No. 81, Stouffville Corridor GO Expansion, Page 66 Credit: Ellisdon

Total Page:16

File Type:pdf, Size:1020Kb

No. 81, Stouffville Corridor GO Expansion, Page 66 Credit: Ellisdon 2019 No. 81, Stouffville Corridor GO Expansion, Page 66 Credit: EllisDon Top100 Projects 2019 Turning Over In Top100 Projects — 2019 Record Numbers An annual report inserted in f you only read through the first 10 projects in this report, little ReNew Canada’s will seem different. Only one project is gone, and the one that January/February 2019 issue I took its place, the Gordie Howe International Bridge, has been part of our report for years. But looking beyond the top 10 shows a different trend, one that indicates record turnover in megaproject EDITOR Andrew Macklin development in Canada. [email protected] This year’s report sees the inclusion of 23 new projects, a record number by our report standards. To put this in perspective, a typical PUBLISHER Todd Latham year sees 12-15 projects leave the list based on completion. So what’s changed? For starters, there really were a large number DIRECTOR OF BUSINESS Elena Langlois of projects that saw substantial completion; 2018 was a banner year Development for getting things done. But we also removed a handful of projects that have clearly stalled, no longer meeting the “currently under ART DIRECTOR Donna Endacott development” requirement that is part of this annual exercise. AND DESIGN And despite a year of political upheaval in many parts of the country, be it at the municipal or provincial scale, new megaprojects CONTENT AND are moving forward at a solid rate. This can still be said in the latter MARKETING Todd Westcott Manager part of 2018 despite not having a clear picture of the infrastructure priorities of two of Canada’s largest provinces thanks to new ADVERTISING Elena Langlois governments being installed. [email protected] We also considered a new number one for this year’s report, as our Todd Latham research team attempted to come to terms with how best to represent [email protected] the $13.5-billion GO Expansion (formerly RER) project in Ontario. At the end of the day, rather than have it trump the Bruce Power refurbishment project at the top, we chose to break it down in the nine budgeted areas, the same way the project is represented by Metrolinx’s chief capital officer Peter Zuk, and add as appropriate to this year’s report. ReNew Canada is published As is the case each year, we continue to refine the requirements for six times a year by Actual Media Inc. inclusion on our list. Projects must be currently under development; 147 Spadina Avenue, Unit 208 it must be a public sector project; it must have a defined scope of Toronto, ON M5V 2L7 work and dollar value; and it must have funding committed past Phone: 416.444.5842 the initial design and environmental assessment phase. That last Subscription services: 416-444-5842, ext 117 requirement is key, as projects have appeared in the past that were being studied and designed, but did not have funding to move forward. That doesn’t make a project a reality, so it should not be included on our list. ReNew Canada subscriptions are available for $29.95/year or $54.95/two years We hope you enjoy the 2019 Top100 Projects report. As always, and include the annual Top100 Projects. if you have any questions, comments, or information to add, we are ©2019 Actual Media Inc. All rights reserved. always listening. Feel free to email me at [email protected] The contents of this publication may not be at any time. reproduced by any means in whole or in part, without prior written consent from the publisher. Andrew Macklin, Editor, ReNew Canada Printed in Canada To create your own report, visit top100projects.ca and sort by project cost, key players, location, sector, and more. top100projects.ca ReNew Canada 3 Top100 Projects 2019 Top100 Project Index By Rank, Project Title, and Page Reference Buildings Public Spaces Transmission rank project title page # 24 81-141 Bay Street 42 40 Fort McMurray West Transmission Project 47 Education 49 Energy Services Acquisition 74 Lake Superior Link 99 Université de Montréal Program’s Energy (Hydro One) or East–West Science Complex 66 Service Modernization 50 Tie Transmission Project (Nextbridge) 59 Health Care 12 Parliamentary Precinct 45 Romaine Complex Rehabilitation Project 30 42 Calgary Cancer Centre 48 Transmission Line 49 87 Regina Railyard 69 CAMH Phase 1C 36 Wataynikaneyap Renewal Project 63 Redevelopment 58 Transmission Project 46 98 CapitalCare Norwood Social Infrastructure Wind Redevelopment Project 66 58 Toronto 54 Henvey Inlet Wind Project 52 17 Centre hospitalier de Courthouse Project 54 l’Université de Other Montréal (CHUM) Energy and Research Centre 38 rank project title page # rank project title page # 78 Corner Brook Acute Carbon Capture Care Hospital 61 Hydroelectric 48 Alberta Carbon 77 Edmonton Clinical 75 Gordon M. Shrum Trunk Line 50 Laboratory Hub 60 Generating Station Remediation 72 Grande Prairie Refurbishment 60 Regional Hospital 59 59 Giant Mine 6 Keeyask Remediation Project 54 22 Hospital for Hydroelectric Project 20 Sick Children 41 46 Port Hope 3 Muskrat Falls Project 14 Area Initiative 49 34 Mackenzie 66 Rehabilitation of Vaughan Hospital 45 Robert-Bourassa Waste Management 88 Michael Garron Generating Units 57 55 Deep Geological Hospital Project 63 Repository 53 35 Renovations to 26 QEII Redevelopment 42 Beauharnois Water-Wastewater Generating Station 45 28 Quebec City University 83 Annacis Island Hospital Center – 7 Romaine Complex 22 Wastewater Treatment Laval University 43 Plant Expansion 62 4 Site C Clean 95 Royal Inland Hospital Energy Project 16 76 Bonnybrook Wastewater Patient Care Tower 65 Treatment Plant D Natural Gas Expansion 60 50 West Park Healthcare Centre 51 71 Chinook Power Station 58 64 Capital Region District Military Wastewater Treatment Plant 56 Nuclear 61 Canadian Forces Base 25 Don River and Central Trenton Expansion 55 1 Bruce Power Nuclear Waterfront Wet Weather Refurbishment 10 Flow System & 63 Canadian Forces Base Connected Projects 42 Esquimalt A and B Jetty 2 Darlington Nuclear Recapitalization Project 56 Refurbishment 12 92 Hanlan Watermain Project 64 top100projects.ca ReNew Canada 5 Top100 Projects 2019 Top100 Project Index (continued) By Rank, Project Title, and Page Reference 84 Lake St. Martin Channel Project 62 Rail 23 F.G. Gardiner Expressway Strategic Rehabilitation Plan 41 43 North End Sewage Treatment 38 Barrie Corridor GO Expansion 46 Plant Biological Nutrient 60 Highway 1 Upgrades – Removal Upgrade 48 82 Bowmanville Extension Project 62 Kamloops to Alberta 54 68 North Shore Wastewater 13 Go Expansion 52 Highway 407 East Treatment Plant 57 Network Infrastructure 32 Extension – Phase 2 51 47 Port Lands Flood Protection 37 Kitchener Corridor GO Expansion 46 73 Highway 427 Upgrades 59 and Enabling Infrastructure 50 65 Lakeshore East GO Expansion 56 29 Regina Bypass Project 43 94 Springbank Off-stream 96 Lakeshore West GO Expansion 65 90 Route 389 Improvement Program 64 Reservoir 65 81 Stouffville Corridor 10 Southwest Calgary Ring Road 28 10 0 Woodward Wastewater GO Expansion 62 Treatment Plant 66 16 Turcot Interchange 36 67 Union Station Infrastructure Renewal Program 57 57 Yellowhead Trail Freeway Transit Conversion Project 53 rank project title page # 70 Union Station Rail Corridor 58 Port 62 Union Station 91 Centerm Expansion Project 64 BRT Revitalization Project 55 89 London Bus Rapid 27 Roberts Bank Transit System 64 Subway Terminal 2 Project 43 93 Côte-Vertu Station 79 Southwest Rapid Transitway Underground Garage 65 Figures page # (Stage 2) and Pembina Highway Underpass Project 61 19 Scarborough Subway Extension 39 Projects & Sectors by Province 8 Energy Development in Canada 10 39 York VIVA Bus Rapid 86 Wilson Facility Enhancement Transit (vivaNext) 47 and Yard Expansion 63 Funding Source Breakdown 12 Project Delivery 22 LRT Transportation Transit Expansion 24 15 Blue Line Extension 36 Expanded Transportation Network 28 rank project title page # 30 Edmonton Valley Line – Total Investment 34 Stage 1 44 Airport Projects by Year of Completion 34 A Decade of Top100 47 5 Eglinton Crosstown LRT 18 31 Vancouver International Airport Upgrades 44 Building Energy Capacity 52 21 Finch West LRT 40 11 Green Line LRT 30 Bridge Acronym Legend 56 Hamilton LRT 53 9 Gordie Howe International Bridge 26 AFP: Alternative financing and procurement 41 Hurontario LRT 48 DBF: Design-build-finance 14 New Champlain Bridge DBFM: Design-build-finance-maintain 85 Metrolinx Light-Rail Vehicles 63 Corridor Project 32 DBFOM: Design-build-finance-operate-maintain 20 Millennium Line 44 Pattullo Bridge EPC: Engineering, procurement, and construction Broadway Extension 40 Replacement Project 48 EA: Environmental assessment 51 New TTC Light Rail Vehicles 51 Highway JV: Joint venture 18 Ottawa LRT – Stage 2 39 LRT: Light rail transit 97 100-Series Highway P3: Public-private partnership 80 Réno-Systèmes Program Improvements 66 RFP: Request for proposals Phase IV 61 33 Crowchild Trail Project 45 RFQ: Request for qualifications 8 Réseau express métropolitain 24 53 East Side SUB: Subcontractor 32 Surrey LRT 45 Transportation Initiative 52 TEUs: Twenty-foot equivalent unit containers top100projects.ca ReNew Canada 7 Top100 Projects 2019 no projects more than $330 million Number of Projects by less than $1 billion $1-$5 billion Province/Territory and $5.1-$20 billion Total Value within Top100 more than $20 billion NL 2 NWT $13.3 billion 1 6.3% $0.9 billion 0.4% BC QC AB 14 SK MB 15 $25.4 13 3 5 46 $36.2 billion $21 $3 $12.4 $98 billion billion 11.9% billion billion billion ON 17% 10% 1.4% 5.8% 46.1% NS 2 $2.4 billion 1.1% Sectors by Province BC AB SK MB ON QC NS NL NWT Energy 2 1 1 1 5 4 1 Buildings 2 4 1 10 4 1 1 Transit 2 2 1 21 4 Transportation 5 3 1 1 4 3 1 Other 3 3 2 6 1 One cross-border project included on the list, which is ON/QC.
Recommended publications
  • Doug Fraser Is the Chief Estimator at Ellisdon Construction Services
    General Contractors (4 of 4 seats available) Doug Fraser is the Chief Estimator at EllisDon Construction Services. Looking for a new challenge with a larger contractor, Doug joined EllisDon where he leads a team of estimators responsible for all Northern Alberta pursuits. Doug, a second-generation estimator, has an extensive history in the Edmonton construction industry. His father was also an estimator with a long history in the construction industry in the city, leading to Doug’s career Doug Fraser path. Doug has 32 years of industry experience, starting EllisDon Construction in his days as a labourer while attending NAIT. For the last Services Inc. 20 years, Doug has worked as an estimator, with the last Chief Estimator nine being in an Estimating Manager or Chief Estimator position, for some of the major general contractors, all here in Edmonton. A born and raised Edmontonian, Doug is happy to call this city home. His entire family, including his two grown children, also call Edmonton home. An avid sports fan, Doug fills his time playing hockey and volunteering with his step-son’s club soccer team. He always has a home reno project on the go or can be found working on his current project car. Doug wants to get further involved and help shape the future of the construction industry into a positive, open and collaborate environment. He looks forward to working with subcontractor and supplier members to further our collective interests and continuing to strengthen the Edmonton Construction Association. 2020 Board Election General Contractors (4 of 4 seats available) Travis Gilson has always been a builder of great things.
    [Show full text]
  • No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx
    2020 No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx Top100 Projects 2020 One Man Changes the Face of 2020’s Top 10 Top100 Projects — 2020 f not for one individual, this year’s Top100 may have looked An annual report inserted in familiar. ReNew Canada’s I When this year’s research process began, there was little change within this year’s Top 10, as many of the nation’s January/February 2020 issue megaprojects were still in progress. Significant progress has been made on all of the projects we saw grace the Top 10 in our report last year, but completion dates extend beyond the end of the MANAGING Andrew Macklin 2019 calendar year. EDITOR [email protected] Enter Matt Clark, Metrolinx’s Chief Capital Officer, who took GROUP over the position from Peter Zuk. You see, when Zuk was in charge Todd Latham PUBLISHER of publicly expressing capital budgets, particularly in the context of the GO Expansion project, he had done so by breaking down PUBLISHER Nick Krukowski the $13.5 billion spend by corridor. That breakdown led to the full expansion represented by as many as nine projects in the content ART DIRECTOR AND Donna Endacott SENIORDESIGN of the Top100. Clark does it differently. In the quarterly reports made public ASSOCIATE following Metrolinx board meetings, the capital projects for the Simran Chattha EDITOR GO Expansion are broken down into three allotments (on corridor, off corridor, and early works). The result? Six less GO Expansion CONTENT AND MARKETING Todd Westcott projects in the Top100, but two new projects in our Top 10 MANAGER including a new number one.
    [Show full text]
  • No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker
    2021 No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker Top100 Projects 2021 Changing the Language of Top100 Projects — 2021 An annual report inserted in Infrastructure ReNew Canada’s had an interesting encounter following the release of last January/February 2021 issue year’s report, and I wanted to share in an effort to get I feedback from the rest of the industry. MANAGING Andrew Macklin We had released the 2020 Top100 Projects report and were EDITOR [email protected] getting set for the Key Players and Owners Dinner, which we host every February in Toronto as a celebration of the accomplishments GROUP Todd Latham PUBLISHER of the industry in developing infrastructure megaprojects. I had heard through one of my colleagues that a couple of well-respected PUBLISHER Nick Krukowski members of the industry wanted to chat with me at the event and I should seek them out. So I did. ART DIRECTOR AND Donna Endacott SENIOR DESIGN My first thought was that, not having nearly the expertise as many of you, that I had somehow managed to royally screw something ASSOCIATE Simran Chattha up. Or perhaps they wanted to tell me that I should try a different EDITOR tact to the report? Maybe a new idea for adding a complementary DIGITAL MARKETING Becky Umweni piece for this report? But as it turned out, they wanted to have a COORDINATOR conversation with me about… language. DIGITAL The language of this report has become, to some, quite convoluted. Connie Vitello EDITOR As different jurisdictions use the language familiar to them, it can often mean that, from one project to the next, different words are EVENT Natasha Mawji MANAGER used to describe the same thing.
    [Show full text]
  • A Look at the Smart and Renewable Energy Sources Behind the Accelerated Innovation of Electric Vehicles
    AN INDEPENDENT SUPPLEMENT FROM MEDIAPLANET TO THE NATIONAL POST Opportunities abound The Air Rail Link Women in engineering Taking city transit to and design another level March 2012 ENGINEERING & INFRASTRUCTURE 3WAYS ENGINEERS ARE IMPACTING CANADA’S FUTURE INNOVATIONS IN CONSERVATION AND DEMAND MANAGEMENT A look at the smart and renewable energy sources behind the accelerated innovation of electric vehicles PHOTO: RVTR 2 · MARCH 2012 AN INDEPENDENT SUPPLEMENT BY MEDIAPLANET TO THE NATIONAL POST CHALLENGES INITIATIVE 1 CONTRIBUTING WE RECOMMEND TO A SUSTAINABLE Electric vehicles Implementing the car ENVIRONMENT of the future within the infrastructure of today. PAGE 4 “What’s interesting about electric vehicles is that they are both an incredible opportun- ity for the grid and an incredible risk.” Conduit urbanism p. 5 How Canada’s linear infrastructure can be o f b e n e fi t . Panel of Experts p. 6 Exploring the model behind successful infrastructure delivery. PLANS FOR SUCCESS The aggregation of economic pro- grams, research centers, intermodal exchange, distributed electric vehicle hubs and renewable energy distribu- tion within a near future of Conduit Urbanism. PHOTO: RVTR With the commencement of National Engineering Month, the profession focuses on fostering the next generation of ingenuity and ensuring sustainable solutions for cities nation-wide. Sustainable development is high on the agenda ne of the chal- norm rather than the exception. Canada is proud to support National lenges we have Engineering Month, an annual cele- as a profession is Creating sustainable “On top of adapt- bration of Canadian engineering getting people to communities excellence that promotes engineering understand that On top of adapting infrastructure ing infrastructure as a career choice to youth.
    [Show full text]
  • PROJECT AGREEMENT Execution Version the REGINA BYPASS
    PROJECT AGREEMENT Execution Version THE REGINA BYPASS PROJECT CONFIDENTIAL The Regina Bypass Project Project Agreement Execution Version TABLE OF CONTENTS 1. DEFINITIONS AND INTERPRETATION .................................................................................... 2 1.1 Definitions and Interpretation ...................................................................................................... 2 1.2 Conflict of Terms ......................................................................................................................... 3 1.3 Conflict of Documents ................................................................................................................. 4 2. COMMERCIAL CLOSE AND FINANCIAL CLOSE ................................................................... 4 2.1 Effective Date .............................................................................................................................. 4 2.2 Standby Letter of Credit ............................................................................................................... 4 2.3 Financial Close ............................................................................................................................. 5 2.4 Disruption in Financial Markets .................................................................................................. 5 3. SCOPE OF AGREEMENT ............................................................................................................. 6 3.1 Scope of Agreement ....................................................................................................................
    [Show full text]
  • Annual Report for 2016-17 Ministry of Highways and Infrastructure
    Ministry of Highways and Infrastructure Annual Report for 2016-17 saskatchewan.ca Table of Contents Letters of Transmittal ................................................................................................................................................................................... 1 Introduction ..................................................................................................................................................................................................... 2 Ministry Overview ......................................................................................................................................................................................... 3 Progress in 2016-17 ...................................................................................................................................................................................... 5 2016-17 Financial Overview ...................................................................................................................................................................23 For More Information .................................................................................................................................................................................27 Appendices .....................................................................................................................................................................................................28 Appendix A: Organizational
    [Show full text]
  • We Have Omitted the Personal Resumes Section As We Feel That the Information Is Either Personal Or Financial
    We have omitted the personal resumes section as we feel that the information is either personal or financial. We have redacted names and personal information of individuals in this document. Request for Interest - QU2591 Master Developer for Regional Events Centre and Entertainment District Submitted: April 29, 2011 Procurement Services Branch Fourth Floor 9909 Franklin Avenue Fort McMurray, AB T9H 2K4 Attention: Tanya MacAulay, Senior Buyer TABLE OF CONTENTS Introduction o 5.1 Company Profile Experience and Qualification o ITS o EllisDon o Casmen o BBB Architects o Sahuri Architects o Nustadia o SMG Project Approach o Resumes o CORE Certificate o CAD 7 History and Cost Control Ability of Finance Project Regional Municipality of Wood Buffalo Request for Interest | Master Developer for Regional Events Centre and Entertainment District ("REC") QU2591 Request for Interest - QU2591 Introduction Introduction Introduction Integrated Team Solutions ("ITS") is ideally positioned to participate in the Request for Proposal ("RFP") process for the establishment of a Regional Events Centre and Entertainment District ("RECED") or the "Project") as proposed by the Regional Municipality of Wood Buffalo ("RMWB") through a Public Private Partnership ("P3") procurement model because of its extensive experience working on other P3 and Alternative Finance and Procurement ("AFP") projects across Canada. ITS represents a joint venture between its two equity shareholders, EllisDon Incorporated ("EllisDon") and Fengate Capital Management Ltd. ("Fengate Capital"), who are dedicated to developing innovative public infrastructure projects through the P3 and AFP model. ITS was created in response to the continuous pipeline of AFP projects under procurement by Infrastructure Ontario and has since established itself as a national player in the P3/AFP markets with projects stretching across Canada from Surrey, British Columbia to Halifax, Nova Scotia.
    [Show full text]
  • The Journey to Net Zero Energy a Lessons Learned Report
    LOW CARBON Presents AGENDA The Journey to Net Zero Energy A Lessons Learned Report Mohawk College The Joyce Centre for Partnership & Innovation Hamilton, Ontario, Canada A Pilot Project of the Carbon Impact Initiative 1 Table of Contents 1 Executive Summary: The Journey to Net Zero Energy 3 Background: Launching the Carbon Impact Initiative 5 Defining Net Zero Targets 6 Developing a Market Standard 9 Mohawk College - Environmental Masterplan 2.0 11 The Joyce Centre for Partnership & Innovation 13 In Conversation With - Tony Cupido, Mohawk College 16 Intelligent Buildings - Its about Systems Thinking 19 The Development Process - Striving for Net Zero Energy 21 In Conversation With - Kevin Stelzer, B+H Architects 25 In Conversation With - Kathleen Agustin, EllisDon Corporation 31 In Conversation With - Andrew Visconti, EllisDon Corporation 34 Facilities Services - Maintaining Net Zero Energy Operations 37 Outcomes - A “Top 10” List of Lessons Learned 39 Looking Forward - Preparing for Market Transformation 42 Acknowledgments 43 Reader’s Notes Mohawk College The Joyce Centre for Partnership & Innovation Hamilton, Ontario, Canada Cover Photo: Courtesy of McCallum Sather and B+H Architects C Copyright 2018, EllisDon Corporation Production Team: Andrew Bowerbank Author, Graphic Design & Publication Kathleen Agustin Content, Interviews, Research, Site Photos Natasha Arsenijevich Content, Editing Table of Contents 1 Executive Summary: The Journey to Net Zero Energy 3 Background: Launching the Carbon Impact Initiative 5 Defining Net Zero Targets
    [Show full text]
  • The Leaders, Volume 11 Construction and Engineering Items Appearing in This Magazine Is Reserved
    SHARING YOUR VISION. BUILDING SUCCESS. Humber River Hospital, Toronto ON 2015 Dan Schwalm/HDR Architecture, Inc. We are Canada’s construction leaders. We look beyond your immediate needs to see the bigger picture, provide solutions, and ensure that we exceed your expectations. PCL is the proud builder of Canada’s landmark projects. Watch us build at PCL.com Message from Vince Versace, National Managing Editor, ConstructConnect 4 East and West connected by rail 6 On the road: the Trans-Canada Highway – Canada’s main street 21 Chinese workers integral in building Canada’s first megaproject 24 Canada’s most transformational project, the building The CN Tower: Canada’s iconic tower 53 of the Canadian Pacific Railway. From the ground up: building Canada’s parliamentary precinct 56 CanaData Canada’s Economy on Mend, but Don’t Uncork the Champagne Just Yet 14 Fighting the Fiction that Prospects are Nothing but Rosy in Western Canada 26 In Eastern Canada, Quebec is Winning the Accolades 60 Canada’s Top 50 Leaders in Construction 5 Leaders in Construction – Western Canada 28 Leaders in Construction – Eastern Canada 62 Advertisers’ Index 90 www.constructconnect.com Publishers of Daily Commercial News and Journal of Commerce Construction Record 101-4299 Canada Way 3760 14th Avenue, 6th Floor Burnaby, British Columbia Markham, Ontario L3R 3T7 V5G 1H3 Phone: (905) 752-5408 Phone: (604) 433-8164 Fax: (905) 752-5450 Fax: (604) 433-9549 www.dailycommercialnews.com www.journalofcommerce.com CanaData www.canadata.com Mark Casaletto, President John Richardson, Vice President of Customer Relations Peter Rigakos, Vice President of Sales Marg Edwards, Vice President of Content Alex Carrick, Chief Economist, CanaData Vince Versace, National Managing Editor Mary Kikic, Lead Designer Erich Falkenberg, National Production Manager Kristin Cooper, Manager, Data Operations Copyright © 2017 ConstructConnect™.
    [Show full text]
  • Plan for 2018-19 Ministry of Highways and Infrastructure
    Ministry of Highways and Infrastructure Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister ..................................................................................................................................................................... 1 Response to Government Direction ...................................................................................................................................................... 2 Operational Plan ............................................................................................................................................................................................. 3 Highlights .........................................................................................................................................................................................................11 Financial Summary ......................................................................................................................................................................................12 Statement from the Minister I am pleased to present the Ministry of Highways and Infrastructure Plan for 2018-19. Government Direction and Budget for 2018-19 is focused on keeping Saskatchewan On Track by controlling spending, delivering high quality services for Saskatchewan people, keeping our economy strong, and returning to balance in 2019-20. The 2018-19 Highways and Infrastructure budget continues our government’s investments in the enhancement of the
    [Show full text]
  • 2013 Major Projects Inventory
    2013 MAJOR PROJECTS INVENTORY The Inventory of Major Projects in Saskatchewan is produced by the Ministry Sector No. of Projects Total Value in $ Millions of the Economy to provide marketing information for Saskatchewan companies from the design and construction phase of the project through the Agriculture 7 342.0 operation and maintenance phases. This inventory lists major projects in Commercial and Retail 78 2,209.5 Saskatchewan, valued at $2 million or greater, that are in planning, design, or Industrial/Manufacturing 6 3,203.0 construction phases. While every effort has been made to obtain the most Infrastructure 76 2,587.7 recent information, it should be noted that projects are constantly being re- Institutional: Education 64 996.3 evaluated by industry. Although the inventory attempts to be as Institutional: Health 23 610.9 comprehensive as possible, some information may not be available at the time Institutional: Non-Health/Education 48 736.5 of printing, or not published due to reasons of confidentiality. This inventory Mining 15 32,583.0 does not break down projects expenditures by any given year. The value of a Oil/Gas and Pipeline 20 5,168.6 project is the total of expenditures expected over all phases of project Power 85 2,191.6 construction, which may span several years. The values of projects listed in Recreation and Tourism 19 757.7 the inventory are estimated values only. Project Phases: Phase 1 - Residential 37 1,742.5 Proposed; Phase 2 - Planning and Design; Phase 3 - Tender and Construction Telecommunications 7 215.7 Total 485 53,345.0 Value in $ Start End Company Project Location Millions Year Year Phase Remarks AGRICULTURE Namaka Farms Inc.
    [Show full text]
  • Saskatchewan
    Saskatchewan Vertical and Horizontal Clearance of Structures on the Provincial Highway System Version: December 2, 2015 IMPORTANT: Vertical clearance at structures often varies due to snow build-up or resurfacing work. The trucker is responsible for ensuring the load being hauled will safely clear structures. The attached tables are compiled to act as a guide only. Due to construction work in any given year, the clearances outlined in these tables may vary. In addition, structures may be erected and not included until the first quarter of the following year Mechanical warning devices are in place at certain locations where the structure has been damaged on several occasions. These devices do not relieve the driver or company, of the responsibility of assuring the load clears the structures involved. POSSESSION OF AN OVER DIMENSION PERMIT DOES NOT RELEIVE THE PERMITTEE FROM THE RESPONSIBILITY OF DAMAGE TO STRUCTURES, POWER LINES, TELEPHONE LINES, TELEGRAPH LINES OR RAILWAY CROSSING EQUIPMENT. If you require additional information, please call SGI, PERMIT OFFICE at: • Toll free in Saskatchewan 1-800-667-7575 • Outside of Saskatchewan 1-306-775-6969 NOTICE: The information contained in these tables refers specifically to structures owned and maintained by the Ministry of Highways and Infrastructure. Every attempt is made to include structures over provincial highways within the limits of larger urban centres. However, where ownership and maintenance of these structures is the responsibility of the city, the information may not necessarily be in this spreadsheet or be up to date. Contact the Engineering Department of the respective city for detailed information. If you find any errors or omissions in this publication, please notify the Saskatchewan Highway Hotline, Road Information Services, at 306-787-2454 or fax to 306-798-0111.
    [Show full text]