Marine Department Notice No. 10 of 2018

Total Page:16

File Type:pdf, Size:1020Kb

Load more

MARINE DEPARTMENT NOTICE NO. 10 OF 2018 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment and Re-alignment of Fairways and Anchorages Owners, operators, masters and person-in-charge of vessels are advised that establishment of three principal fairways and one prohibited fishing area in waters north of the Lantau Island, and the re-alignment of the boundaries of four existing principal fairways and adjacent anchorages in the western part of Victoria Harbour, will come into effect on 1 February 2018. 2. The boundaries of the three new principal fairways, namely the Urmston Road Fairway, the Castle Peak Fairway and the Ha Pang Fairway are respectively specified in items (1) to (3) of Appendix I. The boundaries of the new prohibited fishing area that joins the Ma Wan Fairway, the Kap Shui Mun Fairway and the Ha Pang Fairway, is specified in item (4) of Appendix I. Arising from the establishment of principal fairways, three existing light buoys in the area will be relocated on 31 January 2018 as specified in item (5) of Appendix I. A drawing showing the new principal fairways, the prohibited fishing area and positions of the relocated light buoys is attached to Plan I of this notice. 3. The new boundaries of the four re-aligned principal fairways, namely the Southern Fairway, the North Green Island Fairway, the Northern Fairway and the Central Fairway, are respectively specified in items (1) to (4) of Appendix II. The new boundaries of the re-aligned anchorages, namely the Western Dangerous Goods Anchorage and Kellett Anchorages No. 1, 2 & 3 are respectively specified in items (5) to (8) of Appendix II. Arising from the re-alignment of fairways, one new lateral buoy will be established and five existing light buoys will be relocated on 1 and 2 February 2018 as specified in item (9) of Appendix II. A drawing showing the re-aligned principal fairways, re-aligned anchorages and positions of the new and relocated light buoys is attached to Plan II of this notice. 4. Information on the establishment and re-alignment of fairways and anchorages is also available at the Marine Department website: http://www.mardep.gov.hk/en/publication/pdf/vtc_fairways.pdf We are One in Promoting Excellence in Marine Services - 2 - Maisie CHENG Director of Marine Marine Department Government of the HKSAR Date: 25 January 2018 Action File Ref: L/M. 02/2018 in MD/VTC 7-903/9(3) Appendix I (1) Boundaries of the Urmston Road Fairway (a) On the east, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°21.317´N 113°56.117´E (A) (ii) 22°22.267´N 113°54.483´E (B) (iii) 22°23.067´N 113°53.967´E (C) (iv) 22°24.981´N 113°53.489´E (D) (b) On the west, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°21.033´N 113°55.933´E (E) (ii) 22°22.033´N 113°54.233´E (F) (iii) 22°22.933´N 113°53.650´E (G) (iv) 22°23.709´N 113°53.447´E (H) (v) 22°24.909´N 113°53.147´E (I) (c) On the north, a straight line joining the extremities of the eastern and western boundaries. (d) On the south, a straight line joining the extremities of the eastern and western boundaries. (2) Boundaries of the Castle Peak Fairway (a) On the north, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°20.883´N 114°01.333´E (J) (ii) 22°20.892´N 113°59.018´E (K) (iii) 22°20.820´N 113°57.685´E (L) (iv) 22°20.908´N 113°57.147´E (M) (v) 22°21.317´N 113°56.117´E (A) (b) On the south, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°20.567´N 114°01.417´E (N) (ii) 22°20.667´N 113°59.150´E (O) (iii) 22°20.667´N 113°58.683´E (P) (iv) 22°20.592´N 113°57.507´E (Q) (v) 22°20.783´N 113°56.583´E (R) (vi) 22°21.033´N 113°55.933´E (E) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, a straight line joining the extremities of the northern and southern boundaries. (3) Boundaries of the Ha Pang Fairway (a) On the north, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°21.233´N 114°02.233´E (S) (ii) 22°20.883´N 114°01.333´E (J) (b) On the south, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°20.933´N 114°02.367´E (T) (ii) 22°20.567´N 114°01.417´E (N) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, a straight line joining the extremities of the northern and southern boundaries. (4) Prohibited Fishing Area The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°21.742´N 114°03.397´E (U) (ii) 22°21.425´N 114°03.397´E (V) (iii) 22°20.892´N 114°03.214´E (W) (iv) 22°20.825´N 114°03.114´E (X) (v) 22°20.933´N 114°02.367´E (T) (vi) 22°21.233´N 114°02.233´E (S) (5) Changes to Aids to Navigation Three light buoys will be relocated to the following positions (WGS 84 Datum): Name Latitude Longitude Position (i) CP1 22°20.890´N 114°00.200´E (AA) (ii) CP2 22°20.615´N 114°00.150´E (BB) (iii) TSK 22°22.150´N 113°54.350´E (CC) Appendix II (1) Boundaries of the Southern Fairway (a) On the north, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°17.845’ N 114°08.425’ E (1) (ii) 22°17.617’ N 114°07.309’ E (2) (iii) 22°17.292’ N 114°07.427’ E (3) (iv) 22°16.783’ N 114°06.575’ E (4) (b) On the south, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°17.575’ N 114°08.731’ E (5) (ii) 22°17.408’ N 114°07.914’ E (6) (iii) 22°16.654’ N 114°06.650’ E (7) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, a straight line joining the extremities of the northern and southern boundaries. (2) Boundaries of the North Green Island Fairway (a) On the north, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°17.617’ N 114°07.309’ E (2) (ii) 22°17.617’ N 114°06.086’ E (8) (b) On the south, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°17.292’ N 114°07.427’ E (3) (ii) 22°17.292’ N 114°06.276’ E (9) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, a straight line joining the extremities of the northern and southern boundaries. (3) Boundaries of the Northern Fairway (a) On the north, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°19.475’ N 114 °05.331’ E (10) (ii) 22°19.121’ N 114 °05.984’ E (11) (iii) 22°19.500’ N 114 °06.646’ E (12) (iv) 22°18.883’ N 114 °07.856’ E (13) (v) 22°18.000’ N 114 °08.579’ E (14) (b) On the south, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°17.845’ N 114°08.425’ E (1) (ii) 22°18.722’ N 114 °07.707’ E (15) (iii) 22°19.185’ N 114 °06.798’ E (16) (iv) 22°18.858’ N 114 °06.197’ E (17) (v) 22°18.325’ N 114 °05.914’ E (18) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, a straight line joining the extremities of the northern and southern boundaries. (4) Boundaries of the Central Fairway (a) On the north, straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°18.000’ N 114°08.579’ E (14) (ii) 22°17.858’ N 114°09.097’ E (19) (iii) 22°17.858’ N 114°09.197’ E (20) (iv) 22°17.626’ N 114°09.413’ E (21) (v) 22°17.476’ N 114°10.067’ E (22) (b) On the south, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°17.575’ N 114°08.731’ E (5) (ii) 22°17.274’ N 114°10.036’ E (23) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, bounded by the southern limit of the Northern Fairway and the eastern limit of the Southern Fairway. (5) Western Dangerous Goods Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°18.409’ N 114°06.515’ E (24) (ii) 22°19.000’ N 114°06.459’ E (25) (iii) 22°19.185’ N 114°06.798’ E (16) (iv) 22°18.900’ N 114°07.356’ E (26) (v) 22°18.383’ N 114°06.867’ E (27) (6) Kellett Anchorage No.1 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°17.825’ N 114°05.964’ E (28) (ii) 22°17.617’ N 114°06.086’ E (8) (iii) 22°17.617’ N 114°06.590’ E (29) (iv) 22°17.901’ N 114°06.478’ E (30) (v) 22°18.339’ N 114°06.449’ E (31) (7) Kellett Anchorage No.2 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°18.383’ N 114°06.867’ E (27) (ii) 22°18.708’ N 114°07.174’ E (32) (iii) 22°18.512’ N 114°07.549’ E (33) (iv) 22°17.789’ N 114°08.147’ E (34) (v) 22°17.617’ N 114°07.309’ E (2) (vi) 22°17.617’ N 114°07.024’ E (35) (vii) 22°17.983’ N 114°07.024’ E (36) (8) Kellett Anchorage No.3 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22°18.708’ N 114°07.174’ E (32) (ii) 22°18.900’ N 114°07.356’ E (26) (iii) 22°18.722’ N 114°07.707’ E (15) (iv) 22°17.845’
Recommended publications
  • A Three-Dimensional Numerical Model in Orthogonal Curvilinear –Sigma Coordinate System for Pearl River Estuary

    A Three-Dimensional Numerical Model in Orthogonal Curvilinear –Sigma Coordinate System for Pearl River Estuary

    This is the Pre-Published Version. Journal of Hydraulic Engineering, ASCE, Vol. 127, No. 1, 2001, pp. 72-82 3D NUMERICAL MODEL FOR PEARL RIVER ESTUARY K. W. Chau Associate Professor, Department of Civil & Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong Y. W. Jiang Research Assistant, Department of Civil & Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong ABSTRACT: A 3D numerical model with orthogonal curvilinear coordinate in the horizontal direction and sigma coordinate in the vertical direction has been developed. This model is based on POM (the Princeton Ocean Model). In this model a second moment turbulence closure sub-model is embedded, and the stratification caused by salinity and temperature is considered. Furthermore, in order to adapt to estuary locations where flow pattern is complex, the horizontal time differencing is implicit with the use of a time splitting method instead of the explicit method in POM. This model is applied to the Pearl River estuary, which is the largest river system in South China with Hong Kong at eastern side of its entrance. The computation is verified and calibrated with field measurement data. The computed results mimic the field data well. KEY WORDS Three-dimensional, orthogonal curvilinear coordinate, time-splitting, Pearl River estuary INTRODUCTION The Pearl River (Zhujiang) is the largest river system in South China. The Pearl River Delta Region (PRDR), which includes eight cities (Guangzho, Shenzhen, Dongguan, Huizhou, Foshan, Zhongshan, Jiangmen), is one of the most important economic zone in China, even in Asia and the world. With the economic boom of PRDR, the resources of the estuary such as the harbor, channel, reclamation zone etc.
  • For Information Legislative Council Panel on Environmental Affairs

    For Information Legislative Council Panel on Environmental Affairs

    CB(1) 516/05-06(01) For Information Legislative Council Panel on Environmental Affairs Legislative Council Panel on Planning, Lands and Works Information Note on Overall Sewage Infrastructure in Hong Kong Purpose This note informs members on the policy behind and progress of sewage infrastructure planning and implementation in Hong Kong. Policy Goals for the Provision of Sewage Infrastructure 2. The policy goals for the provision of sewage infrastructure are the protection of public health and the attainment of the declared Water Quality Objectives for the receiving water environment. The latter are set so as to ensure our waters are of a sufficient quality to sustain certain uses which are valued by the community. These include, variously, abstraction for potable supply, swimming, secondary contact recreation such as yachting, and the ability to sustain healthy marine and freshwater ecosystems. The Sewerage Planning Process 3. The sewerage planning process entails the systematic review of the sewerage needs in each sewerage catchment with the aim of drawing up a series of Sewerage Master Plans (SMPs) devised so as to ensure the above policy goals will be met. A total of 16 SMPs covering the whole of Hong Kong were completed between 1989 and 1996 (Annex 1). The SMPs started with those covering areas where waters were close to or exceeded their assimilative limits, were highly valued, or where excessive pollution had resulted in environmental black spots. For example, Hong Kong Island South SMP covering sensitive beach areas and Tolo Harbour SMP covering nutrient loaded Tolo Harbour were among the earliest conducted SMPs. Each study made recommendations for the appropriate network of sewers, pumping stations and treatment facilities for the proper collection, treatment and disposal of sewage generated in the catchment, with the aim of catering for the present and future development needs.
  • File Ref.: MA 60/1(2002) Pt.4 LEGISLATIVE COUNCIL BRIEF

    File Ref.: MA 60/1(2002) Pt.4 LEGISLATIVE COUNCIL BRIEF

    File Ref.: MA 60/1(2002) Pt.4 LEGISLATIVE COUNCIL BRIEF SHIPPING AND PORT CONTROL (AMENDMENT) REGULATION 2002 INTRODUCTION At the meeting of the Executive Council on 25 June 2002, the Council ADVISED and the Chief Executive ORDERED that the A Shipping and Port Control (Amendment) Regulation 2002, at Annex A, should be made under section 80(1) of the Shipping and Port Control Ordinance to impose a designated area in the Kap Shui Mun water area and require all vessels to tender pre-arrival notification (PAN). BACKGROUND AND ARGUMENT Imposing a Special Area in the Kap Shui Mun area 2. At present, through traffic to and from the northwestern approaches of Hong Kong waters are free to be conducted in either the Kap Shui Mun Fairway or Ma Wan Fairway. Such traffic can be both southeast-bound and northwest-bound. The average navigational width of the Kap Shui Mun Fairway and Ma Wan Fairway are 210 metres and 680 metres respectively. 3. In view of the collision incidents that happened in the Kap Shui Mun area, Marine Department conducted an in-house study in the year 2000 on the traffic using the area with a view to developing measures to improve navigational safety there. The study recommends, inter alia, that a single direction traffic scheme should be introduced to the Kap Shui Mun area. Under the scheme, through traffic in the northern part of the much narrower Kap Shui Mun Fairway should be limited to southeast-bound only. The two-way bound traffic arrangement in both the southern part of the Kap Shui Mun Fairway and the entire Ma Wan Fairway can remain unchanged.
  • The Conservation Programme for the Chinese White Dolphin in Hong Kong

    The Conservation Programme for the Chinese White Dolphin in Hong Kong

    The Conservation Programme for the Chinese White Dolphin in Hong Kong Agriculture, Fisheries and Conservation Department 2000 TABLE OF CONTENTS I. INTRODUCTION............................................................................................2 II. SPECIES OVERVIEW ...................................................................................4 1. DISTRIBUTION .....................................................................................................4 2. ABUNDANCE .......................................................................................................4 3. HOME RANGE AND GROUP SIZE..........................................................................4 4. BEHAVIOUR ........................................................................................................5 5. GROWTH AND DEVELOPMENT.............................................................................5 6. FEEDING AND REPRODUCTION ............................................................................5 7. THREATS.............................................................................................................5 III. HUMAN IMPACTS.........................................................................................7 1. HABITAT LOSS AND DISTURBANCE .....................................................................7 2. POLLUTION .........................................................................................................7 3. DEPLETION OF FOOD RESOURCES .......................................................................8
  • WORKING PAPER No. 39 INITIAL ASSESSMENT of POSSIBLE PORT DEVELOPMENT SITES

    WORKING PAPER No. 39 INITIAL ASSESSMENT of POSSIBLE PORT DEVELOPMENT SITES

    This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER No. 39 INITIAL ASSESSMENT OF POSSIBLE PORT DEVELOPMENT SITES Background 1. The port is a vital economic infrastructure of Hong Kong. As a result of rapid economic growth in Southern China and Mainland’s accession to the World Trade Organization, the Port Development Strategy Review (PDSR) 2001 recommended that the existing container terminals may not have sufficient capacity to meet long-term need and the next container terminal would be required in early next decade1. 2. In planning for the future port development, our objective is to formulate a sustainable port development strategy which will take into account both the economic needs for further port facilities and the possible measures to mitigate the existing and new environmental problems. As for future port location, four potential sites for future container port development were shortlisted by PDSR 2001 for further investigation, namely West Tuen Mun, East Lantau, Northwest Lantau and Southwest Tsing Yi. To finalise the best site for future container port development, the sites are now being further investigated under the Study on Hong Kong Port- Master Plan 2020 (HKP2020) to be completed in early 2004. In view of the proximity of the East Lantau site to the Disney Development, this site has not been selected for further detailed assessment.
  • GEO REPORT No. 106

    GEO REPORT No. 106

    SUSPENDED SEDIMENT IN HONG KONG WATERS GEO REPORT No. 106 S. Parry GEOTECHNICAL ENGINEERING OFFICE CIVIL ENGINEERING DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION SUSPENDED SEDIMENT IN HONG KONG WATERS GEO REPORT No. 106 S. Parry This report was originally produced in November 1999 as GEO Natural Resources Report No. NRR 1/99 - 2 - © The Government of the Hong Kong Special Administrative Region First published, November 2000 Prepared by: Geotechnical Engineering Office, Civil Engineering Department, Civil Engineering Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. This publication is available from: Government Publications Centre, Ground Floor, Low Block, Queensway Government Offices, 66 Queensway, Hong Kong. Overseas orders should be placed with: Publications Sales Section, Information Services Department, Room 402, 4th Floor, Murray Building, Garden Road, Central, Hong Kong. Price in Hong Kong: HK$152 Price overseas: US$23 (including surface postage) An additional bank charge of HK$50 or US$6.50 is required per cheque made in currencies other than Hong Kong dollars. Cheques, bank drafts or money orders must be made payable to The Government of the Hong Kong Special Administrative Region. - 4 - FOREWORD This report was produced as part of a literature review, which included existing field measurements, of suspended sediment data in and around Hong Kong waters. The purpose of the report was to provide an overview of the causes and levels of suspended sediments in Hong Kong waters. The report was written by S. Parry. Valuable comments were provided by P.G.D. Whiteside, Q.S.H. Kwan, N.C. Evans, W.N.
  • Report of the Second Workshop on the Biology and Conservation of Small Cetaceans and Dugongs of South-East Asia

    Report of the Second Workshop on the Biology and Conservation of Small Cetaceans and Dugongs of South-East Asia

    CMS Technical Series Publication Nº 9 Report of the Second Workshop on The Biology and Conservation of Small Cetaceans and Dugongs of South-East Asia Edited by W. F. Perrin, R. R. Reeves, M. L. L. Dolar, T. A. Jefferson, H. Marsh, J. Y. Wang and J. Estacion Convention on Migratory Species REPORT OF THE SECOND WORKSHOP ON THE BIOLOGY AND CONSERVATION OF SMALL CETACEANS AND DUGONGS OF SOUTHEAST ASIA Silliman University, Dumaguete City, Philippines 24-26 July, 2002 Edited by W. F. Perrin, R. R. Reeves, M. L. L. Dolar, T. A. Jefferson, H. Marsh, J. Y. Wang and J. Estacion Workshop sponsored by Convention on Migratory Species of Wild Animals; additional support provided by Ocean Park Conservation Foundation, WWF-US and WWF-Philippines. Published by the UNEP/CMS Secretariat Report of the Second Workshop on the Biology and Conservation of Small Cetaceans and Dugongs of South-East Asia UNEP/CMS Secretariat, Bonn, Germany, 161 pages CMS Technical Series Publication No. 9 Edited by: W.F. Perrin, R.R. Reeves, M.L.L. Dolar, T.A. Jefferson, H. Marsh, J.Y. Wang and J. Estacion Cover illustration: digital artwork by Jose T. Badelles from a photograph by Jose Ma. Lorenzo Tan © UNEP/CMS Secretariat 2005 This publication may be reproduced in whole or in part and in any form for educational or non-profit purposes without special permission from the copyright holder, provided acknowledgement of the source is made. UNEP/CMS would appreciate receiving a copy of any publication that uses this publication as a source. No use of this publication may be made for resale or for any other commercial purpose whatsoever with- out prior permission in writing from the UNEP/CMS Secretariat.
  • Appendix 6 BACKGROUND INFORMATION on FISHERIES at TAI O/NORTH LANTAU

    Appendix 6 BACKGROUND INFORMATION on FISHERIES at TAI O/NORTH LANTAU

    Agreement No. CE 41/98 EIA - Final Assessment Report Tai O Sheltered Boat Anchorage - Environmental Impact Assessment May 2000 Civil Engineering Department Appendices Appendix 6 BACKGROUND INFORMATION ON FISHERIES AT TAI O/NORTH LANTAU Scott Wilson (Hong Kong) Ltd ! P:\HOME\ENVIRO\R\98117\Final\EIA\Appendices.doc Appx 71 Agreement No. CE 41/98 EIA - Final Assessment Report Tai O Sheltered Boat Anchorage - Environmental Impact Assessment May 2000 Civil Engineering Department Appendices A6 BACKGROUND INFORMATION ON FISHERIES AT TAI O/NORTH LANTAU A6.1 Introduction A search for background information on fisheries at Tai O found that, due to the Hong Kong/China boundary situation prior to 1997, waters of Tai O Bay and off Tai O were not surveyed by Hong Kong studies. As a result, little strictly local information on Tai O fisheries was available. Information from other fishing areas in north Lantau was used to fill this data gap as far as possible. The following references were consulted: • The Status of Fisheries in Hong Kong Waters (Richards 1980); • The Demersal Fishery Resources in Hong Kong Waters (1982-83) (Chong 1984); • Fisheries Production in Hong Kong Waters (AFD 1985); • Port Survey 1991 (AFD 1991); • The impact of dredging on fisheries sensitive receivers (Ni 1995); • Coastal ecology studies – summary data final report (Binnie 1998); • Port Survey 96/97 (AFD 1998a); • Fisheries Resources and Fishing Operations in Hong Kong Waters - Final Report (AFD 1998b); and • Study on Tonggu Waterway (Scott Wilson 1998 a, b, c). Findings of these reports were reviewed for information on common fisheries species found in north Lantau waters, number and type of fishing vessels, number of fishermen employed and total fisheries production.
  • RECLAMATION OUTSIDE VICTORIA HARBOUR and ROCK CAVERN DEVELOPMENT

    RECLAMATION OUTSIDE VICTORIA HARBOUR and ROCK CAVERN DEVELOPMENT

    Enhancing Land Supply Strategy RECLAMATION OUTSIDE VICTORIA HARBOUR and ROCK CAVERN DEVELOPMENT Strategic Environmental Assessment Report - Reclamation Sites Executive Summary Civil Engineering Development Department Agreement No. 9/2011 Increasing Land Supply by Reclamation and Rock Cavern Development cum Public Engagement - Feasibility Study SEA Report - Reclamation Sites (Executive Summary) Contents Page 1 Introduction 3 1.1 Project Background 3 1.2 Objectives of Assignment 3 1.3 SEA and Objectives of SEA 4 1.4 Disclaimer 4 2 Overall Site Selection Methodology 5 3 Review of Previous Studies and Constraints 6 3.1 Constraints and Considerations 6 3.2 SEA/Environmental Considerations in the Identification of Pre-longlisted Reclamation Sites 8 4 Stage 1 Public Engagement and Formulation of Site Selection Criteria (SSC) 11 4.1 Stage 1 Public Engagement 11 4.2 Site Selection Criteria 11 4.3 SEA/Environmental Comments 12 4.4 Other Comments 12 4.5 SEA/Environmental Observations 13 5 Selection of Longlisted Sites 14 5.1 Site Longlisting Methodology 14 5.2 Initial Site Selection Criteria 14 5.3 SEA/Environmental Findings in the Longlisting Process for Reclamation 16 6 Broad Environmental Assessments 19 6.1 Broad Environmental Assessments 19 6.2 Key Environmental Issues of Longlisted Sites 19 6.3 Overall Strategic Environmental Findings of the Longlisted Reclamation Sites 27 7 Site Shortlisting and Key Environmental Issues and Opportunities of the Shortlisted Sites and Artificial Islands 30 7.1 Site Shortlisting Methodology 30 7.2 Site Shortlisting with SEA/Environmental Considerations 30 7.3 Shortlisted Sites, Artificial Islands and Key Environmental Issues and Opportunities 31 REP/98/01 | Rev 11 | SEA REPORT - RECLAMATION (EXECUTIVE SUMMARY) V11 WITH CEDD MARKED UP.DOCX Civil Engineering Development Department Agreement No.
  • B1 Physical Description and Fisheries Setting

    B1 Physical Description and Fisheries Setting

    B1 PHYSICAL DESCRIPTION AND FISHERIES SETTING B1.1 INTRODUCTION This Annex provides background information on the Hong Kong fishing and aquaculture industry as well as a high‐level description of the physical and fisheries characters of western Hong Kong waters, in particular north and west Lantau waters. This review provides the basis for identifying key habitats, species, fisheries resources or fishermen that may warrant focused effort in enhancement and support under the Fisheries Management Plan (FMP). A description on the current planning of the 3RS Project is also presented. B1.2 PHYSICAL SETTING The 3RS project area mainly comprises approximately 650 ha of land formation in marine open waters and seawall development of approximately 5.9 km immediately north of the HKIA existing platform in the northern Lantau waters. The resulting loss of seabed comprises of marine sediment and debris formed from natural sedimentation with the influence of flows from the Pearl River Estuary (PRE). The existing seawall is largely constructed of sloping armour rock with the berthing point being constructed of vertical concrete. The hydrodynamic regime in the western Hong Kong waters is complex and varies with a number of factors including the lunar cycle (spring and neap tides), the season and the rate of flow of the Pearl River. In general, the main ebb tide currents flow south along the Urmston Road, with a subsidiary flow bifurcating northwest of Chek Lap Kok to flow south down the west coast of Lantau, and southeast around the east of Chek Lap Kok Island. Flood tides show the reverse pattern. The Pearl River, situated in a sub‐tropical climate, brings along with heavy loads of suspended sediment and nitrates during summer (wet) season and as a consequence concentrations of these parameters within western waters are variable but generally far higher than in the more oceanic influenced waters to the south and east of Hong Kong.
  • Highways Department Tuen Mun-Chek Lap Kok Link Project Profile

    Highways Department Tuen Mun-Chek Lap Kok Link Project Profile

    Highways Department Tuen Mun-Chek Lap Kok Link Project Profile Tuen Mun-Chek Lap Kok Link Highways Department Project Profile November 2007 CONTENTS Page 1. BASIC INFORMATION 1 1.1 Project Title 1 1.2 Purpose and Nature of the Project 1 1.3 Name of Project Proponent 1 1.4 Location and Scale of the Project 1 1.5 Number and Types of Designated Projects to be covered by the Project Profile 2 1.6 Contact Person 2 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME 2 2.1 Project Planning and Implementation 2 2.2 Project Programme 2 2.3 Interfacing with other Projects 3 3. POSSIBLE IMPACT ON THE ENVIRONMENT 3 3.1 Outline of Process Involved 3 3.2 Existing Available Data 4 3.3 Construction and Operational Environmental Impact 4 4. MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT 6 4.1 Existing and Planned Sensitive Receivers 6 4.2 Major Elements of Surrounding Environment and Land Uses 8 5. ENVIRONMENTAL MITIGATION MEASURES 8 5.1 Measures to Minimize Environmental Impacts 8 5.2 Severity, Distribution and Duration of Environmental Effects 11 5.3 Further Implication 11 6. USE OF PREVIOUSLY APPROVED EIA REPORTS 11 DRAWING HZMN05004-SP0013 Tuen Mun – Chek Lap Kok Link – Tentative Study Envelope Page i Tuen Mun-Chek Lap Kok Link Highways Department Project Profile November 2007 1. BASIC INFORMATION 1.1 Project Title Tuen Mun – Chek Lap Kok Link 1.2 Purpose and Nature of the Project According to the findings of the Northwest New Territories (NWNT) Traffic and Infrastructure Review conducted by the Transport Department, Tuen Mun Road, Ting Kau Bridge, Lantau Link and North Lantau Highway will be operating beyond capacity after 2016 due to increase in cross boundary traffic, developments in the NWNT, and possible developments in North Lantau, including the Airport developments, the Lantau Logistics Park and the Hong Kong – Zhuhai – Macao Bridge (HZMB).
  • Review of Operations

    Review of Operations

    REVIEW OF OPERATIONS (1) LAND BANK Total land bank of 17 As at 30th June 2002, the land bank of Sino Group increased to million square feet 17 million square feet from 15 million square feet in the previous financial year due to new site acquisitions mainly for residential development. The Group’s land bank comprises a well-diversified portfolio of properties: residential (39%), commercial (34%), industrial (14%), car parks (9%) and hotels (4%). Most of the residential developments currently under construction are located in popular locations throughout the territory and are conveniently served by various modes of transportation including railway and subway lines. Sports, recreational and entertainment facilities are also available in the clubhouses. During the financial year, the Group acquired 7 plots of land located in fast growing new towns in Hong Kong and a 19% interest in a commercial project in Shanghai thereby increasing the land bank by about 2.6 million square feet of attributable gross floor area. The Group’s commercial buildings and car parks are mainly held for long-term investment, generating a stable stream of recurrent income for the Group. The following table shows the breakdown of the Group’s land bank as at 30th June, 2002. By Location and Usage Residential Commercial Industrial Car Park Hotel Total Area Percentage (Gross Floor Area in Square Feet) New Territories 3,258,813 1,408,322 469,649 1,112,610 — 6,249,394 37% Kowloon 1,506,067 2,002,435 1,927,999 391,452 — 5,827,953 34% China and Singapore 1,241,428 1,226,386