30.09.2020

Situatie proiecte depujse POIM axele prioritare 1-2

POIM/25/1/1/Creșterea mobilității pe rețeaua rutiera TEN-T centrală/1/Creşterea mobilităţii pe reţeaua rutieră TEN-T centrală

Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.1

COMPANIA NAŢIONALĂ DE ADMINISTRARE A Constructia autostrazii Lugoj – Deva lot 2, lot 3 si lot 4 (sectorul Dumbrava – Deva) - 1 110562 45865 4/5/2017 INFRASTRUCTURII RUTIERE S.A. FAZA 2 4/5/2017 1,988,825,344.78 500,194,109.66 1,690,501,543.07 0.00 298,323,801.71 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 2 110645 12535 4/5/2017 INFRASTRUCTURII RUTIERE S.A. Constructia Variantei de ocolire Suceava 4/5/2017 30,736,094.33 5,839,857.92 23,052,070.75 0.00 7,684,023.58 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A Constructia autostrazii Timisoara Lugoj si a variantei de ocolire Timisoara la 3 110647 14019 4/14/2017 INFRASTRUCTURII RUTIERE S.A. standard de autostrada 4/13/2017 51,053,473.50 26,763,442.05 43,395,452.47 0.00 7,658,021.03 Act aditional 2 3 Total depuse 2,070,614,912.61 532,797,409.63 1,756,949,066.29 0.00 313,665,846.32

POIM/26/1/1/Creșterea mobilității pe rețeaua rutiera TEN-T centrală/1/Creşterea mobilităţii pe reţeaua rutieră TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 1 115747 36715 9/29/2017 INFRASTRUCTURII RUTIERE S.A. Elaborare documentației tehnico - economice pentru Podul peste Prut la Ungheni 9/28/2017 764,217.74 152,901.70 573,163.31 0.00 191,054.44 Respins SPRIJIN PENTRU PREGĂTIREA DOCUMENTAȚIEI TEHNICO-ECONOMICE PENTRU COMPANIA NAŢIONALĂ DE ADMINISTRARE A PROIECTUL ELABORARE STUDIU DE FEZABILITATE PENTRU POD PESTE PRUT LA 2 122606 18810 5/8/2018 INFRASTRUCTURII RUTIERE S.A. UNGHENI 5/7/2018 763,800.44 186,651.70 649,230.37 0.00 114,570.07 Act aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate si Proiect Tehnic pentru "Drum de mare viteza 3 118697 37636 10/5/2017 INFRASTRUCTURII RUTIERE S.A. Bacau - Pascani" 10/5/2017 18,134,453.66 3,288,699.40 15,414,285.61 0.00 2,720,168.05 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate, Proiect Tehnic, Detalii de Executie, Asistenta 4 119750 46309 11/29/2017 INFRASTRUCTURII RUTIERE S.A. Tehnica, DTAC pentru obiectivul „Varianta ocolitoare " 11/29/2017 1,722,370.93 308,219.51 1,464,015.29 0.00 258,355.64 Act aditional 3 COMPLETAREA STUDIULUI DE FEZABILITATE PENTRU Reabilitarea Podului peste bratul Borcea, situat pe Autostrada A2, la km 149+680 si Reabilitarea Podului de la COMPANIA NAŢIONALĂ DE ADMINISTRARE A Cernavoda situat pe Autostrada A2, la km 157+600 SI ELABORAREA DOCUMENTATIEI 5 120919 4117 1/30/2018 INFRASTRUCTURII RUTIERE S.A. SUPORT PENTRU CEREREA DE FINANTARE 1/29/2018 37,536.84 7,132.00 31,906.32 0.00 5,630.52 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Sprijin pentru pregatirea documentatiei tehnice aferente proiectului de 6 123462 23074 6/8/2018 INFRASTRUCTURII RUTIERE S.A. infrastructura rutiera pentru varianta de ocolire Ramnicu-Valcea 6/8/2018 4,096,616.43 747,094.39 3,482,123.97 0.00 614,492.46 Act Aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Sprijin pentru pregatirea documentatiei tehnice aferente proiectului de 7 127920 47929 12/7/2018 INFRASTRUCTURII RUTIERE S.A. infrastructura rutiera Autostrada Tg. Mures -Tg. Neamt 12/7/2018 19,141,630.28 3,440,897.31 16,270,385.74 0.00 2,871,244.54 Contract COMPANIA NAŢIONALĂ DE ADMINISTRARE A 8 126414 2104 1/17/2019 INFRASTRUCTURII RUTIERE S.A. Elaborare studiu de fezabilitate pentru obiectivul Autostrada Timisoara - Moravita 1/17/2019 9,102,599.43 1,666,770.19 7,737,209.52 0.00 1,365,389.91 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Sprijin pentru elaborarea documentatiei aferente proiectului Drum expres Bucuresti 9 128477 2103 1/17/2019 INFRASTRUCTURII RUTIERE S.A. - Alexandria 1/17/2019 16,129,825.80 2,981,123.66 12,097,369.35 0.00 4,032,456.45 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru Drum Expres 10 126714 4869 2/12/2019 INFRASTRUCTURII RUTIERE S.A. Pașcani - Suceava 2/8/2019 15,870,851.48 2,892,885.73 13,490,223.76 0.00 2,380,627.72 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de fezabilitate si Proiect Tehnic de Executie pentru obiectivul Drum 11 126715 4870 2/12/2019 INFRASTRUCTURII RUTIERE S.A. Expres Suceava - Siret 2/8/2019 13,552,186.10 2,487,101.15 11,519,358.18 0.00 2,032,827.92 Contractat Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru Realizare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Conexiune DN73C cu Autostrada Sibiu - Pitesti (Nod Tigveni) si Modernizare DN73C 12 129996 24973 6/26/2019 INFRASTRUCTURII RUTIERE S.A. (km 44+800 - km 68+000) 6/26/2019 4,022,828.59 706,609.73 3,419,404.30 0.00 603,424.29 Contractat Completare/Revizuire Studiu de Fezabilitate si elaborare Proiect pentru autorizarea COMPANIA NAŢIONALĂ DE ADMINISTRARE A executarii lucrarilor (P.A.C.) pentru tronsonul de autostrada IASI – UNGHENI, inclusiv 13 131159 30251 8/12/2019 INFRASTRUCTURII RUTIERE S.A. realizarea conexiunii la podul peste raul Prut 8/8/2019 6,986,679.87 1,300,172.02 5,938,677.89 0.00 1,048,001.98 Respins Completare/Revizuire Studiu de Fezabilitate si elaborare Proiect pentru autorizarea COMPANIA NAŢIONALĂ DE ADMINISTRARE A executarii lucrarilor (P.A.C.) pentru tronsonul de autostrada IASI – UNGHENI, inclusiv 14 137516 17602 5/11/2020 INFRASTRUCTURII RUTIERE S.A. realizarea conexiunii la podul peste raul Prut 5/8/2020 6,986,679.87 1,300,172.02 5,938,677.89 0.00 1,048,001.98 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 15 139958 29432 7/30/2020 INFRASTRUCTURII RUTIERE S.A. Elaborare Studiu de Fezabilitate pentru “Varianta de Ocolire Timisoara Vest" 7/28/2020 4,262,701.36 785,174.31 3,623,296.16 0.00 639,405.20 In Evaluare

Elaborare SF, PAC si Proiect Tehnic de Executie, inclusiv prestare servicii asistenta COMPANIA NAŢIONALĂ DE ADMINISTRARE A tehnica,pentru proiectul Drum de mare viteza Bucuresti - Alexandria - Rosiori- 16 140231 29708 8/3/2020 INFRASTRUCTURII RUTIERE S.A. Caracal - Craiova (Valahia Expres),sector Bucuresti - Alexandria 7/31/2020 15,024,065.12 2,719,909.28 12,770,455.35 0.00 2,253,609.77 In Evaluare Autostrada Targu Neamt – Iasi – Ungheni (servicii de proiectare pentru revizuirea COMPANIA NAŢIONALĂ DE ADMINISTRARE A Studiului de Fezabilitate, elaborarea Proiectului pentru Autorizatia de Construire si 17 140334 33950 8/20/2020 INFRASTRUCTURII RUTIERE S.A. Proiectului Tehnic de Executie) 8/17/2020 61,766,148.20 15,041,235.80 52,501,225.97 0.00 9,264,922.23 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate, P.A.C. si Proiect Tehnic de Executie pentru “Pasaj 18 140852 37420 9/11/2020 INFRASTRUCTURII RUTIERE S.A. superior pe DN2, peste CF la Roman, Km. 332+961” 9/10/2020 735,062.85 135,239.15 624,803.42 0.00 110,259.43 In Evaluare 18 Total depuse 199,100,254.99 40,147,989.05 167,545,812.40 0.00 31,554,442.60

POIM/27/1/1/Creșterea mobilității pe rețeaua rutiera TEN-T centrală/1/Creşterea mobilităţii pe reţeaua rutieră TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 1 115748 45843 11/27/2017 INFRASTRUCTURII RUTIERE S.A. Constructia autostrazii Targu Mures - Ogra - Campia Turzii 11/27/2017 1,513,061,739.95 310,667,478.09 1,286,102,478.98 0.00 226,959,260.97 Act Aditional 4

COMPANIA NAŢIONALĂ DE ADMINISTRARE A Autostrada Bucuresti-Brasov, sectiunea Bucuresti-Ploiesti, sector 1, km 0+000 - km 2 118545 19242 5/10/2018 INFRASTRUCTURII RUTIERE S.A. 3+325; Nod Centura Bucuresti km 6+500 si Nod Moara Vlasiei km 19+500 5/10/2018 142,358,256.75 28,332,890.67 121,004,518.26 0.00 21,353,738.49 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A 3 116393 19600 5/14/2018 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Targu Mures 5/11/2018 310,597,540.63 79,635,497.93 264,007,909.55 0.00 46,589,631.08 Act Aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 4 119142 32917 8/22/2018 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Timisoara Sud 8/21/2018 342,719,312.97 58,401,093.61 291,311,416.03 0.00 51,407,896.94 Act Aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 5 120234 40085 10/15/2018 INFRASTRUCTURII RUTIERE S.A. Infrastructura integrata pentru zona orbitala a Municipiului Bucuresti 10/15/2018 5,378,993,924.46 1,506,602,333.20 4,572,144,835.79 0.00 806,849,088.67 Act aditional 2

COMPANIA NAŢIONALĂ DE ADMINISTRARE A Reabilitarea Podului peste bratul Borcea, situat pe Autostrada A2, la km 149+680 si 6 126752 2359 1/21/2019 INFRASTRUCTURII RUTIERE S.A. Reabilitarea Podului de la Cernavoda situat pe Autostrada A2, la km 157+600 1/21/2019 140,475,482.97 26,419,577.66 119,404,160.53 0.00 21,071,322.44 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 7 128749 14742 4/17/2019 INFRASTRUCTURII RUTIERE S.A. Pregatirea proiectului de Autostrada Sibiu - Pitesti si constructia Sectiunilor 1, 4 si 5 4/17/2019 4,736,435,374.89 1,414,657,162.46 4,025,970,068.68 0.00 710,465,306.21 Act Aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 8 120235 16012 4/23/2019 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire BACAU 4/23/2019 811,102,174.82 157,535,262.81 689,436,848.61 0.00 121,665,326.21 Act Aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 9 128003 12744 3/24/2020 INFRASTRUCTURII RUTIERE S.A. Infrastructura Integrata pentru Zona Orbitala a Municipiului Bucuresti – Faza II 3/23/2020 3,384,445,907.21 1,242,518,766.08 2,876,779,021.12 0.00 507,666,886.09 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 10 137027 14068 7/16/2020 INFRASTRUCTURII RUTIERE S.A. Drum de legatura autostrada A1 Arad-Timisoara - DN69 4/3/2020 219,409,152.00 40,784,415.99 186,497,779.20 0.00 32,911,372.80 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 11 135147 13034 3/26/2020 INFRASTRUCTURII RUTIERE S.A. Drum de legatura DN5 km 60+500 - Soseaua de centura - Pod Prieteniei km 61+400 3/24/2020 130,047,663.87 22,938,043.22 110,540,514.30 0.00 19,507,149.57 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Autostrada Transilvania, sectiunea Nusfalau - Biharia, inclusiv drum de legatura cu 12 138153 24509 6/30/2020 INFRASTRUCTURII RUTIERE S.A. municipiul Oradea 6/24/2020 1,970,769,144.89 453,920,936.08 1,675,153,773.17 0.00 295,615,371.72 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 13 139556 31032 8/13/2020 INFRASTRUCTURII RUTIERE S.A. Autostrada Transilvania, sectiunea Nadaselu - Poarta Salajului 8/13/2020 2,481,849,301.14 492,311,619.21 2,481,849,301.14 0.00 372,277,395.17 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 14 140595 38388 9/18/2020 INFRASTRUCTURII RUTIERE S.A. Autostrada Sibiu – Pitesti, Etapa 2 - Sectiunea 3 9/16/2020 4,042,805,287.07 2,702,076,753.58 3,436,384,494.02 0.00 606,420,793.05 In evaluare 14 Total depuse 25,605,070,263.62 8,536,801,830.59 22,136,587,119.38 0.00 3,840,760,539.41

POIM/34/1/2/Creșterea mobilității pe rețeaua feroviară TEN-T centrală/2/Creşterea mobilităţii pe reţeaua feroviară TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.2 Rehabilitation of the railway line Brașov - Simeria, component of the IV Pan- European Corridor, for the trains circulation with a maximum speed of 160 km/h, 1 110706 18269 5/17/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Section Sighișoara – Coșlariu phase II 5/17/2017 1,192,268,701.90 391,848,843.68 1,013,428,396.61 0.00 178,840,305.29 Act aditional 6 Reabilitarea podurilor feroviare situate la km 152+149 și km 165+817 pe secțiunea 2 110923 38636 10/11/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA feroviară București - Constanța faza a II a 10/11/2017 60,076,712.03 14,735,766.53 51,065,205.25 0.00 9,011,506.78 Act aditional 4 Rehabilitation of the railway line Brașov - Simeria, component of the IV Pan- European Corridor, for the trains circulation with a maximum speed of 160 km/h, 3 111298 19889 5/29/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA section Coșlariu –Simeria - phase II 5/26/2017 1,149,164,362.68 653,008,227.77 976,789,708.27 0.00 172,374,654.41 Act aditional 4 3 Total depuse 2,401,509,776.61 1,059,592,837.98 2,041,283,310.13 0.00 360,226,466.48

POIM/35/1/2/Creșterea mobilității pe rețeaua feroviară TEN-T centrală/2/Creșterea mobilității pe rețeaua feroviară TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.2 Studiu de fezabilitate pentru modernizarea liniei de cale ferată București Nord – 1 128854 15474 4/19/2019 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Jilava – Giurgiu Nord – Giurgiu Nord Frontieră 4/18/2019 9,540,000.00 1,510,500.00 6,825,075.00 0.00 1,204,425.00 Act aditional 1 Revizuirea Studiului de Fezabilitate pentru modernizarea liniei de cale ferata 2 129483 24089 6/20/2019 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Bucuresti Nord – Aeroport Internatioinal Henri Coanda Bucuresti 6/19/2019 2,525,000.00 475,000.00 2,146,250.00 0.00 378,750.00 Act aditional 2 2 Total depuse 12,065,000.00 1,985,500.00 8,971,325.00 0.00 1,583,175.00

POIM/36/1/2/Creșterea mobilității pe rețeaua feroviară TEN-T centrală/2/Creşterea mobilităţii pe reţeaua feroviară TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.2

Rehabilitation of the Railway Line Border-Curtici-Simeria, component of the IV Pan- European Corridor, for the trains circulations with a maximum speed of 160km/h, 1 117677 45010 11/21/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Section 2: Km 614 - Gurasada and Section 3: Gurasada - Simeria 11/21/2017 8,011,449,721.65 1,515,317,429.51 6,809,732,263.43 0.00 1,201,717,458.22 Act aditional 5 1 Total depuse 8,011,449,721.65 1,515,317,429.51 6,809,732,263.43 0.00 1,201,717,458.22

POIM/309/1/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.3 COMPANIA NAŢIONALĂ "ADMINISTRAŢIA 1 121588 13462 3/27/2018 PORTURILOR MARITIME" - S.A.CONSTANŢA Implementarea unei dane specializate într-o zonă cu adâncimi mari (Dana 80) 3/27/2018 19,025,969.52 6,752,152.54 16,172,074.11 0.00 2,853,895.41 Act aditional 3

COMPANIA NAŢIONALĂ "ADMINISTRAŢIA Modernizarea infrastructurii portuare prin asigurarea cresterii adancimilor senalelor 2 121499 13665 3/28/2018 PORTURILOR MARITIME" - S.A.CONSTANŢA si bazinelor si a sigurantei navigatiei in Portul Constanta 3/28/2018 187,012,688.72 40,613,255.46 158,960,785.40 0.00 28,051,903.32 Act aditional 1

REGIA AUTONOMA ADMINISTRATIA FLUVIALA A 3 121779 23729 6/12/2018 DUNARII DE JOS GALATI RA/SERVICIUL IPFE Aparati de maluri pe Canalul Sulina - Etapa finala 6/12/2018 314,276,805.49 58,985,663.53 267,135,284.66 0.00 47,141,520.83 Act aditional 1

Platformă multimodală Galați -Etapa II-Modernizarea infrastructurii rutiere din zona COMPANIA NAŢIONALĂ ADMINISTRAŢIA Platformei Multimodale pentru înlăturarea blocajelor în trafic şi relocarea unui 4 120940 33050 8/22/2018 PORTURILOR DUNĂRII MARITIME SA segment de cale ferată pentru fluidizarea traficului feroviar din zona portuară 8/22/2018 47,245,398.19 9,795,062.35 40,158,588.46 0.00 7,086,809.73 Contractat 4 Total depuse 567,560,861.92 116,146,133.88 482,426,732.63 0.00 85,134,129.29

POIM/283/1/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.3 COMPANIA NAŢIONALĂ ADMINISTRAŢIA 1 121106 16740 4/26/2018 CANALELOR NAVIGABILE SA Modernizare ecluze. Echipamente si instalatii Faza II 4/26/2018 353,734,274.55 193,389,908.83 300,674,133.37 0.00 53,060,141.18 Act aditional 2 1 Total depuse 353,734,274.55 193,389,908.83 300,674,133.37 0.00 53,060,141.18

POIM/642/1/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.3 1 134104 46014 12/2/2019 PORT BAZINUL NOU SA PLATFORMA MULTIMODALA GALATI- ETAPA III - PLATFORMA MULTIMODALA 11/30/2019 92,840,390.00 136,043,586.16 78,914,331.50 0.00 13,926,058.50 Contractat

2 131354 50369 12/24/2019 COMPANIA NAŢIONALĂ ADMINISTRAŢIA PORTURILORLucrări deDUN infrastructurăĂRII MARITIME portuară SA Cheu Dana 32 Port Docuri Galați 12/24/2019 21,282,154.00 3,963,376.90 18,089,830.90 0.00 3,192,323.10 In evaluare 2 Total depuse 114,122,544.00 140,006,963.06 97,004,162.40 0.00 17,118,381.60

POIM/653/1/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală/3/Creșterea gradului de utilizare a căilor navigabile și a porturilor situate pe rețeaua TEN-T centrală Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.3 STUDIU DE FEZABILITATE pentru obiectivul/proiectul de investiţii: MODERNIZAREA 1 134340 50373 12/24/2019 COMPANIA NAŢIONALĂ ADMINISTRAŢIA CANALELORCANALELOR NAVIGABILE NAVIGABILE SA ALE DUNĂRII: CANAL DUNĂRE – MAREA NEAGRĂ ŞI CANAL 12/23/2019 10,602,704.00 1,994,586.56 9,012,298.40 0.00 1,590,405.60 Contractat Studiu de fezabilitate pentru obiectivul / proiectul de investitii Retehnologizare 2 133332 10902 3/12/2020 COMPANIA NAŢIONALĂ ADMINISTRAŢIA CANALELOREcluza NăvodariNAVIGABILE în vederea SA creșterii siguranței navigației 3/10/2020 3,485,712.00 655,728.00 2,962,855.20 0.00 522,856.80 Contractat 2 Total depuse 14,088,416.00 2,650,314.56 11,975,153.60 0.00 2,113,262.40

POIM/40/1/4/Creșterea gradului de utilizare a transportului cu metroul în București-Ilfov/4/Creşterea gradului de utilizare a transportului cu metroul în Bucureşti-Ilfov Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.4

1 111325 16840 5/9/2017 METROREX SA Magistrala 4. Racordul 2. Sectiunea Parc Bazilescu (PS Zarea) - Straulesti _ Faza II 5/10/2017 200,965,212.00 117,320,081.61 170,820,430.20 0.00 30,144,781.80 Act aditional 2 METRO LINE 5: SECTION RAUL DOAMNEI – EROILOR (PS OPERA), INCLUDING VALEA 2 111687 18485 5/18/2017 METROREX SA IALOMITEI_Phase II 5/18/2017 1,479,894,883.00 333,417,885.00 1,257,910,650.55 0.00 221,984,232.45 Act Aditional 3 Modernizarea Instalatiilor pe Magistralele 1, 2, 3 si TL de Metrou - Tronsonul Petrache Poenaru (fosta Semanatoarea) - Timpuri Noi. Instalatii de VENTILATIE_Faza 3 111879 19507 5/25/2017 METROREX SA II 5/25/2017 18,876,637.00 3,628,901.82 16,045,141.45 0.00 2,831,495.55 Act Aditional 2 3 Total depuse 1,699,736,732.00 454,366,868.43 1,444,776,222.20 0.00 254,960,509.80

POIM/41/1/4/Creșterea gradului de utilizare a transportului cu metroul în București-Ilfov/4/Creşterea gradului de utilizare a transportului cu metroul în Bucureşti-Ilfov Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.4 INTERNATIONAL AIRPORT RAIL ACCESS LINK (Metro Line 6. 1 MAI - 1 117704 35471 9/22/2017 METROREX SA OTOPENI) 9/22/2017 3,999,225,117.00 1,014,745,564.94 2,999,418,837.75 0.00 999,806,279.25 Aprobat Modernizarea Instalatiilor pe Magistralele 1, 2, 3 si TL de Metrou. Instalatii de 2 118443 38628 11/1/2017 METROREX SA Control Acces 10/31/2017 143,326,647.50 38,435,475.06 121,827,650.39 0.00 21,498,997.11 Act aditional 5 Improvement of Urban Public Transport Services by Metro on Metro Line 2. Berceni 3 127255 50582 12/21/2018 METROREX SA – Pipera 12/21/2018 533,825,866.00 100,103,522.44 400,369,399.50 0.00 133,456,466.50 Aprobat 3 Total depuse 4,676,377,630.50 1,153,284,562.44 3,521,615,887.64 0.00 1,154,761,742.86

POIM/116/1/4/Creșterea gradului de utilizare a transportului cu metroul în București-Ilfov/4/Creșterea gradului de utilizare a transportului cu metroul în București-Ilfov Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.4 SPRIJIN PENTRU PREGĂTIREA DOCUMENTAȚIEI TEHNICO-ECONOMICE PENTRU PROIECTUL „LINIA DE METROU MAGISTRALA 5 (DRUMUL TABEREI – PANTELIMON) SECŢIUNEA EROILOR (PS OPERĂ) – PIAȚA IANCULUI - SERVICII DE PROIECTARE ȘI 1 133179 11948 3/18/2020 METROREX SA ASISTENȚĂ TEHNICĂ. 3/18/2020 67,298,117.00 16,825,041.81 57,203,399.45 0.00 10,094,717.55 Contractat 1 Total depuse 67,298,117.00 16,825,041.81 57,203,399.45 0.00 10,094,717.55

POIM/804/1/4/Creșterea gradului de utilizare a transportului cu metroul în București-Ilfov/4/Creșterea gradului de utilizare a transportului cu metroul în București-Ilfov Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 1.4 Edificarea unei statii de metrou la nivel suprateran situata intre statia de metrou 1 137950 21672 4/6/2020 SECTORUL 4 AL MUNICIPIULUI BUCURESTI Berceni si Șoseaua de centură 5/29/2020 180,352,728.00 34,535,277.09 153,299,818.80 27,052,909.20 0.00 In Evaluare Accesibilizarea staţiilor de metrou în funcţiune pentru persoanele cu deficienţe de 2 137971 29439 7/30/2020 METROREX SA vedere 7/28/2020 20,303,130.00 3,825,146.69 17,257,660.50 3,045,469.50 0.00 In Evaluare 2 Total depuse 200,655,858.00 38,360,423.78 170,557,479.30 30,098,378.70 0.00

POIM/28/2/1/Creșterea mobilității pe rețeaua rutieră TEN-T globală/1/Creşterea mobilităţii pe reţeaua rutieră TEN-T Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 1 110595 30608 6/23/2017 INFRASTRUCTURII RUTIERE S.A. Constructia Variantei de Ocolire Caracal (Faza II) 6/23/2017 24,049,491.97 4,696,796.31 20,442,068.17 0.00 3,607,423.80 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 2 110638 14632 4/20/2017 INFRASTRUCTURII RUTIERE S.A. Reabilitare DN56, Craiova-Calafat, km 0+000 + km 84+020 (faza II) 4/20/2017 81,643,009.72 26,250,658.07 69,396,558.27 0.00 12,246,451.45 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 3 110661 13252 4/10/2017 INFRASTRUCTURII RUTIERE S.A. Reabilitare DN 66, Rovinari - Petrosani, km 48+900 - km 126+000 (faza II) 4/10/2017 94,012,205.11 24,651,623.18 79,910,374.36 0.00 14,101,830.75 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Constructia variantei de ocolire a Municipiului Brasov, Tronson I (DN1-DN11), II 4 111081 14808 4/21/2017 INFRASTRUCTURII RUTIERE S.A. (DN11-DN13) and III (DN 13-DN 1) Faza II 4/21/2017 76,014,022.11 16,901,062.59 64,611,918.79 0.00 11,402,103.32 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 5 111085 12780 4/6/2017 INFRASTRUCTURII RUTIERE S.A. Reabilitare DN 6, Alexandria - Craiova (faza II) 4/6/2017 324,404,119.08 61,641,080.04 275,743,501.22 0.00 48,660,617.86 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 6 111428 16194 5/9/2017 INFRASTRUCTURII RUTIERE S.A. Podul pe DN 5, Giurgiu (faza II) 5/9/2017 14,358,583.71 4,099,406.70 12,204,796.16 0.00 2,153,787.55 Act aditional 6 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 7 111429 23585 6/26/2017 INFRASTRUCTURII RUTIERE S.A. Constructia Variantei de ocolire Targu Jiu (faza II) 6/26/2017 155,669,643.10 29,095,567.40 132,319,196.65 0.00 23,350,446.45 Act adtional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Pasaj suprateran peste drumul de centură al municipiului Oradea în zona străzii 8 111438 24158 5/22/2017 INFRASTRUCTURII RUTIERE S.A. Ciheiului, municipiul Oradea, județul Bihor- Faza II 5/22/2017 15,289,256.45 2,984,141.18 12,995,867.97 0.00 2,293,388.48 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 9 111521 21165 6/9/2017 INFRASTRUCTURII RUTIERE S.A. Constructia variantei de ocolire a orasului Sacueni (Faza II) 6/9/2017 25,837,211.74 4,895,426.83 19,377,908.81 0.00 6,459,302.94 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A 10 111951 19804 5/26/2017 INFRASTRUCTURII RUTIERE S.A. Modernizare DN5, sectorul București – Adunații Copăceni - Faza II 5/26/2017 77,372,709.46 25,891,700.78 65,766,803.05 0.00 11,605,906.41 Act aditional 4 10 Total depuse 888,650,252.45 201,107,463.08 752,768,993.45 0.00 135,881,259.01 POIM/29/2/1/Creșterea mobilității pe rețeaua rutieră TEN-T globală/1/Creşterea mobilităţii pe reţeaua rutieră TEN-T Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate si Proiect Tehnic pentru “Drum de mare viteza 1 115749 37199 10/3/2017 INFRASTRUCTURII RUTIERE S.A. Focsani - Bacau” 10/3/2017 21,650,642.61 3,908,187.62 18,403,046.22 0.00 3,247,596.39 Act adtitional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborarea documentației tehnico - economice pentru drumul expres Buzău - 2 115750 36953 10/2/2017 INFRASTRUCTURII RUTIERE S.A. Focșani 9/29/2017 14,962,624.01 2,706,985.31 12,718,230.40 0.00 2,244,393.16 Act aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate si Proiect Tehnic pentru “Drum de mare viteza 3 115751 35774 9/25/2017 INFRASTRUCTURII RUTIERE S.A. Ploiesti – Buzau 9/25/2017 13,390,394.72 2,384,047.52 11,381,835.51 0.00 2,008,559.21 Act Aditional 3 Reactualizare Studiu de Fezabilitate, intocmire Proiect Tehnic si Detalii de Executie COMPANIA NAŢIONALĂ DE ADMINISTRARE A pentru Varianta de Ocolire a Municipiului Zalau, Etapa 2, intre DN1F km 76+625 - 4 116260 42465 11/7/2017 INFRASTRUCTURII RUTIERE S.A. DJ191C 11/6/2017 1,696,979.84 320,322.87 1,442,432.86 0.00 254,546.98 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A ELABORARE STUDIU DE FEZABILITATE , PROIECT TEHNIC , DETALII DE EXECUTIE SI 5 118712 43999 11/15/2017 INFRASTRUCTURII RUTIERE S.A. D.T.A.C. PENTRU LUCRAREA „Alternativa Techirghiol " 11/15/2017 5,415,308.33 1,018,721.37 4,603,012.08 0.00 812,296.25 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A 6 119822 1991 1/15/2018 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Sf. Gheorghe 1/15/2018 1,219,115.23 206,728.51 1,036,247.94 0.00 182,867.29 Act Aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Sprijin pentru pregatirea documentatiei tehnice aferente proiectului de 7 122521 19159 5/9/2018 INFRASTRUCTURII RUTIERE S.A. infrastructura rutiera pentru Varianta de Ocolire Vaslui 5/9/2018 1,624,585.00 280,915.00 1,380,897.25 0.00 243,687.75 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Sprijin pentru elaborarea documentatiei tehnico economice aferente proiectului de 8 123206 19485 5/11/2018 INFRASTRUCTURII RUTIERE S.A. infrastructura rutiera pentru Transfăgărăsan - Transregio 5/11/2018 5,235,398.93 929,397.03 3,926,549.20 0.00 1,308,849.73 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A ELABORARE STUDIU DE FEZABILITATE SI PROIECT TEHNIC DE EXECUTIE PENTRU 9 127983 50025 12/20/2018 INFRASTRUCTURII RUTIERE S.A. DRUM EXPRES BUZĂU – BRĂILA 12/20/2018 24,804,561.69 4,517,244.67 21,083,877.44 0.00 3,720,684.25 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A 10 128039 50280 12/20/2018 INFRASTRUCTURII RUTIERE S.A. Revizuire Studiu de Fezabilitate pentru Autostrada Sibiu - Fagaras 12/20/2018 16,800,426.58 3,107,232.54 14,280,164.94 0.00 2,520,029.10 Act Aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 11 128627 2507 1/22/2019 INFRASTRUCTURII RUTIERE S.A. Completare Studiu de Fezabilitate pentru Autostrada Brasov (Cristian)-Fagaras 1/22/2019 13,833,540.25 2,564,349.16 11,758,509.22 0.00 2,075,031.03 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborarea Studiului de Fezabilitate și Proiect Tehnic de Execuție pentru Drum 12 128842 4061 2/5/2019 INFRASTRUCTURII RUTIERE S.A. Expres Craiova - Târgu Jiu 2/5/2019 24,165,594.01 4,381,842.83 20,540,754.91 0.00 3,624,839.10 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de fezabilitate si Proiect Tehnic de Executie pentru Drum Expres 13 129181 6874 2/22/2019 INFRASTRUCTURII RUTIERE S.A. Constanta - Tulcea 2/22/2019 26,003,007.33 4,720,654.84 22,102,556.23 0.00 3,900,451.10 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de fezabilitate si Proiect Tehnic de Executie pentru obiectivul Drum 14 129180 6875 2/22/2019 INFRASTRUCTURII RUTIERE S.A. Expres Braila (Jijila) - Tulcea (Cataloi) 2/22/2019 14,813,474.19 2,695,949.17 12,591,453.06 0.00 2,222,021.13 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 15 122551 20373 5/28/2019 INFRASTRUCTURII RUTIERE S.A. Elaborare documentatie pentru obiectivul Autostrada Brasov - Bacau 5/28/2019 31,515,402.69 5,677,840.11 26,788,092.29 0.00 4,727,310.40 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de fezabilitate si Proiect Tehnic de Executie pentru Drum Expres 16 137484 17118 5/5/2020 INFRASTRUCTURII RUTIERE S.A. Constanta - Tulcea 4/30/2020 18,963,382.54 3,396,368.99 16,118,875.16 0.00 2,844,507.38 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Completare / Revizuire Studiu de Fezabilitate, elaborare Proiect Tehnic, pentru 17 140408 32622 8/21/2020 INFRASTRUCTURII RUTIERE S.A. «Autostrada Bucuresti – Brasov, tronson Ploiesti – Brasov» 8/13/2020 44,578,543.32 12,947,547.07 37,891,761.82 0.00 6,686,781.50 In Evaluare 17 Total depuse 280,672,981.27 55,764,334.61 238,048,296.53 0.00 42,624,451.75

POIM/30/2/1/Creșterea mobilității pe rețeaua rutieră TEN-T globală/1/Creşterea mobilităţii pe reţeaua rutieră TEN-T Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 1 118317 42713 11/7/2017 INFRASTRUCTURII RUTIERE S.A. Autostrada Sebes - Turda 11/7/2017 1,591,435,172.93 355,001,317.74 1,352,719,897.01 0.00 238,715,275.92 Act aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 2 119143 11540 3/15/2018 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Barlad 3/14/2018 158,104,474.40 28,582,511.14 134,388,803.25 0.00 23,715,671.15 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 3 121490 14130 4/2/2018 INFRASTRUCTURII RUTIERE S.A. Constructia variantei de ocolire Tecuci 4/2/2018 61,760,792.37 14,794,351.68 52,496,673.51 0.00 9,264,118.86 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 4 118005 17776 4/27/2018 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Mihailesti 4/27/2018 70,126,031.76 13,079,218.80 48,489,791.03 0.00 8,557,021.93 Act aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 5 116018 24052 6/19/2018 INFRASTRUCTURII RUTIERE S.A. DN 73 Pitesti - Campulung - Brasov km 13+800-42+850; km 54+050-128+250 6/19/2018 326,721,591.73 87,323,467.32 277,713,352.97 0.00 49,008,238.76 Act aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Autostrada Bucuresti - Brasov, tronson Comarnic - Brasov, Lot 2: sector Predeal - 6 123691 27746 7/10/2018 INFRASTRUCTURII RUTIERE S.A. Cristian, km 162+300 - km 168+600 si drum de legatura 7/10/2018 155,987,533.37 46.247.644,22 132,589,403.37 0.00 23,398,130.00 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A 7 117854 35373 9/12/2018 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Satu Mare 9/12/2018 342,012,000.02 61,099,049.06 290,710,200.02 0.00 51,301,800.00 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Autostrada Cluj Vest (Gilau) - Nadaselu si finalizarea lucrarilor la nodul Gilau 8 118450 35976 9/14/2018 INFRASTRUCTURII RUTIERE S.A. si conexiunea dintre sectiunea 2B cu subsectiunea 3A1 9/14/2018 289,307,799.78 86,553,922.11 245,911,629.80 0.00 43,396,169.98 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 117135 46910 12/3/2018 INFRASTRUCTURII RUTIERE S.A. Pod suspendat peste Dunare in zona Braila 3/12/2018 1,996,408,666.21 576,476,648.71 1,696,947,366.30 0.00 299,461,299.91 Act aditional 1 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 10 116024 49225 12/17/2018 INFRASTRUCTURII RUTIERE S.A. Drum Expres Craiova - Pitesti 12/17/2018 4,680,664,336.73 830,873,195.20 3,510,498,252.58 0.00 1,170,166,084.15 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A 11 118727 9559 3/13/2019 INFRASTRUCTURII RUTIERE S.A. Constructia variantei de ocolire Alesd Sud 3/13/2019 195,964,531.71 33,670,553.29 166,569,851.95 0.00 29,394,679.76 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Autostrada Transilvania - Sectiunea 3C, Subsectiunea 3C3 Biharia - Bors, km 12 129377 16006 4/23/2019 INFRASTRUCTURII RUTIERE S.A. 59+100 - km 64+450 4/23/2019 162,844,360.09 31,123,799.94 138,417,706.07 0.00 24,426,654.02 Contractare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 13 129095 39007 10/8/2019 INFRASTRUCTURII RUTIERE S.A. Pod peste raul Dambovita pe DN73, km 78+519 10/8/2019 41,553,075.37 7,724,466.65 35,320,114.05 0.00 6,232,961.32 In Evaluare Legatura Centura Oradea (Giratie Calea Sântandrei) cu Autostrada Brasov - COMPANIA NAŢIONALĂ DE ADMINISTRARE A Targu Mures - Cluj - Oradea pe teritoriul localitatilor Oradea, Sintandrei, Bors 14 129801 39008 10/8/2019 INFRASTRUCTURII RUTIERE S.A. si Biharia din judetul Bihor 10/8/2019 611,492,330.56 108,010,800.03 519,768,480.98 0.00 91,723,849.58 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A Varianta de ocolire a municipiului Zalau, etapa 2, intre DN1F, km 79+625 - DJ 15 133746 13344 3/30/2020 INFRASTRUCTURII RUTIERE S.A. 191C 3/27/2020 202,534,042.98 37,933,802.62 172,153,936.54 0.00 30,380,106.44 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 16 136048 16793 5/5/2020 INFRASTRUCTURII RUTIERE S.A. Consolidare Pod DN2B km 149+841, peste Prut, la Galati - Giurgiulesti 4/28/2020 6,717,538.50 1,270,472.78 5,709,907.73 0.00 1,007,630.77 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A 17 128444 22100 6/12/2020 INFRASTRUCTURII RUTIERE S.A. Constructia Drumului expres Braila - Galati 6/9/2020 359,941,106.64 477,111,584.64 305,949,940.66 0.00 53,991,165.98 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 18 137301 29728 8/3/2020 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Sfantu Gheorghe 7/31/2020 298,759,250.59 56,671,926.73 253,945,363.01 0.00 44,813,887.58 In Evaluare 18 Total depuse 11,552,334,635.74 2,807,301,088.44 9,340,300,670.83 0.00 2,198,954,746.11 POIM/31/2/2/Creșterea accesibilității zonelor cu o conectivitate redusă la infrastructura rutiera a TEN-T/2/Creşterea accesibilităţii zonelor cu o conectivitate redusă la infrastructura rutieră a TEN-T Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 1 111193 17677 5/12/2017 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Carei (faza II) 5/12/2017 17,586,412.83 3,383,632.54 14,948,450.90 0.00 2,637,961.93 Act aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 2 112112 27820 7/25/2017 INFRASTRUCTURII RUTIERE S.A. Reabilitare DN 76, Deva - Oradea (faza II) 7/25/2017 457,311,870.02 133,462,012.29 388,715,089.53 0.00 68,596,780.49 Act aditional 2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 3 115371 28159 7/27/2017 INFRASTRUCTURII RUTIERE S.A. Constructia variantei de ocolire a orasului Sacueni (Faza II) 7/27/2017 44,144,287.24 9,496,060.61 37,522,644.16 0.00 6,621,643.08 Act aditional 2 3 Total depuse 519,042,570.09 146,341,705.44 441,186,184.59 0.00 77,856,385.50

POIM/32/2/2/Creșterea accesibilității zonelor cu o conectivitate redusă la infrastructura rutiera a TEN-T/2/Creşterea accesibilităţii zonelor cu o conectivitate redusă la infrastructura rutieră a TEN-T Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate si Proiect Tehnic pentru Drum de mare viteza 1 115745 36145 9/26/2017 INFRASTRUCTURII RUTIERE S.A. Legatură A3 - Aeroport Henri Coanda 9/26/2017 3,020,065.65 635,468.34 2,265,049.24 0.00 755,016.41 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A REVIZUIRE/ACTUALIZARE STUDIU DE FEZABILITATE PENTRU „POD PESTE TISA IN 2 121316 9207 2/28/2018 INFRASTRUCTURII RUTIERE S.A. ZONA TEPLITA DIN SIGHETUL MARMATIEI" 2/28/2018 1,227,958.59 252,055.12 1,043,764.81 0.00 184,193.78 Act Aditional 3 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 3 127965 48760 12/12/2018 INFRASTRUCTURII RUTIERE S.A. Sprijin pentru VO Bistrita 12/12/2018 2,430,037.28 445,735.73 2,065,531.69 0.00 364,505.59 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru Drum 4 126809 1329 1/14/2019 INFRASTRUCTURII RUTIERE S.A. Expres Gaesti - Ploiesti 1/14/2019 21,096,016.56 3,855,773.57 17,931,614.08 0.00 3,164,402.48 Contractat Revizuire / Actualizare Studiu de Fezabilitate si Elaborare Proiect Tehnic COMPANIA NAŢIONALĂ DE ADMINISTRARE A pentru "Drum de legătură între A1 şi DN7 (DJ 711A)"-Largire la 4 benzi de 5 128724 3260 1/28/2019 INFRASTRUCTURII RUTIERE S.A. circulatie 1/30/2019 1,081,682.73 182,204.87 919,430.32 0.00 162,252.41 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru Drum 6 129033 6607 2/21/2019 INFRASTRUCTURII RUTIERE S.A. expres Focsani - Braila 2/19/2019 21,410,801.88 3,912,254.61 18,199,181.60 0.00 3,211,620.28 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de fezabilitate si Proiect Tehnic de Executie pentru 7 129414 10985 3/25/2019 INFRASTRUCTURII RUTIERE S.A. obiectivul Nod Rutier Cumpana A4 ( km 16+700) – DN39E 3/21/2019 737,621.17 134,200.42 626,978.00 0.00 110,643.17 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Fezabilitate pentru Drum Expres Caransebes - Resita - 8 129549 17265 5/9/2019 INFRASTRUCTURII RUTIERE S.A. Voiteg 5/7/2019 15,194,130.45 2,784,802.36 12,915,010.89 0.00 2,279,119.56 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A 9 129340 13619 4/17/2019 INFRASTRUCTURII RUTIERE S.A. Elaborare SF pentru Drum expres Bacau - Piatra Neamt 4/9/2019 13,751,825.08 2,540,617.00 11,689,051.32 0.00 2,062,773.76 In evaluare Elaborare Studiu de fezabilitate si Proiect Tehnic de Executie pentru Drum COMPANIA NAŢIONALĂ DE ADMINISTRARE A Expres Pitesti - Brasov - Sector: Pitesti (A1 Centura Pitesti) - Mioveni (Centura 10 129570 20247 5/28/2019 INFRASTRUCTURII RUTIERE S.A. Sud) - Etapa 1 5/29/2019 3,133,802.14 574,327.14 2,663,731.82 0.00 470,070.32 Contractat Elaborare Studiu de fezabilitate si intocmire Proiect Autorizare Lucrari la COMPANIA NAŢIONALĂ DE ADMINISTRARE A obiectivul Drum Expres pentru realizarea conexiunii dintre Autostrada A3 11 129424 26602 7/9/2019 INFRASTRUCTURII RUTIERE S.A. (Turda) si Varianta de ocolire Cluj Est (V.O.C.E.) 7/9/2019 3,585,964.53 642,667.39 3,048,069.85 0.00 537,894.68 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Drum TransRegio (TR ISTER) Braila - Slobozia - Calarasi - Chiciu, Etapa I - Pasaj 12 130483 26509 7/9/2019 INFRASTRUCTURII RUTIERE S.A. denivelat pe DN21, km 105+500 7/9/2019 458,517.53 83,975.77 389,739.90 0.00 68,777.63 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de fezabilitate pentru obiectivul "Drum Expres Tisita - 13 130645 27316 7/12/2019 INFRASTRUCTURII RUTIERE S.A. Albita" 7/12/2019 14,832,070.06 2,672,391.40 12,607,259.55 0.00 2,224,810.51 In evaluare Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru Drum COMPANIA NAŢIONALĂ DE ADMINISTRARE A Expres Conexiune Satu Mare (VO Satu Mare) – Oar (Granita Romano-Ungara – 14 131461 37321 9/25/2019 INFRASTRUCTURII RUTIERE S.A. Drum Expres M49 Ungaria) 9/25/2019 4,277,815.40 780,877.24 3,636,143.09 0.00 641,672.31 In evaluare Elaborare Studiu de Fezabilitate drum de mare viteza Baia Mare – Suceava: COMPANIA NAŢIONALĂ DE ADMINISTRARE A Lot 1 Baia Mare – Bistrita, Lot 2 Bistrita – Vatra Dornei si Lot 3 Vatra Dornei - 15 132391 46926 12/5/2019 INFRASTRUCTURII RUTIERE S.A. Suceava 12/4/2019 55,660,991.39 10,216,279.57 47,311,842.68 0.00 8,349,148.71 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Elaborare Studiu de Prefezabilitate si Studiu de Fezabilitate pentru Varianta 16 131158 925 1/10/2020 INFRASTRUCTURII RUTIERE S.A. de Ocolire Pitesti Vest 1/10/2020 3,212,268.03 589,088.05 2,730,427.83 0.00 481,840.20 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Modernizare DN 29D Botoșani – Ștefănești, km 2+800 – km 18+500 și km 17 137512 24791 6/30/2020 INFRASTRUCTURII RUTIERE S.A. 21+800 – km 48+146 6/25/2020 219,748,308.60 41,147,327.20 186,786,062.31 0.00 32,962,246.29 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Drum TransRegio (TR ISTER) Braila - Slobozia - Calarasi - Chiciu, Etapa 1- Pasaj 18 137823 26075 7/7/2020 INFRASTRUCTURII RUTIERE S.A. denivelat pe DN21, km 105+500 (proiectare si executie) 7/3/2020 112,493,487.86 20,896,918.65 95,619,464.69 0.00 16,874,023.17 In evaluare 18 Total depuse 497,353,364.93 92,346,964.43 422,448,353.67 0.00 74,905,011.26

POIM/33/2/2/Creșterea accesibilității zonelor cu o conectivitate redusă la infrastructura rutiera a TEN-T/2/Creșterea accesibilității zonelor cu o conectivitate redusă la infrastructura rutiera a TEN-T Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.2 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 1 117897 24368 6/20/2018 INFRASTRUCTURII RUTIERE S.A. Varianta de ocolire Stei 6/20/2018 295,058,413.07 54,970,345.57 250,799,651.11 0.00 44,258,761.96 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Modernizare DN 71 Baldana - Targoviste - Sinaia,km 0+000-km 44+130- Largire la 4 2 128514 7143 2/26/2019 INFRASTRUCTURII RUTIERE S.A. benzi si km 51+014 -km 109+905 - drum de 2 benzi 2/26/2019 1,860,222,547.93 348,366,561.40 1,581,189,165.75 279,033,382.18 0.00 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 3 129305 26969 7/10/2019 INFRASTRUCTURII RUTIERE S.A. Largire la 4 benzi DN7 Baldana - Titu km 30+950- km 52+350 7/10/2019 299,082,355.80 47,007,778.56 214,263,390.66 0.00 37,811,186.58 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 4 129313 26350 7/9/2019 INFRASTRUCTURII RUTIERE S.A. Modernizare DN28B, Targu-Frumos – Botosani, km 0+000 – km 76+758 7/8/2019 329787094,00 61,869,625.87 280,319,029.92 0.00 49,468,064.08 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 5 130081 171119 4/30/2020 INFRASTRUCTURII RUTIERE S.A. Centura Municipiului Radauti 4/30/2020 120,224,441.14 26,953,536.12 102,190,774.97 0.00 18,033,666.17 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 6 137272 25465 7/1/2020 INFRASTRUCTURII RUTIERE S.A. Completare/Revizuire Studiu de Fezabilitate pentru Drum Expres Petea - Satu Mare - Baia Mare,6/29/2020 Sector Satu14,088,592.67 Mare - Baia Mare 2,587,754.72 11,975,303.77 0.00 2,113,288.90 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A 7 137316 34795 8/25/2020 INFRASTRUCTURII RUTIERE S.A. Constructia/modernizarea a sase poduri pe reteaua de drumuri nationale 8/24/2020 174,572,625.42 32,755,869.46 148,386,731.61 0.00 26,185,893.81 In Evaluare 7 Total depuse 2,763,248,976.03 574,511,471.70 2,589,124,047.79 279,033,382.18 177,870,861.50

POIM/52/2/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor/3/Creşterea gradului de utilizare sustenabiă a aeroporturilor Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.3

1 103839 40086 10/27/2016 REGIA AUTONOMA AEROPORTUL CRAIOVA Fazarea proiectului reabilitarea infrastructurii de miscare a Aeroportului Craiova 10/27/2016 23,047,538.48 4,990,554.68 19,590,407.71 2,996,180.00 460,950.77 Act aditional 2 1 Total depuse 23,047,538.48 4,990,554.68 19,590,407.71 0.00 460,950.77 POIM/327/2/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.3 SOCIETATEA NAŢIONALĂ "AEROPORTUL INTERNAŢIONAL TIMIŞOARA-TRAIAN VUIA-" CONSTRUIRE TERMINAL SOSIRI CURSE EXTERNE PASAGERI 1 121102 36020 9/17/2018 SA 9/14/2018 15,434,888.79 14,917,832.87 13,119,655.51 0.00 2,315,233.28 Act aditional 4 AEROPORTUL INTERNAŢIONAL AVRAM IANCU Echipamente aeroportuare pentru deszăpezirea/degivrarea/antigivrarea 2 126472 50284 12/20/2018 CLUJ RA suprafețelor de mișcare și determinarea gradului de franare 12/20/2018 6,100,263.59 1,400,912.69 2,241,846.88 747,282.27 3,111,134.44 In evaluare AEROPORTUL INTERNAŢIONAL AVRAM IANCU Cale de rulare paralel cu pista 3 125198 7293 2/26/2019 CLUJ RA ă 2/21/2019 28,500,129.57 44,500,521.48 24,225,110.12 3,750,016.86 570,002.59 Act adtional 1 AEROPORTUL INTERNAŢIONAL "GEORGE Modernizarea şi dezvoltarea infrastructurii de transport aerian la Aeroportul 4 126598 11116 3/25/2019 ENESCU" BACĂU RA Internaţional “George Enescu” Bacău 3/22/2019 58,516,137.16 25,725,411.44 49,738,716.59 7,607,097.82 1,170,322.75 Act adtional 1 Cresterea sigurantei si securitatii pasagerilor pe Aeroportul ”Delta Dunarii” REGIA AUTONOMĂ AEROPORTUL "DELTA Tulcea - siguranta si cresterea sigurantei pasagerilor pe Aeroportul ”Delta 5 127704 13483 4/9/2019 DUNĂRII" TULCEA Dunarii” Tulcea 4/7/2019 9,663,277.16 2,113,452.06 8,381,413.88 1,281,863.28 197,209.74 Act adtional 1 MODERNIZAREA SI DEZVOLTAREA INFRASTRUCTURII AEROPORTUARE LA AEROPORT TUZLA 6 130497 30931 8/7/2019 REGIONAL AIR SERVICES SRL 8/6/2019 70,177,845.52 13,980,503.38 52,633,384.19 17,544,461.33 0.00 In evaluare Suplimentarea capacitatilor de operare pentru pista de decolare aterizare si 7 126309 17662 5/10/2019 AEROPORTUL IASI RA platforma de stationare a aeronavelor de la Aeroportul Iasi 5/8/2019 25,263,218.01 34,720,899.40 21,473,735.31 3,284,218.33 505,264.37 Contractat Cresterea capacitatii portante si modernizarea pistei de decolare - aterizare AEROPORTUL INTERNAŢIONAL "GEORGE si a suprafetelor de miscareaferente la Aeroportul international George 8 125945 36395 9/20/2018 ENESCU" BACĂU RA Enescu Bacau 9/20/2018 162,177,810.20 31,601,104.36 137,851,138.68 21,083,115.31 3,243,556.21 Act aditional 3 8 Total depuse 375,833,570.00 168,960,637.68 309,665,001.16 55,298,055.20 11,112,723.38

POIM/328/2/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor/3/Creşterea gradului de utilizare sustenabiă a aeroporturilor Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.3 SOCIETATEA NAŢIONALĂ "AEROPORTUL INTERNAŢIONAL TIMIŞOARA-TRAIAN VUIA-" Achizitie autospeciale PSI si sistem integrat pentru controlul de securitate 1 126171 35502 9/12/2018 SA 9/12/2018 61,723,635.06 9,837,443.85 38,914,643.41 0.00 12,971,547.80 În evaluare Cresterea sigurantei si securitatii pasagerilor pe Aeroportul ”Delta Dunarii” REGIA AUTONOMĂ AEROPORTUL "DELTA Tulcea - asigurarea securitatii pasagerilor pe Aeroportul ”Delta Dunarii” 2 123542 34275 8/31/2018 DUNĂRII" TULCEA Tulcea 8/31/2018 59,415,601.00 11,042,213.42 44,561,700.76 13,665,588.20 1,188,312.04 Contractat Cresterea sigurantei si securitatii pasagerilor pe Aeroportul ”Delta Dunarii” REGIA AUTONOMĂ AEROPORTUL "DELTA Tulcea - siguranta si cresterea sigurantei pasagerilor pe Aeroportul ”Delta 3 123543 44239 11/12/2018 DUNĂRII" TULCEA Dunarii” Tulcea 11/9/2018 37,025,530.90 8,074,254.58 27,769,148.22 8,515,872.06 740,510.62 Respins AEROPORTUL INTERNAŢIONAL AVRAM IANCU 4 120703 46165 11/26/2018 CLUJ RA Echipamente de detecție explozibil standard 3 de tip CTX 11/23/2018 16,027,448.43 7,261,186.00 13,623,331.17 2,083,568.29 320,548.97 Contractat AEROPORTUL INTERNAŢIONAL AVRAM IANCU Echipamente scanare bagaje de mână standard C3 cu sistem integrat 5 120737 22819 6/11/2019 CLUJ RA automat de management / returnare a tăvilor 6/10/2019 14,918,982.96 4,187,768.83 12,681,135.52 1,939,467.78 298,379.66 Act aditional 1 AEROPORTUL INTERNAŢIONAL AVRAM IANCU 6 120744 49393 12/17/2018 CLUJ RA DOTARE CU ECHIPAMENTE SI FACILITATI PSI SI URGENTE MEDICALE 12/17/2018 6,396,799.60 1,344,779.90 4,701,647.73 1,567,215.88 127,935.99 În evaluare

7 126709 43455 11/12/2019 AEROPORTUL STEFAN CEL MARE SUCEAVA RA Drum perimetral în incinta R.A. Aeroportul „Ștefan cel Mare” Suceava 11/11/2019 6,252,759.15 11,900.00 4,689,569.37 1,438,134.59 125,055.19 În evaluare 7 Total depuse 201,760,757.10 41,759,546.58 146,941,176.18 29,209,846.80 15,772,290.27

POIM/720/2/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.3

AEROPORTUL INTERNAŢIONAL "GEORGE Cresterea gradului de siguranta si securitate la Aeroportul International "George Enescu" Bacau 1 137112 12451 3/20/2020 ENESCU" BACĂU RA 3/20/2020 49,576,782.50 15,105,691.32 42,140,265.14 6,444,981.70 991,535.66 In evaluare CONFORMARE AEROPORT ARAD LA CERINTELE OPERATIONALE DE INFRASTRUCTURA, SIGURANTA SI SECURITATE AEROPORTUARE”, ACTIVITATI NON-ECONOMICE IN VEDEREA ASIGURARII AEROPORTULUI CU DOTARI DE 2 136317 22951 6/15/2020 AEROPORTUL ARAD SA 6/12/2020 18,763,487.05 3,579,634.48 15,948,964.01 2,439,253.23 375,269.81 Respins SIGURANTA SI SECURITATE, CARE NU IMPLICA REALIZAREA DE CONSTRUCTII SOCIETATEA NAŢIONALĂ "AEROPORTUL INTERNAŢIONAL MIHAIL KOGĂLNICEANU- Cresterea sigurantei traficului de pasageri pe Aeroportul International Mihail Kogalniceanu - Constanta 3 139487 38921 9/21/2020 CONSTANŢA" SA 9/18/2020 11,975,780.35 2,261,277.12 10,179,413.30 0.00 1,796,367.05 In evaluare Dezvoltarea infrastructurii aeroportuare a Aeroportului Satu Mare prin îmbun t irea condi iilor de siguran Aeroportuar 4 140277 38919 9/21/2020 AEROPORTUL SATU MARE RA ă ăț ț ță ă 9/18/2020 32,020,875.38 5,983,428.02 27,217,744.09 4,162,713.78 640,417.51 In evaluare 4 Total depuse 112,336,925.28 26,930,030.94 95,486,386.54 13,046,948.71 3,803,590.03

POIM/721/2/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor/3/Creșterea gradului de utilizare sustenabilă a aeroporturilor Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.3 ECHIPAMENTE NECESARE PENTRU CRESTEREA NIVELULUI DE SECURITATE SI SIGURANTA AL PASAGERILOR PE AEROPORTUL INTERNATIONAL SIBIU - 1 135087 46030 11/29/2019 AEROPORTUL INTERNAŢIONAL SIBIU RA ACTIVITATI NON-ECONOMICE 11/29/2019 32,648,708.93 6,220,113.32 27,751,402.60 4,244,332.16 652,974.17 În evaluare SECURIZARE COMPLETA (OUTDOOR/INDOOR) A AEROPORTULUI 2 135066 50371 12/24/2019 REGIA AUTONOMA AEROPORTUL CRAIOVA INTERNATIONAL CRAIOVA 12/21/2019 63,944,322.80 12,069,678.11 62,665,436.34 0.00 1,278,886.46 Contractat SOCIETATEA NAŢIONALĂ "AEROPORTUL INTERNAŢIONAL MIHAIL KOGĂLNICEANU- Creșterea securității și siguranței traficului de pasageri pe Aeroportul Interna ional Mihail Kog lniceanu 3 137214 37045 9/8/2020 CONSTANŢA" SA ț ă 9/8/2020 63,083,855.54 11,919,405.17 53,621,277.22 9,462,578.32 0.00 În evaluare 3 Total depuse 159,676,887.27 30,209,196.60 144,038,116.16 13,706,910.48 1,931,860.63

POIM/313/2/4/Creșterea volumului de mărfuri tranzitate prin terminale intermodale și porturi/4/Creșterea volumului de mărfuri tranzitate prin terminale intermodale și porturi Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.4 1 126456 49362 12/14/2018 UAT JUDEŢUL TULCEA Modernizarea Portului Tulcea - de la Mm 38+1530 - la Mm 38+800 12/14/2018 183,112,413.68 83,300.00 137,334,310.30 42,115,855.11 3,662,248.27 Respins 2 129636 16611 5/10/2019 UAT JUDEŢUL TULCEA Modernizarea Portului Tulcea - de la Mm 38+1530 - la Mm 38+800 5/10/2019 159,969,733.00 30,192,503.67 135,974,273.05 20,796,065.29 3,199,394.66 Act aditional 1 3 129406 19318 5/21/2019 COMPANIA NAŢIONALĂ ADMINISTRAŢIA Dezvoltare Port Isaccea - Reabilitare si modernizare infrastructura portuara 5/21/2019 15,278,639.41 2,877,769.62 12,986,843.50 0.00 2,291,795.91 Contractat 3 Total depuse 358,360,786.09 33,153,573.29 286,295,426.85 62,911,920.40 9,153,438.84

POIM/643/2/4/Creșterea volumului de mărfuri tranzitate prin terminale intermodale și porturi/4/Creșterea volumului de mărfuri tranzitate prin terminale intermodale și porturi Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.4 Amenajarea punctului internațional de trecere a frontierei de stat româno –ucrainiene pentru pasageri și marfă în regim de bac între localitățile Isaccea 1 131317 36689 9/20/2019 NAVROM BAC SRL (România) și Orlivka (Ucraina) 9/18/2019 5,582,037.87 1,307,959.95 4,649,837.55 820,559.56 111,640.76 Act aditional 1 COMPANIA NAŢIONALĂ ADMINISTRAŢIA 2 131430 47720 12/10/2019 PORTURILOR DUNĂRII MARITIME SA Dezvoltare Port Tulcea-Etapa I 12/9/2019 54,029,107.49 10,217,103.41 45,924,741.37 0.00 8,104,366.12 In evaluare 3 135336 15300 4/14/2020 ADMINISTRATIA ZONEI LIBERE SULINA RA Modernizarea Portului Sulina Perimetrul I - Zona Libera 4/13/2020 73,807,559.86 13,770,494.08 62,736,425.90 9,594,982.77 1,476,151.19 In evaluare 4 135338 15595 4/15/2020 ADMINISTRATIA ZONEI LIBERE SULINA RA Modernizarea Portului Sulina Cap Mol - Bazin Maritim - Perimetrul II 4/15/2020 140,621,790.19 26,252,913.96 119,528,521.67 18,280,832.70 2,812,435.82 Respins 5 135872 17646 5/7/2020 U.A.T. ORAS SULINA Reabilitarea și modernizarea infrastructurii portuare a portului Sulina 5/5/2020 132,616,461.51 24,561,784.86 112,723,992.29 0.00 19,892,469.22 In evaluare 6 136521 25560 7/1/2020 COMPANIA NAŢIONALĂ ADMINISTRAŢIA CANALELORModernizare NAVIGABILE şi extindere SA capacitate de operare în portul Medgidia 6/30/2020 77,781,496.68 24,016,944.43 66,114,272.19 0.00 11,667,224.49 In evaluare 7 137306 26074 7/7/2020 COMPANIA NAŢIONALĂ ADMINISTRAŢIA PORTURILORPort Br ăDUNila - ĂLucrRII MARITIMEări de infrastructur SA ă a sectorului portuar din incintă Bazin Docuri 7/3/2020 106,329,891.59 19,989,589.89 90,380,407.88 0.00 15,949,483.71 In evaluare 8 136468 26902 7/10/2020 COMPANIA NAŢIONALĂ ADMINISTRAŢIA CANALELORModernizare NAVIGABILE si extindere SA capacitate de operare in portul Ovidiu 7/10/2020 56,736,284.14 13,693,791.45 48,225,841.52 0.00 8,510,442.62 In evaluare 9 136521 25560 7/1/2020 COMPANIA NAŢIONALĂ ADMINISTRAŢIA CANALELORModernizare NAVIGABILE şi extindere SA capacitate de operare în portul Medgidia 6/30/2020 77,781,496.68 24,016,944.43 66,114,272.19 0.00 11,667,224.49 In evaluare 9 Total depuse 725,286,126.01 157,827,526.46 616,398,312.56 28,696,375.03 80,191,438.42

POIM/160/2/5/Creșterea gradului de siguranță și securitate pe toate modurile de transport și reducerea impactului transporturilor asupra mediului/5/Creşterea gradului de siguranţă şi securitate pe toate modurile de transport şi reducerea impactului transporturilor asupra mediului Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.5 COMPANIA NAŢIONALĂ DE ADMINISTRARE A 1 117138 36129 9/26/2017 INFRASTRUCTURII RUTIERE S.A. Strategia ITS 9/26/2017 626,270.70 123,450.30 469,703.03 0.00 156,567.68 Contractat

Implementare măsuri specifice de creștere a gradului de siguranță rutieră COMPANIA NAŢIONALĂ DE ADMINISTRARE A (eliminarea punctelor periculoase) prin semnalizare orizontală și verticală, 2 120251 2022 1/15/2018 INFRASTRUCTURII RUTIERE S.A. reamenajări de intersecții, iluminat cu led, etc - Asistenta Tehnica 1/15/2018 1,612,836.59 293,904.90 1,209,627.44 0.00 403,209.15 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A Masuri de sporire a capacitatii de circulatie pe DN 1 - Valea Prahovei, sectorul de 3 139645 35342 8/31/2020 INFRASTRUCTURII RUTIERE S.A. drum Comarnic - Predeal 8/27/2020 3,119,365.91 567,431.44 3,651,461.04 0.00 467,904.87 In evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Asistenta tehnica pentru implementarea si integrarea sistemelor ITS si Dezvoltarea 4 141224 39671 9/29/2020 INFRASTRUCTURII RUTIERE S.A. Arhitecturii Nationale STI 9/25/2020 7,224,651.20 1,359,092.80 6,140,953.52 0.00 1,083,697.68 In evaluare 4 Total depuse 12,583,124.40 2,343,879.44 11,471,745.03 0.00 2,111,379.38

POIM/49/2/5/Creșterea gradului de siguranță și securitate pe toate modurile de transport și reducerea impactului transporturilor asupra mediului/5/Creşterea gradului de siguranţă şi securitate pe toate modurile de transport şi reducerea impactului transporturilor asupra mediului Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.5 COMPANIA NAŢIONALĂ DE ADMINISTRARE A Îmbunătățirea siguranței rutiere pentru legătura orașului Timișoara cu Autostrada 1 116005 8395 2/22/2018 INFRASTRUCTURII RUTIERE S.A. Arad-Timișoara-Lugoj 2/22/2018 219,409,152.00 40,348,908.44 164,556,864.00 0.00 54,852,288.00 Respins COMPANIA NAŢIONALĂ DE ADMINISTRARE A Îmbunătățirea siguranței rutiere pentru legătura orașului Timișoara cu Autostrada 2 129417 14745 4/17/2019 INFRASTRUCTURII RUTIERE S.A. Arad-Timișoara-Lugoj 4/17/2019 219,409,152.00 40,359,225.97 186,497,779.20 0.00 32,911,372.80 Respins

3 117750 34519 9/15/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Centralizare electronică în stația C.F. Videle 9/15/2017 23,722,728.50 4,633,781.39 20,164,319.22 0.00 3,558,409.28 Act aditional 1 Modernizarea instalaţiilor de centralizare electromecanică pe secţia de circulaţie 4 118184 14005 3/30/2018 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Siculeni – Adjud 3/30/2018 79,740,600.92 48,526,213.79 67,779,510.80 0.00 11,961,090.12 Act aditional 3 Achizitia echipamentelor pentru verificarea calitatii lucrarilor de constructie, COMPANIA NAŢIONALĂ DE ADMINISTRARE A reabilitare si modernizare a infrastructurii rutiere in vederea asigurarii viabilitatii si 5 116006 25082 6/20/2018 INFRASTRUCTURII RUTIERE S.A. sigurantei traficului 6/20/2018 30,844,250.00 5,860,407.50 26,217,612.50 0.00 4,626,637.50 Contractat Remorcher multifuncțional cu clasă de gheață, având zona de navigație 3 - căi REGIA AUTONOMA ADMINISTRATIA FLUVIALA A navigabile interioare (2 buc.) și Remorcher multifuncțional cu clasă de gheață, având 6 122664 30516 7/31/2018 DUNARII DE JOS GALATI RA zona de navigație maritim costieră (2 buc.) 7/31/2018 127,948,592.10 24,051,458.90 108,756,303.29 0.00 19,192,288.81 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A 7 118729 50375 12/20/2018 INFRASTRUCTURII RUTIERE S.A. Imbunatatirea sigurantei rutiere pentru legatura PTF Giurgiu cu DN5 12/20/2018 179,328,173.98 33,356,566.80 134,496,130.51 0.00 44,832,043.47 Respins INSPECTORATUL GENERAL AL POLITIEI Educație rutieră - modelarea factorului uman prin responsabilizarea participanților 8 125179 12221 4/1/2019 ROMANE/UIP la trafic pentru creșterea gradului de siguranța rutieră 3/29/2019 23,603,936.00 7,801,121.98 20,063,345.58 0.00 3,540,590.42 Contractat COMPANIA NAŢIONALĂ DE ADMINISTRARE A Implementare planuri de actiune pentru reducerea zgomotului generat de traficul 9 120576 27432 7/16/2020 INFRASTRUCTURII RUTIERE S.A. rutier, etapa 2011-2016: Achizitie, transport si montare panouri fonoabsorbante, 7/4/2020 57,153,853.70 35,268,793.80 48,580,775.63 0.00 8,573,078.07 In Evaluare COMPANIA NAŢIONALĂ DE ADMINISTRARE A Măsuri de îmbunătățire a siguranței traficului prin amenajarea trecerilor la nivel a 10 120781 38204 10/2/2019 INFRASTRUCTURII RUTIERE S.A. drumurilor cu calea ferată 10/2/2019 28,890,108.52 5,434,772.89 24,556,592.25 0.00 4,333,516.27 In Evaluare 10 Total depuse 990,050,547.72 245,641,251.46 801,669,232.98 0.00 188,381,314.74

POIM/50/2/5/Creșterea gradului de siguranță și securitate pe toate modurile de transport și reducerea impactului transporturilor asupra mediului/5/Creşterea gradului de siguranţă şi securitate pe toate modurile de transport şi reducerea impactului transporturilor asupra mediului Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.5 „Modernizarea instalațiilor de centralizare electromecanică pe secția de circulație 1 114831 31160 8/21/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Ilia - Lugoj – Faza II” 8/21/2017 27,399,913.55 15,697,160.65 23,289,926.52 0.00 4,109,987.03 Act Aditional 3

2 115216 29296 8/4/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Sistem de detectare a cutiilor de osii supraîncălzite şi a frânelor strânse Faza II 8/4/2017 37,305,115.73 12,160,232.26 31,709,348.35 0.00 5,595,767.38 Act Aditional 3

3 115300 32852 9/4/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Centralizare electronică în stația C.F. Videle 8/31/2017 23,722,728.50 4,633,781.39 17,792,046.38 0.00 5,930,682.13 Respins 3 Total depuse 88,427,757.78 32,491,174.30 72,791,321.25 0.00 15,636,436.54

POIM/37/2/7/Creșterea sustenabilității și calității transportului feroviar/7/Creşterea sustenabilităţii şi calităţii transportului feroviar Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.7 Lucrări de reabilitare pentru poduri, podeţe şi tuneluri de cale ferată - SRCF Braşov 1 110707 21784 6/13/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA faza II 6/13/2017 9,681,480.51 2,348,350.47 8,229,258.43 0.00 1,452,222.08 Act aditional 2 Lucrări de reabilitare pentru poduri, podeţe şi tuneluri de cale ferată - Sucursala 2 111698 21785 6/13/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Regională de Căi Ferate Timişoara faza a II a 6/13/2017 11,605,009.76 4,021,588.56 9,864,258.31 0.00 1,740,751.45 Act aditional 4 COMPANIA NATIONALA DE CAI FERATE "CFR" 3 114059 23745 6/27/2017 SA/SECTOR INVESTITII Modernizarea staţiilor de cale ferată Sfântu Gheorghe şi Târgu Mureş faza a II a 6/26/2017 15,726,960.36 7,850,471.47 13,367,916.32 0.00 2,359,044.04 Act aditional 4 Lucrări de reabilitare pentru poduri, podețe și tuneluri de cale ferată - SRCF Iași faza 4 114060 25723 6/29/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA a II a 6/30/2017 30,680,172.50 7,888,034.59 26,078,146.63 0.00 4,602,025.87 Act aditional 3 „Lucrări de reabilitare poduri, podețe și tuneluri de cale ferată – Sucursala Regională 5 114234 22814 6/20/2017 COMPANIA NATIONALA DE CAI FERATE "CFR" SA de Căi Ferate Bucureşti - Faza II ” 6/19/2017 31,153,623.05 11,942,135.91 26,480,579.62 0.00 4,673,043.44 Act aditional 3 5 Total depuse 98,847,246.18 34,050,581.00 84,020,159.31 0.00 14,827,086.88

POIM/38/2/7/Creșterea sustenabilității și calității transportului feroviar/7/Creșterea sustenabilității și calității transportului feroviar Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.7

Actualizarea documentației tehnico - economice pentru proiectul de Electrificare a 1 117152 41319 10/23/2018 COMPANIA NATIONALA DE CAI FERATE "CFR" SA liniei de cale ferată Cluj-Napoca - Episcopia Bihor (TENT Comprehensive) 10/22/2018 4,603,783.01 866,058.21 3,913,215.60 0.00 690,567.44 Contractat Studiu de fezabilitate pentru modernizarea liniei de cale ferată București Nord 2 123370 45486 11/20/2018 COMPANIA NATIONALA DE CAI FERATE "CFR" SA –Jilava – Giurgiu Nord – Giurgiu Nord Frontieră 11/20/2018 7,181,584.80 2,358,415.20 5,386,188.60 0.00 1,795,396.20 Respins 3 125887 48037 12/7/2018 AUTORITATEA PENTRU REFORMĂ FEROVIARĂ Studiu de sustenabilitate si eficientizare a retelei feroviare din 12/7/2018 5,259,531.40 909,252.25 4,470,601.69 0.00 788,929.71 Act aditional 2 3 Total depuse 17,044,899.21 4,133,725.66 13,770,005.89 0.00 3,274,893.35

POIM/39/2/7/Creșterea sustenabilității și calității transportului feroviar/7/Creșterea sustenabilității și calității transportului feroviar Nr crt COD SMIS Nr. DGOIT Beneficiar Proiect Data depunerii TOTAL ELIGIBIL TOTAL NEELIGIBIL Contributie FEDR/FC Contributie BS Contrib Beneficiar Stadiu 2.7 Lucrări de reabilitare pentru poduri, podețe și tuneluri de cale ferată Sucursala 1 117149 9794 3/18/2019 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Regională C.F. Cluj 3/15/2019 98,799,570.27 866,058.21 83,979,634.75 0.00 14,819,935.52 Respins Lucrări de reabilitare pentru poduri, podețe și tuneluri de cale ferată Sucursala 2 132564 43821 11/13/2019 COMPANIA NATIONALA DE CAI FERATE "CFR" SA Regională C.F. Cluj 11/13/2019 45,094,523.56 17,439,534.39 38,330,345.03 0.00 6,764,178.53 Contractat 2 Total depuse 143,894,093.83 18,305,592.60 122,309,979.78 0.00 21,584,114.05