Sofpopulationand
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
RAPID FLOOD IMPACT ASSESSMENT REPORT March 2007
RAPID FLOOD IMPACT ASSESSMENT REPORT March 2007 VAC ZAMBIA Vulnerability Assessment Committee BY THE ZAMBIA VULNERABILITY ASSESSMENT COMMITTEE (ZVAC) LUSAKA Table of Contents Acknowledgements...........................................................................................................................4 Acronyms .........................................................................................................................................5 EXECUTIVE SUMMARY...............................................................................................................6 1.0 INTRODUCTION.................................................................................................................8 1.1. Background .......................................................................................................................8 1.2 Overall Objective ..............................................................................................................8 1.2.1. Specific ...........................................................................................................................8 1.3. Background on the Progression of the 2006/07 Rain Season..............................................8 1.4. Limitations to the Assessment ...........................................................................................9 2.0 METHODOLOGY................................................................................................................9 3.0 FINDINGS......................................................................................................................... -
The Iccf Group Brochure Ed
THE ICCF GROUP BROCHURE ED. 2021-2022 INTERNATIONALCONSERVATION.ORG TABLE OF CONTENTS WHO WE ARE AND WHAT WE DO ................................................................ 4 WORKING WITH LEGISLATURES ..................................................................... 8 • Caucuses We Support ................................. 10 • ICCF in the United States ................................ 12 • The ICCF Group in the United Kingdom ......................................................................................................... 31 • The ICCF Group in Latin America & the Caribbean ...................................................................................... 39 • The ICCF Group in Africa ............................ 63 • The ICCF Group in Southeast Asia ................ 93 WORKING WITH MINISTRIES ....................................................................... 103 MISSION THE MOST ADVANCED WE WORK HOW TO ADVANCE SOLUTION IN CONSERVATION CONSERVATION GOVERNANCE GOVERNANCE BY BUILDING 1. WE BUILD POLITICAL WILL POLITICAL WILL, The ICCF Group advances leadership in conservation by building political will among parliamentary PROVIDING and congressional leaders, and by supporting ministries in the management of protected areas. ON-THE-GROUND SOLUTIONS 2. CATALYZING CHANGE WITH KNOWLEDGE & EXPERTISE We support political will to conserve natural resources by catalyzing strategic partnerships and knowledge sharing between policymakers and our extensive network. VISION 3. TO PRESERVE THE WORLD'S MOST CRITICAL LANDSCAPES -
Environmental Project Brief
Public Disclosure Authorized IMPROVED RURAL CONNECTIVITY Public Disclosure Authorized PROJECT (IRCP) REHABILITATION OF PRIMARY FEEDER ROADS IN EASTERN PROVINCE Public Disclosure Authorized ENVIRONMENTAL PROJECT BRIEF September 2020 SUBMITTED BY EASTCONSULT/DASAN CONSULT - JV Public Disclosure Authorized Improved Rural Connectivity Project Environmental Project Brief for the Rehabilitation of Primary Feeder Roads in Eastern Province Improved Rural Connectivity Project (IRCP) Rehabilitation of Primary Feeder Roads in Eastern Province EXECUTIVE SUMMARY The Government of the Republic Zambia (GRZ) is seeking to increase efficiency and effectiveness of the management and maintenance of the of the Primary Feeder Roads (PFR) network. This is further motivated by the recognition that the road network constitutes the single largest asset owned by the Government, and a less than optimal system of the management and maintenance of that asset generally results in huge losses for the national economy. In order to ensure management and maintenance of the PFR, the government is introducing the OPRC concept. The OPRC is a concept is a contracting approach in which the service provider is paid not for ‘inputs’ but rather for the results of the work executed under the contract i.e. the service provider’s performance under the contract. The initial phase of the project, supported by the World Bank will be implementing the Improved Rural Connectivity Project (IRCP) in some selected districts of Central, Eastern, Northern, Luapula, Southern and Muchinga Provinces. The project will be implemented in Eastern Province for a period of five (5) years from 2020 to 2025 using the Output and Performance Road Contract (OPRC) approach. GRZ thus intends to roll out the OPRC on the PFR Network covering a total of 14,333Kms country-wide. -
Zambia Page 1 of 8
Zambia Page 1 of 8 Zambia Country Reports on Human Rights Practices - 2003 Released by the Bureau of Democracy, Human Rights, and Labor February 25, 2004 Zambia is a republic governed by a president and a unicameral national assembly. Since 1991, multiparty elections have resulted in the victory of the Movement for Multi-Party Democracy (MMD). MMD candidate Levy Mwanawasa was elected President in 2001, and the MMD won 69 out of 150 elected seats in the National Assembly. Domestic and international observer groups noted general transparency during the voting; however, they criticized several irregularities. Opposition parties challenged the election results in court, and court proceedings were ongoing at year's end. The anti-corruption campaign launched in 2002 continued during the year and resulted in the removal of Vice President Kavindele and the arrest of former President Chiluba and many of his supporters. The Constitution mandates an independent judiciary, and the Government generally respected this provision; however, the judicial system was hampered by lack of resources, inefficiency, and reports of possible corruption. The police, divided into regular and paramilitary units under the Ministry of Home Affairs, have primary responsibility for maintaining law and order. The Zambia Security and Intelligence Service (ZSIS), under the Office of the President, is responsible for intelligence and internal security. Civilian authorities maintained effective control of the security forces. Members of the security forces committed numerous serious human rights abuses. Approximately 60 percent of the labor force worked in agriculture, although agriculture contributed only 15 percent to the gross domestic product. Economic growth increased to 4 percent for the year. -
Winrock Report Template
<name of> Project | Month Year Photo: EMPOWER participants from Chimtende Hub, Katete District (Winrock International) EMPOWER Case Study UNDERSTANDING VARIATION IN REAL COURSE ATTENDANCE AND ACHIEVEMENT Date: October 30, 2020 Author: Alex Hardin, Winrock International EMPOWER Case Study UNDERSTANDING VARIATION IN REAL COURSE ATTENDANCE AND ACHIEVEMENT Date: October 30, 2020 PROJECT NAME: EMPOWER: Increasing Economic and Social Empowerment for Adolescent Girls and Vulnerable Women in Zambia COOPERATIVE AGREEMENT NUMBER: IL-29964-16-75-K- AUTHOR: Alex Hardin, Winrock International FUNDER: United States Department of Labor Funding is provided by the United States Department of Labor under cooperative agreement number IL-29964-16-75-K-. One hundred percent of the total costs of the project are financed with federal funds, for a total of $5,000,000. This material does not necessarily reflect the views or policies of the United States Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the United States Government. CONTACT: 2101 Riverfront Drive 2451 Crystal Drive, Suite 700 Little Rock, AR 72202 Arlington, VA 22202 501-280-3000 701-302-6500 winrock.org Acknowledgements The case study researcher would like to thank everyone who offered their time and energy toward the development of this report. Special thanks go to the Chasefu and Petauke District Coordinators, Dennis and Sombo, without whom the vast majority of the research would have been impossible, and to Diana, Mutale, Doug, -
Monthly Report January 19 – February 19, 2002 Summary
Monthly Report January 19 – February 19, 2002 Summary • Zambia continued to experience a generally normal to below-normal rainy season. The dry spell in the southern parts of the country is of great concern as this has extended into some high- producing districts in Southern Province (Choma District), Western Province (Kaoma District) and the southern parts of Central Province. Crop yields in these areas are expected to be significantly reduced as a result. In some areas, crops have passed the permanent wilting point. • Zambia’s neighboring countries of Malawi, Mozambique, and particularly Zimbabwe have also experienced well-below normal rainfall this season. • Zambia’s food security situation continues to be of great concern, as the availability of staple food (maize) remains limited this late into the marketing season. Many households are also having problems purchasing maize as a result of exceptionally high prices. • The World Food Program started its relief food distribution program on January 24. So far, progress has been good despite the slow rate of relief food being brought into the country. Out of the estimated 42,000 MT requirement, only 12,000 MT has been purchased in South Africa for distribution to Zambia. Response from donors has been slow. As of February 12, 1,800 MT of maize was received from South Africa, all of which has been moved to the targeted districts. 1.0 Rainfall and Crop Condition 1.1 Rainfall Generally, the rainy season in Zambia so far has been characterized by normal to below-normal rainfall. Normal rainfall has been confined to northern and central parts of Zambia. -
Zambia Page 1 of 16
Zambia Page 1 of 16 Zambia Country Reports on Human Rights Practices - 2002 Released by the Bureau of Democracy, Human Rights, and Labor March 31, 2003 Zambia is a republic governed by a president and a unicameral national assembly. Since 1991 generally free and fair multiparty elections have resulted in the victory of the Movement for Multi -Party Democracy (MMD). In December 2001, Levy Mwanawasa of the MMD was elected president, and his party won 69 out of 150 elected seats in the National Assembly. The MMD's use of government resources during the campaign raised questions over the fairness of the elections. Although noting general transparency during the voting, domestic and international observer groups cited irregularities in the registration process and problems in the tabulation of the election results. Opposition parties challenged the election result in court, and court proceedings remained ongoing at year's end. The Constitution mandates an independent judiciary, and the Government generally respected this provision; however, the judicial system was hampered by lack of resources, inefficiency, and reports of possible corruption. The police, divided into regular and paramilitary units operated under the Ministry of Home Affairs, had primary responsibility for maintaining law and order. The Zambia Security and Intelligence Service (ZSIS), under the Office of the President, was responsible for intelligence and internal security. Members of the security forces committed numerous, and at times serious, human rights abuses. Approximately 60 percent of the labor force worked in agriculture, although agriculture contributed only 22 percent to the gross domestic product. Economic growth slowed to 3 percent for the year, partly as a result of drought in some agricultural areas. -
Zambia USADF Country Portfolio
Zambia USADF Country Portfolio Overview: Country program established in 1984 and reopened in U.S. African Development Foundation Partner Organization: Keepers Zambia 2004. USADF currently manages a portfolio of 23 projects and one Country Program Coordinator: Guy Kahokola Foundation (KZF) Cooperative Agreement. Total active commitment is $2.9 million. Suite 103 Foxdale Court Office Park Program Manager: Victor Makasa Agricultural investments total $2.6 million. Youth-led enterprise 609 Zambezi Road, Roma Tel: +260 211 293333 investments total $20,000. Lusaka, Zambia Email: [email protected] Email: [email protected] Country Strategy: The program focuses on support to agricultural enterprises, including organic farming as Zambia has been identified as a Feed the Future country. In addition, there are investments in off-grid energy and youth led-enterprises. Enterprise Duration Grant Size Description Mongu Dairy Cooperative Society 2012-2017 $152,381 Sector: Agriculture (Dairy) Limited Town/City: Mongu District in the Western Province 2705-ZMB Summary: The project funds will be used to increase the production and sales of milk through the purchase of improved breed cows, transportation, and storage equipment. Chibusa Home Based Care 2013-2018 $187,789 Sector: Agriculture (Food Processing) Association Town/City: Mungwi District in the Northern Province of Zambia 2925-ZMB Summary: The project funds will be used to provide working capital for purchasing grains, increase milling capacity, build a storage warehouse, and provide funds to improve marketing. Ushaa Area Farmers Association 2013-2018 $94,960 Sector: Agriculture (Rice) Limited Town/City: Mongu District in the Western Province of Zambia 2937-ZMB Summary: The project funds will be used to provide working capital for purchasing rice, build a storage warehouse, and provide funds to improve marketing. -
Full Text Document (Pdf)
Kent Academic Repository Full text document (pdf) Citation for published version Macola, Giacomo (2006) “It Means as If We Are Excluded from the Good Freedom”: Thwarted Expectations of Independence in the Luapula Province of Zambia, 1964-1967. Journal of African History, 47 (1). pp. 43-56. ISSN 0021-8537. DOI https://doi.org/10.1017/S0021853705000848 Link to record in KAR https://kar.kent.ac.uk/7559/ Document Version UNSPECIFIED Copyright & reuse Content in the Kent Academic Repository is made available for research purposes. Unless otherwise stated all content is protected by copyright and in the absence of an open licence (eg Creative Commons), permissions for further reuse of content should be sought from the publisher, author or other copyright holder. Versions of research The version in the Kent Academic Repository may differ from the final published version. Users are advised to check http://kar.kent.ac.uk for the status of the paper. Users should always cite the published version of record. Enquiries For any further enquiries regarding the licence status of this document, please contact: [email protected] If you believe this document infringes copyright then please contact the KAR admin team with the take-down information provided at http://kar.kent.ac.uk/contact.html ‘IT MEANS AS IF WE ARE EXCLUDED FROM THE GOOD FREEDOM’: THWARTED EXPECTATIONS OF INDEPENDENCE IN THE LUAPULA PROVINCE OF ZAMBIA, 1964-1966* BY GIACOMO MACOLA Centre of African Studies, University of Cambridge ABSTRACT: Based on a close reading of new archival material, this article makes a case for the adoption of an empirical, ‘sub-systemic’ approach to the study of nationalist and post- colonial politics in Zambia. -
1 Elections and Peacebuilding in Zambia Assessment Final Report
Elections and Peacebuilding in Zambia Assessment Final Report Contents Executive Summary ............................................................................................................ 3 Introduction ......................................................................................................................... 8 I. Structural Vulnerabilities ................................................................................................. 9 A. Political Factors.............................................................................................................. 9 B. Social Factors ............................................................................................................... 11 Table 1 .............................................................................................................................. 14 Composition of Members of Parliament by Gender since 1994 ....................................... 14 C. Economic Factors ......................................................................................................... 14 D. Security Factors............................................................................................................ 14 II. Vulnerabilities Specific to the 2011 Election ............................................................... 15 A. Electoral Administration .............................................................................................. 15 B. Parallel Vote Tabulation (PVT) .................................................................................. -
Country Profile: Zambia
TECHNICAL MARKET REVIEW Country Profile: Zambia CTCN Report No.: REPORT NO, Rev. Draft Date: 2018-06-06 1 IMPORTANT NOTICE AND DISCLAIMER 1. This document is intended for the sole use of the Customer as detailed on the front page of this document to whom the document is addressed and who has entered into a written agreement with the DNV GL entity issuing this document (“DNV GL”). To the extent permitted by law, neither DNV GL nor any group company (the "Group") assumes any responsibility whether in contract, tort including without limitation negligence, or otherwise howsoever, to third parties (being persons other than the Customer), and no company in the Group other than DNV GL shall be liable for any loss or damage whatsoever suffered by virtue of any act, omission or default (whether arising by negligence or otherwise) by DNV GL, the Group or any of its or their servants, subcontractors or agents. This document must be read in its entirety and is subject to any assumptions and qualifications expressed therein as well as in any other relevant communications in connection with it. This document may contain detailed technical data which is intended for use only by persons possessing requisite expertise in its subject matter. 2. This document is protected by copyright and may only be reproduced and circulated in accordance with the Document Classification and associated conditions stipulated or referred to in this document and/or in DNV GL’s written agreement with the Customer. No part of this document may be disclosed in any public offering memorandum, prospectus or stock exchange listing, circular or announcement without the express and prior written consent of DNV GL. -
Corporate Affairs and Business Development
CORPORATE AFFAIRS AND BUSINESS DEVELOPMENT ENVIRONMENTAL IMPACT ASSESSMENT THE PROPOSED CONNECTION OF NORTH WESTERN PROVINCE TO THE NATIONAL GRID AT 132kV PREPARED BY THE ENVIRONMENT AND SOCIAL AFFAIRS UNIT 2011 EXECUTIVE SUMMARY In the Northwestern Province (NWP) ZESCO Limited supplies electricity to five districts namely Mwinilunga, Mufumbwe, Kabompo, Zambezi and Chavuma from isolated Diesel Generation Stations located in each district. The older districts (Mwinilunga, Kabompo, and Zambezi) have been on diesel power supply for over forty years now. Solwezi and Kasempa are the only two districts in the province that are supplied from the national hydro power grid. Power supply from the diesel power stations is characterized by high operational costs, inadequate capacity, very low reliability and high emissions. ZESCO Limited has therefore long sought to replace diesel generated power supply with reliable and cost effective power from the national grid by connecting all the diesel power stations to the grid. By the year 2000, ZESCO Limited was operating ten diesel stations country wide, but by 2007, four such stations had been replaced by grid supply while two new stations were installed in two newly designated districts. Despite having great potential for mining and agricultural development, NWP generally remains underdeveloped due to insufficient and unreliable power supply. It is against this background that the Government of the Republic of Zambia through ZESCO Limited, intends to connect the 5 NWP Districts still on diesel, to the National Grid at 132 kilo Volts (kV) through a transmission line network from Kasempa T-Off (Nselauke) to Chavuma and linking Mwinilunga to Lumwana. The main objective of the project is to replace the diesel generated electricity with hydro electricity by constructing a 132kV transmission line network which would be linked to the main national power grid.