Top100 Projects — 2019 Record Numbers An annual report inserted in f you only read through the first 10 projects in this report, little ReNew Canada’s will seem different. Only one project is gone, and the one that January/February 2019 issue I took its place, the Gordie Howe International Bridge, has been part of our report for years. But looking beyond the top 10 shows a different trend, one that indicates record turnover in megaproject EDITOR Andrew Macklin development in Canada. [email protected] This year’s report sees the inclusion of 23 new projects, a record number by our report standards. To put this in perspective, a typical PUBLISHER Todd Latham year sees 12-15 projects leave the list based on completion. So what’s changed? For starters, there really were a large number Director of Business Elena Langlois of projects that saw substantial completion; 2018 was a banner year Development for getting things done. But we also removed a handful of projects that have clearly stalled, no longer meeting the “currently under ART DIRECTOR Donna Endacott development” requirement that is part of this annual exercise. AND DESIGN And despite a year of political upheaval in many parts of the country, be it at the municipal or provincial scale, new megaprojects Content AND are moving forward at a solid rate. This can still be said in the latter Marketing Todd Westcott Manager part of 2018 despite not having a clear picture of the infrastructure priorities of two of Canada’s largest provinces thanks to new ADVERTISING Elena Langlois governments being installed. [email protected] We also considered a new number one for this year’s report, as our Todd Latham research team attempted to come to terms with how best to represent [email protected] the $13.5-billion GO Expansion (formerly RER) project in . At the end of the day, rather than have it trump the Bruce Power refurbishment project at the top, we chose to break it down in the nine budgeted areas, the same way the project is represented by ’s chief capital officer Peter Zuk, and add as appropriate to this year’s report. ReNew Canada is published As is the case each year, we continue to refine the requirements for six times a year by Actual Media Inc. inclusion on our list. Projects must be currently under development;

147 Spadina Avenue, Unit 208 it must be a public sector project; it must have a defined scope of Toronto, ON M5V 2L7 work and dollar value; and it must have funding committed past Phone: 416.444.5842 the initial design and environmental assessment phase. That last Subscription services: 416-444-5842, ext 117 requirement is key, as projects have appeared in the past that were being studied and designed, but did not have funding to move forward. That doesn’t make a project a reality, so it should not be included on our list. ReNew Canada subscriptions are available for $29.95/year or $54.95/two years We hope you enjoy the 2019 Top100 Projects report. As always, and include the annual Top100 Projects. if you have any questions, comments, or information to add, we are ©2019 Actual Media Inc. All rights reserved. always listening. Feel free to email me at [email protected] The contents of this publication may not be at any time. reproduced by any means in whole or in part, without prior written consent from the publisher. Andrew Macklin, Editor, ReNew Canada Printed in Canada

To create your own report, visit top100projects.ca and sort by project cost, key players, location, sector, and more.

top100projects.ca ReNew Canada 3

Top100 Projects 2019

Top100 Project Index By Rank, Project Title, and Page Reference

Buildings Public Spaces Transmission rank project title page # 24 81-141 Bay Street 42 40 Fort McMurray West Transmission Project 47 Education 49 Energy Services Acquisition 74 Lake Superior Link 99 Université de Montréal Program’s Energy (Hydro One) or East–West Science Complex 66 Service Modernization 50 Tie Transmission Project (Nextbridge) 59 Health Care 12 Parliamentary Precinct 45 Romaine Complex Rehabilitation Project 30 42 Cancer Centre 48 Transmission Line 49 87 Regina Railyard 69 CAMH Phase 1C 36 Wataynikaneyap Renewal Project 63 Redevelopment 58 Transmission Project 46

98 CapitalCare Norwood Social Infrastructure Wind Redevelopment Project 66 58 Toronto 54 Henvey Inlet Wind Project 52 17 Centre hospitalier de Courthouse Project 54 l’Université de Other Montréal (CHUM) Energy and Research Centre 38 rank project title page # rank project title page # 78 Corner Brook Acute Carbon Capture Care Hospital 61 Hydroelectric 48 Carbon 77 Clinical 75 Gordon M. Shrum Trunk Line 50 Laboratory Hub 60 Generating Station Remediation 72 Grande Prairie Refurbishment 60 Regional Hospital 59 59 Giant Mine 6 Keeyask Remediation Project 54 22 Hospital for Hydroelectric Project 20 Sick Children 41 46 Port Hope 3 Muskrat Falls Project 14 Area Initiative 49 34 Mackenzie 66 Rehabilitation of Vaughan Hospital 45 Robert-Bourassa Waste Management 88 Michael Garron Generating Units 57 55 Deep Geological Hospital Project 63 Repository 53 35 Renovations to 26 QEII Redevelopment 42 Beauharnois Water-Wastewater Generating Station 45 28 City University 83 Annacis Island Hospital Center – 7 Romaine Complex 22 Wastewater Treatment Laval University 43 Plant Expansion 62 4 Site C Clean 95 Royal Inland Hospital Energy Project 16 76 Bonnybrook Wastewater Patient Care Tower 65 Treatment Plant D Natural Gas Expansion 60 50 West Park Healthcare Centre 51 71 Chinook Power Station 58 64 Capital Region District Military Wastewater Treatment Plant 56 Nuclear 61 Canadian Forces Base 25 Don River and Central Trenton Expansion 55 1 Bruce Power Nuclear Waterfront Wet Weather Refurbishment 10 Flow System & 63 Canadian Forces Base Connected Projects 42 Esquimalt A and B Jetty 2 Darlington Nuclear Recapitalization Project 56 Refurbishment 12 92 Hanlan Watermain Project 64 top100projects.ca ReNew Canada 5

Top100 Projects 2019

Top100 Project Index (continued) By Rank, Project Title, and Page Reference

84 Lake St. Martin Channel Project 62 Rail 23 F.G. Gardiner Expressway Strategic Rehabilitation Plan 41 43 North End Sewage Treatment 38 Barrie Corridor GO Expansion 46 Plant Biological Nutrient 60 Highway 1 Upgrades – Removal Upgrade 48 82 Extension Project 62 Kamloops to Alberta 54

68 North Shore Wastewater 13 Go Expansion 52 Highway 407 East Treatment Plant 57 Network Infrastructure 32 Extension – Phase 2 51

47 Port Lands Flood Protection 37 Kitchener Corridor GO Expansion 46 73 Highway 427 Upgrades 59 and Enabling Infrastructure 50 65 Lakeshore East GO Expansion 56 29 Regina Bypass Project 43 94 Springbank Off-stream 96 Lakeshore West GO Expansion 65 90 Route 389 Improvement Program 64 Reservoir 65 81 Stouffville Corridor 10 Southwest Calgary 28 10 0 Woodward Wastewater GO Expansion 62 Treatment Plant 66 16 Turcot 36 67 Infrastructure Renewal Program 57 57 Yellowhead Trail Freeway Transit Conversion Project 53 rank project title page # 70 Union Station Rail Corridor 58 Port 62 Union Station 91 Centerm Expansion Project 64 BRT Revitalization Project 55 89 London Bus Rapid 27 Roberts Bank Transit System 64 Subway Terminal 2 Project 43 93 Côte-Vertu Station 79 Southwest Rapid Transitway Underground Garage 65 Figures page # (Stage 2) and Pembina Highway Underpass Project 61 19 Scarborough Subway Extension 39 Projects & Sectors by Province 8 Energy Development in Canada 10 39 York VIVA Bus Rapid 86 Wilson Facility Enhancement Transit (vivaNext) 47 and Yard Expansion 63 Funding Source Breakdown 12 Project Delivery 22 LRT Transportation Transit Expansion 24 15 Blue Line Extension 36 Expanded Transportation Network 28 rank project title page # 30 Edmonton Valley Line – Total Investment 34 Stage 1 44 Airport Projects by Year of Completion 34 A Decade of Top100 47 5 Eglinton Crosstown LRT 18 31 International Airport Upgrades 44 Building Energy Capacity 52 21 Finch West LRT 40 11 Green Line LRT 30 Bridge Acronym Legend 56 Hamilton LRT 53 9 Gordie Howe International Bridge 26 AFP: Alternative financing and procurement 41 Hurontario LRT 48 DBF: Design-build-finance 14 New Champlain Bridge DBFM: Design-build-finance-maintain 85 Metrolinx Light-Rail Vehicles 63 Corridor Project 32 DBFOM: Design-build-finance-operate-maintain 20 Millennium Line 44 Pattullo Bridge EPC: Engineering, procurement, and construction Broadway Extension 40 Replacement Project 48 EA: Environmental assessment 51 New TTC Light Rail Vehicles 51 Highway JV: Joint venture 18 LRT – Stage 2 39 LRT: Light rail transit 97 100-Series Highway P3: Public-private partnership 80 Réno-Systèmes Program Improvements 66 RFP: Request for proposals Phase IV 61 33 Crowchild Trail Project 45 RFQ: Request for qualifications 8 Réseau express métropolitain 24 53 East Side SUB: Subcontractor 32 Surrey LRT 45 Transportation Initiative 52 TEUs: Twenty-foot equivalent unit containers top100projects.ca ReNew Canada 7 Top100 Projects 2019 no projects more than $330 million Number of Projects by less than $1 billion $1-$5 billion Province/Territory and $5.1-$20 billion Total Value within Top100 more than $20 billion NL 2 NWT $13.3 billion 1 6.3% $0.9 billion 0.4% BC QC AB 14 SK MB 15 $25.4 13 3 5 46 $36.2 billion $21 $3 $12.4 $98 billion billion 11.9% billion billion billion ON 17% 10% 1.4% 5.8% 46.1% NS 2 $2.4 billion 1.1% Sectors by Province BC AB SK MB ON QC NS NL NWT Energy 2 1 1 1 5 4 1

Buildings 2 4 1 10 4 1 1

Transit 2 2 1 21 4

Transportation 5 3 1 1 4 3 1

Other 3 3 2 6 1 One cross-border project included on the list, which is ON/QC. Project valued halved for each province. Projects by Sector Energy Hydroelectric Transmission Nuclear Natural Gas Wind

7 4 2 1 1 Transit Buildings LRT Rail BRT Subway Health Care Public Spaces Military Education Social Infrastructure

14 10 3 3 14 4 2 1 1 Transportation Other Highway Bridge Port Airport Water/Wastewater Remediation Carbon Capture Waste Management

12 3 2 1 11 2 1 1

8 ReNew Canada top100projects.ca Top100 Projects 2019

8 ReNew Canada top100projects.ca Photos: Bruce Power 2019 top100projects.ca top100projects.ca $0.7 Natural Gas billion 1 project Transmission • $5.0 billion • 4 projects Wind $1.0 billion 1 project Generation • $69 billion • 11 projects The Bruce Power refurbishment project will make up to will make project refurbishment The Bruce Power and the Ontario government between agreement The new billion $13 approximately is investing Bruce Power of over announced the awarding In April, Bruce Power In December of 2015, Bruce Power announced its plan Bruce Power In December of 2015, at its plant six of its eight nuclear reactors to refurbish originally scheduled to Ont. The project, near Kincardine, until 2020 based on the postponed was commence in 2016, project refurbishment The 15-year usable life of the reactors. reactors. on six of the plant’s eight CANDU will include work annually, power of MW 6,300 produce reactors eight The usage. energy 30 per cent of Ontario’s current approximately about $6.3 billion in annual 23,000 jobs possible and generate the province. economic benefits in communities throughout electricity for $1.7 billion in savings has achieved Bruce Power Long- in the 2013 to the forecast customers when compared in a reduction This means LTEP). (2013 Plan Energy Term about $66 each year electricity bills by household forecast to the Ontario government. decade according the next over the costs associated with the funds to cover of its own full risk of cost overruns to take and agrees refurbishmment, of the six nuclear units. on refurbishments which will of manufacturing contracts, million worth $914 when components for the refurbishment necessary provide 2020. in it gets underway Nuclear $25.8 billion 2 projects Hydroelectric

$41.5 billion 7 projects 7

WSP (drafting support); Golder (drafting WSP Players: ey Bruce Power Nuclear Refurbishment $13.0 billion

Energy Development in Canada Energy Total investment in Energy: $74 billion investment in Energy: Total 1 2018 Rank: 1 Rank: 2018 Ontario Location: Tiverton, Owner: Bruce Powertop Facility): and Training (Office Complex DBFM Team Stantec, Construction, Bird Concert Infrastructure, Corp. Services, Stonebridge Financial Concert Realty NP AREVA AECOM, Aecon, Contractor: Black & McDonald replacement); (Unit 6 steam generator (Unit 6 mechanical and electrical projects) study) Engineer: Hatch (preliminary/planning Hatch (on MCS and decontamination building) Architect: Components Supplier: Bombardier; Reactor Products Energy Laker (acting for the lender) Legal: Osler (lead counsel); Torys Other K Laker Energy Products (end fittings, liners, and (end Products Energy Suppliers: Laker Nu- (steam generators); BWXT Canada Inc. elements); flow tubes); Cameco pressure alloy Metals (zirconium Precision Tech Fuel Manufacturing (calandria tubes and annulus spacers) Funding: Private Top100 Projects Top100 10 ReNew Canada Top100 Projects 2019

10 ReNew Canada top100projects.ca Top100 Projects 2019 Credit: OPG

Darlington Nuclear Refurbishment The commencement of the execution phase marks the joint 2 venture’s (JV) successful delivery of the definition phase $12.8 billion (2012-2016) of the project, which included the construction of 2018 Rank: 2 a full-scale reactor mock-up facility to simulate key elements of the refurbishment work and the testing of specialized Location: Clarington, Ontario tooling to help prepare a comprehensive estimate and schedule Owner: Ontario Power Generation for the project. Project/Construction Manager: Aecon Group Inc./ A $35-million reactor vault mock-up and re-tube and feeder SNC-Lavalin JV (execution phase of the Retube replacement (RFR) was completed as part of the preliminary and Feeder Replacement) phase of the refurbishment project. Led by SNC-Lavalin Nuclear Legal: Blake, Cassels & Graydon; (SLN) and Aecon Nuclear, the mock-up helped to train the team Torys (acting for the owner) for feeder and fuel channel replacements to be undertaken as part of the overall refurbishment project. Other Key Players: GE Power; ABB; The execution phase of the project will involve the replacement Wood PLC; Deloitte LLP; Kiewit; of main reactor components using tools and methods that were Black & McDonald; Tetra Tech; BDI Canada; developed and tested during the project’s definition phase, Burns & McDonnell/Modus (Independent Project carried out by the JV. Each of the four Darlington Candu reactors Oversight); Cameco (calandria tubes and annulus will be taken out of service sequentially for approximately three spacers); Alstom Power & Inc. (turbine years to allow for the replacement of fuel channels, feeder pipes, generator refurbishment); Hatch (engineering services); calandria tubes, and end fittings. The first outage took place in Armtec; Comtech (Project Control Consultant Services) October of 2016, with the first reactor scheduled to be down Suppliers: DECAST Ltd.; Laker Energy for 40 months. The overall project is scheduled for 112 months. (nuclear components); Nu-Tech Precision Metals In late September, OPG announced that reassembly of Unit 2 (calandria tubes) is underway, and that planning for the Unit 3 overhaul Funding: Public has commenced.

Funding Source Breakdown

Sector Total Investment Federal Provincial Municipal Private Energy $74 billion $4.5 billion $47.6 billion – $21.9 billion Transit $60.3 billion $11.3 billion $36.9 billion $9.2 billion $2.9 billion Transportation $35.6 billion $12.8 billion $17.1 billion $2.0 billion $3.7 billion Buildings $29.2 billion $7.5 billion $18.0 billion $0.4 billion $3.3 billion Water/Wastewater $9.1 billion $1.2 billion $1.9 billion $6.0 billion – Remediation $2.2 billion $2.2 billion – – – Carbon Capture $1.2 billion – $0.2 billion – $1.0 billion Waste Management $1.0 billion – $1.0 billion – – 2019 Top100 $212.6 billion $39.5 billion $122.7 billion $17.6 billion $32.8 billion

12 ReNew Canada top100projects.ca Top100 Projects 2019

12 ReNew Canada top100projects.ca Credit: Nalcor Energy 2019 top100projects.ca top100projects.ca The Government of Newfoundland and of Newfoundland The Government will Once completed, the project transmission of the new The energization Nalcor Energy leads this development, leads this development, Nalcor Energy an which includes construction of generating hydroelectric 824-megawatt on the lower Falls facility at Muskrat than and more in Labrador River Churchill transmission associated of kilometres 1,600 that will deliver lines and infrastructure and Labrador. electricity to Newfoundland Falls Muskrat the sanctioned Labrador and construction in December 2012, Project began in January 2013. of the project Construction has started as planned on all including sites for the project, major work Churchill Soldiers Pond, Falls, Muskrat and the of Belle Isle, the Strait Falls, routes. transmission for production energy sustainable provide and industrial commercial, residential, and Newfoundland throughout growth in the coming decades. Labrador in the second quarter assets occurred the 1,100-kilometre including of 2018, pouring of Link. Concrete Labrador-Island and concrete the North Dam is progressing, passages to the for the water and steel work completed. been turbines have

IKC-ONE—Innu Kiewit Constructors, H.J. O’Connell, Kiewit IKC-ONE—Innu Players: ey Muskrat Falls Project $12.7 billion

3 2018 Rank: 3 Rank: 2018 and Labrador Newfoundland Falls, Location: Muskrat Link) Transmission (Labrador–Island Emera Owner: Nalcor Energy; Canada; Astaldi Canada; Andritz Hydro Generation: Contractor: JV Barnard-Pennecon (formerly Alstom Grid Canada and Alstom GE Energy Transmission: Canada; H.J. O’Connell Canada); Andritz Hydro Power Renewable Construction; Pomerleau Construction; Valard and SNC Lavalin Engineer: Nalcor Energy Financier: TD Securities and Goldman Sachs (co-lead arrangers) of Canada); Dentons (Government & Blackwell Legal: Cassels Brock Martineau DuMoulin (finance counsel to Fasken (advisor to owner); (TD Tétrault McCarthy WLG (counsel to Emera); Nalcor); Gowling (legal advisor) Ladner Gervais Securities/Goldman Sachs); Borden Other K Neilson, and EBC (rock and overburden excavation); Hatch (engineering excavation); and overburden Neilson, and EBC (rock and Holcim Canada (cement); EY (advising gov’t.); services); Golder; Lafarge advisor to authority); KPMG (advisory Risk Solutions (risk/insurance Aon for Construction (subcontractor CRT work); services); EXP (quality control Wood PLC Laboratories; AGAT installation); Morrison Hershfield; concrete and Holcim Canada (cement); GE (transformers, Suppliers: Lafarge Marine; Canam Group and stators); Mammoet; McKeil rotors, Funding: Public/Private Top100 Projects Top100 14 ReNew Canada Top100 Projects 2019

14 ReNew Canada top100projects.ca Credit: BC Hydro 2019 top100projects.ca top100projects.ca BC Hydro: $10.7 billion $10.7 BC Hydro: AL Sims and Sons (road improvements); Aon Risk Aon improvements); AL Sims and Sons (road Players: ey The project’s rigorous environmental assessment was completed completed assessment was environmental rigorous The project’s called for an coalition government NDP-Green the new In 2017, announced that it had selected BC Hydro In September of 2018, Provincial Provincial Other K (cost consultant); to authority); BTY Group broker Solutions (insurance advisor); permitting); KPMG (lead commercial Hatch (environmental and survey); materials testing, environment, (engineer, McElhanney analyses, design of tunnel McMillen Jacobs Associates (dam/tunnel bank); Paul (north Construction and Environmental support); Morgan Interior Architecture (south bank); Kasian & Son’s Contracting Paquette Lodging Rivers Two ATCO Inc.; Group Design and Planning Ltd.; WSP and Son’s Contracting Paquette lodge); Paul accommodation (worker Group Ltd. Construction and Environmental Ltd. (south bank clearing); Morgan services); (QA) Englobe (quality assurance (north bank site preparation); PLC Wood Laboratories; Leaders; AGAT Colliers Project Canada Inc. Calzoni Hydro Riva Suppliers: ATB Precast Advanced equipment); (hydromechanical Funding: Public • includes several Peace River dam on the earthfill This hydroelectric high, a long and 60 metres an earthfill dam 1,050 metres components: 83-kilometre- an structures, associated and station generating 1,100-MW 29, and two six sections of Highway of realignment long reservoir, line right- transmission existing along an lines transmission 77-kilometre grid. power provincial connecting Site C to the existing of-way, consultation after numerous granted and approval in October 2014 Aboriginal groups, with the public, and events meetings, presentations, has been done, engineering work Preliminary and local governments. clearing of plans for construction access roads, including the development and investigations, plans, construction materials, geotechnical shoreline plans. realignment of highway reviews Utilities Commission the B.C. by of the Site C project independent review or cancelled outright. As to determine if it should be continued, delayed, president BC Hydro the investigation, caused by of the delays a result cost had risen by announced that the project and CEO Chris O’Riley sits at $8.945 billion, cost now project million. The total forecast $610 fund. The cost set aside as a contingency with the additional project associated with the inability to meet the timeline cost was increased project the that determined was it However, 2019. in diversion river of still attainable. 2024 was completion deadline of November of the As a result 29 redesign. alignment for the Highway the new in has to be realigned the highway construction of the Site C project, this for span. Construction works a 30-kilometre six locations across to commence in 2020. expected are project

Site C Clean Project Energy $10.7 billion

4

4 Rank: 2018 St. John, Location: Near Fort Owner: BC Hydro (Site C accommodation DB(F)OM Team Group— Lodging Rivers Two lodge): ATCO & Logistics Ltd. and Bird Structures ATCO Design Build Construction Inc. Construction (site Petrowest Other Players: Canada (surveying WSP work); preparation Pier Systems (pile work); Helical work); Northern Geo (compaction testing); Bennett Jones (acted for successful proponent) Partners— Hydro River Peace Contractor: Canada, Infrastructure ACCIONA Canada Corp., and Samsung C&T Petrowest construction) (main civil works Dragados, AFDE Partnership—Aecon, works) civil EBC (spillways Flatiron, (transmission Inc. Allteck Line Contractors station) generating Canyon Site C to Peace line, and SNC- Engineer: Klohn Crippen Berger and design—dam and (engineering Lavalin BGC Engineering; Tech; Tetra reservoir); Binnie & Associates; Lasalle | R.F. WSP; NHC (engineering and design); Associated team—design) Engineering (owner’s Services: Golder (EA and Environmental fisheries agriculture, permitting, archaeology, and aquatics, socioeconomics); Pathfinder Wildlife Research Keystone Ltd.; Endeavours Knight Piésold; Air Inc.; Ltd.; McMillen; RWDI Service Ltd. (environmental Industrial Forestry Morrison Hershfield work); and regulatory for EA authority); Hemmera review (project Hydro Turbine Supplier: Voith (turbine and generator) counsel); Legal: Dentons Canada (owner’s (legal advisor) Ladner Gervais Borden Top100 Projects Top100 16 ReNew Canada Top100 Projects 2019

16 ReNew Canada top100projects.ca Top100 Projects 2019 Credit: EllisDon

Eglinton Crosstown LRT Management Consultants: Infrastructure Ontario; Metrolinx; 5 SEG Management Consultants (fairness advisor); EY (transaction $9.1 billion advisor); BMO Capital Markets (financial advisor); Aon Risk Solutions 2018 Rank: 5 (insurance advisor) Location: Toronto, Ontario Legal: Blake, Cassels & Graydon (Metrolinx legal advisor); Owner: Metrolinx Fasken Martineau DuMoulin (advising lenders to consortium); Borden Ladner Gervais (legal advisor); DLA Piper DBFM Team: Crosslinx Transit Solutions—ACS Other Key Players: AECOM (consulting engineer, preliminary planning/ Infrastructure Canada, Aecon, EllisDon, study, design); Aon Risk Solutions (risk/insurance advisor to authority); SNC-Lavalin, and Dragados Canada Arup (preliminary design work); BTY Group (independent certifier); Contractor: Design-Build JV: Aecon Caterpillar; Entro; Entuitive (structural eng. consultant); EY (advising Infrastructure Management, Dragados Canada, gov’t.); EXP (instrumentation and monitoring); Golder; Hanscomb EllisDon, and SNC-Lavalin Constructors (Pacific) (preliminary and concept designers’ cost consultant for seven stations); Engineer: Jacobs and 4 Transit—WSP, Hatch, Infrastructure Ontario; INTECH (insurance advisor); McCormick and Parsons (consulting engineer, technical Rankin; Munro (concrete); Norton Rose Fulbright; Obayashi Canada; advisor, construction oversight); AECOM Kenny Construction; Kenaidan Contracting; Technicore (contractors); (consulting engineer, preliminary planning/ URS/Parsons JV (systems design); WSP (program manager and engineer, study, design) GIS); CRH Canada (cement supply); Dufferin Construction (prep work); Architect: Station Architects; IBI Group; McMillen Jacobs Associates (independent verifier); Mott MacDonald NORR Limited Architect & Engineers; (track design review and tunnel construction management); Englobe DIALOG; Daoust Lestage (geotechnical studies); CIMA+ (traffic mgmt. and road safety audits); Morrison Hershfield (transit operations and maintenance advisory Financiers/Banks: National Bank Financial services); GHD (traffic mgmt., site civil support); GAT Laboratories; and Scotiabank Global Banking and Markets Comtech (consulting services); Wood PLC; Rider Levett Bucknall (underwriters); Alberta Treasury Branches, Caisse Centrale Desjardins, Bank of , Supplier: Bombardier (vehicle); DECAST Ltd. Bank of Tokyo-Mitsubishi UFJ, and Toronto- (precast tunnel liner segments); CRH Canada (cement) Dominion Bank (mandate lead arrangers) Funding: P3

This light-rail transit line will run along with priority signalling at intersections. the first piece of track, part of a turnout Toronto’s Eglinton Avenue between Travelling at an average speed of 28 km/h, track connecting Mount Dennis (Weston Road) and it will link to 54 bus routes, three subway with the storage and maintenance Kennedy Station. Part of the Government stations, and various GO Transit lines. facility. Construction of the Eglinton of Ontario’s light-rail transit plan for the The capacity of the LRT vehicles is 15,000 maintenance and storage facility (EMSF) city, this 19-kilometre corridor will include passengers per hour per direction, with at Black Creek Drive achieved substantial an 11-kilometre underground portion the flexibility to easily remove or add cars. completion in October of 2018 and between Keele Street and Laird Drive. Projected ridership is 5,400 passengers per vehicle readiness followed a month later, When running at street level, the line will hour in the peak direction by 2031. in anticipation of the first vehicle delivery. carry passengers in dedicated right-of-way In August of 2017, the project reached The overall project’s construction is transit lanes separate from regular traffic a major milestone with the laying of scheduled to be completed in 2021.

18 ReNew Canada top100projects.ca Top100 Projects 2019

18 ReNew Canada top100projects.ca Credit: Hydro Credit: EllisDon

2019 top100projects.ca top100projects.ca Provincial Provincial/First Nations Keeyask Limited Hydropower Partnership by (co-owned Manitoba Hydro and Keeyask Nations): Cree $8.7 billion Hydro Supplier: Voith Funding: Public • Construction began in summer 2014. Construction began in summer 2014. key milestones important to the milestones key including the progression, project’s to support completion of earthworks of and the enclosure diversion, river 4 and 5. It is expected units powerhouse 105,000 2018, that, for the calendar year will have of concrete cubic metres been poured. The station’s first unit is scheduled to go into service in the fall of 2020 thanks winter. to solid gains the previous Aon Risk Aon Players: ey Fasken Martineau Martineau Legal: Fasken DuMoulin (advised Manitoba Ladner Gervais Borden Hydro); (legal advisor) Other K advisor Solutions (risk/insurance to authority); Golder (info mgmt. solution services); Hanscomb cost consultant (owner’s and special advisor); Boston (capital project Consulting Group analysis); Englobe (quality inspection services); assurance (construction surveying); WSP PLC Wood The past year focused on several focused on several The past year into Manitoba Hydro’s electric system into Manitoba Hydro’s for use in Manitoba and for export. fourth- will be Manitoba’s Keeyask station. The design generating largest is based on a agreement for the project Manitoba partnership model between Cree four Keeyask and the Hydro the Tataskweyak including Nations, Nation, First Lake Nation, War Cree Factory York Nation, and Cree Lake Fox First Nation.

Keeyask Hydroelectric Project Project Keeyask Hydroelectric $8.7 billion

Energy produced will be integrated will be integrated produced Energy 6 This 695-megawatt hydroelectric hydroelectric This 695-megawatt of station will be a source generating average an producing energy, renewable of electricity each of 4,400 gigawatt-hours includes rock The scope of work year. for the powerhouse concrete excavation, earthen structures, and spillway, and the electrical and mechanical work, of temporary construction and removal needed to manage the river cofferdams during construction. flow

2018 Rank: 6 Rank: 2018 Manitoba Nelson River, Location: Lower Limited Partnership Hydropower Owner: Keeyask Manager: Manitoba Hydro Project/Construction plant manager and will operate (acting as project Tech on behalf of KHLP once completed); Tetra (construction management support) Ltd.— Constructors BBE Hydro Contractor: and EllisDon Bechtel, Barnard, (engineer); KGS Hatch Engineer: SNC-Lavalin; AECOM Group; Top100 Projects Top100 20 ReNew Canada Top100 Projects 2019

20 ReNew Canada top100projects.ca Credit: Hydro-Québec 2019 3 billion $16.1 Private Private top100projects.ca top100projects.ca (7.6% of list value)

12 billion $28.4 Hydro-Québec: $6.5 billion Hydro-Québec: Total Investment: $212.6 billion Total Public/Private Tetra Tech (design and construction (design and Tech Tetra Players: ey (13.3% of list value) Hydro-Québec began its work in summer of 2009. Romaine-2 in summer of 2009. Romaine-2 began its work Hydro-Québec to be online in 2020. is expected Romaine-4 Provincial Provincial This 1,550-MW hydroelectric complex on the Romaine River River on the Romaine complex This 1,550-MW hydroelectric 150 spaced over and reservoirs stations four generating involves located on the north shore River, along the Romaine kilometres an associated Each station will have of the Gulf of St. Lawrence. One permanent units, and a spillway. generating dam, two rockfill of the long will also be built as part 150 kilometres access road highway. station to the regional the generating linking project in 2015, Romaine-1 by followed in 2014, commissioned was and is underway, on Romaine-4 Work in 2017. and Romaine-3 new a with associated structures the all of building includes station, dam, diversion, facility: generating generation power of the Excavation tunnel, etc. canal, headrace tailrace spillway, diversion along with the temporary intake, and water spillway completed in 2018. were structure, Other K Construction CRT (EA and access roads); support); WSP and dam construction); road and concreting, (excavation CIMA+; GHD (geotechnical and material technology); inspection services); EXP Englobe (QA et Fils (cement) Marchand Supplier: Les Excavations Funding: Public •

27 billion $62.1 Partnerships Public-Private (29.2% of list value)

58 $106 Public billion

Romaine Complex $6.5 billion

(49.9% of list value) 7 2018 Rank: 7 Rank: 2018 Quebec Location: Havre-Saint-Pierre, Owner: Hydro-Québec AECOM Engineer: Romaine-1: RSW and SNC-Lavalin Groupe Romaine-2: AECOM Romaine-3: Hamel-CRT, Romaine-1: Contractor: Contractor: a consortium of Cegerco Construction Proco, Cegerco, Pomerleau, Hexagone, Gilbert, Groupe and Fernand and Inter-cité a consortium of J. Euclide Perron EBC Construction, a consortium of Neilson & Industriel. Construction, LAR Machinerie and Canmec EBC-Neilson, Canmec Industriel, Hamel-CRT, Romaine-3: Construction, Groupe Couillard Construction Proco, LAR, COH, HMI Construction, Groupe Hexagone, Consortium ATA Nordex, Neilson-EBC, Cégerco, Pomerleau EBC Inc.; Romaine-4: Hydro Voith Turbine Supplier: Romaine-1: (formerly Alstom) GE Energy Romaine-3:

2019 Top100 Project Delivery Project Top100 2019 Top100 Projects Top100 22 ReNew Canada Top100 Projects 2019 Bring us your toughest project.

We dare you.

MilestoneEnv.ca

22 ReNew Canada top100projects.ca Top100 Projects 2019 Photos: CDPQ Infra

8 Réseau express métropolitain Funding: Public-Private $6.3 billion The Réseau express metropolitain (REM) will be a new integrated 2018 Rank: 8 network linking downtown Montreal, South Shore, West Island, North Shore, and the airport. Once completed, the REM will be Location: Montreal, Quebec the fourth largest automated transportation system in the world Owner: Caisse de dépôt et placement du Québec after Singapore (82 km), Dubai (80 km), and Vancouver (68 km). Contractor: Engineering, procurement, and For the metropolitan area, the REM also represents the largest public construction contract: Groupe NouvLR; SNC Lavalin transportation infrastructure since the Montreal metro, inaugurated Grands Projets Inc.; Dragados Canada Inc.; Groupe in 1966. Aecon Québec Ltée; Pomerleau Inc.; EBC Inc. Combined with existing transportation networks (metro, trains, and buses), the REM opens a new era of public transit development Conception: SNC Lavalin Inc.; in the Greater Montreal Area: Aecom Consultants Inc. • 27 stations—67 kilometres—20 hours a day—seven days a week Architects: Lemay; Bisson Fortin; • This constitutes Québec’s first “public-public” partnership project Perkins+Will; Provencher Roy Construction of the line began in April of 2018, following the RSSOM Contract: Groupe des Partenaires contract award two months earlier. pour la Mobilité des Montréalais: Alstom This project also represents the first in Canada that has received Transport Canada Inc.; SNC-Lavalin O&M Inc. an investment through the Canada Infrastructure Bank, following Engineer: CIMA+; Hatch receipt of a 15-year, $1.283-billion loan in August. Legal: Norton Rose Fulbright (advising CDPQ Infra); Lavery de Billy (advising CDPQ Infra); Financing Borden Ladner Gervais (advised NouvLR); Davies In 2017, both the provincial and federal governments pledged Ward Phillips & Vineberg (advised PMM); Stein $1.283 billion to the project. The federal government pledge Monast (advised the Quebec Government); Fasken has transformed into a 15-year senior secured loan from the Martineau DuMoulin (advisor for ARTM) Canada Infrastructure Bank. ARTM and Hydro Québec have Other Key Players: Hanscomb (advisory services also contributed to the project, with $512 million and $295 for design, engineering, and costing); EXP (feasibility million respectively being provided for the project. CDPQ and diligence studies); WSP (geotechnical); Infra has committed $2.95 billion to the project. Aon Risk Solutions; GHD (geotechnical/testing)

Transit Expansion The Top100 includes $60.3 billion invested in LRT, rail, subway, and BRT infrastructure.

14 10 3 3 $41.3 $12 $4.5 $2.6 LRT billion Rail billion Subway billion BRT billion

24 ReNew Canada top100projects.ca Top100 Projects 2019

24 ReNew Canada top100projects.ca Top100 Projects 2019 Photos: WDBA

Gordie Howe International Bridge This crossing is the largest and most ambitious 9 binational border infrastructure project along $5.7 billion the Canada–United States border. It includes 2018 Rank: 21 a new six-lane bridge across the Detroit River, Location: Windsor, Ontario to Detroit, Michigan associated border inspection plazas, and connections to the freeway systems in Ontario Owner: Windsor-Detroit Bridge Authority (WDBA) and Michigan. This project will provide a new Project/Construction Manager: Deloitte alternative crossing for this trade corridor. DBFOM Team: Bridging North America—ACS Infrastructure Canada The Canada-Michigan Crossing Agreement, Inc.; Fluor Canada Ltd.; Aecon Concessions, a division of Aecon signed in June 2012 by Canada and Michigan, Construction Group Inc.; RBC Dominion Securities Inc.; AECOM; provided a framework for the construction, Carlos Fernandez Casado S.L/FHECOR Ingenieros Consultores, S.A.; financing, operation, and maintenance of the Moriyama and Teshima Architects; Smith-Miller + Hawkinson new publicly owned bridge. The agreement Architects LLP; Dragados Canada Inc.; Aecon Infrastructure called for the establishment of both a crossing Management Inc.; Turner Construction Company; Aecon O&M, a authority, known as the WDBA, to deliver, division of Aecon Construction Group Inc.; DBI Services, LLC; URS procure, and fund the project through a P3 Federal Services, Inc., an AECOM company and an international authority to oversee the project procurement and the compliance with Engineer: Morrison Hershfield (PDC consultant); Davis Langdon the agreement. (an AECOM company); Parsons (owner’s engineer) Both the formation of the WDBA (a Canadian Legal: Fasken Martineau DuMoulin (transaction advisor); Blake, Crown corporation) and the international Cassels & Graydon (legal advisor to the proponent) authority was announced in July 2014. The first Other Key Players: EY (advising team); Golder (geotech./foundation phase of construction, including construction of engineering); Hanscomb (owner’s cost consultant and special advisor); a perimeter access road at the Canadian Port of Kasian (PDC team); LeighFisher (lender’s technical advisor); INTECH Entry (POE), utility relocations, and advance fill Risk Management (insurance advisor); CIMA+ (transmission relocation placement, was ongoing in 2016. design); WSP (environmental services); Aon Risk Solutions; Parsons In July of 2018, Bridging North America (bridge technical advisor); Tetra Tech; Rider Levett Bucknall (RLB) was named as the successful proponent for the project. Financial close was reached at the end Supplier: Entro (signage and wayfinding) of September. The new date for substantial Funding: P3 completion is late 2024.

26 ReNew Canada top100projects.ca Top100 Projects 2019

26 ReNew Canada top100projects.ca Credit: Mountain View Partners

2019 top100projects.ca top100projects.ca 1,270.9 km Transportation projects on projects Transportation list Projects the 2019 Top100 represent in new, expanded, in new, roads and rehabilitated Canada across Work got underway in the spring on three spring on three in the got underway Work on schedule to open in remains The road National Infrastructure Federal Building Component of the New Canada Fund: up to $582.9 million (confirmed July 2016) Alberta Transportation: Provincial billion $4.4 around Funding: P3 •  •  between land transfer a historic 2015, In May finalized, Alberta and the Tsuu T’ina Nation was the of construction the that certainty providing segment of the Calgary Ring Road southwest Lott from This will extend could go forward. Trail/Highway on Glenmore Boulevard Creek 2A) and is (Highway 8 south to Macleod Trail long. The project kilometres 21 approximately of kilometres 10 will also include approximately upgrades. connector road Widening Trail Glenmore projects: integration S.W. 90 Avenue Improvements, and Interchange Bow Connections, and Drive and Southland Widening and Intersection Improvements. Trail late 2021. New 7.1 km Bridges New Roads 103.4 km

EY; LeighFisher (lenders technical advisor); EY; Players: ey Roads Southwest Calgary Ring Road $5 billion

Rehabilitated 1,160.4 km 10 Expanded Transportation Network Expanded Transportation

2018 Rank: 10 Rank: 2018 Alberta Location: Calgary, Owner: Alberta Transportation Ledcor, Kiewit, Partners—Meridiam, Mountain View DB(F)O Team: lead); Meridiam (financing lead); Connor Clark and Lunn (project Highway Ledcor (design-construction lead); Alberta Graham, Kiewit, Services Ltd. (O&M lead) bridge) River Constructors (Elbow KGL Contractor: North America (concept engineer); COWI Engineer: Jacobs (owner’s ISL Engineering and Land structures); interchange design of highway engineer) (owner’s Tech engineer); Tetra Services (owner’s Borden WLG (counsel to Alberta Transportation); Legal: Gowling (lenders to MVP); Osler (legal advisor); Torys Ladner Gervais Other K Risk eng. services); Aon (functional planning and preliminary WSP INTECH proponent); for preferred Solutions (risk advisor/broker advisor); Golder; Englobe (concrete Risk Management (insurance (technical advisory EXP (geotechnical); ARUP quality control); Parsons; review); design services); Morrison Hershfield (structure PLC; McElhanney GHD (dust & air monitoring); Wood Top100 Projects Top100 28 ReNew Canada Top100 Projects 2019

Remediation Site Assessments

Helping our clients solve environmental issues since 1990.

OUR SERVICES

Brownfield Services Site Assessments R emediation R isk Management Solid Waste Solid Waste Risk Management HAZ MAT MANAGEMENT Brownfield Services xcg offices

Kitchener, on T: 519-741-5774 [email protected]

Kingston, on T: 613-542-5888 [email protected]

edmonton, ab T: 780-432-5770 [email protected]

EXPERT PEOPLE. BETTER DECISIONS. xcg.com

28 ReNew Canada top100projects.ca Top100 Projects 2019 Credit: City of Calgary

Green Line LRT Other Key Players: The Green Line light rail transit system will add 28 stations 11 Colliers Project and 46 kilometres of track to Calgary’s existing LRT system. $4.87 billion Leaders; CIMA+; RLB The line will run from 16th Avenue north to 126 Avenue SE, with an underground tunnel for the downtown portion of 2018 Rank: 11 Funding: Public the system. The initial plans were for the Green Line to be • Federal Public Location: Calgary, Alberta constructed as a bus-only transitway, but was later converted Owner: City of Calgary Transit Fund: to LRT as funding became available. $1.53 billion Engineer: Hatch While procurement for Stage 1 of the Green Line LRT • Provincial: continues, the City of Calgary is moving forward with Consulting Architect: Sturgess $1.68 billion enabling works construction, supported by $250 million in Architecture, IBI Group • Municipal: combined provincial and federal funding. Legal: Blake, Cassels & Graydon $1.56 billion The current project schedule calls for construction to begin (advising the City of Calgary) over 30 years in 2020, with a completion date of 2026.

Parliamentary Precinct The is undertaking an extensive rehabilitation of the 12 Rehabilitation Project Parliament Buildings in Ottawa. The West Block and Centre Block will all undergo intensive interior and exterior upgrades throughout the buildings, $4.7 billion and extensive work is also being undertaken on the building grounds and 2018 Rank: 18 support structures. The West Block, the first scheduled for completion, has included repairs to Location: Ottawa, Ontario the exterior masonry, replacement of electrical, mechanical, and life-safety Owner: Government of Canada systems, asbestos abatement, window and door replacement, structural Project/Construction Manager: reinforcement, and technology upgrades to modern standards. PCL/EllisDon (West Block); PCL/EllisDon The original plan was to have Parliament move to the West Block in time for JV (Centre Block) the fall session, but the timeline has been adjusted to have MPs move in time for Architect: Arcop/Fournier Gersovitz the 2018-19 winter session, scheduled to begin on Jan. 28, 2019. Construction Moss & Associates (West Block) of the Centre Block, however, began in the fall of 2018 as scheduled. Other Key Players: Turner & Townsend To date, the Treasury Board has approved an investment of $4.7 billion for (risk management services); Colliers the delivery of the Long Term Vision and Plan for the Parliamentary Precinct, Project Leaders Inc. and Tiree Facility of which $3 billion was spent as of March 31, 2018. Included within the Solutions (project management support approved funding are major projects such as the rehabilitation of the West services for Centre Block); Atwell-Morin Block, Visitor Welcome Centre Phase 1, Government Conference Centre, Sir (northern ventilation towers rehabilitation John A. Macdonald Building, the Wellington Building, along with the initial for Centre Block); Golder; spending authority for the rehabilitation of the Centre Block, the East Block, Morrison Hershfield (code consulting) 100 Wellington, and funding for other projects in the Parliamentary Precinct. Funding: Public The work is expected to take until at least 2027, but could be extended to 2033.

30 ReNew Canada top100projects.ca Top100 Projects 2019

30 ReNew Canada top100projects.ca Credit: SSLC. (Signature on St. Lawrence Construction) 2019 top100projects.ca top100projects.ca Network infrastructure is one of the key the key is one of infrastructure Network GO of the of the expansion components rail electrified provide which will network, budget for the all corridors. The service on works includes all infrastructure network in the electrification of the network, involved will be to signalling that as the upgrades as well in the design is currently This project required. in 2025. and scheduled for completion phase, PricewaterhouseCoopers; Steer Davies Gleave; Gleave; Steer Davies PricewaterhouseCoopers; Players: ey In August of 2017, the first phase of steel work on the Jacques Cartier work steel phase of the first of 2017, In August Canada announced that the structure Infrastructure In October of 2018, 4-Transit JV 4-Transit Players: ey Morrison Hershfield (business case); Englobe, Consortium Perron; Hudon; Perron; Consortium Morrison Hershfield (business case); Englobe, Hanscomb to government); Bélanger and Consultants (advisory services Risk (advising team); Aon (cost consultant and special advisor); EY (insurance partner); INTECH advisor to private Solutions (risk/insurance CIMA+; Englobe (audits); advisor); GHD (inspection and testing services); services); DECAST environmental EXP (construction, design, planning, and Funding: P3 $4.239 billion • Federal: Champlain of Canada announced the new the Government On Oct. 5, 2011, in North projects infrastructure one of the largest Bridge corridor project, Champlain not only includes the new America. The corridor-wide project and widening of reconstruction and Bridge Île-des-Soeurs a new but bridge, three have to designed is bridge new The 15. Autoroute of portion federal the and a two- traffic corridors for vehicular three-lane corridors, including two system. transit corridor capable of accommodating a light rail lane transit bridge will also include a multi-use path for pedestrians and cyclists. The new This phase completed, marking a major milestone for the project. Bridge was and eight bottom of four braces the replacement involved of the project Also, reinforced. while 150 gusset plates and 17 diagonals were chords, with bolts. also replaced were rivets 100,000 approximately that certain but 2018, 21, Dec. of original deadline the by place in be would the and 2019, of spring the until completed be not would works finishing 2019. in June of bridge will officially open to traffic Other K SNC-Lavalin; SNC-Lavalin; Engineer: Stantec CIMA+; Other K advisory services): Hatch, (technical Hershfield; Morrison WSP; Parsons, Gannett Fleming; Infrastructure lead); Ontario (procurement mgmt. services) Comtech (project Funding: Public

HSBC and Arup Canada (engineering

New Champlain Bridge Corridor Project $4.24 billion GO Expansion Network Infrastructure Network $4.7 billion Dentons Canada (advising federal Dentons Canada (advising federal

14 13 advisory services); IBI Group/Roche (owner (owner advisory services); IBI Group/Roche engineer and electrical); Stantec; Ramboll independent engineer) (project’s Dissing+Weitling Consulting Architect: designs) (preliminary Roy and Provencher Financiers/Banks: 2018 Rank: 12 Rank: 2018 Quebec to Brossard, Location: Montreal Canada Owner: Infrastructure on the Signature DBFOM Team: Group—SNC-Lavalin, Saint-Lawrence PPP HOCHTIEF Infrastructure, ACS T.Y. WSP, Flatiron, Solutions, Dragados, Lin International, International Bridge EBC Inc. Technologies, Engineer: National Bank of Canada Legal: (legal advisor); Gervais Ladner Borden govt.); DLA Piper (Canada); McMillan (legal counsel to the finance parties) Greater Toronto and Toronto Location: Greater Ontario Hamilton Area, Owner: Metrolinx

NEW Top100 Projects Top100 32 ReNew Canada Top100 Projects 2019

32 ReNew Canada top100projects.ca Top100 Projects 2019

2019 Top100 Provincial: $122.7 billion Total Investment Federal: $39.5 billion Private: $32.8 billion $212.6 billion Municipal: $17.6 billion

Energy Transit Transportation Buildings

$74 $60.3 $35.6 $29.2 billion billion billion billion

Provincial Private Federal Provincial Federal Municipal Private Provincial Federal Private Municipal Provincial Federal Private Municipal $47.6 billion $21.9 billion $4.5 billion $36.9 billion $11.3 billion $9.2 billion $2.9 billion $17.1 billion $12.8 billion $3.7 billion $2 billion $18 billion $7.5 billion $3.3 billion $0.4 billion

Water/ Waste Carbon Capture Wastewater Management Remediation

$1.0 $1.2 $2.2 $9.1 billion billion billion billion

Provincial Private Provincial Federal Federal Municipal Provincial Federal $1 billion $0.9 billion $0.2 billion $0.1 billion $2.2 billion $6.1 billion $1.9 billion $1.1 billion

Projects by Year of Completion 2 2 13 16 9 11 13 9 13 4 1 1 1 5 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2030 2041 2043 TBD

Top100 Badge Program Badges are sent to key players involved PLATINUM PLATINUM GOLD SILVER BRONZE ELITE 2019 2019 2019 2019 2019 in multiple infrastructure projects on the 20 10 to 19 6 to 9 3 to 5 2 Top100 list. Companies use these icons projects projects projects projects projects or more to identify themselves as top key players.

Visit top100projects.ca for a company index and list of badge recipients. Call Elena Langlois at 416- 444-5842 ext. 151 to get your badge if you are a key player!

34 ReNew Canada top100projects.ca Top100 Projects 2019

34 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects Dinner: February 19, 2019

Blue Line Extension The Blue Line Extenson project will add 5.8-kilometres of track and five new 15 stations to the current 12-station Blue Line, one of four Metro lines that runs $3.9 billion through the Greater Montreal Area. The extension will run along Jean-Talon NEW Street, ending at the Galeries D’Anjou shopping mall next to Highway 25. In April of 2018, Prime Minister Justin Trudeau announced his support for Location: Montreal, Quebec the project, including an initial investment of $16 million to help develop the Owner: Société de transport de Montréal business case for the project. Project Manager: ARTM The Quebec Government announced its hopes for a 50-40-10 funding split for Other Key Players: EXP the extension project, however the exact commitments were not confirmed prior (JV for engineering services) to the onset of the provincial election in the fall. Should funding commitments Funding: Public arrive in on time, tenders for construction work will be released in 2020. Credit: KPH Turcot

Turcot Interchange Legal: Dentons Canada (legal counsel, under the authority 16 of the Societé québécoise des infrastructures) $3.67 billion Other Key Players: WSP (designer, environmental, 2018 Rank: 13 geotechnical work); Arup (technical advisor, independent Location: Montreal, Quebec certifier); AOR (geotechnical study); Axor experts-conseils (site supervision); Coentreprise Groupe Qualitas/Englobe- Owner: Transports Québec Technisol (geotechnical study); ConsultRail (study on Project/Construction Manager: AECOM and BPR-Batiment railway equipment); Daniel Arbour & associés, S.E.N.C. Design-Build Team: KPH Turcot—Kiewit, Parsons, (study on highways); Ethnoscop (archaeological studies); WSP, and Holcim Canada Génius Conseil (site supervision); Les Conseillers Adec Engineer: Consortium Génivar/Dessau; Consortium (economic study); Patrimoine Experts S.E.N.C. (archeological Inspec-Sol inc./EXP; CIMA+; Dessau; Inspec-Sol inc.; excavations); Raymond Chabot Grant Thornton & Englobe (environmental, geotechnical and materials Cie (assurance and guarantees); Trimax Sécurité (site engineering); WSP (independent engineer); Tetra Tech supervision); Aon Risk Solutions (insurance broker); GHD (part of owner’s engineer team); Hatch (rail engineer) (geotechnical design/materials); Englobe (audits) Contractors: Axxys Construction; CMS Entrepreneurs Supplier: Canam Group généraux; Construction Demathieu & Bard; Construction (steel superstructure and components) DJL; Construction Garnier; DB-AECOM Pont Saint-Jacques Funding: Public S.E.P.; Demix Construction; Demvar; EBC Inc.; Entreprises • Provincial: $3.67 billion de construction Panzini; Excavation Loiselle & Frères; Golder The Turcot Interchange is a major traffic hub in the Construction; Groupe Hexagone, S.E.C.; Groupe TNT; Hulix Montreal area, connecting Autoroutes 15, 20, and 720, Construction; Jacques Arsenault Asphalte; L.A. Hébert Ltée; and facilitating access to the Champlain Bridge. It is also Lanco Aménagement; Les entreprises Claude Chagnon; a vital link between the Montreal Pierre-Elliott-Trudeau Les Grands Travaux Soter; Les services de construction International Airport and downtown. The final plans Demo Spec; Les services environnementaux Delsan-A.I.M.; for the reconstruction of the deteriorating expressway Louisbourg SBC; Pomerleau; Simard-Beaudry Construction; interchange include more space allocated to public transit, Tesco 3000; SPG Hydro International; TNT2 cyclists, pedestrians, and green space. Several bus-only Environmental Services: Consortium Dessau-Soprin/Les lanes have been reserved along Highway 20, Notre Dame Consultants S.M. (environmental impacts study); Dessau- Street West, and St. Patrick Street. Soprin (environmental study and decontamination); Groupe Construction of the new interchange reaches several Qualitas (environmental study); EXP (environmental study); milestones in 2018, with completion of the new Amphibia-Nature (environmental study on brown grass configuration of A-20 East and the dismantling and new snake); Séti Media (environmental study); Tecsult configuation of A720 West. The project is expected to be Financiers/Banks: PricewaterhouseCoopers completed on schedule by 2020. For corporate tables of eight or single tickets, visit top100projects.ca/celebrate

36 ReNew Canada top100projects.ca Sponsorship opportunities are still available. Contact Elena Langlois at 416-444-5842 ext. 151 or [email protected] Top100 Projects 2019 Top100 Projects Dinner: February 19, 2019

Premier partner

Elite partnerS Top100 Projects Key Players and Owners Dinner All leaders in Canadian infrastructure are invited to attend the gala dinner select partnerS and networking event that celebrates the Top100 Projects each year. On Feb. 19, enjoy a high-powered evening with your colleagues and Date: Tuesday, Feb. 19, 2019

hundreds of owners, constructors, Credit: swirlto.com/portfolio/carlu Cocktail engineers and key players who Reception: 6:00 p.m. are building Canada’s biggest Dinner: 7:30 p.m. infrastructure projects. Venue: The Carlu Special guests and speakers will be 444 Yonge Street announced soon at top100projects.ca 7th Floor, Toronto, ON

For corporate tables of eight or single tickets, visit top100projects.ca/celebrate

36 ReNew Canada top100projects.ca Sponsorship opportunities are still available. Contact Elena Langlois at 416-444-5842 ext. 151 or [email protected] Top100 Projects 2019 Credit: ReNew Canada

Centre hospitalier de l’Université de Montréal Other: BTY Group (lenders technical 17 (CHUM) and Research Centre advisor); Hatch (independent certifier); Hanscomb (mechanical and electrical cost $3.63 billion consultant and special advisor); INTECH Risk Management (insurance advisor); 2018 Rank: 14 Société québécoise des infrastructures; Location: Montreal, Quebec SNC-Lavalin, WSP (owner’s advisor); Owner: Centre hospitalier de l’Université de Montréal Colliers Project Leaders; GHD (geotechnical Project/Construction Manager: Groupement SLDG, & materials); EXP (MEP services) led by SNC-Lavalin Supplier: Demix Beton (concrete) Research Tower DBFM Team: Accès Recherche Montréal—Pomerleau Funding: Public/Private and Verreault, a subsidiary of Dessau. A new hospital and research centre will Hospital DBFM Team: Collectif Santé Montréal—Laing O’Rourke, replace the three facilities that currently make Obrascón Huarte Lain, Innisfree, and Dalkia Canada up the Centre hospitalier de l’université de Contractor: EBC Inc. Montréal (CHUM): Hôtel-Dieu in Montréal, Engineer: AECOM; Consortium Pageau Morel, BPR Bâtiment, LBHA, Notre-Dame Hospital, and Saint-Luc Hospital. and SDK NCK (Research Centre); HH Angus, Pasquin St-Jean, and The project received the go-ahead in 2010, Groupe SMi International (Hospital) which brings all three francophone university Financiers/Banks: Research Centre: Axium Infrastructure and hospitals together under one roof. Meridiam Infrastructure; Hospital: Innisfree (30%), Laing O’Rourke Phase one, construction of the research (25%), Obrascon Huarte Lain (25%), Dalkia Canada (20%), and RBC centre, was opened in the fall of 2013. Phase Dominion Securities (underwriter) two of the project, three 25-storey buildings that will each house therapeutic and hospital Consulting Engineer: Tetra Tech (mechanical/electrical engineering) diagnostic services, emergency, and clinical Architect: Research Centre: NFOE et Associés, follow-ups as well as clinical and logistical Menkès Shooner Dagenais LeTourneux, Jodoin Lamarre support, welcomed its first patients in early Pratte (sub-consultant), Lemay et Associés, Parkin Architects; October of 2017. Phase three of the project, Hospital: Cannon Designs, NEUF Architectes now underway, consists of the construction of Legal: Research Centre: Blake, Cassels & Graydon; an adjacent building to accommodate part of Hospital: Fasken Martineau DuMoulin (advised authority), Lavery, de the outpatient clinics, clinico-administrative Billy (legal counsel); Blake, Cassels & Graydon (legal advisor); Gowling offices, library, archives, a 500-seat Lafleur Henderson (repped consortium); McCarthy Tétrault (advised amphitheatre, and another parking section. RBC); Stikeman Elliott (repped Dalkia); Raymond Chabot Grant Thornton Phase three is scheduled for completion in the (financial and process advisor); Dentons Canada (legal advisor) spring of 2020.

38 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019 Credit: City of Ottawa Ottawa LRT – Other Key Players: EXP 18 Stage 2 (instrumentation and monitoring); Hanscomb $3.6 billion (owner’s cost consultant and 2018 Rank: 17 special advisor); Aon Risk Location: Ottawa, Ontario Solutions (owner advisor and Owner: City of Ottawa construction insurance broker); INTECH Risk Management Engineer: McMillenJacobs (insurance advisor); AECOM Associates (owner’s tunnel (owner’s representative); engineer); Morrison Hershfield GHD (testing, inspection, and (owner’s engineer); Golder geotechnical services); Golder; (owner’s engineer team); Parsons Enstoa; SNC-Lavalin; WSP Legal: Borden Ladner Gervais (legal (geotechnical) advisor); Norton Rose Fulbright (advisor for project owner); Osler; Supplier: DECAST Ltd. Torys (acted for lender) Funding: P3

Ottawa’s mayor, council, and The project will: In May of 2018, the Government of Ontario representatives from the city’s • Extend the Confederation Line east announced an additional $50-million business, tourism, and academic from Blair to Orléans, with stations contribution to fund the anticipated communities officially launched at St. Joseph, Jeanne D’Arc, Orléans $80-million cost of the 3.4-kilometre the Ottawa LRT Stage 2 funding Drive, and Place d’Orléans; extension from Earl Armstrong/Bowesville request to the federal and provincial Station to a new terminus station • Extend the Confederation Line west governments. Stage 2 will further approximately 200 metres west of Limebank to Algonquin College and Bayshore, reduce commute times by adding Road in the future Riverside South Town with stations at Westboro, Dominion, 19 new stations and 30 kilometres Centre community. The additional $30 of rail to Ottawa’s O-Train system Cleary, New Orchard, Lincoln Fields, million needed for this extension will be between 2018 and 2023. It was Queensview, Pinecrest, Iris, Baseline, secured through the introduction of an recently confirmed through EA and Bayshore; and area-specific development charge. work it can be constructed within • Extend the O-Train to Riverside South When completed in 2023, Stage 2 would the $3-billion budget established and Bowesville, with a new station at bring the LRT to within five kilometres of in the city’s 2013 Transportation Gladstone, and stations at Walkley, almost 70 per cent of residents. Construction Master Plan. South Keys, Leitrim, and Bowesville. is slated to begin in the summer of 2019. Credit: AECOM Scarborough Environmental Services: 19 Subway Extension AECOM Other Key Players: Aon $3.56 billion Risk Solutions (risk/ 2018 Rank: 16 insurance advisor to authority); EY (advising Location: Scarborough, Ontario gov’t.); Golder (owner’s Owner: TTC consultant); Hanscomb Project Manager: (station designer’s cost Scarborough Link Joint consultant); Englobe Venture—Parsons, Hatch, WSP (geotechnical investigation); Contractor: Hatch AGAT Laboratories; Comtech (tunnel design); WSP (systems (property consulting design and management); services); Wood PLC AECOM (station design) Funding: P3

The Scarborough Subway Extension is Triton Avenue and Progress Avenue. and provincial government. The funding a six-kilometre extension of Toronto’s The project also includes a new bus envelope, including the contribution from Line 2 subway system, providing a terminal to link subway riders to local the municipality, sat at $3.56 billion, just direct link from Kennedy Station to and regional bus routes. over $200 million more than the current Scarborough Centre. The new line Originally, the Scarborough transit anticipated cost of the one-stop subway. will run along the McCowan corridor, project had been designed as a seven- In July of 2018, station designs were with the new station located on the stop light rail transit system, and had presented to the City of Toronto’s west side of McCowan Road between received funding from both the federal Design Review Panel for consideration.

top100projects.ca ReNew Canada 39 Top100 Projects 2019 Credit: TransLink Millennium Line Financing 20 Broadway Extension The Government of Canada announced an investment of $888.4 million in the $2.83 billion project. The provincial government has NEW provided a $1.82-billion contribution, while the City of Vancouver has Location: Vancouver, provided an in-kind donation of $99.8 British Columbia million. The final component is $17 Owner: TransLink million, which will come from the Other Key Players: Golder Phase 1 Mayors’ Vision plan. Funding: Public

The Broadway Extension project will Street. The line will replace the existing more than $3 billion in funding for both see the addition of six underground B-line bus service, increasing transit this and the Surrey LRT project. stations and 5.7 kilometres of track to capacity in the corridor by 250 per cent. The current construction schedule the Millenium Line. The extension will In September of 2018, the provincial calls for the extension to open to the run from VCC-Clark Station to Arbutus and federal governments announced public in 2025. Credit: TTC 21 Finch West LRT $2.5 billion 2018 Rank: 47 Location: Toronto, Ontario Owner: Metrolinx Project/Construction Manager: Parsons (project management, engineer, and environmental assessment); Infrastructure Ontario DBFM Team: Mosaic Transit Partners–ACS Infrastructure Canada Inc.; Aecon Concessions—a division of Aecon Construction Group Inc.; CRH Canada Group Inc. Construction: Aecon Infrastructure and Management Inc.; Dragados Legal: Norton Rose Fulbright Canada Inc.; Dufferin Construction Other Key Players: AECOM (technical advisor); Aon Risk Solutions (risk/ Company—a division of CRH insurance advisor to authority); EY (advising gov’t.); Infrastructure Ontario Canada Group Inc. (managing procurement/construction); LeighFisher (lenders technical advisor); Design: Arup Canada Inc.; Dillon Parsons (overseeing technical advisor); INTECH Risk Management (insurance Consulting Limited; DPM Energy advisor); Morrison Hershfield (MEP design services); GHD (traffic mgmt.); Inc.; DTAH; Perkins + Will Canada Golder; Comtech (program/project consulting); Rider Levett Bucknall Inc.; Sener SES Canada Inc. Supplier: Dufferin Concrete; DECAST (precast infrastructure) Maintenance: ACS Infrastructure Funding: P3/AFP Canada Inc.; Aecon O&M—a division of Aecon Construction This new LRT, located along Finch Avenue West in the city’s northwest end, will be Group Inc. integrated with the city’s existing transit system. The project includes: 11 kilometres Financial Advisor: RBC Dominion of new semi-dedicated rapid transit between Humber College and the new Finch Securities Inc. West subway station on the Toronto-York Spadina subway extension; 18 surface stops and a below-grade interchange station to connect with the new Finch West Engineer: Jacobs (owner’s engineer subway station; and a maintenance and storage facility for the light rail vehicles. and project manager); WSP In April of 2018, Metrolinx and Infrastructure Ontario announced that the (engineer/sustainability consultant); Mosaic Transit Group had been chosen as the preferred proponent for the project. Hatch (owner’s engineer) However, just one week after the announcement, Metrolinx stated that, based on Consulting Engineer: WSP the construction schedule submitted by Mosaic, the project would be completed by (geotechnical consultant) 2023, one year later than had been announced in the fall of 2017. Construction got Vehicle Supplier: Bombardier underway in the summer of 2018.

40 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Hospital for Engineer: In October of 2017, the Hospital for Sick Children announced its plan 22 Sick Children Entuitive for a $1.3-billion fundraising campaign, the largest in Canadian health (structural); care history. Of the $1.3 billion, $600 million of that was dedicated to $2.4 billion TMP the construction of a new patient care centre on University Avenue in (mechanical); NEW downtown Toronto. MBII In March of 2018, then-Ontario Premier Kathleen Wynne announced Location: Toronto, (electrical) the provincial government would commit $2.4 billion to the design and Ontario Architect: construction of a massive redevelopment of the hospital, including the Owner: Hospital B+H construction of the aforementioned patient care centre. for Sick Children Funding: Public The project is currently in the design phase. Credit: City of Toronto

F.G. Gardiner Expressway Funding: P3 23 Strategic Rehabilitation Plan • Federal: $820 million (anticipated) • Municipal: $1.75 billion $2.3 billion 2018 Rank: 19 The City of Toronto is taking a proactive approach to managing the rehabilitation of the Gardiner to keep the roadway in safe and Location: Toronto, Ontario operable condition. City staff have evaluated the procurement options Owner: City of Toronto and are recommending an AFP approach to rehabilitate the Gardiner Contractor: Aecon (Section 1) in the most efficient way for Toronto residents and businesses. Engineer: Morrison Hershfield The proposed plan addresses the rehabilitation of the expressway, (baseline study of substructure components) extending from Highway 427 to the eastern limit at Logan Avenue, Environmental Services: Dillon Consulting including the 11-kilometre at-grade section from Highway 427 to Limited (environmental assessment); Dufferin Street with its 32 bridges and structures, and the seven- Perkins+Will; Hargreaves Associates kilometre elevated section from Dufferin Street to Logan Avenue with Legal: Blake, Cassels & Graydon 335 spans. It incorporates the change of scope for the rehabilitation (City of Toronto); Osler of the Gardiner Expressway east of Jarvis Street based on the future Other Key Players: Ernst & Young, Hanscomb, outcome of the environmental assessment. and HDR (advisory support); Aon Risk Solutions In June of 2018, Aecon was awarded a $308.5-million contract for (owner advisor and construction insurance broker) Phase 1 of the project between Cherry Street and Jarvis Street.

top100projects.ca ReNew Canada 41 Top100 Projects 2019

81–141 Other Key Players: Arup The Bay Street project involves the construction of 24 Bay Street (pedestrian modelling); two new commercial buildings, joined by a one-acre INTECH Risk Management elevated park over the rail corridor near Union Station in $2 billion (advisor to developers); downtown Toronto. KPMG (advisor to A key compnent of the construction is the new Union 2018 Rank: 24 Metrolinx for initial Station Bus Terminal. Construction got underway on Location: Toronto, Ontario planning stage); Morrison the terminal in June of 2017. The terminal will provide Owner: Metrolinx and Hershfield (building stronger connections for users of the rail and bus networks, Ivanhoé Cambridge envelope consultant); WSP and provide straightforward access to the Gardiner Expressway. The new terminal also includes over 1,000 Contractor: EllisDon (sustainability consultants, bicycle parking spots and integrated green space. (general contractor) geotech./env. work); Steel and concrete works at 81 Bay Street continued Cushman & Wakefield Consulting Architect: throughout 2018, with the concrete core of the building Wilkinson Eyre Architects Funding: Public/Private rising at 1.5 storeys per six work days during peak periods. (design); Adamson • Provincial Metrolinx: The final two super steel columns on the west side were Associates Architects around $100 million installed in September. (executive architect); DBOX • Private Ivanhoé Phase 1 of the project—81 Bay Street—is scheduled for Legal: Torys Cambridge: around completion 2020. Phase 2, construction of 141 Bay Street (representing project owner) $2 billion and the elevated park, is set to be complete in 2023.

Don River and Central Engineer: The Don River and Central Waterfront Wet Weather Flow 25 Waterfront Wet Morrison System & Connected Projects is a 25-year program aimed Hershfield; Weather Flow System & at improving water quality in Toronto’s Lower Don River, Parsons (bridge Taylor-Massey Creek, and the Inner Harbour. Connected Projects technical advisor); The Coxwell Bypass Tunnel, as well as the integrated $2 billion AECOM pumping station at the Ashbridges Bay Wastewater Treatment NEW Other Key Plant, and new outfall at the plant, are among the first parts Players: Golder; to be undertaken within the overall program. Construction of Location: Toronto, Ontario Rider Levett the tunnel is underway now, and is scheduled for completion Owner: City of Toronto Bucknall in 2023. The station project is anticipated to be completed by Contractor: Hatch (outfall tunnel) Funding: Public 2026, and the new outfall by 2025. Credit: ReNew Canada 26 QEII Redevelopment $2 billion NEW Location: Halifax, Nova Scotia Owner: Government of Nova Scotia Project Manager: Nova Scotia Lands Contractor: PCL Constructors Canada Ltd. (Hants Community The redevelopment of the QEII • Expansion of the Halifax Hospital renovation) Health Science Centre is a multi- Infirmary site; Other Key Players: Contracting phase project involving several health • A new hospice residence Specialties (2005) Inc.; Coastal care sites throughout Halifax and the in Halifax; and Woodworkers Ltd.; Dantra Specialty surrounding area. The project will • Movement of the QEII Cancer Products; Duron Atlantic Limited; transform health care delivery in Nova Centre to the new Infirmary site. Twin City Painting (1979) Limited; Scotia, providing modern services for Completion of these projects will Northfield Glass Group Ltd.; Apex patients throughout the province. result in the closure of Centennial, Industries; Atlantica Mechanical; Bond The primary project elements Dickson, and Victoria buildings on the and Coolen Contracting Ltd.; Life Safety include: QEII Victoria site in Halifax. Systems; RKO Steel Ltd.; Southeast • The renovation of Hants In the fall of 2018, the Government of Drywall Ltd.; Inflector Environmental Community Hospital in Windsor; Nova Scotia announced that the Halifax Services; Darim Masonry Limited; • Renovation of Dartmouth Infirmary and Bayers Lake projects Flynn Canada Limited; McCarthy’s General Hospital; would be delivered as a public-private Roofing Limited; Royal Door Limited • A new Community Outpatient partnership using the DBFM model. Funding: Public/P3 Centre in Bayers Lake; The RFQ was released in the fall.

42 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Roberts Bank Legal: Blake, Cassels & Graydon Financing 27 Terminal 2 Project (counsel to owner); Borden Ladner Gervais (legal advisor); Norton Vancouver Fraser Port Authority is a financially $2 billion Rose Fulbright (Proponent team in self-sufficient corporation established by the the Terminal Operator RFP) Government of Canada in accordance with 2018 Rank: 25 Other Key Players: the Canada Marine Act. Vancouver Fraser Location: Delta, Aon Risk Solutions Port Authority is funding the initial planning British Columbia Funding: Private and environmental assessment phase of the Owner: Port Metro Vancouver • Private Port Metro Vancouver proposed project; funding for construction land (self-sufficient corporation Project/Construction and terminal equipment will be obtained from established by the Government Manager: WorleyParsons private sources through a competitive process. of Canada): $2 billion (project management); WSP (construction management, This is a proposed new three-berth container terminal that would provide additional quality assurance, reporting to capacity of 2.4 million TEUs per year to meet the port’s forecast demand until 2030. the project manager, construction The project would be approximately 5.5 kilometres offshore, northwest of the existing contract administration, geomatic Roberts Bank terminal facilities. The new rectangular terminal would have a berth scanning); Hatch length of 1,300 metres, long enough for the mooring of three ships, and a width of (project manager) 700 metres to support terminal components, such as a container storage yard and rail intermodal yard. The existing causeway would also be widened to accommodate road Engineer: Parsons and rail improvements, and the tug basin at Deltaport would be expanded. Environmental As part of the environmental assessment (EA) process for the project, the Vancouver Services: Hemmera Fraser Port Authority submitted an environmental impact statement for the project to (supporting project planning the Canadian Environmental Assessment Agency in March 2015. In 2018, the review and leading the EA); WSP panel tasked with the EA was seeking comments on information request responses and (air quality assessment); Golder draft Public Hearing Procedures, with the comment period running from July to October.

Quebec City University Engineer: SNC-Lavalin; In April of 2017, the Government of Quebec formally announced plans to move forward with the 28 Hospital Center – CIMA+; Stantec Other Key Players: replacement of the Hôpital Enfant-Jésus de Québec (Hospital of the Child Jesus) in Québec City. The Laval University Englobe (geotechnical/ project will consolidate the research and clinical environmental $1.97 billion activities of L’Hôtel-Dieu de Québec on the site of the investigation, 2018 Rank: 23 new hospital. The first phase of the multi-phase project quality control); includes the construction of the Integrated Cancer Centre, Location: Quebec City, Quebec GHD (vibration along with a new generator building, power plant, and Owner: CHU de monitoring); Golder parking. Construction is underway, with Phase 1 of the Québec-Université Laval Funding: Public/Private project set to be complete by the end of 2020.

Regina Bypass Project Financiers/Banks: Graham Supplier: Funding: P3 29 Capital, Parsons Enterprises, Canam • Federal PPP Canada: $200 million $1.88 billion Vinci Concessions, and Connor, Group • Provincial: $1.68 billion 2018 Rank: 26 Clark & Lunn (equity investors) This bypass is the largest infrastructure Location: Regina, Legal: Aird & Berlis (P3 legal project in Saskatchewan’s history. Based on advisor); Fasken Martineau Owner: Saskatchewan Ministry of preliminary numbers, this project will have DuMoulin (advising lenders to Highways and Infrastructure significant economic benefits for the province consortium); Norton Rose DBFOM Team: SaskLink Global by creating 8,200 construction-related jobs in Fulbright (OMR service provider Transportation Partners—VINCI, Saskatchewan. The project consists of a free Gracorp Capital, Parsons, Graham, on a Proponent team); Osler; flow highway corridor through the Regina Carmacks, McElhanney, Urban Systems, Torys (representing City of Regina) region, which includes approximately 58 COWI North America, EXP, Clifton Other Key Players: Aon Risk kilometres of four-lane highway (including 40 Associates, National Bank Solutions (risk/insurance advisor kilometres of new highway) and service roads Engineer: Associated Engineering to authority); EY (financial and along with 10 new interchanges, and three (owner’s engineer team); EXP procurement advisor); Golder; new intersections. One of the key aspects of (geotechnical design for structures INTECH Risk Management the project is integration and management of and pavements); Graham (insurance advisor); LeighFisher both existing and new infrastructure during (construction lead and concession (ind. certifier); Englobe (quality all stages. In March of 2018, the Highway 1 partner); Morrison Hershfield (ind. assurance and pavement life- interchange near Pilot Butte opened, only structural design certifier); cycle analysis); CIMA+ (owner’s the second diverging diamond interchange in WSP (legal survey for 50% of bypass) engineer subcontractor); Wood PLC Canada and first in Saskatchewan.

top100projects.ca ReNew Canada 43 Top100 Projects 2019

Edmonton Valley Line – Stage 1 Supplier: Canam Group 30 Funding: P3 $1.8 billion • Federal Building Canada Fund: $150 million; 2018 Rank: 27 PPP Canada: $250 million Location: Edmonton, Alberta • Provincial GreenTRIP: $310 million; Building Canada Fund matching: $150 million; Owner: City of Edmonton interest-free loan: $140 million DBFOM Team: TransEd Partners—Fengate Capital Management, • Municipal: $800 million Bechtel, EllisDon, Bombardier, Transdev, ARUP, IBI Group Engineer: ConnectED Transit Partnership—AECOM, The Valley Line is the largest single infrastructure project Hatch, Mott MacDonald, DIALOG, ISL Engineering and in the history of Edmonton. It consists of a 27-kilometre Land Services Ltd., GEC Architecture; Associated low-floor urban line running from Mill Woods to Lewis Engineering (engineering & environmental services) Farms that crosses downtown. It will be separate from Legal: Borden Ladner Gervais (legal advisor); the city’s existing high-floor LRT system. This line will McCarthy Tétrault; Norton Rose Fulbright feature modern, low-floor, light-rail vehicles running Other Key Players: Aon Risk Solutions (risk/insurance segregated along existing streets and integrating advisor to owner); BTY Group (cost consultant); EY (advising with Edmonton’s surrounding neighbourhoods. team); KPMG (financial and process advisor); LeighFisher The 13.1-kilometre southeast section from Mill (equity O&M advisor); Morrison Hershfield (transit O&M Woods to 102 Street (Stage 1) is currently being consultant); INTECH Risk Management (insurance advisor); delivered as a Design-Build-Finance-Vehicles-Operations- Englobe (quality control); Tetra Tech (geotechnical and Maintenance P3 (public-private partnership). Target environmental services); AGAT Laboratories; Wood PLC service commencement is scheduled for Dec. 15, 2020. Valley Line Stage 2

The 14-kilometre west portion of the Valley Line will run between downtown and Lewis Farms, servicing Edmonton with direct connections to West Edmonton Mall, Misericordia Hospital, downtown post-secondary campuses, and many new mixed-use developments and mature established neighbourhoods in between. Valley Line West will include 14 street-level stops and two elevated stations. In September 2016, the City of Edmonton received funding through the Government of Canada’s Public Transit Infrastructure Fund to update the Valley Line West preliminary design, determine project delivery method, and ultimately ensure the project is ready for construction procurement in 2019. Once additional funding is secured, it is anticipated it would take about one year to select a contractor for the Valley Line West and another five years to complete construction. Valley Line West has a current estimated cost of $2.5 billion.

Vancouver International Other Key Players: BMO Capital Markets Supplier: Canam Group 31 Airport Upgrades (bonds issue); BTY Group (cost consultant); (joists and steel deck) Entro (wayfinding and signage); exp Services Funding: Private $1.7 billion (quality management); WSP (materials • Vancouver 2018 Rank: 28 engineering, quality management); Aon Risk Solutions (owner advisor and construction Airport Authority: Location: Vancouver, British Columbia insurance broker); Mott MacDonald (baggage $1.8 billion (collected Owner: Vancouver Airport Authority handling master planner); Hanscomb (airport through an increased Project/Construction Manager: cost consultant); Colliers project Leaders airport improvement fee) Vancouver Airport Authority Engineer: Stantec; SNC-Lavalin; The multi-year expansion at Vancouver International Airport (YVR) involves WSP (materials engineering, quality a number of capital construction projects to enhance the airport experience and management) improve YVR’s competitive position as a world-class connecting hub. Current projects include a Central Utilities Building that will house one of Canada’s Architect: Kasian Architecture Interior largest GeoExchange energy systems; a new parkade and ground transportation Design and Planning Ltd. facility; expanded international terminal building with four new bridged Contractor: Graham (general contractor aircraft gates; four new bus operation gates; and new remote aircraft stands. for airside operations support building); Two new international hold rooms with capacity for 600 passengers have just Ledcor (A-B connector); PCL Constructors opened and a new transboder hold room is starting construction in October— Canada Ltd. (secure corridors); Hatch both will support YVR’s remote stand operations. To make room for the new (civil design, construction support services) remote aircraft stands, YVR will reclaim a portion of its existing jetSet parking Legal: McCarthy Tétrault LLP concept and convert the remaining space into a valet operation. Construction (represented VIAA) on YVR’s runway safety enhancements will also continue until 2022.

44 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Surrey LRT Consulting The Surrey-Newton-Guildwood light rail transit system is an 11- 32 Services: stop, 10.5-kilometre addition to the transit network in the Greater $1.65 billion McElhanney Vancouver Area. The system will run at street level along King George NEW Consulting Boulevard. and 104th Avenue, and will offer five-minute frequency Services and Location: Surrey, British Columbia during peak hours. With provincial and federal funding confirmed in Stewart Group early September, the project immediately moved to the procurement Owner: TransLink Strategic process with the issuance of a Request for Qualifications. It is Contractor: WestPro Consulting expected that the procurement process will be completed in the next (Bear Creek Bridge replacement) Funding: Public 18-24 months in order for construction to begin sometime in 2020.

Crowchild Trail Project On May of 2017, the City of Calgary approved the plan for changes and 33 upgrades to Crowchild Trail, as outlined in its Crowchild Trail Study. $1.65 billion Contractor: The renewal and expansion of Crowchild Trail, located west of the city’s NEW Graham downtown core, is necessary to improve the life of the current infrastructure, (Phase 1) as well as to accommodate future growth. Phase 1 focuses on work around Location: Calgary, Alberta Funding: and over the Bow River, including adding a lane of traffic in each direction Owner: City of Calgary Public on the existing bridge, as well as upgrades to the off-ramps already in place. Credit: Mackenzie Health Mackenzie Legal: Torys (represented 34 Vaughan Hospital Johnson Controls) Other Key Players: Hanscomb $1.6 billion (hospital’s cost consultant); A.W. 2018 Rank: 42 Hooker Associates (independent certification); GHD (condition Location: Vaughan, Ontario assessment remediation); Aon Risk Owner: Mackenzie Health Solutions; Colliers Project Leaders Project Manager: Supplier: DECAST Ltd. Infrastructure Ontario Funding: Public/Private DFBM Team: Plenary Group (Canada) Ltd. (developer); Stantec Mackenzie Vaughan Hospital represents the first new hospital built in York Region in (design); PCL Constructors the last 30 years. The new hospital will include a state-of-the-art emergency department, Canada Inc. (design builder); advanced diagnostic imaging services, modern surgical services and operating rooms, Johnson Controls Canada LP specialized ambulatory clinics and intensive care beds, and new technology to connect (facilities management); Plenary systems with medical devices for optimum information exchange. By late October of Group (Canada) Ltd. (financial 2018, the topping off of the hospital had taken place, and cranes were in place lifting 300 advisor); WSP (construction modular washrooms into place on floors four through eight. The hospital continues on services for DB team) schedule, and is expected to open to patients sometime in 2020.

Renovations to Beauharnois Other Key Since 1994, this hydroelectric station has 35 Generating Station Players: GHD been undergoing gradual renovations and (geotechnical replacement of its generation units. The plant $1.6 billion and material was powered by the Beauharnois Canal, which 2018 Rank: 29 testing); had been newly dredged and expanded to one Englobe Location: Beauharnois, Quebec kilometre in width for that purpose. At the (quality time of its construction, it was considered to Owner: Hydro-Québec assurance be the largest hydroelectric station in Canada. Project/Construction Manager: Hydro-Québec inspection Today, at 1,900 MW, it is still one of the largest Équipement services) run-of-river plants in the world. The current Contractor: HMI Construction Inc. Funding: Public project also includes restoration of the station’s Engineer: Stantec, SNC-Lavalin, CIMA+ • Provincial historic art deco architecture, which led it Hydro-Québec: Turbine Supplier: GE Energy (formerly Alstom) to be designated as a National Historic Site. $1.6 billion (design, manufacture, and delivery of runners for Renovations continue, and work is expected to multiple units); Voith Hydro be completed in 2019.

top100projects.ca ReNew Canada 45 Top100 Projects 2019

Wataynikaneyap Other Key Players: PowerTel, Deutsche Bank (MOU for Funding: 36 Transmission Project design, construction, and financial services); PwC (financial Public/Private feasibility study and socioeconomic impact analysis); Torys $1.6 billion (regulatory overview); Arcadis Canada Inc. (Phase 2 routing study); EY (consultant); Wood PLC 2018 Rank: 40 Location: Northern Ontario Wataynikaneyap Power—composed of 22 Northwestern First Nation communities—partnered Owner: Wataynikaneyap with FortisOntario and RES Canada in August 2015 to develop and operate the transmission facilities to connect 16 remote reserves to the power grid and transition them away from diesel Power in partnership with generation. The plan calls for an 1,800-kilometre transmission line broken into two phases: FortisOntario and RES Canada a 300-kilometre line to Pickle Lake ($200 million), and transmission lines to connect the Engineer: Hatch communities north of Pickle Lake and Red Lake ($1.15 billion). In March, the provincial and (owner’s engineer) federal governments unveiled the funding framework for the project. That was followed by Environmental Services: the selection of four pre-qualified proponents to receive EPC RFP packages for Phase 1 and Golder (Phase 1 EA) 2 of the project in September. The date of selection of the successful proponent has not been Consultant: EY released. Potential remote electrification is anticipated in 2022, with build-out to 2024.

Kitchener Corridor 37 GO Expansion $1.534 billion 2018 Rank: 31 Location: Toronto to Kitchener, Ontario Owner: Metrolinx Contractor: DBF Team (Highway 401 Rail Tunnel)—EllisDon Capital Inc., STRABAG Inc., EllisDon Civil Ltd., STRABAG Inc.; WSP Canada Inc., Dr. Sauer & Partners, Wood PLC (design) Improvements to the Kitchener GO rail network is one of 10 projects Legal: Norton Rose Fulbright (advisor to IO) that comprise the $13.5-billion Regional Express Rail redevelopment. Other Key Players: 4-Transit JV (technical The overall project aims at upgrading and improving the rail lines, advisory services): Hatch, Parsons, WSP; CIMA+ stations, and technology, as well as the electrification of core segments. (utilities relocation); Golder; Morrison Hershfield; Significant improvements to this corridor are needed in order to provide Gannett Fleming; Comtech (program/project two-way, all-day service between Kitchener and Bramalea GO. Work is consulting); Infrastructure Ontario (procurement currently underway on a multi-level parking structure and Bramalea to lead); Rider Levett Bucknall accommodate future growth, and the Highway 401/409 tunnel is in the Funding: Public implementation phase. Credit: ReNew Canada Barrie Corridor 38 GO Expansion $1.506 billion 2018 Rank: 32 Location: Toronto, Ontario to Barrie, Ontario Owner: Metrolinx Contractor: EllisDon (Dufferin Street at Queen Street bridge); Cole Engineering and Kenaidan (rapid pedestrian tunnels) Other Key Players: 4-Transit JV (technical advisory services): Hatch, Parsons, WSP; Aon Risk Solutions; CIMA+ (utilities relocation); The $13.5-billion Regional Express Rail (RER) program includes significant Golder; Morrison Hershfield; Gannett Fleming; improvements to the Barrie GO corridor. The current corridor consists of Comtech (program/project consulting) 11 stations running from the Allandale Waterfront GO station on the shores Supplier: Mammoet (crane for precast of Lake Simcoe and Barrie through to Union Station in downtown Toronto. tunnel placement); DECAST Ltd.; Wood PLC; Non-AFP work on the Barrie Corridor includes three contracts. The RFP Infrastructure Ontario (procurement lead); for the first contract closed in the fall of 2018, and the RFP has been released Rider Levett Bucknall for the two remaining contracts. Full construction and expansion of the Funding: Public Barrie Corridor is scheduled for completion in 2025.

46 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

York VIVA Bus Rapid Legal: McCarthy Tétrault; WeirFoulds (acting Supplier: Canam 39 Transit (vivaNext) for York Region); Borden Ladner Gervais (legal Group (steel advisor); Osler; Torys (acted for lender) joists); Van Hool; $1.5 billion Other Key Players: Aon Risk Solutions DECAST Ltd. (risk/insurance advisor to authority); BTY Funding: Public 2018 Rank: 34 Group (ind. certifier); Entro; Golder (ground • Federal: Location: York Region, Ontario engineering services); Hanscomb; Revay and $85 million Owner: York Region Rapid Transit Corp. and Metrolinx Associates; Morrison Hershfield (prime design • Provincial Project Manager: Kiewit EllisDon partnership consultants); KPMG (advisory services); Capital allotment (rapidways along Highway 7 between Bayview and LeighFisher (ind. quality certifier); Hanscomb to Metrolinx, Warden avenues in Markham) (owners’ engineer’s cost consultant); the regional York RapidLINK Constructors—Aecon, Dufferin INTECH (insurance advisor); CIMA+ (road transportation Construction, AECOM, Hatch, Morrison Hershfield, safety audits); GHD (sanitary design); EY authority: and Leigh Fisher Canada (rapidways along Yonge (financial advisory services); ARUP (technical $1.33 billion Street in Richmond Hill and Newmarket) advisory services); Comtech (program mgmt. • Municipal: consulting); Wood PLC; Rider Levett Bucknall $85 million Program Manager: MMM Group DBF Team: EDCO—EllisDon Capital Inc. and Coco Once completed, vivaNext Rapidways will be more than 35 kilometres of Paving Inc., IBI Group, LEA Consulting Ltd., Peto dedicated bus lanes in the centre of the road that will allow rapid transit MacCallum Ltd. (design, build, and finance rapidways buses to provide more reliable and frequent service to York residents. along the Highway 7 transit corridor in the City of This new bus rapid transit service will be available on two significant Vaughan and Town of Richmond Hill) corridors: east-west along Highway 7 and north-south along Yonge Street Engineer: AECOM; Parsons; KED; McCormick with another small east-west route along Davis Drive in Newmarket. As Rankin Corp.; MMM Group (engineer and program of the fall of 2018, the Vaughan, Woodbridge, and Newmarket sections of manager); Ecoplans Ltd.; IBI Group (design engineer) the project had reached 60 per cent completion, while the Richmond Hill Environmental Services: WSP portion of the project was approximately one-third complete. The previous (environmental consultant, EA) three sections are scheduled for completion by the end of 2019, while the Vehicle Supplier: NovaBus Richmond Hill portion is expected to be finished by the end of 2020.

Fort McMurray West Other Key Players: Aon Risk Solutions Funding: Private 40 Transmission Project (risk/insurance advisor to authority); INTECH • Private: $1.43 billion Risk Management (insurance advisor) $1.43 billion This project will consist of approximately 500 kilometres of 2018 Rank: 35 transmission line and associated facilities in order to support increasing Location: Edmonton to Fort McMurray, Alberta growth in northeastern Alberta. It will include a 500-kilovolt (kV) Owner: Alberta PowerLine AC single-circuit transmission line, approximately 100 kilometres DBFOM Team: Alberta PowerLine—Quanta in length, running from a new substation in the Thickwood Hills Services (subsidiary Valard Construction to provide area to the existing Livock 939S substation, and a 500 kV AC single- EPC services), ATCO Electric (route planning, circuit transmission line, approximately 400 kilometres in length, operations, and maintenance) running from Livock 939S substation to the approved Sunnybrook Legal: Bennett Jones (acted for successful 510S substation. The proposed route, substations, and design of the proponent); Norton Rose Fulbright; Torys (proponent transmission line are subject to approval by the Alberta Utilities lenders); Fasken Martineau DuMoulin (counsel to Commission (AUC). Approval for the project was granted by the Quanta Services and Valard Construction) AUC in February 2017. The project is set to be in service in 2019.

The total value of the Top100 projects list A Decade of Top100 has grown over the years (in billions of dollars) 68.0 96.0 114.2 140.7 140.5 157.9 161.3 187.5 199.0 212.6

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

top100projects.ca ReNew Canada 47 Top100 Projects 2019

Hurontario LRT Legal: Borden Ladner Gervais (legal The Hurontario light rail transit (LRT) project 4125 advisor); Torys (acted for lender) will bring 20 kilometres of fast, reliable, rapid $1.4 billion Other Key Players: DIALOG (urban transit to the cities of and Brampton 2018 Rank: 36 design); Dufferin Construction; Golder along the Hurontario corridor. New, modern light rail vehicles will travel in a dedicated right- Location: Mississauga and (preliminary geotechnical services); Hanscomb (preliminary design of-way and serve 22 stops with connections to Brampton, Ontario GO Transit’s Milton and Lakeshore West rail engineer’s cost consultant); Hatch; lines, Mississauga MiWay, Brampton Züm, Owner: Metrolinx LEA Group (ITS); Aon Risk Solutions and the Mississauga Transitway BRT. Funded Project Manager: (owner advisor and construction through a $1.4-billion commitment from the insurance broker); AECOM (owner’s Infrastructure Ontario Province of Ontario, the Hurontario LRT is a representative/technical advisor); EY Construction Manager: SNC-Lavalin signature project of the Moving Ontario Forward (financial and transaction advisory); (preliminary design/EA phases) plan. The Request for Proposals was released Morrison Hershfield (transit O&M to three selected proponents in August 2017. Engineer: SNC-Lavalin (project advisors); AGAT Laboratories; The winning bidder was to be selected, and lead); Steer Davies Gleave Comtech (program/project consulting); construction was scheduled to begin, in 2018, (preliminary engineering); AECOM DECAST; Rider Levett Bucknall however that was pushed until early 2019. The (technical advisory services) Funding: Public anticipated completion of the project is 2022.

Calgary Cancer Centre Other Key Players: This new comprehensive cancer centre is currently under 42 Arup (technical construction at the Foothills Medical Centre site in Calgary. $1.4 billion advisor and prime The 95,000-plus-square-metre complex will include 160 2018 Rank: 37 consultant); EY inpatient beds, outpatient facilities with over 100 exam Location: Calgary, Alberta (advising gov’t.); rooms, systemic treatment and radiation treatment technologies, clinical trial units and research laboratories, a Owner: Alberta Health Services KPMG (commercial knowledge exchange centre and 1,650 stalls of underground advisor); Morrison Design-Build Team: parking. The centre will provide much-needed access to Hershfield PCL; Stantec; DIALOG cutting-edge treatment and care for residents of Calgary and Consulting Architect: HKS and Marshall (commissioning southern Alberta. In 2018, the five-storey-deep foundation Tittemore Architects (subconsultants); study); Colliers was dug out, and four 300-ft. construction cranes were Legal: Norton Rose Fulbright Project Leaders erected. Concrete pouring of the foundation is now (for the authority) Funding: Public underway. The facility is on schedule to open in 2023.

North End Sewage Cassels & Graydon The Province of Manitoba has issued the City of 43 Other Key an Environment Act Licence requiring Treatment Plant the treatment of nutrients (such as nitrogen Players: Hanscomb Biological Nutrient and phosphorus) among other requirements at Removal Upgrade (independent/ this treatment facility. The implementation of a engineer’s design stage nutrient-removal process will require a major plant $1.4 billion cost consultant); Veolia expansion and, given the age of the infrastructure 2018 Rank: 62 (professional services); and the complexity of phasing the construction, Location: Winnipeg, Manitoba P1 Consulting Ltd. several new facilities will be constructed. The addition of wet weather treatment processes Owner: City of Winnipeg Funding: Public associated with combined sewer overflow control • Provincial: Engineer: AECOM must be considered in the overall nutrient-removal (owner’s advocate/consultant); $195 million process design and operational effluent disinfection KGS Group Ltd. • Municipal: for wet weather. The preliminary design phase of Legal: Blake, $1.205 billion the plant upgrade is nearing completion.

Pattullo Bridge In February of 2018, the Government of British Columbia announced 44 Replacement Project its plans to replace the Pattullo Bridge. Built in 1937, the bridge is one of the oldest in the Metro Vancouver Area, and was built for a 50-year $1.377 billion lifespan. The new bridge will be four lanes that will be built to modern NEW safety standards, featuring a centre safety median barrier and wider lanes Location: New Westminster, British Columbia to accommodate both passenger and commercial vehicles. The bridge will also have walking and cycling lanes, separated from traffic, on both sides Owner: Government of B.C. of the bridge. The RFQ for the new bridge was released in the summer of Engineer: Parsons (owner’s engineer) 2018, with a successful proponent to be announced in the spring of 2019. Other Key Players: Golder Construction is expected to get underway in 2019, with the bridge opening Funding: Public to traffic in 2023.

48 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019 Credit: Hydro-Québec Romaine Complex This project involves 45 Transmission Line the construction of transmission lines needed $1.3 billion to connect the 1,550- MW Romaine Complex 2018 Rank: 41 to the rest of the grid Location: Minganie Region, in Quebec. The project Quebec includes building more Owner: Hydro-Québec than 500 kilometres Engineer: AECOM (engineer, of transmission lines, detailed design for transmission designed for both 315 kV towers and foundations) and 735 kV but operated at 315 kV, constructing Contractor: Lockwell, Fabrinet, new switchyards at the Prometek (steel); General Cable generating stations, (cables); TCI-Arnaud and GLR and modifying and JV (assembly) adding equipment in Other Key Players: WSP existing facilities. The (environmental impact transmission line is a assessment); Thirau; GLR; separate venture from the GHD (geotechnical services); Romaine Complex project. Englobe (field surveillance); EXP Construction has been Funding: Public underway since summer • Provincial Hydro-Québec: 2011 and is expected to be $1.3 billion completed by 2020.

Port Hope Area Initiative Engineer: AECOM; MMM-GHD Joint Venture 46 Environmental Services: Golder (contamination $1.28 billion investigation/remediation; Phase 1 ESA; geotechnical) 2018 Rank: 43 Financiers/Banks: Natural Resources Canada Location: Port Hope and Clarington, Ontario Legal: Osler; Torys (acted for the lender) Owner: Atomic Energy Canada Limited, Other Key Players: Hanscomb (owner’s preliminary Natural Resources Canada design stage cost consultant and special advisor); Project/Construction Manager: Canadian Nuclear Laboratories Arcadis (excavation and waste removal); Tetra Tech; Contractor: Wood PLC-CB&I Joint Venture; ECC/Quantum SNC-Lavalin; Colliers Project Leaders; CIMA+ Murray Limited Partnership; Wood PLC; Maple Reinders; Funding: Public Kenaidan Contracting Ltd.; Northwind Portage; Milestone • Federal Atomic Energy of Environmental; WSP; Graham Canada Limited: $1.28 billion The Port Hope Area Initiative (PHAI) Energy of Canada Limited, a federal radioactive waste, located at an existing is a federal environmental cleanup Crown corporation. site on the shoreline of Lake Ontario program. Its mandate is the remediation The Port Hope Project involves in southeast Clarington, to a new, and local, long-term, safe management of the construction of an engineered engineered above-ground mound at a approximately 1.7 million cubic metres above-ground mound and supporting long-term waste management facility of historic low-level radioactive waste infrastructure for the safe, long-term being constructed approximately 700 in the municipalities of Port Hope and management of approximately 1.2 metres north of the lake. Clarington in southern Ontario. The million cubic metres of historic low-level In August of 2018, a turbidity historic waste resulted from the radium radioactive waste, cleanup of the waste curtain was installed in the approach and uranium refining operations of the from various major sites and small-scale channel of Port Hope Harbour to former Crown corporation, Eldorado sites in Port Hope, and transportation limit the movement of sediment in the Nuclear Limited, and its private sector of the waste to a new long-term waste harbour. This work is part of the five- predecessors, which operated from the management facility currently under year cleanup of contaminated sediment 1930s to 1988. construction. After the facility is capped in the harbour, which also includes The PHAI has two projects: the and closed, anticipated to be in 2023, rehabilitating the aging harbour walls Port Hope Project and the Port Granby ongoing maintenance and monitoring and suction dredging approximately Project. The Historic Waste programs will continue for hundreds of years. 120,000 cubic metres of sediment. Management Office, led by Canadian The Port Granby Project involves the Substantial completion of the entire Nuclear Laboratories, is implementing relocation of approximately 450,000 Port Hope Area Initiative is expected these projects on behalf of Atomic cubic metres of historic low-level by 2023.

top100projects.ca ReNew Canada 49 Top100 Projects 2019

Port Lands Flood Other Key Players: MVVA The Port Lands Flood Protection and Enabling 47 (design of parks, flood Infrastructure project is the redevelopment of Protection and Enabling protection, rover valley); one of the largest portions of under-developed Infrastructure WSP and DTAH (roads and land in a major urban core in North America. municipal infrastructure); Located along the shore of Lake Ontario $1.25 billion Entuitive with Grimshaw southeast of Toronto’s downtown core, the and SBP (bridges); Jacobs 2018 Rank: 44 project will include substantial soil remediation, (environmental); Toronto a new mouth for the Don River, and critical Location: Toronto, Ontario Region Conservation Authority; Golder infrastructure for flood resilience to unlock the Owner: City of Toronto 325-hectare site for residential and commercial Funding: Public development. In November 2018, Waterfront Project Manager: Waterfront Toronto; • The Federal, City of Toronto Provincial, and Municial Toronto held a groundbreaking ceremony to governments are each mark the start of construction on the new river Architect: Michael Van contributing an equal valley. The work includes a kilometre-long river Valkenburgh Associates Inc. share of $416.6 million valley, a natural spillway, and a new mouth for (Port Lands Estuary Plan) to this project. the Don River.

Alberta Carbon Supplier: Siemens; MAN Diesel Funding: Public/Private 48 Trunk Line and Turbo; Comco Pipe and Supply; • Federal: $63.2 million KTI Ltd; Exchanger Industries Ltd.; • Provincial CCS Fund: $223 million $1.233 billion Startech Refrigeration; Spectrum • Private: $641.8 million (Enhance Energy), Process Systems $305 million (Wolf Carbon Solutions) 2018 Rank: 46 Location: Fort Saskatchewan This 240-kilometre pipeline will collect CO2 from industrial emitters in and to Clive, Alberta around Alberta’s industrial heartland and transport it to aging reservoirs Owner: Enhance Energy Inc.; throughout central and southern Alberta for secure storage in enhanced oil Wolf Carbon Solutions recovery projects. At full capacity, the line will provide access to reservoirs Project/Construction Manager: capable of producing an additional one billion barrels of high-quality light crude

SAW Engineering (EPC management) oil. These reservoirs will safely and securely store 14.6 million tonnes of CO2 Engineer: Caber Engineering; SAW per year as the oil is produced. It will be the largest carbon capture and storage Engineering; BETA Tech Engineering project in the world, storing six times more carbon dioxide than the Other Key Players: WSP (geomatics project in Saskatchewan. In August of 2018, Enhance Energy announced a services); North West Redwater Partnership’s partnership with Wolf Carbon Solutions Inc. Under this agreement, Wolf will

Sturgeon Refinery; Agrium Inc.; LeighFisher construct, own, and operate the CO2 capture and pipeline transportation assets.

(lenders technical advisor); Land Solutions Enhance will continue to be the owner and operator of the CO2 utilization and LP; BOSS Environmental; Worley; Scott Land sequestration portion of the ACTL project through its EOR operations.

Energy Services Public Works and Government Services Canada (PWGSC) is responsible for heating 49 Acquisition and cooling services for 80 and 67 buildings respectively within the National Capital Region (NCR). The Energy Services Acquisition Program was established in 2009 to Program’s “explore new business models for the provision of energy services in the NCR.” The Energy Service modernization project looks for an energy services solution for PWGSC’s five Central Modernization Heating and Cooling Plants (CHCP) and their associated distribution networks within the four National Capital region service areas, three of which are in Ottawa and one in $1.2 billion Gatineau. The five CHCPs service 79 total buildings. In March of 2018, Innovate Energy NEW and Rideau Energy Partners were named as the two proponents that will bid on the Location: Ottawa, Ontario project. Once their proposals are submitted, Public Services and Procurement Canada and Gatineau, Quebec will consider elements that extend beyond cost. For instance, the firms will have the opportunity to demonstrate that their technologies can reduce greenhouse gas emissions Owner: Government of Canada beyond targets set by Canada. They will also have to provide innovative design features Legal: Norton Rose Fulbright for the Cliff Heating and Cooling Plant, which is located along the Ottawa River and (advisor to project owner) bordered by parliamentary buildings. The winning proponent will be announced in Funding: Public early 2019. The procurement process will result in a public-private partnership, and a • Federal: $1.2 billion contract is expected to be finalized with a private sector partner in the spring of 2019.

50 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

West Park Healthcare Centre The West Park Healthcare • Demolition of three existing 50 Centre is a new 730,000-sq.-ft hospital buildings—Main, Ruddy, $1.2 billion hospital that will replace the and Gage—as well as the existing NEW existing facility. maintenance buildings; Location: Toronto, Ontario The new hospital will feature: • New campus entrance with new Owner: West Park Healthcare Centre • 314 beds, with 80 per cent of public and private roads within Project Manager: Infrastructure Ontario beds in single-patient rooms; the campus; and DBFM Team: EllisDon Infrastructure Healthcare— • Three-piece private washroom • Increased green space, CannonDesign, Montgomery Sisam Architects for each patient, even in landscaping for outdoor therapy, (design); EllisDon (constructor); EllisDon Facilities double occupancy rooms; therapeutic gardens, walking Services Inc. (facilities management provider); • Significant increase in paths and courtyards, plus EllisDon Capital Inc. (financial advisor); Modern outpatient care space to terraces on every floor. Niagara Toronto Inc., Ozz Electric (mechanical accommodate current and The winning bidder was selected and electrical subcontractor) new services such as geriatric in June of 2018, and construction Other Key Players: EXP (PDC services) clinics and day hospital, and began shortly thereafter. The project Funding: P3 satellite hemodialysis; is to be completed in early 2023.

New TTC Other Key Players: The provincial government has allocated up to $416 51 Light Rail KPMG (advisor for TTC Capital million, or one-third funding of eligible costs related Program Delivery Review); WSP to the purchase of 204 light rail vehicles, to replace Vehicles (consulting on the manufacture the current streetcar fleet. Delivery of the vehicles has $1.187 billion and procurement, commissioning, seen significant delays throughout the order’s tenure hazard and safety control phases due, in large part, to issues with the supply chain. 2018 Rank: 48 of new vehicle projects); Comtech In July of 2018, it was announced that the first 67 of the 89 cars delivered would have to be sent to the Location: Toronto, Ontario (project consultant services) Owner: TTC company for repairs, citing the fact that they could fail Funding: Public prematurely. The program is active and is slated to run Engineer: Parsons • Provincial: $416 million from 2009 to 2019, when the last LRV is delivered. Vehicle Supplier: • Municipal TTC: However, an updated timeline for the delivery of all Bombardier $771 million 204 functioning vehicles has not yet been established. Credit: Ontario Ministry of Transportation Highway 407 Legal: Cassels Brock & 52 East Extension – Blackwell (legal counsel to the Authority); Osler (legal counsel Phase 2 to the SPV); McMillan (legal $1.158 billion counsel to the finance parties; Torys (acted for lender) 2018 Rank: 49 Other Key Players: Aon Risk Location: to Solutions (risk/insurance advisor Clarington, Ontario to authority); Jacobs (technical Owner: Ontario Ministry advisors for procurement and of Transportation implementation); EY (advising Project Manager: gov’t.); Infrastructure Ontario Infrastructure Ontario (procurement manager and Financing DBFM Team: DBFM Team: project development); LeighFisher The aggregate AFP delivery costs are $1.158 Blackbird Infrastructure Group— (lenders technical advisor); billion, with base capital costs of $1.052 billion. Holcim (Canada) and Cintra INTECH Risk Management (insurance advisor); Golder Infraestructuras (developer); Phase 2 will extend Highway 407 East approximately (materials testing and inspection); Dufferin Construction and 22 kilometres from Harmony Road to Highway Englobe; A.W. Hooker Associates Ferrovial Agroman Canada 35/115 in Clarington. The work also includes the (independent certification); (constructors); Urban Systems, addition of the 10-kilometre East Durham Link (EDL GHD (quality assurance AIA Engineers, and Louis Berger or Highway 418), which connects Highway 407 with services); WSP (archaeology); Group (designers); Holcim Highway 401. There are eight interchanges as well, AGAT Laboratories; and Cintra Infraestructuras three of which are freeway-to-freeway. Phase 2A of Rider Levett Bucknall (maintenance) the project, running from Harmony Road to EDL, was Engineer: EXP (geotechnical Suppliers: Canam Group; completed in January 2018. Phase 2B of the project, design for structures and DECAST Ltd. from EDL to Highway 35/115 and including the EDL, pavements); Parsons Funding: P3/AFP is underway and scheduled for completion in 2020.

top100projects.ca ReNew Canada 51 Top100 Projects 2019

East Side This all-season road on the east side of Lake Winnipeg is a multi-year, multi- 53 Transportation Initiative billion-dollar project. In 2000, the communities on the east side of Lake Winnipeg delivered a report with recommendations on where government $1.125 billion should focus their long-range planning activities, including increased economic 2018 Rank: 50 development opportunities and improvements to the transportation network. Construction has been guided through the East Side Transportation Initiative, Location: Eastern Manitoba launched following the East Side Large Area Transportation Network Study Owner: Province of Manitoba undertaken by SNC-Lavalin/AECOM. It is a strategic initiative to provide Engineer: SNC-Lavalin; AECOM; improved, safe, and more reliable transportation service to remote and isolated Dillon Consulting; Associated Engineering communities on the east side of Lake Winnipeg. The final report of the (design engineer) Large Area Transportation Network Study was completed in June 2011 and recommended an all-season road network for the region that is estimated at Consulting Architect: Dillon Consulting 1,028 kilometres in length costing $3 billion. (compliance architect); KGS Group The all-weather road linking Berens River and Bloodvein First Nation to (compliance architect) the provincial highway network was completed in December of 2017. Among Environmental Services: Tetra Tech the work in the planning stages is the all-season road linking Manto Sipi Cree Funding: Public Nation, Bunibonibee Cree Nation and God’s Lake First Nation.

Henvey Inlet The 300-MW Henvey Inlet 54 Wind Project wind project in northern Ontario is in the final planning $1 billion stages. The feed-in tariff scheme is a 50-50 joint venture 2018 Rank: 52 between Pattern Development Location: Between and Nigig Power, which is Sudbury and Parry Sound, wholly owned by Henvey Ontario Inlet First Nation. It will be Owner: Pattern constructed on reserve lands Development and Nigig in Parry Sound County, near Power (wholly owned by Georgian Bay. The project Henvey Inlet First Nation) does not require provincial Environmental permits as the First Nation has Services: AECOM legal authority to grant a lease (environmental and environmental approval. assessment reports) Construction work began in 2017, with an estimated Legal: Torys (project timeline of 18-24 months. owner legal advisor); Construction was temporarily Osler halted during the summer Other Key Players: of 2018 due to the Parry Englobe (geotechnical Sound 33 forest fire, however investigation, construction of the project quality control) is still slated for completion Funding: Private in 2019.

New: Building Energy Capacity 4,259 MW Work on new Rufurbished: and refurbished Rufurbished: New: New: 9,812 MW energy projects in 350 MW 300 MW 7,619 MW Canada represents 22,340 MW Hydroelectric Nuclear Natural Gas Wind of power

52 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019 Credit: Ontario Power Generation Deep Geological Repository Other Key Players: AECOM (env. 55 consulting); Geofirma Engineering $1 billion (geoscientific characterization); G.L. 2018 Rank: 53 Tiley & Associates; Golder (env. impact Location: Kincardine, Ontario statement); Tetra Tech; WorleyParsons; Owner: Ontario Power Generation WSP (technical review/support); Project/Construction Manager: Morrison Hershfield (fire protection Nuclear Waste Management Organization analysis); AGAT Laboratories Engineer: Hatch Funding: Public OPG is building this 680-metre-deep contain the waste undergroud ensuring underground storage facility to house protection of the water and the environment 200,000 cubic metres of low and for many thousands of years. It will be intermediate level radioactive waste. Low- buried 680 metres—deeper than the CN level waste consists of material that may be Tower is tall—in stable rock formations contaminated through the normal course that are more than 450 million years old. of operations at a nuclear facility such as In May 2015, an independent federal joint paper towels, mops, and used tools. While review panel recommended to the Federal low-level waste does not require specialized Minister of the Environment that OPG be shielding for workers, the intermediate granted a licence to construct the DGR. waste will require special handling and In August of 2017, OPG was asked for can consist of items such as irradiated further information about the project from core components, ion exchange resins, and Minister of Environment and Climate Change various filters. Used fuel, considered high- Catherine McKenna, including an update level waste, is not to be stored in the Deep on impacts to the Saugeen Ojibway Nation. Geologic Repository (DGR). Negotiations with both parties to allow the The repository will safely isolate and project to move forward are still ongoing. Credit: Metrolinx 56 Hamilton LRT $1 billion 2018 Rank: 55 Location: Hamilton, Ontario Owner: Metrolinx Project Manager: Infrastructure Ontario Engineer: Morrison Hershfield (design engineer) Legal: Torys (acted for lender); Blake, The original plan for the Hamilton LRT project included approximately 11 Cassels & Graydon (advising Infrastructure kilometres of new light rail that will connect McMaster University through Ontario and Metrolinx) downtown Hamilton to Queenston Circle. The project also includes a high-order Other Key Players: AECOM (technical pedestrian connection to the Hamilton GO Centre Station, and a maintenance advisory services); Morrison Hershfield and storage facility. In April 2018, Hamilton City Council voted in favour of the (feasibility study); SNC-Lavalin (preliminary LRT line, but decided to investigate the 14-kilometre option, versus the original design); Aon Risk Solutions; AGAT Laboratories; 11-kilometre option, extending the line eastward from Queenston Circle to Comtech (program/project consulting); Eastgate Square. In April of 2018, three teams were announced as the successful Rider Levett Bucknall proponents to participate in the RFP. The winner will be announced in early Funding: Public 2019, with construction to begin later that year.

Yellowhead Trail Freeway The Yellowhead Trail Freeway Conversion Financing Project will transition 15 kilometres of the 57 Conversion Project The Government of Canada, current west-east roadway in Edmonton’s north end to a free-flowing six-lane freeway, $1 billion along with the Government with a targeted speed of 80 km/h. The of Alberta, have each NEW upgrade will eliminate eight intersections, contributed $241.6 million Location: Edmonton, Alberta build two new interchanges, modify three to the project. The City Owner: City of Edmonton existing intersections, and build new of Edmonton will cover collector roads. Construction in the first Engineer: Morrison Hershfield the remaining costs two areas of the freeway project will begin (owner’s engineer) of the project. in 2019. The entire project is projected to Funding: Public be completed sometime in 2026.

top100projects.ca ReNew Canada 53 Top100 Projects 2019

Toronto Courthouse Project The new Toronto Courthouse will amalgamate several 58 Toronto courts located throughout the city. $956.4 million The new Toronto courthouse will include: NEW • Barrier-free access, to allow visitors and occupants to travel Location: Toronto, Ontario throughout the building with ease, regardless of ability; Owner: Ministry of the Attorney General • Video conferencing to allow witnesses to appear from remote locations and in-custody individuals to appear Project Manager: Infrastructure Ontario from detention facilities; DBFM Team: EllisDon Infrastructure—EllisDon Capital Inc. • Closed-circuit television to enable children and other (developer); EllisDon Design Build Inc. (constructor); Renzo vulnerable witnesses to appear before the court from a Piano Building Workshop, NORR Architects & Engineers private room; Limited (design); EllisDon Facilities Services Inc. and SNC- • Courtroom video/audio systems to allow counsel to display Lavalin O&M (facilities mgmt.); EllisDon Capital Inc. (financial video evidence recorded in various formats and for the advisor); Morrison Hershfield (sustainability services) simultaneous viewing of evidence; and Architect: Kleinfeldt Mychajlowycz Architects Inc.; • A single point of entry with magnetometers, baggage Montgomery Sisam Architects Inc. scanners, continuous video surveillance, and separate Legal: Blake, Cassels & Graydon (advisor to the proponent); corridors to ensure the security of judges, members of the McCarthy Tétrault (advisor for MAG, IO); Norton Rose public, and the accused. Fulbright (advisor for SNC-Lavalin), Farris, Vaughan, Willis & Construction began shortly after the project reached Murphy (advisor for the lenders and hedge providers) financial close in February 2018. Substantial completion is Funding: P3 expected in 2022.

Giant Mine Project/Construction Other Key Players: Parsons 59 Manager: Aboriginal Affairs (project planning/permitting, Remediation Project and Northern Development decontamination, hazardous waste $903.5 million Canada and the Government abatement, deconstruction, construction of the Northwest Territories; management); Golder (multi-disciplinary 2018 Rank: 57 AECOM (construction consulting services, general and civil Location: Yellowknife, Northwest Territories management) design); Hatch (design); SRK Consulting, Owner: The Government of the Northwest Engineer: AECOM Arcadis Canada Inc. (lead technical Territories and Aboriginal Affairs and Northern (environmental studies, advisors); Colliers Project Leaders Development Canada, with support from Public preliminary and detail design, Funding: Public Works and Government Services Canada construction management); Parsons • Federal: $903.5 million Between 1948 and 2004, the Giant when the mine closed, 237,000 tonnes surface cleanup at the site. In February Mine was a major economic driver for of arsenic trioxide were left behind in of 2018, the main construction manager Yellowknife and the Northwest Territories. underground chambers. The remediation for the project was selected. Term 1 of the Mining operations at the site, which grew project proposes to leave behind a site work will centre around responsibility for over the years to encompass more than 870 suitable for future community use as the site care and maintenance and emerging hectares, including a number of ponds and community sees fit. In August 2014, the risks on site, as well as supporting small lakes, were halted in July 2004. Since decision was made to move forward in planning efforts for the full remediation in 2005, Aboriginal Affairs and Northern implementing the measures outlined in the Term 2. This work will start immediately Development Canada (AANDC) and the environmental assessment. The project’s and will be undertaken until March 31, Government of Northwest Territories goal is to ultimately protect public health 2020. In Term 2, set to begin in 2020, the (GNWT) have co-managed the site, with the and safety and the environment through construction manager will oversee the Det’on Cho Nuna Joint Venture providing long-term containment and management implementation of the overall remediation on-site care and maintenance. However, of the site’s waste, water treatment, and plan and associated activities.

Highway 1 Upgrades— Other Key Players: The Government of B.C. has embarked on a 10-year, 60 Kamloops to Alberta Golder (geotech, $650-million project to expand the Trans-Canada Highway environmental (Highway 1) between the City of Kamloops and the Alberta $872.7 million services); Englobe border. The focus of the expansion is to four-lane the entire section of roadway, which includes 339 kilometres under 2018 Rank: 58 (pavement the jurisdiction of the B.C. Ministry of Transportation engineering Location: Kamloops, British Columbia and Infrastructure, as well as 101 kilometres under the to Alberta border services, QA, QV); jurisdiction of Parks Canada. Construction is underway on Owner: Government of B.C. WSP (construction a 2.5-kilometre stretch 20 kilometres west of Golden. One Contractor: Emil Anderson supervision section of the Hoffman’s Bluff to Jade Mountain section Construction Inc. (Pritchard to services); Wood PLC will begin construction in 2019, with the remaining Hoffman’s Bluff) Funding: Public sections currently in the design phase.

54 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Canadian Forces Base Design Engineer: Wood PLC; SNC-Lavalin; 61 Trenton Expansion Jain & Associates; J.L. Richards & Associates; Peak; Stantec $860 million Consulting Architect: Architecture 49 2018 Rank: 59 (previously Smith Carter Architects); Colbourne & Kembel Architects Inc.; Jacobs Carter Burgess; Location: Trenton, Ontario Kasian Architecture Interior Design and Owner: Department of National Defence Planning Ltd.; Robertson Martin Architects Inc. Contractor: Bird Construction; SNC-Lavalin; Bondfield Environmental Services: Englobe Construction; Buddy Haegele Enterprises; Budget Environmental Other Key Players: Engineering Harmonics Disposal; Dufferin Construction; Graham (general contractor (AV consultant); Hanscomb (owner and design for maintenance hangar); Fitzgibbon Construction; Gordon Barr architect/engineer’s cost consultant) Limited; Jasper Construction Corporation; Kiley Paving; M.J. Dixon Construction; Miller Group; Mirtren Construction; Strong Funding: Public Brothers Heating & Air Conditioning; Varcon Construction • Federal: $860 million Established in 1929, CFB Trenton has Joint Task Force 2 to the base, and the has already begun construction, with traditionally been an air base, home addition of a hazardous material transfer several components already complete. to the 8 Wing unit, and it is one of facility, among other construction and In 2016, Hangar 2 obtained LEED Gold Canada’s primary launching sites for reconstruction components. Substantial certification. The project continues and military missions abroad. The base is upgrades to the natural gas service and is expected to be finalized by 2022. At now undergoing a major expansion that an expansion of the electrical service CFB Trenton, substantial upgrades to will add the Land Advanced Warfare are underway. The project involves the natural gas service, expansion of Centre (a multi-functional training and acquiring an additional 401 hectares of the electrical service, and construction administrative campus), as well as new land—a move that has been controversial of the Land Advanced Warfare Centre, hangars and runways to accommodate as it involves expropriating neighbouring hazardous materials transfer facility, and additional aircraft, and a new fire hall. farms, some more than 200 years fire hall is all complete. Work on new It will also see the relocation of the elite old. The 10-year expansion program hangars and runways is ongoing.

Union Station 62 Revitalization Project $823.7 million 2018 Rank: 61 Location: Toronto, Ontario Owner: City of Toronto Project/Construction Manager: (Stage 1) and Bondfield Construction (Stage 2/3) Program Manager: WSP (Stage 2/3) Engineer: EXP (train shed roof design and construction admin); NORR Limited Architects & Engineers (structural, mechanical and electrical) Contractor: Clifford Restoration (building envelope restoration) Architect: NORR Limited Architects & Engineers (prime design consultant); DIALOG (executive architect of retail features) Supplier: Canam Group Funding: Public Management Consultants: EY (steel deck); Dufferin Concrete Legal: WeirFoulds (acting for architects); Osler The revitalization project includes restoration of many of Other Key Players: Arup (4D modelling, pedestrian flow, the station’s heritage elements, creation of 160,000 sq. ft. of construction coordination analyses); A.W. Hooker Associates retail space with the focus of bringing the best of Toronto’s (cost management); Entro (wayfinding and signage); independent retailers and restaurants to the station, and Engineering Harmonics (AV consultant); FGMDA (heritage expansion of the GO concourses to accommodate the expected consultant); Golder (construction mat. engineering/testing); doubling of passengers by 2030. In April 2015, the new Hanscomb (study and design teams’ cost consultant); WSP spacious 62,000-sq.-ft. York Concourse opened to provide (geotechnical consultant); Aecon (train shed platform); Aon almost twice the space of the existing Bay Concourse to (risk advisor/broker for preferred proponent); Morrison help get customers to where they are going faster and easier. Hershfield (conceptual study); Comtech (multidisciplinary In August 2015, the Bay Concourse was closed to undergo consulting services) renovation. Substantial completion is expected in early 2019.

top100projects.ca ReNew Canada 55 Top100 Projects 2019

Canadian Forces Base Construction Manager: Other Key Players: Wood Funding: 63 Esquimalt A and B Jetty WestPro (Pomerleau) PLC (design authority for A Public (demolition of the jetty); Stantec (design authority • Federal Recapitalization Project existing B jetty) for B jetty); BTY Group (cost Department consultant); Hanscomb (design of National $781 million Contractor: Scansa engineer’s cost consultant for Defence: 2018 Rank: 91 Construction (utility corridor) Jetty A); McElhanney (survey/ $781 million Location: Constance Cove, British Columbia Engineer: SNC-Lavalin geomatics services); Owner: Department of National Defence (multiple services) Milestone Environmental The aim of the jetty project is to of National Defence. This project will renewed. The project will also include demolish the existing A and B jetties at provide sufficient operational berthing rebuilding roads and sidewalks as well CFB Esquimalt’s dockyard and construct space for four Halifax-class frigate, as the expansion and improvement a new steel-and-concrete-pile A and B two Arctic/offshore patrol ships, one of the jetty-apron area. Phase 1 of the jetty facility in the same location. Due Queenston-class joint support ship, A/B Jetty project was completed in to the degraded functional and technical and one Victoria-class submarine. 2014. A contract for works involving condition of the existing 70-plus-year- Significant portions of the dockyard’s the replacement of the main substation old structures, the recapitalization service-support infrastructure will was awarded in early 2018, and final of these facilities has long been an be recapitalized: both existing jetty elements of that work were continuing infrastructure priority for the Royal cranes will be replaced, and all utility into 2019. The project is expected to be Canadian Navy and the Department infrastructure to the site will be completed by 2024. Credit: Capital Region District Capital Region 64 District Wastewater Treatment Plant $765 million 2018 Rank: 63 Location: Victoria, British Columbia Owner: Capital Region District DBF Team: Harbour Resource Partners (McLoughlin Point Wastewater Treatment Plant)—AECOM Canada; Graham; SUEZ; CEI; Gracorp; Michelss Canada DBFOM Team: Hartland The Capital Regional District’s Wastewater Treatment Project will provide Resource Management Group tertiary treatment for wastewater from the core area municipalities of Victoria, (Residuals Treatment Facility) Esquimalt, Saanich, Oak Bay, View Royal, Langford, and Colwood, as well as Contractor: Kenaidan Contracting Ltd. for theEsquimalt and Songhees Nations. The project consists of three main (Clover Point Pump Station) components: the McLoughlin Point Wastewater Treatment Plant which Management Consultants: EY will provide tertiary treatment to the core area’s wastewater; the Residuals Legal: Norton Rose Fulbright Treatment Facility which will turn the residual solids into Class A biosolids; (advisor to CRD) and the conveyance system which is the pumps and pipes that will carry Other Key Players: KPMG (commercial wastewater from across the core area to the treatment plant and residual advisor); Operis (financial advisor for RTF solids to the Residuals Treatment Facility. Construction of the McLoughlin team); Aon Risk Solutions; Associated Point Wastewater Treatment Plant got underway in April 2017. In 2018, the Engineering; Kerr Wood Leidal; Stantec; Residuals Treatment Facility began construction, along with the major parts of Parsons (Residual Solids Pipeline Phase – the conveyance system. The remaining aspects of the conveyance system will Designer); GHD (odour control & HVAC) begin construction in 2019. All of the project components are scheduled for Funding: P3 completion by the end of 2020.

Lakeshore East Engineer: Parsons (owner’s engineer) The Lakeshore East GO Expansion project will 65 GO Expansion Other Key Players: 4-Transit provide two-way, all-day service on the corridor, which JV (technical advisory services): currently stretches from Union Station east to Oshawa. The expansion project will push the line further east, $735 million Hatch, Parsons, WSP; Golder; with two new stations to be built in Oshawa, as well as NEW Infrastructure Ontario (procurement one in Courtice and one in Bowmanville. The project Location: Toronto to lead); Rider Levett Bucknall; also includes station enhancements throughout the Bowmanville, Ontario Comtech (project mgmt. services) current network. Completion of the Lakeshore East Owner: Metrolinx Funding: Public GO Expansion is currently scheduled for 2025.

56 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Rehabilitation of Robert- Robert-Bourassa generating station is one of the crown jewels in Hydro- 66 Québec’s generating fleet. With an installed capacity of 5,616 MW, it is Bourassa Generating Units the most powerful generating facility in Québec. Its longevity is essential $732 million to ensuring the long-term supply of reliable power in Quebec. This project 2018 Rank: 66 includes the rehabilitation of eight of the 16 generating units of the Robert- Bourassa generating station, as well as the speed governors, static excitation Location: Baie-James, Quebec systems and cooling systems in all 16 units. The DEW generating units Owner: Hydro-Quebec (made by Dominion Engineering Works) will be the ones rehabilitated, Contractor: GE; TRANSAR as they show the most signs of wear. This work will allow Hydro-Québec Other Key Players: EXP; McElhanney to optimize its facilities and adequately secure Quebec’s energy future. Funding: Public Project completion is targeted for 2022.

Union Station Other Key Players: The Union Station rail corridor is the 6.4-kilometre hub 67 Entro (signage and of Toronto’s transit network and consists of a complex Infrastructure wayfinding consultant); arrangement of approach tracks, passenger platforms, and Renewal Morrison Hershfield four interlockings at Cherry, Scott, John, and Bathurst streets. Program (track/signals eng. for The corridor supports GO Transit commuter trains, Canadian conceptual work); WSP Pacific, Canadian National, VIA, and ON Rail operations. It $700 million (geotechnical consultant, has 14 station tracks with platform access and more than 180 2018 Rank: 67 design services); Aon signals, 250 switch machines, 40 kilometres of circuited track, Location: Toronto, Ontario Risk Solutions (risk and all associated infrastructure, dating back to the late 1920s. advisor/broker for Owner: Metrolinx This will be replaced with state-of-the-art computer-based member of preferred interlockings and LED signalling technology. The scope of work Project/Construction proponent); Hatch has included track additions and upgrading, replacement of all Manager: Joint Venture— (signals specialist); WSP special trackwork in the multi-track rail corridor extending Hatch (lead), Parsons, (materials inspection and almost 6.5 kilometres east and west of the station, and IBI Group testing); Golder; Rider replacement of the 90-year old signalling system with new state- Engineer: Morrison Hershfield Levett Bucknall of-the-art signals, communications, power supply, CCTV, and (design engineer) Funding: Public SCADA systems. The program is expected to wrap up in 2019. Credit: Acciona North Shore 68 Wastewater Treatment Plant $700 million 2018 Rank: 68 Location: North Vancouver, British Columbia Owner: Metro Vancouver DB(F) Team: ADAPT Consortium— Acciona Infrastructure; DIALOG; Wood PLC; TetraTech Engineer: AECOM (owner’s engineer) Consulting Architect: Miller Hull; HDR/CEI Legal: Norton Rose Fulbright (counsel This greenfield secondary treatment plant will replace an existing primary for Metro Vancouver); Osler (DBF treatment plant. New federal and provincial regulations require the upgrade of Counsel); Torys (acted for lender) all primary treatment plants. The existing primary plant removes only 40 to 60 Other Key Players: Space2Place (public per cent of suspended organic matter in the wastewater which, after primary consultation, research and analysis, treatment, is discharged directly into Burrard Inlet—a matter of concern for some concept development); BTY Group environmentalists—and is located on land leased from the Squamish Nation. (cost consultant); Golder (geotechnical The new secondary plant will be able to remove over 90 per cent of organic evaluations); Maple Reinders matter and will be located two kilometres east of the existing plant. Increased (compatibility advisor); KPMG (business plant capacity will allow up to 320 million litres per day to be treated under storm case financial advisor); Pomerleau; Aon conditions. Construction officially began in late August of 2018. The new plant Risk Solutions; WSP (procurement) is scheduled to be operational by the end of 2020, and the existing primary plant Funding: P3 will be de-constructed once the new plant is in service.

top100projects.ca ReNew Canada 57 Top100 Projects 2019 Credit: Plenary Group CAMH Phase 1C 69 Redevelopment $685 million 2018 Rank: 70 Location: Toronto, Ontario Owner: Government of Ontario Project Manager: Infrastructure Ontario DBFM Team: Plenary Health— Plenary Group and PCL (developer); PCL (design-build); Stantec (architect); Plenary The redevelopment project of approximately 655,000 • Site improvements, group (financial advisor); ENGIE will see the construction sq. ft. of new build space, including parks Services (facilities manager) of two modern buildings which will include: and green space Other Key Players: along Queen Street West in • 235 in-patient beds; improvements. INTECH Risk Management Toronto featuring inpatient • Ambulatory programs; By the fall of 2018, (insurance advisor); and outpatient services for • Relocation of the slab pours up to Level 5 Hascomb (owner’s cost those most in need: people emergency department had been completed, and consultant); ARUP who are acutely ill and to the Queen Street site; forming work on Level 6 (risk assessment); those experiencing the most • Research and had begun. The project Aon Risk Solutions; complex forms of mental educational facilities; is on track to reach Colliers Project Leaders illness. The project will • Information and substantial completion Funding: P3 result in the construction resource facilities; and in 2020. Credit: ReNew Canada 70 Union Station Rail Corridor $682 million NEW Location: Toronto, Ontario Other Key Players: Morrison Hershfield; Gannett Fleming; Owner: Metrolinx Infrastructure Ontario Engineer: Pavex, (procurement lead); Comtech Mike Kelly and Sons; (project mgmt. services) Humber Valley Paving Funding: Public

Creating an electrified GO service means that significant work will be necessary at the system hub, Union Station in Toronto. Work on the Union Station Rail Corridor (USRC) will include system and track upgrades that will provide the necessary infrastructure for electrified GO trains to enter and exit the station at high frequency throughout the day and night. Completion of the upgrades to the USRC is anticipated by the end of 2025.

Chinook Power Station Supplier: The Chinook Power Station is SaskPower’s newest project 71 Siemens (one for providing a stronger energy supply for the people of $680 million SGT6-5000F Saskatchewan. The 350-MW natural gas-fired power facility 2018 Rank: 72 gas turbine, a will be located on the outskirts of Swift Current in the province’s Location: Swift Current, Saskatchewan SST-900 steam southwest. The EPC contract was awarded in September of turbine, a 2016. In August 2018, SaskPower announced that power had Owner: Government of Saskatchewan SGen6-1000A been successfully brought to the station, allowing for functional Project Manager: SaskPower generator, and tests to proceed. Also, approximately five kilometres of power Contractor: Burns and McDonnell one SGen6-100A lines, linking the station to the grid, have been constructed. As (EPC services) generator) of the fall of 2018, the project remained on budget and on time, Other Key Players: WSP (surveying) Funding: Private set to come online in October 2019.

58 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Grande Prairie Other Key Players: Aon Risk Solutions (risk Supplier: Canam Group 72 Regional Hospital advisor/broker for preferred proponent); Colliers Funding: Public Project Leaders; Tetra Tech (materials testing); • Provincial Alberta Health $647.5 million Graham (construction management services) Services: $647.5 million 2018 Rank: 74 This new 64,000-square-metre hospital is expected to provide 200 beds, a cancer care Location: Grande Prairie, Alberta centre, and a nursing and medical careers training facility from the Grande Prairie Owner: Alberta Health Services Regional College. It will function as a regional referral centre, providing health services to Project/Construction Manager: northwestern Alberta residents. The existing Queen Elizabeth II Hospital will continue as a Clark Builders health care facility to be used to provide ambulatory, community, and other health services. Engineer: Stantec; WSP (engineer, Alberta Health Services will operate on the two sites. In July of 2018, the Government mechanical, and electrical design) of Alberta filed a notice of default with contractor Graham Construction. The company Consulting Architect: DIALOG responded that the notice was “rife with errors and misstatements.” A mitigation plan was (prime consultants); Stantec, submitted to the Alberta Government, however they decided that new timelines and costs HOK (design); Stantec (landscape did not meet the certainty it was expecting. The project was put on hold temporarily while architecture); ISL Engineering and a new contractor was found. In November 2018, Clark Builders was announced as the new Land Services Ltd. contractor. The project remains on target to be completed in 2019.

Highway 427 Upgrades Other Key Players: Golder (preliminary Supplier: DECAST 73 foundation and pavement engineering (precast infrastructure) $616 million services); INTECH Risk Management Funding: P3 2018 Rank: 75 (insurance advisor); Aon Risk Solutions • Provincial: $616 million Location: Toronto to Vaughan, Ontario The expansion of Highway 427 is a 10.4-kilometre addition to one of Owner: Government of Ontario Toronto’s 400-series highways, which currently runs from the Queen Project Manager: Infrastructure Ontario Elizabeth Way north to Highway 7 in the city’s west end. There are two DBFM Team: LINK 427—ACS Infrastructure sections to the project. The first is the widening of the highway from Canada Inc., Brennan Infrastructures Inc. Finch Avenue to Highway 7 (four kilometres), expanding the highway (Miller Group) (developer); Dragados Canada from four and six lanes to eight lanes. This will include the addition of Inc., Brennan Infrastructures Inc. and Bot high-occupancy toll (HOT) lanes. The second section is the 6.4-kilometre Infrastructure Ltd. (construction); MMM Group extension of the highway from Highway 7 to Rutherford Road. This Ltd. and Thurber Engineering Ltd. (design); includes the creation of six- and eight-lane highway sections, three ACS Infrastructure Canada Inc. and Brennan interchanges, and median HOT lanes. In 2018, work was done to clear Infrastructures Inc. (maintenance) the land north of the current highway, and bridge and culvert installation Engineer: AECOM has begun at multiple points throughout the 10.4-kilometre extension. Legal: Torys (acted for the lender) Completion of the project is expected in 2021.

Lake Superior Link (Hydro One) The East-West Tie Transmission Project is planned to consist 74 or East–West Tie Transmission of a new, approximately 447-kilometre, double-circuit, 230-kV transmission line, primarily parallelling an existing transmission line Project (Nextbridge) corridor. The new East-West Tie will connect the Wawa Transformer $600 million Station to the Lakehead Transformer Station in the Municipality of Shuniah, near Thunder Bay, with a connection approximately mid- 2018 Rank: 77 way at the Marathon Transformer Station. The need for the project Location: Municipality of Shuniah was established by the Independent Electricity System Operator to: (near Thunder Bay) to Wawa, Ontario (i) increase capacity to meet expected electricity demand growth Owner: NextBridge Infrastructure, a partnership in northwestern Ontario; (ii) provide two-way power flow across with NextEra Energy Canada, Enbridge Inc., the tie, allowing more efficient use of generation resources; and and Borealis Infrastructure (iii) create improved electricity system reliability, flexibility, and Environmental Services: Dillon Consulting Limited operation. Additionally, in March 2016, Ontario declared that the (environmental assessment) construction of the East-West Tie Transmission line is needed as Legal: Gowling WLG (counsel to NextBridge); a priority project. In October of 2017, the Ontario Energy Board Osler; Torys (acting for the owner) issued the letter of direction and notice of proceeding for the project. Other Key Players: Ontario Energy Board and the IESO; The targeted in-service date in 2020. In early 2018, Hydro One filed Golder (environmental and social impact assessment, for a leave to construct, presenting its own vision (Lake Superior environmental inspection services for geotech drilling program); Link) for the project. Acting on concerns that the project cost had Hatch (constructability reviews and access planning) risen to $777 million, Hydro One announced that it could build the Supplier: Canam Group project for $100 million less, by using an existing corridor through Funding: Private Pukaskwa National Park. A final decision from the OEB on whether • Provincial: $600 million or not Hydro One will be granted leave is still pending.

top100projects.ca ReNew Canada 59 Top100 Projects 2019 Credit: BC Hydro Gordon M. Shrum 75 Generating Station Refurbishment $600 million 2018 Rank: 76 Location: Peace River, British Columbia Owner: BC Hydro Contractor: Peter Kiewit Infrastructure Turbine Supplier: This generating station, located at the W.A.C. Bennett Dam, provides 24 per cent Voith Hydro of BC Hydro’s hydroelectric power. Currently, there are several capital projects Supplier: Andritz Hydro underway at this generating station and the W.A.C. Bennett Dam to replace the (rotor poles), Siemens station’s 50-year-old equipment. The largest in terms of budget is the replacement (replacement transformers) of five turbines and this project was completed in fall 2015. In 2018, work began to Funding: Public install new exciter transformers on units one through five. Work is also continuing • Provincial BC Hydro: $600 million on the rip-rap and spillway upgrades. Credit: City of Calgary Bonnybrook 76 Wastewater Treatment Plant D Expansion $600 million 2018 Rank: 78 Location: Calgary, Alberta Owner: City of Calgary Project/Construction Manager: Graham Engineer: Stantec (local); One of Calgary’s three wastewater treatment plants, Bonnybrook is undergoing an Jacobs; AECOM expansion with the plant estimated to be able to service an additional equivalent Legal: Blake, Cassels & Graydon population of 325,000 people. When construction is completed in 2022, the facility (advised the City of Calgary) will service a population of 1.366 million people. The Plant D expansion is the largest Other Key Players: Hanscomb project of the overall upgrade and includes new primary and secondary clarifiers, (owner’s design stage cost consultant); new bioreactors with biological nutrient removal system, new treated effluent filtration facility, new Thermal Hydrolysis Process facility, and a new flood berm. Aon Risk Solutions (owner advisor and The city is also upgrading the existing ultraviolet disinfection system, digesters, and construction insurance broker); WPC primary sludge thickening systems. A cofferdam has been installed south of the CN Water Solutions; AGAT Laboratories Rail river crossing near the project site, which is allowing for the installation of new Funding: Public effluent diffusers. The cofferdam is expected to stay in place until April 2019. Credit: of Alberta Government Edmonton Clinical The Edmonton Clinical 77 Laboratory Hub Laboratory Hub will amalgamate similar diagnostic services $590 million and research under one roof, NEW providing laboratory services for Edmonton and northern Location: Edmonton, Alberta Alberta. The Hub will be built Owner: Government of Alberta on government land, south of the Construction Manager: main campus of the University PCL Constructors Ltd. of Alberta. Schematic design of Other Key Players: DIALOG; the hub was completed in June of Morrison Hershfield 2018. Construction is scheduled Funding: Public to begin in 2019, with the project • Provincial: $600 million operational in the spring of 2022.

60 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Corner Brook Acute Contractor: Marine This new hospital will continue to offer the 78 Contractors of Pasadena high level of services currently available at Care Hospital (site excavation Western Memorial Regional Hospital including $588 million and grading); emergency care, obstetrics, palliative care, 2018 Rank: 79 Brook Construction rehabilitation, inpatient mental health services (underground concrete and diagnostic services, in addition to new Location: Corner Brook, water reservoir) services such as radiation treatment and a Newfoundland and Labrador Engineer: WSP dedicated space for a PET scanner. In June Owner: Government of Newfoundland (structural engineers, of 2018, Atlantic Healthcare Partnership and and Labrador (to be turned over upon sustainability consultants) Corner Brook Health Partnership were named completion to the Western Health Other Key Players: as the two successful proponents invited to Regional Health Authority) Hanscomb (functional submit a project proposal as part of the RFP Project/Construction Manager: programmer’s cost process. Premier Dwight Ball stated at that time Corner Brook Care Team—B+H consultant); WSP that he expected the successful proponent to be Architects, Montgomery Sisam Architects, (heliport planning) named in the spring of 2019, and construction Constructors, Marco Construction Funding: Public to begin shortly after that announcement.

Southwest Rapid Transitway Other Key Players: Deloitte (financial); Hanscomb (engineer’s 79 (Stage 2) and Pembina cost consultant); LeighFisher (lenders technical advisor); Plenary Group (lead developer and equity provider, OM&R provider); Highway Underpass Project Aon Risk Solutions (risk advisor/broker for preferred proponent); $587.3 million Hatch (rail design); Morrison Hershfield (transitway and road works design); TetraTech (structural design); Wood PLC 2018 Rank: 80 Funding: Public Location: Winnipeg, Manitoba Owner: City of Winnipeg This project—previously listed as the Winnipeg Capital Integration Project—will be P3 Team: Plenary Roads the City of Winnipeg’s largest infrastructure project to date. It involves significant Winnipeg (Plenary Group); components in the southwest quadrant of the city, including completion of Stage 2 of PCL Construction (construction) the Southwest Transitway, the addition of active transportation infrastructure, and the Engineer: Dillon Consulting renewal and expansion of the Pembina Underpass. Stage 2 will extend the transitway (owner’s advocate); Landmark from the Pembina Highway and Jubilee Avenue south to the University of Manitoba. Planning & Design (public Completion of the project will represent a significant step forward in building the consultation); McGowan Russell Group transportation network outlined in the city’s transportation master plan and will help (active transportation, station design, promote the increased densification of Winnipeg by facilitating the future development station areas, landscaping) of several large-scale, infill, transit-oriented developments. Construction has started; Legal: Blake, Cassels & Graydon with completion expected in late 2019. Operator training and facility commissioning (counsel to owners) will be carried out, with full operation expected to commence in April 2020. Credit: STM 80 Réno-Systèmes Program Phase IV $582.5 million 2018 Rank: 81 Location: Montreal, Quebec Owner: STM Engineer: SNC-Lavalin Other: Englobe (quality management services) Funding: Public

In the fall of 2014, the board of directors of Société de transport de Montréal (STM) announced that it would invest $582.5 million into replacement of metro stationary equipment in Phase 4 of its Réno-Systèmes program. The program, still in the design phase according to the 2016-2026 Quebec Infrastructure Plan, calls for the systematic replacement of end-of-life assets in the following categories: energy, accessibility, ventilation, motorized installations, telecommunications and operating process controls, track equipment, and train control. STM’s current budget calls for a $64.6-million investment in 2017, with over $100 million to be spent on the project each year from 2018 to 2020.

top100projects.ca ReNew Canada 61 Top100 Projects 2019

Stouffville Corridor Other Key Players: 4-Transit JV The expansion of the Stouffville corridor is expected 81 GO Expansion (technical advisory services): Hatch, to increase service along the line by up to 400 per cent. Parsons, WSP; Golder; Morrison The upgrades will provide all-day, two-way service $581 million Hershfield; Gannett Fleming; throughout the corridor, which stretches north from Infrastructure Ontario (procurement Union Station to Lincolnville GO. The current plan for NEW the expansion also includes the addition of four new lead); Rider Levett Bucknall; Location: Stouffville, Ontario stations: Lawrence-Kennedy, Finch-Kennedy, East Comtech (project mgmt. services) Owner: Metrolinx Harbour and Gerrard-Carlaw. Work on the Stouffville Engineer: AECOM Funding: Public expansion is expected to be completed in 2025.

Bowmanville Other Key Announced in June of 2016, the Bowmanville Extension project 82 Players: Wood will see the Lakeshore East train line extened nearly 20 kilometres Extension Project from Oshawa to Bowmanville. The project includes the creation PLC and Stantec $550 million of four new stations: two in Oshawa, one in Courtice, and one in (technical Bowmanville. When service begins, four rush-hour trains will leave 2018 Rank: 82 advisory from Bowmanville in the morning, and return in the afternoon. When Location: Bowmanville, service opens in 2024, the line will provide four morning trips along services) Ontario the line to Union Station in downtown Toronto, and four afternoon Owner: Metrolinx Funding: Public trips making all station stops to the new Bowmanville station.

Annacis Island Wastewater Legal: Norton Rose Fulbright (for Metro Vancouver) Funding: Public 83 Treatment Plant Expansion Other Key Players: EXP (vibration monitoring); • Municipal: JJM Construction and Geopac Inc. (prepare the $550 million $550 million ground and relocate utilities); Golder (outfall design 2018 Rank: 83 team); WSP (materials engineering and testing); Location: Delta, British Columbia Hatch (tunnel design review and outfall construction Owner: Metro Vancouver management); Colliers Project Leaders; Wood PLC Construction Manager: Graham/Aecon Joint When this Stage 5 project by Metro Vancouver is complete, the Venture (Stage 5 expansion); Hatch (outfall project) Annacis Island facility will serve 1.5 million people in 14 Metro Contractor: North American Construction; Vancouver municipalities. Today, it serves 1.25 million people. Kenaidan Contracting (computer control system The previous expansion, Stage 4, was done in the late 1990s. The and laboratory building) plant serves much of the Tri-Cities, Burnaby, Maple Ridge, Delta, Engineer: Brown and Caldwell, Stantec, EIC Surrey, Pitt Meadows, Langley, and White Rock. Four proponents Solutions, Klohn Crippen Berger (Stage 5 Expansion); have been shortlisted for the outfall project, the next phase of the CDM Smith, Golder Associates (outfall); Wood Group, Annacis expansion. The winning bidder is scheduled to be named Black & Veatch (Cogeneration Backup Power) in early 2019, with construction beginning shortly thereafter. Lake St. Martin Financing 84 Channel Project From the Government of Manitoba: Cost-share with Infrastructure $540 million Canada (INFC) as part of the Disaster Mitigation Adaption Fund NEW (DMAF). Agreement-in-principle signed with INFC to cost share up to $247.5M of the total project cost. Location: Interlake, Manitoba Owner: Government of Manitoba In 2011, southern Manitoba experienced widespread flooding and Lake Manitoba Contractor: 513 Construction Ltd./Glen experienced excessively high inflows through the Waterhen River, Whitemud River, Hartman Construction Ltd. (all-weather and the Portage Diversion. This flood protection project is intended to improve lake road construction); Interlake Regional level regulation and consequently reduce the likelihood of flooding along Lakes Tribal Council/Sigfusson Northern Ltd. Manitoba and St. Martin. The $540-million flood protection project consists of two (all-weather road construction) 23-kilometre long outlet channels with associated control structures and bridge Engineer: Hatch; KGS Group crossings as well as an 80-kilometre all-weather access road and a 24kV transmission line to the Lake St. Martin outlet channel control structure. The Lake Manitoba outlet Environmental Services: North/South channel will connect Watchorn Bay on Lake Manitoba to Birch Bay on Lake St. Martin Consultants Inc.; M. Forster Enterprises; and the Lake St. Martin outlet channel will drain Lake St. Martin from a point in Stantec; E. Hicks & Associates Ltd.; the southeast to Willow Point in Lake Winnipeg. Two sections of the all-weather Szwaluk Environmental Consulting Ltd.; access road are currently under construction, with an anticipated completion in 2019. Magellanicum Ecological Services Outlet Channel construction is scheduled to commence in 2020. Manitoba recognizes Funding: Public its duty to consult with Indigenous peoples in a meaningful way. The engagement • Federal: $247.5 million and consultation process is currently underway, with 31 Indigenous communities • Provincial: $292.5 million identified as having the potential to be affected by the project.

62 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Metrolinx Light-Rail Vehicles Metrolinx announced the purchase of 61 Citadis Spirit light 85 rail vehicles from Alstom in May 2017. The purchase provides $528 million Vehicle Supplier: Alstom Metrolinx with the flexibility to use the vehicles as needed across Other Key Players: 2018 Rank: 84 its current light rail transit projects, with 17 of the vehicles will be Comtech (project mgmt. purpose-built for the Finch West LRT project; the remaining 44 Location: Toronto, Ontario consultant services) available for additional projects underway including the Eglinton Owner: Metrolinx Funding: Public LRT and Hurontario LRT. The vehicles are expected to be available Engineer: SNC-Lavalin • Provincial: $528 million in time for use on any of the aforementioned projects in 2021.

Wilson Facility Other Key Players: KPMG (advisor for TTC Capital Program Delivery 86 Enhancement Review); Hanscomb (owner’s cost consultant); Comtech (consulting services) Supplier: Ansaldo; Canam Group; DECAST Ltd. (precast chambers); and Yard Expansion Dufferin Concrete; Nedco; Nortrak; Powell; Tomlinson; Thales; Twinco $506.4 million Funding: Public 2018 Rank: 85 • Municipal TTC: $506.4 million (2015 Capital Budget) Location: Toronto, Ontario TTC’s Wilson Yard is undergoing a significant expansion of the rail yard and Owner: TTC supporting maintenance facilities, which is required to accommodate the needs Project/Construction Manager: Bondfield for Toronto Rocket train storage and as a result of the introduction of the Spadina Construction (construction management) Subway Extension and increasing service demands on Line 1 (Yonge University Contractor: Dufferin Construction, a division Spadina). This expansion will add eight new storage tracks to the facility with of CRH Canada (contract for prep work) room to store 16 trains, as well as an expanded car house for servicing Toronto Engineer: AECOM, Hatch, TTC Rocket trains, new run-around connections, and a connection to Downsview Legal: Osler station. The entire project is expected to be completed by 2019.

Regina Railyard Other Key Players: Urban Strategies; Funding: Public/Private 87 Urbanics Consultants; P3A Architecture; • Municipal: $47 million Renewal Project WSP (assessment, analysis, ESA) • Private: $450 million to $500 million $500 million This is the second phase of the Regina Revitalization Initiative, including the 2018 Rank: 87 redevelopment of approximately 17.5 acres of vacant downtown land formerly used as a Canadian Pacific intermodal yard. With new offices, shops, and restaurants, there Location: Regina, will be new opportunities for work and play, and a variety of housing options will Saskatchewan provide distinctive urban living. With a new walkway connecting this lively district to Owner: City of Regina downtown, it will strengthen Regina’s culture and nightlife. Urban planning and design, as well as engineering consulting work, is currently taking place as part of a public Engineer: WSP; Ground engagement process. Work has been pushed back, based on other community priorities, Engineering Consultants and it could now be up to five years before anything concrete happens with the lands. Credit: Infrastructure Ontario Michael Garron 88 Hospital Project $498.2 million NEW Location: Toronto, Ontario Owner: Toronto East Health Network Project Manager: Infrastructure Ontario DBF Team: EllisDon Infrastructure Healthcare—EllisDon Design Build Inc. (design-builder); B+H Architects, Diamond Schmitt Architects (design); Mulvey & Banani International Inc., Crossey Engineering Ltd., Stephenson The Michael Garron Hospital—Phase 1 new patient care tower project involves Engineering Ltd., WalterFedy (engineer); the construction of a new eight-storey patient care tower and three-storey EllisDon Capital Inc. (financial advisor) connection, as well as demolition of some existing space and renovations to the Legal: Blake, Cassels & Graydon existing hospital. The project will add up to approximately 550,000 sq. ft. to the (advisor to the proponent) existing hospital and renovate approximately 100,000 sq. ft. of select areas within Other Key Players: EXP the existing hospital. Construction began in late April 2018 following financial Funding: P3/AFP close. Substantial completion of the project is slated for the fall of 2023.

top100projects.ca ReNew Canada 63 Top100 Projects 2019

London Bus Rapid The London bus rapid transit (BRT) system is a proposed 23.7-kilometre system that will 89 run throughout the city’s busiest corridors. The current iteration’s north-south route runs Transit System from the downtown to the city’s north end past Western University, and to the south end $498 million near Highway 401. The west-east corridor will run west from the downtown past Wonderland Road, and east to the campus of Fanshawe College. The project has received $170 million of NEW provincial funding, and the City of London has budgeted $130 million for the project. While Location: London, Ontario there is under $200 million in funding commitments still outstanding, the federal government Owner: City of London contribution for transit funding for the next decade exceeds the amount needed to pay for the balance of the project. If the project is kept to its current timeline, construction is phased and Consultant: IBI Group estimated to begin on the east corridor in 2020 and on the north corridor in 2022, with the Funding: Public opening of these corridors in 2023 and 2026 respectively. Construction would then begin on • Federal $198 million* the south corridor in 2023 and on the west corridor in 2025, and open by 2026 and 2028. • Provincial $170 million *The federal funding has been made available from the federal government, but the • Municipal $130 million City of London has not officially committed the funds to the London BRT project.

Route 389 Other Key Players: BPR/ This 570-kilometre long highway joins the city of Baie- 90 Improvement AXOR Experts-Conseils Comeau in Quebec with the Newfoundland-Labrador Consortium (planning border. The improvement program is key in the Program and specifications north development of Plan Nord, as it will improve access to $468 million of Manic-5); Roche- lands north of the 49th parallel. The program is divided TDA Consortium, into five individual projects: Project A: from Fire Lake to 2018 Rank: 88 in conjunction with Fermont; Project B: Baie-Comeau to Manic-2; Project C: Location: Baie-Comeau, Quebec to Inspec-Sol (now winding sector north of Manic-Five; Project D: Manic-2 the Newfoundland-Labrador border GHD) (environmental north of Manic-3; Project E: Manic-3 North to Manic-5. Owner: Government of Quebec assessment) In July of 2018, the provincial and federal governments Engineer: SNC-Lavalin Funding: Public confirmed their $468-million commitment to the project.

Centerm Expansion Project Other Key Players: PBX Engineering; Klohn Crippen Funding: Public 91 Berger; WSP; Proactive Infrastructure Consulting $454 million NEW The Port of Vancouver’s Centerm Expansion Project involves a series of improvements to the Centerm container terminal to meet near-term demands Location: Vancouver, British Columbia for container shipment in the port. The two-thirds increase in capacity would Owner: Vancouver Fraser Port Authority expand by 600,000 20-ft. equivalent unit containers (TEUs), from 900,000 Design-Build contractor: Centennial TEUs to 1.5 million TEUs. The project also includes the South Shore Access Expansion Partners—Dragados Canada Inc.; project, a wide range of road improvements that will benefit the entire south Jacob Bros. Construction Inc.; Fraser River shore port area, including a new Centennial Road Overpass and an extension Pile & Dredge Inc. to Waterfront Road. With the design-build proponent selected, construction Engineer: AECOM was expected to begin in late 2018 or early 2019.

Hanlan Watermain Project Other Key Players: AECOM Supplier: Hanson Pipe and 92 (preliminary design report); Arup Precast (concrete pressure $450 million (geotechnical engineering, tunnel pipe); DECAST Ltd. 2018 Rank: 89 design, pipeline and structural design (concrete pressure pipe, Location: Mississauga, Ontario support, engineering and construction precast chambers); CRH Owner: Region of Peel phase services); EXP (instrumentation Canada, Dufferin Concrete, Contractor: McNally Construction Inc. (Contract and monitoring); Revay and Associates Dufferin Aggregates 1, Lakeshore and Dixie Roads to Golden Orchard (project management support services); (materials supply) Drive); T2DMP (Contract 2, Dixie Road from WSP (consultant and geotechnical); Aon Funding: Public Golden Orchard Drive to Eastgate Parkway); Risk Solutions (risk advisor/broker for • Municipal Southland Technicore Mole JV (Contract 3, Eastgate preferred proponent on their phases of Peel Region: $330 million; Parkway and Tomken and Cawthra Roads) the project); Golder; AGAT Laboratories York Region: $120 million Engineer: Jacobs (detailed design consultant: South The Hanlan feedermain will run approximately 14.5 kilometres Assignment—Contracts 1 & 2); WSP (detailed from the Lakeview Water Treatment Plant on Lake Ontario to the design consultants: North Assignment—Contract 3); Hanlan Reservoir and Pumping Station. Part of the same project, the The Municipal Infrastructure Group; GM Blueplan 1,500-millimetre-wide Mississauga City Centre Subtransmission Main Environmental Services: AECOM will run approximately six kilometres from the Hanlan pumping station (environmental assessment) to the intersection of Cawthra and Burnhamthorpe roads. The entire Legal: Borden Ladner Gervais (legal advisor) project is scheduled for completion in 2019.

64 ReNew Canada top100projects.ca Top100 Projects 2019 Top100 Projects 2019

Côte-Vertu Station Engineer: Hatch, The new Côte-Vertu underground garage will double the 93 Underground Garage SNC-Lavalin, Stantec capacity of the train storage available at the end of the Orange (engineer consortium) line in Montreal, enabling 20 trains to be stored at the site. A $440 million Other Key Players: fan of tracks at the entrance of the garage will consist of three 2018 Rank: 90 Englobe (geotechnical tunnels, with two tracks holding eight trains. A connecting and environmental track from the garage to the station will provide space for an Location: Montreal, Quebec field surveillance); extra four trains to be parked if necessary. A maintenance Owner: STM WSP (geotechnical) pit will also be built as part of the garage project. The Project/Construction Funding: P3 additional space for parking trains will allow for a 20 per Manager: SNC-Lavalin • Provincial: cent increase in train frequency during peak periods. The Contractor: Dragados $440 million project is expected to be completed by 2020.

Springbank Legal: The Springbank Off-stream reservoir represents the Government of 94 Off-stream Reservoir McLennan Alberta’s solution to mitigate severe flooding along the Elbow River, similar Ross to what took place in June of 2013. Current plans call for a dry reservoir $432 million (Counsel with a capacity of 70.2 million cubic metres, with an outlet structure to safely release the water back to the river when safe to do so. The reservoir NEW for the will be located approximately 15 kilometres west of the City of Calgary. Location: Calgary, Alberta Government Construction will require three years, with the reservoir being functionally Owner: Government of Alberta of Alberta) operational at a reduced level after two years. The project is expected to be Engineer: Stantec Funding: partially complete by fall 2021 and fully complete by the end of 2022. This Environmental Services: Stantec Public timeline represents a 10-month delay from previous project expectations. Credit: Inland Health Royal Inland Hospital 95 Patient Care Tower $417.2 million NEW Location: Kamloops, British Columbia Owner: Interior Health DB(F)M Team: EllisDon Capital Inc. (team lead); EllisDon Capital Inc. (equity providers); EllisDon Infrastructure (design-builder); Parkin Architects Ltd./Kasian Architects (architect); EllisDon Facility Services Inc. (service provider) Funding: Public/Private The Royal Inland Hospital, located in Kamloops, B.C., is a 254-bed tertiary acute-care hospital. It is one of two Interior Health tertiary referral Financing hospitals. The Patient Care Tower project will take place in two phases. Phase 1 will be the design and construction of the Patient Care Tower, The total budget for the entire project, which will feature single-patient rooms and will bring Royal Inland including both phases, is $417.2 million Hospital up to current standards of care, improving working conditions, with the province of British Columbia and as well as infection control and prevention measures. Phase 2 will include Interior Health contributing $225.2 million, significant renovation and expansion to the emergency department, the Thompson Regional Hospital District pediatrics, post-anaesthetic recovery, and the morgue. New parking stalls contributing $172 million and the Royal Inland will be added to the site. Construction of the patient tower got underway Hospital Foundation contributing $20 million. in the fall of 2018. The Patient Care Tower is scheduled to open in early 2022, with Phase 2 renovations to be completed in the fall of 2024.

Lakeshore West Other Key Players: 4-Transit The Lakeshore West GO Expansion will provide 15-minute 96 JV (technical advisory service or better each day from Toronto to Burlington, as GO Expansion services): Hatch, Parsons, well as hourly service to and from Hamilton seven days WSP; Golder; Morrison a week. The expansion will also include a station at Port $401 million Hershfield; Gannett Fleming; Credit that will link to the future Hurontario light rail NEW Infrastructure Ontario transit system. The preferred proponents for the Lakeshore Location: Toronto, Ontario (procurement lead); Rider West Infrastructure improvements project will be named in Levett Bucknall; Comtech 2019. That portion of the project includes improvements to Owner: Metrolinx (project mgmt. services) five stations throughout the corridor, as well as two grade Engineer: Parsons Funding: Public separations and the replacement of one pedestrian bridge.

top100projects.ca ReNew Canada 65 Top100 Projects 2019

100-Series The Government of Nova Scotia • Highway 101, Three Mile Plains to Falmouth, 97 Highway had studied the cost of twinning including the Windsor Causeway, 9.5 the 100-series highway network, a kilometres; Improvements total of just over 300 kilometres of • Highway 103, Tantallon to Hubbards, 22 $390 million highway. An initial report suggested kilometres; that the cost would be close to • Highway 104, Sutherlands River to Antigonish, 2018 Rank: 93 $2 billion, a number that forced including Barneys River, 38 kilometres; and Location: Nova Scotia the province to explore alternative • construction of the four-lane, divided Burnside Owner: Government of Nova Scotia funding mechanisms for the project. Connector (Highway 107) between Burnside to Consulting Engineer: Following a resounding rejection by Bedford, 8.7 kilometres. CBCL Limited Consulting the public of a recommendation to In July of 2018, the federal and provincial Engineers (highway corridor study) toll sections of the highway to pay for governments announced a combined investment Other Key Players: MQO the cost of the project, the province of $195 million towards the Highway 104 project. Research (consultation report) instead decided to move forward Construction of that section is to begin in early Funding: Public with four smaller projects: 2020 and be completed sometime in 2024.

CapitalCare Norwood The CapitalCare Norwood Redevelopment Project involves a 40,000-sq.-ft. 98 Redevelopment Project redevelopment of the current CapitalCare Norwood site in Edmonton. The expansion will include the construction of two new buildings: a seven-storey $364 million patient tower and an adjacent two-storey structure for outpatient clinics. The NEW tower will include 234 private resident rooms, helping to increase the bed count at the centre from 205 to 350 beds. The current design calls for a Y-shaped tower, Location: Edmonton, Alberta which will allow for natural light to reach every patient room. The adjacent Owner: Alberta Health System building will include a new dialysis unit and a Centre for Lung Health. It will Other Key Players: DIALOG also include a garden on the roof that can be utilized by patients. The RFP for the (primary consultant) project was released in April 2018, with the successful proponent selected in early Funding: Public 2019. Construction is set to begin in the summer of 2019 and run until 2023.

Université de Montréal Architects: MSDL; The first building of the new Outremont 99 Science Complex Lemay; NFOE Yards campus, the 650,000-sq.-ft. science Environmental Services: complex at the Université de Montréal $348.3 million WSP (environmental/acoustic) will provide a home for 2,200 students in the fields of biological science, physics, 2018 Rank: 96 Other Key Players: chemistry, geography, and materials Location: Montreal, Quebecc Englobe (QC and roofing engineering. Financial contributions from inspection services) Owner: Université de Montréal the provincial and federal governments Project Manager: DECASULT (Phase 1) Supplier: Canam Group helped to cover costs associated with the Contractor: EBC Inc. Funding: Public/Private decontamination of the site, which also Engineer: Bouthillette Parizeau Inc., PMA • Provincial: $173.4 million includes five hectares for green space. The Engineering, SNC-Lavalin (engineer consortium); • Université de Montréal: project is expected to be completed in time SDK (civil and structural engineers) $176.6 million for the start of the 2019-2020 school year.

Woodward Wastewater Other Key Players: CIMA+ The Woodward Wastewater Treatment Plant project 100 Treatment Plant Funding: is one of several measures being implemented to • Federal: $100 million address concerns over the quality of the water in $340 million • Provincial: $100 million Hamilton Harbour. This multi-stage project will 2017 Rank: 99 • Municipal: $140 million have a direct impact on the health of the local enviroment, specifically the water quality in the Location: Hamilton, Ontario harbour. The project includes: new raw sewage Owner: City of Toronto Financing pumping station; new energy centre/electrical Contractor: Maple/Ball JV—Maple Both the federal and upgrades; the addition of a tertiary level of treatment; Reinders and Ball Construction provincial governments new chlorine contact tank; upgrades to the Red Hill (Raw Sewage Pumping Station); pledged $100 million each Creek outfall; and upgrades to the collection system. Alberici Contractors (Electrical and to the project. The City of Construction of two phases are underway with the Chlorination System Upgrades) Hamilton is responsible third, the tertiary treatment upgrades, new chlorine Legal: Blake, Cassels & Graydon for all remaining costs. contact tank, and improvements to Red Hill Creek (advised the City of Hamilton) to begin in Q1 2019.

66 ReNew Canada top100projects.ca Top100 Projects 2019