Mount Kellett
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
List of Buildings with Confirmed / Probable Cases of COVID-19
List of buildings with confirmed / probable cases of COVID-19 List of residential buildings in which confirmed / probable cases have resided (Note: The buildings will remain on the list for 14 days since the reported date) District Building name Related confirmed / probable case number Sai Kung Yee Ching House Yee Ming Estate 58,128 Wan Chai Envoy Garden 114, 213 Case notified by the health Southern Block 28, Baguio Villa authority of Canada and Case 117, 118 Tai Po Heng Tai House, Fu Heng Estate 119, 124, 140 Tuen Mun On Hei House, Siu Hei Court 120, 121 Sha Tin Mau Lam House, Kwong Lam Court 122 Tsuen Wan Tower 7, Bellagio 123, 129 Kwun Tong Block T, Telford Gardens 125 Kwun Tong Block 26, Phase 2, Laguna City 126, 127 130, 131,133, Kwai Tsing iPlace 138 Central & Western Serene Court, 35 Sai Ning Street 132 Tai Po Ng Tung Chai, Lam Tsuen 134 Central & Western View Villa 135 Southern 18 Stanley Main Street 136 Wan Chai Block A, Tai Hang Terrace 137 Eastern Cornell Centre 139 Sai Kung 684 Clear Water Bay Road 141 Kwai Tsing Tivoli Garden 142 North Lai Ming House, Wah Ming Estate 143 Sai Kung The Palisades 145 Eastern Fort Mansion 146 Central & Western Kellett View Town Houses, 65 Mount 147, 148 District Building name Related confirmed / probable case number Kellett Road Southern Wah Cheong House, Wah Fu 2 Estate 149 Yau Tsim Mong Hotel ICON 150 Yau Tsim Mong Block A, Chungking Mansions 151 Tuen Mun Tower 1, Oceania Heights 152 Shatin Block 10, Pristine Villa 153 Kowloon City 8 Hok Ling Street 154 Wong Tai Sin Lung Chu House, Lung Poon -
260193224.Pdf
4 14 Tai Tam Upper Reservoir Tai Tam Tuk Reservoir Dam 1912-1917 Valve House 1883 - 1888 12 10 12 6 Tai Tam Byewash Reservoir The masonry-faced concrete gravity dam features ornamental parapets and The valve house forthe dam is located atone third of the way 12 large spillways to handle water overflow. Spillways ateither end ofthe along the top ofthe dam. A simple square structure with a Valve House 1904 damare the original spillways while the other10 have been modified with single doorand small window openings which have since been additionalconcre te structures to actas siphon spillways. Over the spillways blocked, the valve house has been builtin rock-faced rusticated are a road deck formed by 12 arches supported by half-round granite granite blocks. The original hipped roofhas been replaced with columns where busy road runs along connecting Stanley and TaiTam with a flatroof with the projecting cornice, supported by carved ChaiWan and Shek O. ornamental corbels, remains intact. Asmall valve house, located halfway along the 15 16 5 subsidiary dam,is rectangular in shape and features rock-faced granite walls,a flatroofand Tai Tam Tuk Reservoir Valve House 1917 Tai Tam Tuk Reservoir windows. Access walkways along the dam Tai Tam Upper Reservoir R ecorder House 1917 and Memorial Stone 1918 allowed regularins pections and are used today Tunnel Inlet 1883 - 1888 by hikers following trails in TaiTam Country 1918 Park. Original castiron safety railings remain (SirHenryMay, 1912-1918) in place. The valve house is situated near the south end ofthe Tai TamTuk Reservoir dam. The valve house was builton a projecting platformwhich Acommemorative stone is ere cted near the southern end at the top ofthe damto mark the completion ofthe Tai TamReservoirScheme has cantilevered steelbalconies or catwalks fixed to the frontof it. -
Revitalising Historic Buildings Through Partnership Scheme Old Dairy Farm Senior Staff Quarters
Revitalising Historic Buildings Through Partnership Scheme Old Dairy Farm Senior Staff Quarters Resource Kit Date: 16 December 2013 Table of Contents I. Introduction II. Historical Background and Architectural Merits 2.1 Historical Background 2.2 Architectural Merits III. Site Information 3.1 Location 3.2 Site Boundary 3.3 Site Area 3.4 Major Datum Levels IV. Building Information 4.1 Building Description 4.2 Historic Grading 4.3 Schedule of Accommodation 4.4 Materials of Construction 4.5 Internal Circulation 4.6 Major Alterations and Additions 4.7 Preliminary Structural Appraisal 4.8 Building Services and Utilities V. Vicinity and Access 5.1 Immediate Surroundings 5.2 Access VI. Conservation Guidelines 6.1 General Conservation Approach 6.2 Specific Conservation Requirements VII. Town Planning Issues VIII. Land and Tree Preservation Issues 8.1 Land Issues 8.2 Tree Issues IX. Slope Maintenance X. Technical Compliance for Possible Uses 10.1 Uses That Can Possibly Be Considered 10.2 Technical Considerations 10.3 Further Information on Possible Use 10.4 Recurrent Expenditure XI. Special Requirements of the Project 11.1 Adjacent Proposed Development 11.2 Building Services and Utilities 11.3 Traffic and Parking 11.4 Basic Repair Works 2 List of Appendices Appendix I Location Plan Appendix II(A) Site Boundary Plan Appendix II(B) Grading Boundary Plan Appendix III Datum Levels Plan Appendix IV Summary of Site and Buildings Information Appendix V Architectural Drawings Appendix VI Photos of the Site and Buildings Appendix VII Plan Showing Immediate Surroundings Appendix VIII Access Plan Appendix IX List of Architectural Features to be Preserved Appendix X List of Required Treatments to Architectural Features Appendix XI List of Recommended Treatments to Architectural Features Appendix XII Outline Zoning Plan Appendix XIII(A) Topographic Survey Appendix XIII(B) Tree Survey Plan and Tree Survey Schedule Appendix XIV Recurrent Expenditure Appendix XV(A) Record Plan of Water Supplies Department Appendix XV(B) Record Plan of the Hongkong Electric Co. -
Full Text in Pdf Format
Vol. 78: 87–95, 2007 DISEASES OF AQUATIC ORGANISMS Published December 13 doi: 10.3354/dao01861 Dis Aquat Org Survey for the amphibian chytrid Batrachochytrium dendrobatidis in Hong Kong in native amphibians and in the international amphibian trade Jodi J. L. Rowley1, 5,*, Simon Kin Fung Chan2, Wing Sze Tang2, Richard Speare3, Lee F. Skerratt 4, Ross A. Alford1, Ka Shing Cheung 2, Ching Yee Ho2, Ruth Campbell4 1School of Marine and Tropical Biology and Amphibian Disease Ecology Group, James Cook University, Townsville, Queensland, Australia 4811 2Herpetofauna Working Group, Agriculture, Fisheries and Conservation Department, The Government of the Hong Kong Special Administrative Region, 7/F, Cheung Sha Wan Government Offices, 303 Cheung Sha Wan Road, Kowloon, Hong Kong, China 3School of Public Health, Tropical Medicine and Rehabilitation and Amphibian Disease Ecology Group, James Cook University, Townsville, Queensland, Australia 4811 4School of Veterinary and Biomedical Sciences and Amphibian Disease Ecology Group, James Cook University, Townsville, Queensland, Australia 4811 5Present address: Conservation International Indo-Burma, PO Box 1356, Phnom Penh, Cambodia ABSTRACT: Chytridiomycosis, caused by the pathogen Batrachochytrium dendrobatidis, is respon- sible for many amphibian declines and has been identified in wild amphibian populations on all con- tinents where they exist, except for Asia. In order to assess whether B. dendrobatidis is present on the native amphibians of Hong Kong, we sampled wild populations of Amolops hongkongensis, Paa exil- ispinosa, P. spinosa and Rana chloronota during 2005–2006. Amphibians infected with B. dendro- batidis have been found in the international trade, so we also examined the extent and nature of the amphibian trade in Hong Kong during 2005–2006, and assessed whether B. -
Hong Kong Island - 1 1
832000 834000 836000 838000 Central Park Copyright by Black & Veatch Hong Kong Limited Naval Base Hoi Fu Court Kowloon Map data reproduced with permission Lok Man TO KWA Rock Park Sun Chuen of the Director of Lands(C) Hong Kong Avenue KOWLOON HO MAN TIN WAN Chun Man Ho Man Tin Court Estate Legend Charming Garden To Kwa Wan YAU MA TEI Typhoon Shelter W1 King's Park Oi Man Hill Shafts New Yau Ma Tei Estate Sewage Treatment Works Typhoon Shelter Meteorological Kwun Tong Station Typhoon Shelter King's Park Villa Prosperous Garden KING'S PARK Tunnel Alignment Main Tunnel Alignments Ka Wai Hung Hom KOWLOON BAY Adits Alignments Chuen Estate Laguna Verde HUNG HOM Sorrento Intercepted Catchment Barracks Royal The Peninsula Whampoa Garden Waterfront 67 Subcatchment Boundary Victoria Tower 0 0 0 0 0 0 8 8 1 1 8 8 TSIM SHA TSUI TAI PAU MAI NORTH POINT North Point V Estate I C SAI YING PUN T O Healthy Village SAI WAN R Tanner Model I Garden Housing A Estate 42 H A R Pacific Palisades B O QUARRY BAY U R BRAEMAR HILL LITTLE GREEN ISLAND SHEK TONG TSUI Braemar Hill Mansions Causeway Bay SHEUNG WAN CENTRAL DISTRICT Typhoon Shelter L The Belcher's NE AN 5 CH 4 6 WAN CHAI 0 va 0 0 R W8 0 0 U 0 6 PH HKU1(P) 46 6 1 L 1 8 SU KENNEDY TOWN Sewage 8 Treatment RR1(P) Barracks Works CAUSEWAY BAY Sai Wan W10 Estate 3 MID-LEVELS vc Kung Man W11(P) 45 Tsuen Kwun Lung LUNG FU SHAN P5(P) 137 Lau 13 C 0 C 0 PFLR1(P) H Lai Tak 0 H 12 W5(P) A + TAI HANG A 0 Tsuen 7 Added Tunnel 8 + A W12(P) B 10/2005 LWG + C 5 H Scheme 0 H 0 00 0 0 240 A +0 C 8 0 VICTORIA P 7EAK + A EASTERN -
Pok Fu Lam Road Bus-Bus Interchange Scheme
Pok Fu Lam Road Bus-Bus Interchange Scheme Passengers on selected routes can interchange, at the bus stop opposite Queen Mary Hospital, for connection to Central, Admiralty, Mid-levels, Wan Chai, Eastern districts or Kowloon. Passengers from Central, Admiralty, Mid-levels, Wan Chai, Eastern districts or Kowloon on selected routes can interchange at the bus stop on outside Queen Mary Hospital, to different Southern districts. Please note that passengers will not be able to enjoy any discount if they interchange on the same bus route. From Southern District to Central / Admiralty / Wan Chai First Journey on Interchange Point Second Journey on Discount Fare Time Limit (Direction) (Direction) 7 from Shek Pai Wan Queen Mary Hospital, 7 to Central (Ferry Piers) Free 90 minutes 37X from Chi Fu Pok Fu Lam Road 37X to Admiralty 71 from Wong Chuk Hang 71 to Central 71P from Sham Wan 71P to Central (Ferry 90B from South Horizons Piers) 40 from Wah Fu (North) 90B to Admiralty 40M fromWah Fu (North) 40P from Sham Wan 4 from Wah Fu (South) / Tin Wan 4Xfrom Wah Fu (South) 30X from Cyberport 33Xfrom Cyberport 93from South Horizons 93Afrom Lei Tung Estate 970 from Cyberport 970X from Aberdeen X970 from South Horizons 973 from Stanley Market / Free 120 minutes Aberdeen 40 from Wah Fu (North) Queen Mary Hospital, 40 to Wan Chai (North) Free 90 minutes 40M from Wah Fu (North) Pok Fu Lam Road 40M toAdmiralty (Central 40P from Sham Wan Government Offices) 33X from Cyberport 40P to Robinson Road 93from South Horizons 93C to Caine Road 93Afrom Lei Tung Estate -
SDC Paper No. 7/2020 Annex 2
Annex 2 Sustainable Development of the Southern District Responses by Relevant Government Departments and Organisations (I) Response to enquiry (1) from the Transport and Housing Bureau To tie in with the redevelopment of Wah Fu, the actual implementation of the South Island Line (West) (SIL(W)) is subject to the actual programme for the development in the Wah Fu area and redevelopment of Wah Fu Estate as well as the build-up of transport demand. Besides, to implement the SIL(W), it is also necessary to free up space within Wah Fu Estate for railway construction, including Wah Fu Station proposed in the preliminary conceptual scheme of the SIL(W). The Transport and Housing Bureau invited the MTR Corporation Limited to submit a proposal for the SIL(W) in June 2019. In line with established procedures, prior to the finalisation of the railway scheme of SIL(W), we will consult the public, including the Legislative Council and the relevant District Councils, on the scheme. 1 (II) Response to enquiries (2) and (3) from the Transport Department Response to enquiry (2) Whether the Pok Fu Lam Moratorium will be lifted upon the completion of the proposed South Island Line (West) would depend on the traffic assessments in the Railway Development project on the traffic conditions in the Pok Fu Lam area. Response to enquiry (3) When there is a planning development, the project proponent shall conduct Traffic Impact Assessment (TIA) to assess the traffic impact arising from the project. The TIA will assess the cumulative traffic impact arising from the existing, planned and committed developments within the study area, so that no adverse traffic impact will be caused by the proposed development. -
EHHC Paper No. 29/2020 Appendix
Appendix 2020-21 Food and Environmental Hygiene Department Southern District Action Plan Contents Item Description Page Improving Environmental Hygiene Conditions 1 Mosquito and rodent control services 3 2 Cleansing of “grey areas” 3 3 Public cleansing services 4-5 3.1 Street cleansing 3.2 Refuse collection 3.3 Public toilets improvement works 4 Enforcement actions against public cleanliness offences 5 5 Hygiene conditions of food premises 6 Market Management 6 Upgrading market management and hygiene standards 6 7 Improving market facilities and conducting promotional activities 6-7 Others 8 Special district-based operations 7-8 8.1 Shop front extensions 8.2 Strengthening control on spilling of seawater from seafood trucks 8.3 Special cleaning operations for typhoon shelters and seashores 8.4 Cleaning rear lanes to improve environmental hygiene 8.5 Enforcement actions against animal (including bird and wild boar) feeders who litter public places) 9 Annexes 9-17 - 2 - Improving Environmental Hygiene Conditions 1. Mosquito and rodent control services In 2019, one local dengue fever case and one local Japanese encephalitis case were reported in Hong Kong. To safeguard public health and as a precautionary measure, the Food and Environmental Hygiene Department (FEHD) will continue to step up mosquito control and conduct the anti-mosquito campaign in 2020. FEHD will implement a series of stringent control measures. In addition to the in-house staff, FEHD’s contractors have stepped up pest control services. All the pest control teams are provided with vehicles and appropriate equipment, so that they can carry out their pest control duties swiftly and effectively. -
SDC Paper No. 5/2021 Annex 1
Annex 1 Hong Kong 12 February 2021 Mr. Lo Kin Hei Chairman Southern District Council Re: The Pok Fu Lam Conduit – Heritage status and improvement works Dear Chairman, We hope to raise an agenda item regarding the ‘Pok Fu Lam Conduit’ at the 8th SDC (2020- 2023) meeting scheduled at 2:30pm on 11 March 2021. Background The Pok Fu Lam Conduit was built between the Pokfulam Reservoir and the Albany Tanks during 1876 and 1877. It improved the supply of water to the City of Victoria. In 2004, based on Appraisal 429, Grade 2 Historic status was awarded to the No. 9 aqueduct of the Pok Fu Lam Conduit. Aspects of the conduit between the filter beds at west point (where the staff quarters and manager’s bungalow of the filter beds are now used as the Lung Fu Shan Environmental Education Centre) and the Albany tanks above Garden Road are hard to find. Part of Tank 2 is present at the corner of Caine, Bonham, Seymour and Hospital Road. The conduit was terminated at the filter beds in its early years and with construction of Conduit Road the alignment of that section disappeared from maps early last century. Between the Pok Fu Lam Reservoir and the former filter beds much of the conduit is present, and parts are still used for water supply. Of the 32 aqueducts bridging over ravines and gullies our survey found 16 to be present (8 in the Southern District, 8 in the Central and Western District): 1. Aqueducts No. 1 – 4 have been lost during construction of HKU properties (High West and Alberose). -
Aberdeen & Ap Lei Chau Area
TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1 – Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1– Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) Final Report Aberdeen & Ap Lei Chau Area April 2010 ………………………………………. by Professor Edward Ng School of Architecture, CUHK, Shatin, NT, Hong Kong T: 26096515 F:26035267 E: [email protected] W: www.edwardng.com Final Report Page 1 of 33 20 April 2010 TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1 – Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) The Study Area Final Report Page 2 of 33 20 April 2010 TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1 – Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) Expert Evaluation Report of Aberdeen & Ap Lei Chau Area Executive summary 0.1 Wind Availability (a) Based on the available wind data, one may conclude that the annual wind of the study area is mainly from the East and North-East. The directions of summer winds are ranging from the East, Southerly quarters, and the West. There is a strong east-west channeling at/near ground level due to the surrounding topography. 0.2 Topography (a) For background wind coming from the northeast and southeast, the wind profiles and characteristics will be affected by hills. Turbulence and re-circulation of wind when it moves downhill towards the study area is expected. -
Kellett School
U Kellett School Candidate Brief Deputy Head of School (Inclusion) Kellett School - The British International School in Hong Kong Dear Applicant Thank you for your interest in the post of Deputy Head School (Inclusion) at Kellett School, The British International School in Hong Kong Kellett School is seeking a dynamic Deputy Head of School with proven leadership and management skills who will have responsiblity for the overview of Inclusion (three INCOs and other support staff) across both Preparatory Schools and the Senior School. The attached Candidate Brief provides an introduction to the School; and outlines the scope and responsibilities of the post. I encourage you to visit the School website for a comprehensive overview of the School. The post is a Senior Management role, with a generous remuneration package, which reflects the importance we place on appointing a colleague of the highest calibre. Details of the package will be provided to all shortlisted candidates. I do hope having read the Candidate Brief and satisfied yourself that you have the necessary skills and experience to fulfil the role that you will wish to pursue the post further. All applications will be handled in the strictest confidence and the information you provide will be used solely for the purpose of recruitment. Yours sincerely Ann McDonald Principal Candidate Brief Deputy Head of School (Inclusion) Kellett School - The British International School in Hong Kong Background Afforded charitable status by the Hong Kong Government, Kellett School is a leading provider of quality British style education, in a day school setting, to the English speaking community in Hong Kong for children aged 4 to 18 years. -
生態文物徑指南eco-Tour Map 戰蹟風雲
港燈與長春社攜手合辦「綠遊香港」,以提升香港島及南丫島的生態保育和推動兩地的可持續發展,並促進市民對香港生態 文物資源的認識。計劃包括於港島及南丫島開發八條生態文物徑,並沿途設置教育資訊牌,以及培訓超過一百五十位義務生 態導賞員帶領市民認識香港的生態文物資源。 這份指南介紹了三條分別位於香港仔郊野公園、大潭郊野公園及龍虎山郊野公園的生態文物徑,與大家分享其中有趣或富歷 史價值的生態文物點,讓我們齊齊綠遊香港,自然起行! To enhance the ecological value of Hong Kong and Lamma islands, as well as to promote sustainable development and environmental education, HK Electric and The Conservancy Association join hands to undertake the Green Hong Kong Green programme. Eight eco-heritage routes have been developed, with education panels en-route and over 150 voluntary eco-leaders trained to conduct eco-tours for the public. This eco-tour map introduces a highlight of the interesting spots along the three routes developed in Aberdeen, Tai Tam and Lung Fu Shan country parks on Hong Kong Island. Come and experience the natural wonders of Green Hong Kong Green. 香港仔郊野公園 Tai Tam Country Park 生態旅遊守則 香港仔郊野公園是本港最早劃定的郊野公園之一。公園由南區的 Established in 1977, Tai Tam Country Park is the largest of its kind 香港仔延伸至北面的灣仔峽,公園內的南風道風水林,為本港 on Hong Kong Island. Located in the Eastern region of Hong Kong, 生態旅遊的目的是透過親身體驗大自然,增加對環境生 態系統、自然資源及歷史傳統文化的認識,並在對環境 「具特殊科學價值地點」之一,鄰近一帶孕育了不少本地大樹, it takes up one-fifth of the island, stretching from Jardine’s Lookout 造成最少影響的原則下,成為具經濟效益的旅遊活動。 是研習樹木的理想地方。為人熟悉的香港仔水塘原為私人水塘, in the north to Stanley Gap Road in the south. Within this park is 及後於一九三二年被政府徵用,是香港島最後興建的水塘。 the Tai Tam Reservoir, the second built on the island, and a major 切勿傷害或帶走沿途所見的動植物;欣賞河溪生態時, supplier of water in the early days of Hong Kong. Its 22 waterworks 切勿挖掘沙石或翻起石頭,以免破壞原有生態及騷擾水 生態文物徑指南 facilities are preserved as declared monuments. Tai Tam Valley is 中生物。 Aberdeen Country Park surrounded by hills with a high degree of biodiversity. This unique 請穿著長袖衣物,衣服顏色則以能配合大自然為佳。如 One of the earliest country parks established in Hong Kong, the environment sets the perfect scene for us to look at the ECO-TOUR MAP 要防蚊,請使用天然驅蚊劑(以減少化學物質對環境的 Aberdeen Country Park stretches from Aberdeen in the South relationship between “water and ecology”.