Wiggins Island Rail Project Balloon Loop

Total Page:16

File Type:pdf, Size:1020Kb

Wiggins Island Rail Project Balloon Loop Wiggins Island Rail Project Balloon Loop The Wiggins Island Rail Project (WIRP) is the staged development of new rail lines and upgrading of existing lines to service the new Wiggins Island Coal Export Terminal (WICET) at the Port of Gladstone. About the Project WIRP Stage One includes constructing a new 13km Balloon Loop Fast Facts Balloon Loop from the North Coast Line near Yarwun to enable unloading of coal for the new port facility. Construction of 13km rail loop Works at the Balloon Loop project site include earthworks and drainage, track infrastructure, Location: Near Yarwun, Gladstone overhead electrical equipment, power systems, signals and telecommunications. Approximate project value: $200 million Once operational, coal trains will travel from mines Construction start: Mid 2012 in the southern Bowen Basin along Aurizon’s rail network to the Balloon Loop where it will be unloaded onto Est. construction completion: End 2013 WICET’s conveyor and carried to the port for export. Up to five trains can be held on the Balloon Loop Workers at peak construction: Approximately 180 at one time - three on the arrival side waiting to be unloaded, one at the unloader unloading coal, and one on the departure side heading back to the mines. Environment Beaks Creek Diversion Aurizon aims to continuously improve our Beaks Creek flows from the southern slope of Mount environmental performance. Martin in the Calliope Conservation Park, prior to meeting the Calliope River about one kilometre A comprehensive Environmental Management Plan upstream of the Calliope River rail bridges. will be implemented on site. As a result of the Balloon Loop works, a new drainage Aurizon will work to offset environmental rehabilitation channel is needed to manage flows from Beaks Creek. within the rail loop precinct through revegetation This means a small section of the creek needs to initiatives. be realigned through the loop to manage environmental flows. Fact Sheet Balloon Loop L a n d in g R d Wiggins Islands Coal Export Terminal d R m o rc T a a L rg t in M ie e R n Rio Tinto Alcan Yarwun d Gl adsto P ort C urt is W ay Orica Targinie Rd Bridge Lindherr Rd Morgan St Boat Creek Bridge Reid Rd Butler St Yarwun Mt Miller Mainline Freight Centre LEGEND WICET Unloading Facility Landmarks WIRP project area Bridges Rail network Callemondah Feeder Station Terminals Roads SEGMENT 1 Towns Site office WICET BALLOON LOOP Environmental Impact Study The Balloon Loop project site is adjacent to the existing North Coast Line which carries coal and freight train Aurizon worked with WICET to prepare an EIS for the traffic. To ensure the safety of the public and those new coal export terminal. The Balloon Loop was included working on site, the level crossings across this section in this EIS. The Coordinator General took into account of the operating railway have been upgraded with community feedback before approving the project with boom gates and flashing lights. conditions in 2007. Visit Aurizon’s website for links to view the EIS. About Aurizon Community » Australia’s largest rail freight operator and Aurizon is committed to working with stakeholders rail transporter of coal from mine to port for and communities in an effort to address the impact export markets. at construction and operation of a new rail line may » Listed on the Australian Stock Exchange in have. All construction work on the Balloon Loop will November 2010. be undertaken on site, away from most residents and » Operations in Queensland, New South Wales, businesses. Aurizon will work with landowners and Victoria, South Australia and Western Australia. tenants to ensure they are informed of works prior » Hauls more than 500,000 tonnes of coal per day. to their commencement. » Employs approximately 8,000 people with the majority living in regional communities in which Safety Aurizon operates. Aurizon has a ZERO harm policy. The safety of staff, contractors and the community is critical to all its rail operations, including all work undertaken as part of the Wiggins Island Rail Project. T 13 23 32 Contact us E [email protected] JM0513 W aurizon.com.au.
Recommended publications
  • Development Services Information to Councillors 36/2015 Major Development Snapshot July - September 2015
    Development Services Information to Councillors 36/2015 Major Development Snapshot July - September 2015 File Reference: DB10.2 The information below is provided for the July - September Quarter. The information report contains a brief overview of major developments within the Gladstone region and has three sections: 1. Major developments currently under construction 2. Major developments with development approval (Town Planning) but not under construction 3. Major developments currently under development assessment (Town Planning) SECTION 1: GLADSTONE - MAJOR DEVELOPMENTS UNDER CONSTRUCTION RESIDENTIAL ESTATES Vantage Estate – Kirkwood Road, KIRKWOOD Stages 1,2,3,4 & 5 (177 Lots inc Completed Balance Lots) Stage 6 (72 lots inc Balance Lots) Stage 7A & 7B (46 Lots) Stage 9 (50 Lots) Stage 8 (Lots 48) Yet to commence Stage 10 (Lots 35) Vantage Estate Stage 8 to 10 Approved Lot Layout Stages 1, 2, 3, 4A, 5, 6, 8, 12, 13 Completed and 14 4B, 15A, 16A & 17A Stages Yet to commence 9 (30 Lots) 11A(22 Lots) 11B(20 Lots) 14B-16B (43 Lots) 17B, 18A, 18B, 18C, 10 & 19 (Total 104 Lots) Little Creek Estate - Kirkwood Road, KIRKWOOD Little Creek Estate Stage 6 Little Creek Estate Stage 10 (Town House Site) Forest Springs Estate - Kirkwood Road, KIRKWOOD Stage 1,2 & 3 & 5A (Total 187 Completed Lots inc Balance Lots) Stage 4 Commenced Stages 5 - 21 Yet to commence OPW 17/2015 NPM - lodged 25/05/2015 Forest Springs Estate Approved Lot Layout Oasis on Kirkwood, Kirkwood Road, KIRKWOOD Stage 1A,1B, 2A & 2B Completed Stage 3A, B & C and 4A & B Stage 3A Completed, Survey DA/10986/2008 Plan not yet Endorsed.
    [Show full text]
  • Derailment and Collision Between Coal Trains Ravenan (25Km from Muswellbrook), New South Wales, on 26 September 2018
    Derailment and collision between coal trains Ravenan (25km from Muswellbrook), New South Wales, on 26 September 2018 ATSB Transport Safety Report Rail Occurrence Investigation (Defined) RO-2018-017 Final – 18 December 2020 Cover photo: Source ARTC This investigation was conducted under the Transport Safety Investigation Act 2003 (Commonwealth) by the Office of Transport Safety Investigations (NSW) on behalf of the Australian Transport Safety Bureau in accordance with the Collaboration Agreement Released in accordance with section 26 of the Transport Safety Investigation Act 2003 Publishing information Published by: Australian Transport Safety Bureau Postal address: PO Box 967, Civic Square ACT 2608 Office: 62 Northbourne Avenue Canberra, ACT 2601 Telephone: 1800 020 616, from overseas +61 2 6257 2463 Accident and incident notification: 1800 011 034 (24 hours) Email: [email protected] Website: www.atsb.gov.au © Commonwealth of Australia 2020 Ownership of intellectual property rights in this publication Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this publication is owned by the Commonwealth of Australia. Creative Commons licence With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence. Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work. The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations.
    [Show full text]
  • Muswellbrook to Ulan Balloon Loop
    Division / Business Unit: Enterprise Services Function: Operations Interface Document Type: Route Access Standard Route Access Standard HHN Section Pages H4 - Muswellbrook to Ulan Balloon Loop Applicability ARTC Network Wide SMS Publication Requirement External Only Primary Source Document Status Version # Date Reviewed Prepared by Reviewed by Endorsed Approved 1.7 Nov 2017 Manager Stakeholders Manager GM Technical Standards Procedures Standards Development Amendment Record Amendments to the RAS are published at the following link https://www.artc.com.au/uploads/RAS_Amendments_Register.xlsx © Australian Rail Track Corporation Limited (ARTC) Disclaimer This document has been prepared by ARTC for internal use and may not be relied on by any other party without ARTC’s prior written consent. Use of this document shall be subject to the terms of the relevant contract with ARTC. ARTC and its employees shall have no liability to unauthorised users of the information for any loss, damage, cost or expense incurred or arising by reason of an unauthorised user using or relying upon the information in this document, whether caused by error, negligence, omission or misrepresentation in this document. This document is uncontrolled when printed. Authorised users of this document should visit ARTC’s intranet or extranet (www.artc.com.au) to access the latest version of this document. CONFIDENTIAL Page 1 of 10 Route Access Standard HHN Section Pages H4 - Muswellbrook to Ulan Balloon Loop Muswellbrook to Ulan Balloon Loop 1 Muswellbrook to Ulan Balloon Loop NB: These line maps are indicative only and should be reviewed in conjunction with the legend on page 3. For more detailed map information refer to the ARTC website.
    [Show full text]
  • 13. Transport
    Moura Link - Aldoga Rail Project Queensland Rail Environmental Impact Statement Transport 13. Transport This section addresses the transport requirements for the Project and the potential transport impacts during the construction and operational phases of the Project. 13.1 Existing road network 13.1.1 General The existing road network in the Gladstone/Calliope area is shown in Figure 13.1. The existing roads that are likely to be directly impacted by the Project are outlined below according to their location within the overall project area. 13.1.2 Major roads The project area is adequately serviced by the existing road network, comprising local, State and National road elements. Bruce Highway The Bruce Highway, which extends north from Brisbane to Cairns, is part of the Australian National Highway Network and major traffic carrier in Queensland. The Bruce Highway is under the control of the Queensland Department of Main Roads (DMR) Central District Office. Adjacent to the project area the Bruce Highway is a high standard arterial road (two lane, two way carriageway with auxiliary overtaking lanes for increased capacity) linking the township of Miriam Vale and Rockhampton via the township of Mount Larcom. The Bruce Highway traverses the project area and provides for direct access to sections of the Moura Link. DMR are currently undertaking concept level planning to determine long term requirements with respect to the Bruce Highway. The planning shall identify the corridor requirements and typical arrangements for future upgrades, inclusive of four lane divided carriageways. Dawson Highway The Dawson Highway is a State controlled road under the control of the DMR Central District Office.
    [Show full text]
  • Status of TTC 2015 06 Final.Pdf
    Status of the Transportation U.S. Department of Transportation Technology Center - 2015 Federal Railroad Administration Office of Research, Development, and Technology Washington, DC 20590 DOT/FRA/ORD-16/05 Final Report March 2016 NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. Any opinions, findings and conclusions, or recommendations expressed in this material do not necessarily reflect the views or policies of the United States Government, nor does mention of trade names, commercial products, or organizations imply endorsement by the United States Government. The United States Government assumes no liability for the content or use of the material contained in this document. NOTICE The United States Government does not endorse products or manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this report. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
    [Show full text]
  • Gladstone Region Population Report, 2016
    Queensland Government Statistician’s Office Gladstone region population report, 2016 Introduction The Gladstone region population report, 2016 provides estimates of Figure 1 Gladstone region the non-resident population of the Gladstone region during the last week of June 2016, based on surveys conducted by Queensland Government Statistician’s Office (QGSO). Information regarding the supply and take-up of commercial accommodation by non-resident workers is also summarised. The non-resident population represents the number of fly-in/fly-out and drive-in/drive-out (FIFO/DIDO) workers who were on-shift in the region at the time of collection. This group includes those involved in the production, construction, and maintenance of mining and gas industry operations, projects and related infrastructure. Non-resident workers are not included in estimated resident population (ERP) data released annually by the Australian Bureau of Statistics. As a result, the full–time equivalent (FTE) population estimates presented in this report, which combine the resident and non-resident populations, provide a more complete indicator of total demand for certain services than either measure used alone. Key findings Key findings of this report include: The non-resident population of the Gladstone region was The Gladstone region – at a glance estimated at 1,540 persons at the end of June 2016, around 3,890 persons or 72% lower than in June 2015. The Gladstone region comprises the local government area (LGA) of Gladstone (R), which Gladstone region's non-resident population in 2015–16 largely includes the city and port of Gladstone, as well as comprised FIFO/DIDO workers engaged in construction of three other residential centres and the rural hinterland.
    [Show full text]
  • Submission to the Independent Review of the Port of Gladstone
    A member group of Lock the Gate Alliance www.savethereef.net.au Dr Andrew Jeremijenko [email protected] 0438372653 Chad Kirby [email protected] Dr Libby Connors [email protected] 0429487110 Gladstone Review Secretariat PO Box 787 Canberra ACT 2601 Email: [email protected] Submission to the Independent Review of the Port of Gladstone Thank you for this opportunity to make a submission. Save the Reef would like to respond to points a) to e) of the terms of reference. a) all previous review findings and information used as a basis for the current approvals for development in the Port of Gladstone; Save the Reef has concerns about the approvals process. There is the suspicion that pressure has been applied at all levels from the inception of the idea, where World Heritage Status and the Outstanding Universal Value of Gladstone harbour and Curtis Island was not properly accounted, through to the Environmental Impact Statements that minimised the environmental sensitivity of the area and did not adequately assess the risks, through to the approval process at both state and federal levels. Coordinator-General Decision-Making Process Three CSG/LNG plants are currently being constructed on Curtis Island. Additionally, the statutory authority, Gladstone Ports Corporation [GPC] is undertaking major coal terminal expansion and preparatory work for potential additional csg/LNG plants on the mainland. In order to support this infrastructure Gladstone Ports Corporation is undertaking the largest dredging operation ever attempted in the Great Barrier Reef World Heritage Area. The Ports Corporation plans to dredge 46 million cubic tonnes from Gladstone Harbour and the LNG sites.
    [Show full text]
  • Overview of Wheel/Rail Load Environment Caused by Freight Car Suspension Dynamics
    34 TRANSPORTATION RESEARCH RECORD 1241 Overview of Wheel/Rail Load Environment Caused by Freight Car Suspension Dynamics SEMIH KALAY AND ALBERT REINSCHMIDT It has been a well-established fact that excessive wheel/rail loads dynamic load factors that represent only the effects of max­ cause accelerated wheel/rail wear, truck component deterioration, imum dynamic load conditions (7). The most serious problem track damage, and increased potential for derailment. The eco­ with these types of assumptions is that they neither make any nomic and safety impact of the increased wheel rail loads can only distinction for the effects of suspension design used in differ­ be ascertained by a total characterization of the wheel/rail loads. In this paper, a comprehensive set of experimental results obtained ent types of freight cars nor describe the variety of track from on-track testing of conventional North American freight cars conditions found in revenue service. Ideally, for design of using both wayside and on-board measurement systems are pre­ track and fretgh:t car structures, a total description of the load sented. The particular emphasis is given to the wheel/rail loads spectra including low-frequency high-dynamic loads should resulting from suspension dynamics. The dynamic wheel/rail envi­ be used (8). ronment addressed in this paper is limited to dynamic performance Our purpose in this paper is to provide an overall under­ regimes such as rock-and-roll and pitch-and-bounce, hunting, and standing of the dynamic load environment encountered under curving. The strong dependence of the dynamic response of a railway vehicle on a truck suspension system has been illustrated typical North American freight cars.
    [Show full text]
  • FOR PUBLICATION UT4 Maintenance Submission
    FOR PUBLICATION 30 April 2013 UT4 Maintenance Submission THIS PAGE INTENTIONALLY BLANK UT4 Maintenance Submission 30th April 2013 TABLE OF CONTENTS Definitions and Abbreviations vii Executive Summary 10 1. Background 16 1.1 Submission Document Structure .................................................................................................... 16 1.2 Submission Development Process ................................................................................................ 17 1.2.1 Key Assumptions ...................................................................................................................... 19 1.2.2 Efficiency Gains ........................................................................................................................ 20 1.2.3 Use of External Expertise ...................................................................................................... 20 1.2.4 Maintenance Cost Index......................................................................................................... 20 1.2.5 Internal Experts ......................................................................................................................... 21 1.3 Aurizon Network’s Business Structure .......................................................................................... 23 1.3.1 Business Structure History .................................................................................................... 23 1.3.2 Aurizon Network’s Operational Structure .........................................................................
    [Show full text]
  • Tng 71 Spring 1976
    .•. ' NARROW GAUGE RAILWAY SOCIETY NARROW GAUGE RAILWAY SOCIETY (FOUNDED 1951) HON. MEMBERSHIP SECRETARY: Ralph Martin, 27 Oakenbank Crescent, Huddersfield, Yorks. HD5 8LQ. EDITOR: Andrew Neale, 7 Vinery Road, Leeds LS4 2LB, Yorkshire. LAYOUT & ASSISTANT EDITOR: Ron Redman. EDITORIAL Judging from the large numbers of letters from members, issue number 70 seems to have been well received, and I am most grateful to all those of you who took the trouble to write, particularly those who either sent or offered articles and photographs. We are gradually building up a stock of articles, but as mentioned before, the provision of suitable illustrations for these articles is still something of a problem and I will be most pleased to hear from anyone who can offer any good, sharp, black and white pictures of any aspect of the narrow gauge. It is a great pleasure to be able to include in this issue an article from one of our Australian members while two other illustrations in this issue have come from contributors in America and East Germany. I very much hope this will be the start of a trend and I will be receiving many more contributions from those of you living overseas who have access to much material denied to us in Britain. · From the next issue I hope to use this page to comment on various aspects of the narrow gauge scene (but NOT internal Society affairs) and will always be pleased to receive your views for possible inclusion in our correspondence pages. Cover: E. P. C. Co. No. 2 Back home in Port Elizabeth in 1971 (Ron Redman) WELL, WE'RE ALMOST ON TIME ...
    [Show full text]
  • Natural, Cultural & World Heritage Values of Curtis Island, Queensland
    NATURAL, CULTURAL & WORLD HERITAGE VALUES OF CURTIS ISLAND, QUEENSLAND Capricorn Conservation Council Inc. A Summary Report of the values and current threats to Curtis Island within the Great Barrier Reef World Heritage Area August 2013 Contents Introduction ............................................................................................................................................ 2 Recommendations .................................................................................................................................. 3 Background to Curtis Island and Current Threats ................................................................................... 5 LIST OF KNOWN THREATS TO THE WORLD HERITAGE VALUES OF CURTIS ISLAND ....................... 6 Natural Values of Curtis Island ................................................................................................................ 8 Geomorphology and vegetation ......................................................................................................... 8 Curtis Island Vegetation .................................................................................................................... 11 The Narrows ...................................................................................................................................... 14 The Contribution of Curtis Island to GBR World Heritage Values and Diversity .................................. 15 Marine Plain of North Curtis Island..................................................................................................
    [Show full text]
  • Master-Planning-Sustainable-Development-Priority-Port-Of-Gladstone.Pdf
    Department of State Development Priority port master planning Sustainable development of the priority Port of Gladstone Queensland | Australia | 2017 Master planning for the priority Por t of Gladstone The priority Port of Gladstone is Queensland’s largest multi-commodity port and plays a critical role in supporting the state’s economy. Through master planning under the Sustainable Ports Development Act 2015 (Ports Act) the Queensland Government is demonstrating its commitment to supporting its sustainable development, jobs creation in the region and growth of the state’s trade and investment opportunities. The priority Port of Gladstone is representing approximately The master plan considers issues located 525 kilometres from Brisbane 34 per cent of the state’s total beyond strategic port land, including and operates within the Great Barrier trade port throughput. marine and land-based impacts, Reef World Heritage Area (GBRWHA). port and supply chain infrastructure The state government is delivering The priority port is a major economic capacity and connectivity and a master plan for the priority hub for central Queensland and economic, community and Port of Gladstone in accordance handles over 30 different products environmental interests. with the Ports Act. including the export of coal, alumina, cement, Liquefied Natural Gas (LNG), The master plan will establish petroleum and grain. a long-term strategic outlook for the port and the surrounding land In 2015-16, the port had a total and marine areas vital for its throughput of 115.9 million tonnes, sustainable development. Photo courtesy QGC Pty Limited Port of Gladstone Located 525 kilometres north of Brisbane, the Port of Gladstone covers 4 448 hectares of land, including more than 700 hectares of reclaimed land.
    [Show full text]