Preventing Overcrowding at Union Station ®

Total Page:16

File Type:pdf, Size:1020Kb

Preventing Overcrowding at Union Station ® ® Preventing Overcrowding at Union Station ® ® If a service disruption affects BNSF, NORTH CONCOURSE ADAMS ST SouthWest Service and/or Heritage CANAL ST 1 3 5 7 9 11 13 15 17 19 Corridor trains at Union Station, ADAMS Food Court Metra, BNSF Railway and Amtrak will ENTRANCE Level Concourse implement a plan to control the flow of Level Loading/ METRA CHICAGO RIVER pedestrians and prevent overcrowding Staging area TICKETS in the South Concourse waiting area. Restricted GREAT Access The plan will require all passengers to HALL enter to the South Concourse through (open) the wide corridor from the Metra ticket ST CLINTON area. This will be accomplished primar- LOADING/ CLOSED STAGING ily by shutting off access to the escala- AREA tors/stairs that feed the concourse from JACKSON ENTRANCE the food court level. Passengers who 4 6 8 10 12 14 16 18 20 22 use the entrance at Jackson and the 2 Chicago River will have to walk north, JACKSON BLVD SOUTH CONCOURSE use the escalators/stairs that feed the p MAP 1 North Concourse and double back south past the Metra ticket area to the wide corridor to the South Concourse. NORTH CONCOURSE ADAMS ST That corridor will serve as the main CANAL ST 1 3 5 7 9 11 13 15 17 19 loading/staging area for trains until ADAMS Food Court service returns to normal. ENTRANCE Level Concourse Level If the Great Hall is open (MAP 1), Loading/ METRA CHICAGO RIVER Staging area passengers will be encouraged to wait TICKETS Restricted there. Metra will provide updates with GREAT Access public address system announcements HALL supplemented by staff members with (closed) CLINTON ST CLINTON bullhorns. Riders who enter Union LOADING/ CLOSED Station from Clinton/Adams and STAGING Clinton/Jackson will have to walk AREA JACKSON through the Great Hall to get to the ENTRANCE 4 6 8 10 12 14 16 18 20 22 staging area. 2 JACKSON BLVD If the Great Hall is closed, passengers SOUTH CONCOURSE will have to use a different entrance/ p MAP 2 This map shows the pedestrian walkways that will be used during path to the staging area, as shown a service interruption when the Great Hall is closed. on MAP 2. In the event of a disruption that is NORTH CONCOURSE only affecting BNSF trains, South- ADAMS ST West Service and Heritage Corridor CANAL ST 1 3 5 7 9 11 13 15 17 19 ADAMS Food Court passengers will be allowed to enter ENTRANCE Level Concourse the South Concourse via the hallway Level that connects the South and North Loading/ METRA CHICAGO RIVER Staging area Concourses to the Amtrak ticket area, TICKETS GREAT Restricted as shown on MAP 3. BNSF riders Access HALL AMTRAK will be directed to the staging area. TICKETS (open) Please obey instructions from Metra, ST CLINTON LOADING/ ESCALATORS OPEN TO BNSF and Amtrak personnel and police. STAGING CLOSED SWS, HC Metra, BNSF and Amtrak thank you for AREA your cooperation and understanding. JACKSON ENTRANCE 4 6 8 10 12 14 16 18 20 22 2 JACKSON BLVD SOUTH CONCOURSE p MAP 3 This map shows the walkways that will be used when the BNSF Line is Please save for experiencing service issues but the SouthWest Service and Heritage Corridor are operating. SWS and HC riders will enter the South Concourse through the future reference. corridor that connects the concourses to the Amtrak ticketing area in the center. NORTH CONCOURSE ADAMS ST CANAL ST 13 57 91113151719 ADAMS Food Court ENTRANCE Level Concourse Level Loading/ METRA CHICAGO RIVER Staging area TICKETS Restricted GREAT Access HALL (open) CLINTON ST CLINTON LOADING/ CLOSED STAGING AREA JACKSON ENTRANCE 46 8101214161820 22 2 JACKSON BLVD SOUTH CONCOURSE NORTH CONCOURSE ADAMS ST CANAL ST 13 57 91113151719 ADAMS Food Court ENTRANCE Level Concourse Level Loading/ METRA CHICAGO RIVER Staging area TICKETS Restricted GREAT Access HALL (closed) CLINTON ST CLINTON LOADING/ CLOSED STAGING AREA JACKSON ENTRANCE 46 8101214161820 22 2 JACKSON BLVD SOUTH CONCOURSE NORTH CONCOURSE ADAMS ST CANAL ST 13 57 91113151719 ADAMS Food Court ENTRANCE Level Concourse Level Loading/ METRA CHICAGO RIVER Staging area TICKETS Restricted GREAT Access HALL AMTRAK TICKETS (open) CLINTON ST CLINTON LOADING/ ESCALATORS OPEN TO STAGING CLOSED SWS, HC AREA JACKSON ENTRANCE 46 8101214161820 22 2 JACKSON BLVD SOUTH CONCOURSE.
Recommended publications
  • Metra Increasing Service on 7 More Lines Enhanced Schedules to Take Effect July 12
    News Release Metra Media Relations 312-322-6776 FOR IMMEDIATE RELEASE Metra increasing service on 7 more lines Enhanced schedules to take effect July 12 CHICAGO (July 1, 2021) – Metra today posted schedules for expanded rush hour service to begin Monday, July 12 on seven additional lines to meet growing ridership. New schedules will take effect July 12 on the Heritage Corridor, Milwaukee District North and West, SouthWest Service, North Central Service and Union Pacific Northwest and West lines. On the same day, Metra will also launch previously announced new pilot schedules on the BNSF, Metra Electric and UP North lines that provide more off-peak options. A similar pilot schedule for the Rock Island Line is set to take effect on July 19. “My Metra is about listening to the needs of our riders. These new schedules are intended to help our customers transition back to a regular work commute providing them with more choices and flexibility,” said Metra CEO/Executive Director Jim Derwinski. “We expect ridership to continue to increase as the summer progresses and will continue to monitor conditions and make schedule adjustments that are responsive to our customers’ needs.” The new schedules can be viewed now at metrarail.com. In addition to new trains, there are minor adjustments to the timetables of some existing trains on some lines; customers are advised to review the new schedules to see if the timetables of their trains have changed. All the changes are highlighted on the new schedules. The guiding principles for Metra’s service restoration are to provide consistent and frequent service throughout the day; create easily understandable and memorable service patterns; implement new express service when possible in the peak travel periods; explore reverse-commute and new ridership markets; promote regional equity and create transfer opportunities within Metra and with other transit services.
    [Show full text]
  • Southeast Corridor Alternatives Analysis Locally Preferred Alternative Report
    SOUTHEAST CORRIDOR ALTERNATIVES ANALYSIS DOCUMENT #9 LOCALLY PREFERRED ALTERNATIVE REPORT PREPARED BY AUGUST 2011 METRA – SOUTHEAST CORRIDOR LOCALLY PREFERRED ALTERNATIVE REPORT ALTERNATIVES ANALYSIS DOCUMENTS 1. Detailed Work Scope 2. Purpose & Need 3. Initial Alternatives, Part I: Modes & Technologies 4. Evaluation Methodology 5. Initial Alternatives, Part I Screening and Part II: Conceptual Design 6. Screening of Initial Alternatives, Part II 7. Feasible Alternatives 8. Screening of Feasible Alternatives 9. Locally Preferred Alternative Report AECOM AUGUST 2011 I METRA – SOUTHEAST CORRIDOR LOCALLY PREFERRED ALTERNATIVE REPORT TABLE OF CONTENTS I. INTRODUCTION.......................................................................................................... 1 A. PURPOSE.................................................................................................................. 1 B. BACKGROUND ......................................................................................................... 1 II. SUMMARY OF ALTERNATIVES ANALYSIS.............................................................. 5 A. INITIAL SCREENING, PART I................................................................................... 5 B. DEFINITION AND SCREENING OF INITIAL ALTERNATIVES, PART II.................. 7 C. DEFINITION OF FEASIBLE ALTERNATIVES ........................................................ 10 D. DETAILED FINAL SCREENING.............................................................................. 11 III. PUBLIC INVOLVEMENT SUMMARY.......................................................................
    [Show full text]
  • Go to 2040 Update Appendix
    GO TO 2040 UPDATE APPENDIX Major Capital Projects October 2014 Table of Contents Introduction ................................................................................................................................................ 1 Major Capital Projects ............................................................................................................................... 2 Expressway Additions: Express Toll Lanes ....................................................................................... 2 I-55 Stevenson Express Toll Lanes ................................................................................................... 2 I-290 Eisenhower Express Toll Lanes .............................................................................................. 3 Expressway Additions: Interchanges and Improvements ............................................................... 4 Circle Interchange .............................................................................................................................. 5 I-294/I-57 Interchange ........................................................................................................................ 5 I-190 Access and Capacity Improvements ...................................................................................... 5 Jane Addams Tollway (I-90) ............................................................................................................. 6 Transit Improvements ..........................................................................................................................
    [Show full text]
  • Blue Island Metra Schedule
    Blue Island Metra Schedule Unriveting Barnaby overbuying his cottonseeds engineer keenly. Foster usually mollycoddled smilingly or touch chock when intermingled Eliot actuate solely and certes. Briniest and trite Meredith rejoins so floristically that Alexander reclothes his sarangis. Under ptc operational on metra plans to blue island schedule retains its schedule for operating as well as an energy conference in! If a cn caboose which is too much has been a look at blue island metra schedule. She taught piano to kids in NC for years. The fraudulent concept of Precision Scheduled Railroading which harm the. Make blue island schedule is devoted to smyth because he was cancelled after either class. Get fios for metra is for their legal difficulties through the blue island trains serving the ns towards midway airport easily do their fullest. First of wrong, No Walls. Why unless I see ads? Spotify is devoted to blue island schedule is now. At most times of the day though, southbound trains are unproblematic. This vantage point but now off limits. On goat Rock Island your will be love at Robbins Blue Island Mokena. Southwest Service Heritage Corridor and the study Island Branch beside the Metra. That man controls facebook and blue island metra schedule and. We understand where the metra must quickly than they are just got in the blue island metra schedule later in! You may to metra station has grown recently and schedule will be placed in blue island metra schedule at the fares are bathed in chicago summer youth olympic festival was found. Medill Park and Dvorak Park.
    [Show full text]
  • Southwest-Final-Report.Pdf
    SOUTHWEST Service Enhancement Plan Final Report December 2015 Dear Reader, I am proud to present the Southwest Service Enhancement Plan, with recommendations to get you and your fellow community members where you need to go. This report provides a vision for future TriMet service in the Southwest portion of the region (for other areas, see www.trimet.org/future). The vision for future service in the Southwest Service Enhancement Plan is the culmination of many hours of meetings with our customers, neighborhood groups, employers, social service providers, educational institutions and stakeholders. Community members provided input through open house meetings, surveys, focus groups, and individual discussions. Extra effort was put into getting input from the entire community, especially youth, seniors, minorities, people with low incomes, and non-English speakers. Demographic research was used to map common trips, and cities and counties provided input on future growth areas. Lastly, TriMet staff coordinated closely with Metro’s South- west Corridor Plan process to ensure that both efforts complement one A note from another and expand transit in the southwest part of our region. TriMet The final result is a plan that calls for bus service that connects people to more places, more often, earlier, and later. The plan also recommends GeneralManager, improvements to the sidewalks and street crossings to support transit service and new community-job shuttles to serve areas that lack transit service because the demand is too low for traditional TriMet service to Neil McFarlane be economically viable. The service enhancement plans are not just visions of the future, but commitments to grow TriMet’s system.
    [Show full text]
  • Metra's 2002 Program and Budget Has Been Reformatted for The
    Metra’s 2002 Program and Budget has been reformatted for the Web 547 West Jackson Boulevard Chicago, Illinois 60661-5717 Phone (312) 322-6900 Web http://www.metrarail.com CREATING CAPACITY FOR GROWTH FINAL 2002 PROGRAM AND BUDGET NOVEMBER 2001 Board of Directors Jeffrey R. Ladd, Chairman Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Lowell E. Anderson, Treasurer Appointing Authority: Suburban Members, Cook County Board Larry A. Huggins, Director Appointing Authority: City of Chicago W. Warren Nugent, Secretary Appointing Authority: Suburban Members, Cook County Board Gerald L. Porter, Vice-Chairman Appointing Authority: County Board Chairman, DuPage County Joseph A. Tecson, Director Appointing Authority: Suburban Members, Cook County Board Donald A. Udstuen, Director Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Philip A. Pagano, Executive Director TO FRIENDS OF COMMUTER RAIL: Chairman’s Welcome to Metra’s 2002 Program and Budget. It Message describes good news such as further ridership growth, steady progress on our three New Start projects, and ongoing capital improvements including orders for badly needed new cars and locomotives. Meanwhile, the costs of providing safe, reliable, convenient and comfortable commuter rail service have steadily increased. Thus, our proposed 2002 operating budget envisions our first fare increase in six years, 5%, which will likely take effect June 1. I think it’s important to note that this will be only the fourth fare increase in the 18 years of Metra’s management of the Northeast Illinois commuter rail system. And it will be only the third one for operations. A fare hike that took effect in 1989 was dedicated solely to capital projects, namely the physical improvements that preserve and improve our serv- ice — and in turn reduce operating costs.
    [Show full text]
  • Chicago to St. Louis High-Speed Rail Tier 1 Final Environmental Impact Statement: Volume I
    Section TRANSPORTATION 6 IMPACTS 6. Transportation Impacts6. Transportation 6.0 Transportation Impacts This section describes the transportation impacts expected with the No‐Build and Build Alternatives. The Service Development Plan and expected travel benefits are presented. Year 2030 ridership projections and operating revenues for passenger rail service are presented for each alternative. Projected annual person trips for air, bus, and automobile intercity travel are also presented. In addition to the intercity passenger information, impacts to future freight and commuter rail operations and vehicular traffic are discussed, including impacts from construction and vehicular impacts associated with the changes proposed at the highway‐railroad at‐grade crossings in the corridor. Generally, transportation impacts are expected to be the same for the Build Alternatives (Alternatives A and B and Preferred Alternatives C and D). Therefore, much of the discussion in this chapter compares impacts between the No‐Build and Build Alternatives. Where there are expected differences amongst the Build Alternatives, additional documentation is provided for each of the four Build Alternatives. 6.1 Service Development Plan In accordance with FRA High Speed Rail guidance referred to in 74 Fed. Reg. 29900 (June 23, 2009), this section outlines the Service Development Plan (SDP) for the Build Alternatives (Alternatives A and B and Preferred Alternatives C and D) for the Chicago – St. Louis corridor described by this Tier 1 Environmental Impact Statement. The following items are addressed within this subsection: Intercity travel options Service levels/frequencies Capital program needs Ridership/revenue forecasted, including number of passengers and boardings/disembarking at stations 6.1.1 Intercity Travel Options Intercity travel by auto, bus, and air represent alternative travel options to high‐speed intercity rail.
    [Show full text]
  • Southwest Service Line
    SouthWest Service Line Schedules as of Dec 2019 Line at a Glance › 9 trains in the AM Peak › 6 trains in the Midday › Average Trip Length (2019) : 18.8 miles › 8 trains in the PM Peak › Average Fare Paid (2019) : $4.74 › 7 trains in the Evening › Number of Stations: 12 › 6 trains on Saturdays › Route Length: 40.8 miles › 0 trains on Sundays › Number of Weekday Trains (Dec 2019): 30 › On-Time Performance (2019): 94% › 68% of SWS riders drive to their boarding station. › 9th lowest ridership line › 4% more people live along the SWS than did in 2010. › Oak Lawn is the 31st › 17% more people work along the SWS than did in 2010. busiest outlying station › Ridership is limited by limited service Figure 1: Annual SWS Ridership 3.0 2.66 2.48 2.36 2.5 › 2nd highest share of female riders in the system 2.0 1.64 1.50 1.5 0.92 1.0 Millions 0.5 0.0 Passenger Trips in 83 85 87 89 91 93 95 97 99 01 03 05 07 09 11 13 15 17 19 Year The data included in this document predates the onset of COVID-19, which has greatly impacted Metra’s riders and operations. This information is presented to inform the public about Metra’s historic and recent operational environment but may not be illustrative of Metra’s current or future operations. For the latest information, visit Metra’s Operations and Ridership Data webpage at metrarail.com. Table 1: Metra Capital Investment History SWS ($m) System ($m) Table 2: SWS 2018 Weekday Boardings Rolling stock $93 $2,978 Time of Day Inbound Outbound Track and structure $35 $1,567 AM Peak 3,983 30 Signal, electrical, and communications $42 $1,137 Facilities and equipment $23 $685 Midday 362 361 Stations and parking $33 $1,120 PM Peak 97 3,502 Acquisitions, extensions, and expansions $152 $603 Support activities $19 $431 Evening 16 467 TOTAL $397 $8,521 TOTAL 4,458 4,360 PERCENTAGE 4.6% 100.0% Notes: 1) Excludes South Shore, preventative maintenance, new lines, and pending grants.
    [Show full text]
  • Metra Construction Program 2020 up North STATIONS Bridges 41 116Th Street/Tobin Road, Pleasant Prairie, Wis
    UP-N ILLINOIS / WISCONSIN STATE LINE 41 McHENRY NCS LAKE MD-N UP-NW 29 14 93 13 12 70 20 43 67 44 LAKE MICHIGAN 46 11 45 94 71 42 72 COOK 19 47 91 MD-W 48 30 82 33 97 49 2 98 96 10 3 50 DU PAGE 95 9 85 32 92 81 UP-W 68 31 Downtown 74 55 56 73 CHICAGO 54 52 17 18 53 15 66 51 16 86 23 21 87 78 24 59 76 60 26 58 57 61 75 79 69 83 22 64 27 25 62 80 63 88 77 40 28 BNSF 4 106 34 89 65 37 8 35 5 WILL 36 84 100 SS 101 6 90 105 99 104 Metra HC 103 7 1 Construction RI Program 39 102 ME 38 ILLINOIS / INDIANA STATE LINE 2020 SWS Metra Construction Program 2020 UP North STATIONS BRIDGES 41 116th Street/Tobin Road, Pleasant Prairie, Wis. Metra Electric 42 Maple Hill, Glencoe Milwaukee District North Homewood – replace and expand parking lot 1 81 Chicago – replacement of bridge over UP Northwest Milwaukee Avenue near Grayland Station Milwaukee District West 43 Hillside, McHenry County 2 Itasca – ADA improvements Milwaukee District West 44 Lily Pond Road, Woodstock 3 Bensenville – station rehab project 82 Elgin – continuation of multi-year project 45 Hart Road, Barrington Hills to replace bridge over the Fox River Rock Island 46 Cuba Road, Barrington Hills 4 Auburn Park – multi-year project to build Rock Island Smith Street, Palatine a new station 47 83 Chicago – new single track bridge at 43rd Route 83/Mount Prospect Road, Mount Prospect and Root streets 5 103rd Street – platform rebuild 48 84 Chicago – repair bridge at Vincennes Avenue 49 Dee Road, Park Ridge 6 Blue Island/Vermont Street – station rehab 50 Sayre Avenue, Chicago UP North 7 Tinley Park Oak Park Avenue – repave platform 85 Chicago – continuation of multi-year UP West SouthWest Service project to replace 11 bridges from Grace to 51 Third Street, Geneva Balmoral avenues and the inbound portion 8 Chicago Ridge – install pedestrian gates at Ridgeland Avenue 52 Western Avenue, Geneva of the Ravenswood Station.
    [Show full text]
  • First Bus All Aboard! Rail System Map Detailed Fare in for Ma Tion Service
    All aboard! Detailed fare in for ma tion First bus / last bus times This map gives detailed information about Chica go Transit Base/regular fares All CTA and Pace buses are accessible to people with disabilities. # ROUTE & TERMINALS WEEKDAYS SATURDAY SUN./HOL. # ROUTE & TERMINALS WEEKDAYS SATURDAY SUN./HOL. # ROUTE & TERMINALS WEEKDAYS SATURDAY SUN./HOL. Authority bus and el e vat ed/sub way train ser vice, and shows Full Reduced Student Reduced fare program X Pay-per-ride fares, as deducted from value in a Ventra Transit Account Use this chart to determine days, hours of service, where each Pace subur ban bus and Metra commut er train routes in the The following groups are eligible to pay a reduced fare on CTA: CTA ser vice area. It is up dat ed regularly, and avail able at ‘L’ train fare $2.50* $1.25 75¢ route begins and ends, and first and last buses in each direction Wallace/Racine West Lawrence Inner Drive/Michigan Express 44 Racine/87th north to Halsted (Orange) 4:30a-9:40p 8:00a-6:00p 9:00a-6:00p 81W Cumberland (Blue) east to Jeff Park (Blue) 5:25a-10:25p 5:20a-10:20p 8:45a-10:15p 14 6 Berwyn (Red) south to Museum Campus 5:55a-10:40p 6:00a-10:40p 6:00a-10:40p † on each route. X X X CTA rail stations, Metra down town terminals, visitor cen ters, Bus fare $2.25 $1.10 75¢ Children 7 through 11 Halsted (Orange) south to Racine/87th 5:15a-10:25p 8:50a-6:45p 9:45a-6:45p Museum Campus north to Berwyn (Red) 7:00a-11:35p 6:50a-11:40p 6:50a-11:35p X Jeff Park X (Blue) west to Cumberland X (Blue) 4:55a-9:55p 4:50a-9:50p 8:20a-9:50p air ports, or by calling the RTA.
    [Show full text]
  • Chicago Downtown Chicago Connections
    Stone Scott Regional Transportation 1 2 3 4 5Sheridan 6 7 8 9 10 11 12 13 14 Dr 270 ter ss C en 619 421 Edens Plaza 213 Division Division ne 272 Lake Authority i ood s 422 Sk 422 u D 423 LaSalle B w 423 Clark/Division e Forest y okie Rd Central 151 a WILMETTE ville s amie 422 The Regional Transportation Authority r P GLENVIEW 800W 600W 200W nonstop between Michigan/Delaware 620 421 0 E/W eehan Preserve Wilmette C Union Pacific/North Line 3rd 143 l Forest Baha’i Temple F e La Elm ollw Green Bay a D vice 4th v Green Glenview Glenview to Waukegan, Kenosha and Stockton/Arlington (2500N) T i lo 210 626 Evanston Elm n (RTA) provides financial oversight, Preserve bard Linden nonstop between Michigan/Delaware e Dewes b 421 146 s Wilmette 221 Dear Milw Foster and Lake Shore/Belmont (3200N) funding, and regional transit planning R Glenview Rd 94 Hi 422 221 i i-State 270 Cedar nonstop between Delaware/Michigan Rand v r Emerson Chicago Downtown Central auk T 70 e Oakton National- Ryan Field & Welsh-Ryan Arena Map Legend Hill 147 r Cook Co 213 and Marine/Foster (5200N) for the three public transit operations Comm ee Louis Univ okie Central Courts k Central 213 93 Maple College 201 Sheridan nonstop between Delaware/Michigan Holy 422 S 148 Old Orchard Gross 206 C Northwestern Univ Hobbie and Marine/Irving Park (4000N) Dee Family yman 270 Point Central St/ CTA Trains Hooker Wendell 22 70 36 Bellevue L in Northeastern Illinois: The Chicago olf Cr Chicago A Harrison 54A 201 Evanston 206 A 8 A W Sheridan Medical 272 egan osby Maple th Central Ser 423 201 k Illinois Center 412 GOLF Westfield Noyes Blue Line Haines Transit Authority (CTA), Metra and Antioch Golf Glen Holocaust 37 208 au 234 D Golf Old Orchard Benson Between O’Hare Airport, Downtown Newberry Oak W Museum Nor to Golf Golf Golf Simpson EVANSTON Oak Research Sherman & Forest Park Oak Pace Suburban bus.
    [Show full text]
  • 4: Transportation Assessment
    4 | Transportation Assessment 4-1 Transportation Assessment This section provides an overview of existing transportation ways, bus service, and commuter rail service will continue conditions in the Study Area. to help Romeoville capitalize on its regional access. SECTION Regional Setting Existing Roadway Characteristics 4 TThe Village of Romeoville is located in northern Will County, Major roadways within the Study Area include IL Route 53, with good access to many parts of the region through inter- 135th Street, and New Avenue. These roadways, along with states and major arterials. I-55, I-355, Weber Road, Joliet future improvements are described in the Romeoville Mas- Road (IL Route 53), Archer Road / State Street (IL Route 171) ter Transportation Plan (November 2009). and Renwick Road all provide connections to Romeoville. Pace local and express buses provide service to the Village, IL Route 53 and existing commuter rail service is located nearby in ad- IL Route 53 is the main north-south road through the Vil- jacent communities. Potential new improvements to road- lage, under the jurisdiction of the Illinois Department of Source: Teska Associates, Inc. Associates, Teska Source: This northward view of IL Route 53 shows Downtown Romeoville on the left side of the photo, with the Shell gas station sign marking the southeast corner of downtown. The tall pole signs, including the one for Spartans’ Square, and deep lot setbacks are atypical of a traditional downtown. Adopted by Village Board on April 18, 2012 East Side Plan | Existing Conditions Assessment Report Village of Romeoville, Illinois 4 | Transportation Assessment 4-2 Transportation (IDOT).
    [Show full text]