Screening of Feasible Alternatives 9. Locally Preferred Alternative Report AECOM AUGUST 2011 I METRA – SOUTHEAST CORRIDOR LOCALLY PREFERRED ALTERNATIVE REPORT TABLE OF CONTENTS I. INTRODUCTION.......................................................................................................... 1 A. PURPOSE.................................................................................................................. 1 B. BACKGROUND ......................................................................................................... 1 II. SUMMARY OF ALTERNATIVES ANALYSIS.............................................................. 5 A. INITIAL SCREENING, PART I................................................................................... 5 B. DEFINITION AND SCREENING OF INITIAL ALTERNATIVES, PART II.................. 7 C. DEFINITION OF FEASIBLE ALTERNATIVES ........................................................ 10 D. DETAILED FINAL SCREENING.............................................................................. 11 III. PUBLIC INVOLVEMENT SUMMARY.......................................................................
    [Show full text]
  • Go to 2040 Update Appendix
    GO TO 2040 UPDATE APPENDIX Major Capital Projects October 2014 Table of Contents Introduction ................................................................................................................................................ 1 Major Capital Projects ............................................................................................................................... 2 Expressway Additions: Express Toll Lanes ....................................................................................... 2 I-55 Stevenson Express Toll Lanes ................................................................................................... 2 I-290 Eisenhower Express Toll Lanes .............................................................................................. 3 Expressway Additions: Interchanges and Improvements ............................................................... 4 Circle Interchange .............................................................................................................................. 5 I-294/I-57 Interchange ........................................................................................................................ 5 I-190 Access and Capacity Improvements ...................................................................................... 5 Jane Addams Tollway (I-90) ............................................................................................................. 6 Transit Improvements ..........................................................................................................................
    [Show full text]
  • Chicago Transit Authority (CTA)
    06JN023apr 2006.qxp 6/21/2006 12:37 PM Page 1 All Aboard! Detailed Fare Information First Bus / Last Bus Times All CTA and Pace buses are accessible X to people with disabilities. This map gives detailed information about Chicago Transit # ROUTE & TERMINALS WEEKDAYS SATURDAY SUNDAY/HOL. # ROUTE & TERMINALS WEEKDAYS SATURDAY SUNDAY/HOL. # ROUTE & TERMINALS WEEKDAYS SATURDAY SUNDAY/HOL. Authority bus and elevated/subway train service, and shows Type of Fare* Full Reduced Reduced fares are for: You can use this chart to determine days, hours and frequency of service, and Fare Payment Farareboebox Topop where each route begins and ends. BROADWAY DIVISION ILLINOIS CENTER/NORTH WESTERN EXPRESS Pace suburban bus and Metra commuter train routes in the 36 70 Division/Austin east to Division/Clark 4:50a-12:40a 5:05a-12:40a 5:05a-12:40a 122 CASH FARE Accepted on buses only. $2 $1 Devon/Clark south to Polk/Clark 4:00a-12:10a 4:20a-12:00m 4:20a-12:15a Canal/Washington east to Wacker/Columbus 6:40a-9:15a & CTA service area. It is updated twice a year, and available at CTA Children 7 through 11 BUSES: CarCardsds It shows the first and last buses in each direction on each route, traveling Polk/Clark north to Devon/Clark 4:55a-1:20a 4:55a-1:05a 4:50a-1:15a Division/Clark west to Division/Austin 5:30a-1:20a 5:40a-1:20a 5:45a-1:20a 3:40p-6:10p Exact fare (both coins and bills accepted). No cash transfers available. years old.
    [Show full text]
  • Blue Island Metra Schedule
    Blue Island Metra Schedule Unriveting Barnaby overbuying his cottonseeds engineer keenly. Foster usually mollycoddled smilingly or touch chock when intermingled Eliot actuate solely and certes. Briniest and trite Meredith rejoins so floristically that Alexander reclothes his sarangis. Under ptc operational on metra plans to blue island schedule retains its schedule for operating as well as an energy conference in! If a cn caboose which is too much has been a look at blue island metra schedule. She taught piano to kids in NC for years. The fraudulent concept of Precision Scheduled Railroading which harm the. Make blue island schedule is devoted to smyth because he was cancelled after either class. Get fios for metra is for their legal difficulties through the blue island trains serving the ns towards midway airport easily do their fullest. First of wrong, No Walls. Why unless I see ads? Spotify is devoted to blue island schedule is now. At most times of the day though, southbound trains are unproblematic. This vantage point but now off limits. On goat Rock Island your will be love at Robbins Blue Island Mokena. Southwest Service Heritage Corridor and the study Island Branch beside the Metra. That man controls facebook and blue island metra schedule and. We understand where the metra must quickly than they are just got in the blue island metra schedule later in! You may to metra station has grown recently and schedule will be placed in blue island metra schedule at the fares are bathed in chicago summer youth olympic festival was found. Medill Park and Dvorak Park.
    [Show full text]
  • Spatial Variation in House Prices and the Opening of Chicago's Orange
    1 Spatial Variation in House Prices and the Opening of Chicago’s Orange Line Daniel McMillen University of Illinois Department of Economics 1407 W. Gregory Dr. Urbana, IL 61801 [email protected] April 2018 Abstract The recent literature on the effect of public transit lines on property values has relied primarily on difference in difference estimation approaches. The standard difference in difference approach of comparing sales prices before and after the opening of a new transit line or station is not well suited to this analysis because prices typically rise well in advance of the new service and there is no clear treatment or control area. Moreover, estimated treatment effects are likely to vary spatially and are not necessarily uniform across the full spectrum of home prices. An analysis of home prices before and after the opening of Chicago’s Orange Line from the Loop to Midway Airport suggests that house prices began to rise near the new line about two years before the opening. Estimated appreciation rates are highest for relatively low priced homes, and there is signification spatial variation within the area close to the new line. 2 1. Introduction The large literature on the effects of transit lines on house prices began with straightforward hedonic regressions of house prices on distance to stations, typically using cross sectional data sets. Representative examples of the hedonic approach include Dewees (1976), Bajic (1983), and Voith (1993). Although the hedonic approach can establish whether prices are higher near transit stations, the results are likely to be biased by missing variables that themselves are correlated with transit access.
    [Show full text]
  • Inner Circumferential Commuter Rail Feasibility Study
    INNER CIRCUMFERENTIAL COMMUTER RAIL FEASIBILITY STUDY FINAL REPORT and STV Inc. April 1999 Inner Circumferential Commuter Rail Feasibility Study TABLE OF CONTENTS PAGE FOREWORD ............................................................. iii EXECUTIVE SUMMARY ................................................ ES-1 1.0 INTRODUCTION .................................................. 1 2.0 EXISTING CONDITIONS ......................................... 5 2.1 Alignment Options .................................................. 5 2.2 Description of Alignments ............................................ 8 2.3 Land Use and Zoning ................................................ 12 2.4 Potential Station Locations ............................................ 12 2.5 Environmental Issues ................................................ 19 3.0 FUTURE PLANS .................................................. 24 3.1 Demographic and Socioeconomic Characteristics .......................... 24 3.2 Municipal Development Plans. ........................................ 27 3.3 Railroads and Other Agencies .......................................... 34 4.0 POTENTIAL OPERATIONS ...................................... 39 4.1 Option 1: IHB-BRC ................................................. 40 4.2 Option 2 :MDW-BRC. .............................................. 41 4.3 Option 3: WCL-CSX-BRC ........................................... 42 4.4 Option 4: IHB-CCP-BRC ............................................ 43 5.0 CAPITAL IMPROVEMENTS ....................................
    [Show full text]
  • Southwest-Final-Report.Pdf
    SOUTHWEST Service Enhancement Plan Final Report December 2015 Dear Reader, I am proud to present the Southwest Service Enhancement Plan, with recommendations to get you and your fellow community members where you need to go. This report provides a vision for future TriMet service in the Southwest portion of the region (for other areas, see www.trimet.org/future). The vision for future service in the Southwest Service Enhancement Plan is the culmination of many hours of meetings with our customers, neighborhood groups, employers, social service providers, educational institutions and stakeholders. Community members provided input through open house meetings, surveys, focus groups, and individual discussions. Extra effort was put into getting input from the entire community, especially youth, seniors, minorities, people with low incomes, and non-English speakers. Demographic research was used to map common trips, and cities and counties provided input on future growth areas. Lastly, TriMet staff coordinated closely with Metro’s South- west Corridor Plan process to ensure that both efforts complement one A note from another and expand transit in the southwest part of our region. TriMet The final result is a plan that calls for bus service that connects people to more places, more often, earlier, and later. The plan also recommends GeneralManager, improvements to the sidewalks and street crossings to support transit service and new community-job shuttles to serve areas that lack transit service because the demand is too low for traditional TriMet service to Neil McFarlane be economically viable. The service enhancement plans are not just visions of the future, but commitments to grow TriMet’s system.
    [Show full text]
  • Metra's 2002 Program and Budget Has Been Reformatted for The
    Metra’s 2002 Program and Budget has been reformatted for the Web 547 West Jackson Boulevard Chicago, Illinois 60661-5717 Phone (312) 322-6900 Web http://www.metrarail.com CREATING CAPACITY FOR GROWTH FINAL 2002 PROGRAM AND BUDGET NOVEMBER 2001 Board of Directors Jeffrey R. Ladd, Chairman Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Lowell E. Anderson, Treasurer Appointing Authority: Suburban Members, Cook County Board Larry A. Huggins, Director Appointing Authority: City of Chicago W. Warren Nugent, Secretary Appointing Authority: Suburban Members, Cook County Board Gerald L. Porter, Vice-Chairman Appointing Authority: County Board Chairman, DuPage County Joseph A. Tecson, Director Appointing Authority: Suburban Members, Cook County Board Donald A. Udstuen, Director Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Philip A. Pagano, Executive Director TO FRIENDS OF COMMUTER RAIL: Chairman’s Welcome to Metra’s 2002 Program and Budget. It Message describes good news such as further ridership growth, steady progress on our three New Start projects, and ongoing capital improvements including orders for badly needed new cars and locomotives. Meanwhile, the costs of providing safe, reliable, convenient and comfortable commuter rail service have steadily increased. Thus, our proposed 2002 operating budget envisions our first fare increase in six years, 5%, which will likely take effect June 1. I think it’s important to note that this will be only the fourth fare increase in the 18 years of Metra’s management of the Northeast Illinois commuter rail system. And it will be only the third one for operations. A fare hike that took effect in 1989 was dedicated solely to capital projects, namely the physical improvements that preserve and improve our serv- ice — and in turn reduce operating costs.
    [Show full text]
  • N:\JOE\RTCP\Interim Progress Report\Links\Report Cover.Tif
    Final Report Submitted to Regional Transportation Authority REGIONAL TRANSIT COORDINATION PLAN: LOCATION STUDY prepared by BOOZ·ALLEN & HAMILTON INC. in association with WELSH PLANNING July 2001 This report is confidential and intended solely for the use and information of the company to whom it is addressed Table of Contents Disclaimer Page.........................................................................................................................1 Section 1 – Project Summary...................................................................................................2 Section 2 – Study Purpose .......................................................................................................5 Section 3 – Background............................................................................................................7 3.1 Introduction .............................................................................................................7 3.2 Assessment of Transit Coordination ...................................................................8 3.2.1 Physical Coordination.............................................................................9 3.2.2 Service Coordination .............................................................................10 3.2.3 Fare Coordination ..................................................................................10 3.2.4 Information Coordination.....................................................................11 3.2.5 Other Themes and Issues......................................................................13
    [Show full text]
  • Chicago to St. Louis High-Speed Rail Tier 1 Final Environmental Impact Statement: Volume I
    Section TRANSPORTATION 6 IMPACTS 6. Transportation Impacts6. Transportation 6.0 Transportation Impacts This section describes the transportation impacts expected with the No‐Build and Build Alternatives. The Service Development Plan and expected travel benefits are presented. Year 2030 ridership projections and operating revenues for passenger rail service are presented for each alternative. Projected annual person trips for air, bus, and automobile intercity travel are also presented. In addition to the intercity passenger information, impacts to future freight and commuter rail operations and vehicular traffic are discussed, including impacts from construction and vehicular impacts associated with the changes proposed at the highway‐railroad at‐grade crossings in the corridor. Generally, transportation impacts are expected to be the same for the Build Alternatives (Alternatives A and B and Preferred Alternatives C and D). Therefore, much of the discussion in this chapter compares impacts between the No‐Build and Build Alternatives. Where there are expected differences amongst the Build Alternatives, additional documentation is provided for each of the four Build Alternatives. 6.1 Service Development Plan In accordance with FRA High Speed Rail guidance referred to in 74 Fed. Reg. 29900 (June 23, 2009), this section outlines the Service Development Plan (SDP) for the Build Alternatives (Alternatives A and B and Preferred Alternatives C and D) for the Chicago – St. Louis corridor described by this Tier 1 Environmental Impact Statement. The following items are addressed within this subsection: Intercity travel options Service levels/frequencies Capital program needs Ridership/revenue forecasted, including number of passengers and boardings/disembarking at stations 6.1.1 Intercity Travel Options Intercity travel by auto, bus, and air represent alternative travel options to high‐speed intercity rail.
    [Show full text]
  • Southwest Service Line
    SouthWest Service Line Schedules as of Dec 2019 Line at a Glance › 9 trains in the AM Peak › 6 trains in the Midday › Average Trip Length (2019) : 18.8 miles › 8 trains in the PM Peak › Average Fare Paid (2019) : $4.74 › 7 trains in the Evening › Number of Stations: 12 › 6 trains on Saturdays › Route Length: 40.8 miles › 0 trains on Sundays › Number of Weekday Trains (Dec 2019): 30 › On-Time Performance (2019): 94% › 68% of SWS riders drive to their boarding station. › 9th lowest ridership line › 4% more people live along the SWS than did in 2010. › Oak Lawn is the 31st › 17% more people work along the SWS than did in 2010. busiest outlying station › Ridership is limited by limited service Figure 1: Annual SWS Ridership 3.0 2.66 2.48 2.36 2.5 › 2nd highest share of female riders in the system 2.0 1.64 1.50 1.5 0.92 1.0 Millions 0.5 0.0 Passenger Trips in 83 85 87 89 91 93 95 97 99 01 03 05 07 09 11 13 15 17 19 Year The data included in this document predates the onset of COVID-19, which has greatly impacted Metra’s riders and operations. This information is presented to inform the public about Metra’s historic and recent operational environment but may not be illustrative of Metra’s current or future operations. For the latest information, visit Metra’s Operations and Ridership Data webpage at metrarail.com. Table 1: Metra Capital Investment History SWS ($m) System ($m) Table 2: SWS 2018 Weekday Boardings Rolling stock $93 $2,978 Time of Day Inbound Outbound Track and structure $35 $1,567 AM Peak 3,983 30 Signal, electrical, and communications $42 $1,137 Facilities and equipment $23 $685 Midday 362 361 Stations and parking $33 $1,120 PM Peak 97 3,502 Acquisitions, extensions, and expansions $152 $603 Support activities $19 $431 Evening 16 467 TOTAL $397 $8,521 TOTAL 4,458 4,360 PERCENTAGE 4.6% 100.0% Notes: 1) Excludes South Shore, preventative maintenance, new lines, and pending grants.
    [Show full text]