Appendix H Projects Required for Achieving a State of Good Repair by 2030

Total Page:16

File Type:pdf, Size:1020Kb

Appendix H Projects Required for Achieving a State of Good Repair by 2030 Appendix H Projects Required for Achieving a State of Good Repair by 2030 The following projects, which are currently unfunded, must be completed to achieve and maintain a state of good repair by 2030. This list does not represent the full universe of projects that will be needed to bring the system into a state of good repair. REVENUE VEHICLES • Procurement of 146 New Orange Line #14 Cars (to Replace #12 Cars) • Procurement of 480 New Buses • Bi-Level Coach Procurement (85 Coaches to Replace Pullman Fleet and Support Service Expansion) • Procurement of 74 New Red Line #4 Cars (to Replace #1 Cars) • Bus (CNG, Diesel and Electric) Midlife Overhaul • Midlife Overhaul of 25 GP40-MC Locomotives • Top Deck Overhaul of 37 F40 Locomotives and Upgrade of 25 Engines to Tier 0 Compliance • Midlife Overhaul of 75 Bi-Level Kawasaki Coaches • Coach Reliability and Safety Program (CRASP) • Lease of 20 Passenger Coaches to Support the CRASP and Kawasaki Coach Overhaul Programs • Green Line: #8 Primary Suspension Overhaul - Safety/Reliability/Comfort ACHIEVING A ST A TE OF GOOD REP A I R H-1 • Orange Line Bearing Overhaul Program • Systemwide Tunnel Lighting • Green Line: Type 8 Air Compressor • Yard Switch Replacement and Track Replacement Reconstruction • Red Line: #1 Car A/C Motor and Compressor • Replace Layover Facility - Franklin Overhaul • Subway Facility Enhancement Program • Red Line: #1 Car Inter-Car Cabling and Auto- • Crossover Upgrades (Red Line) at Broadway matic Train Operation (ATO) Modification and South Station • Ferry Overhauls • Clayton Street Curve Rehab (Red Line) • Orange Line: Improve ATO and Speed Sensors • Green Line Frog Replacement Program on Vehicles • Permanent Snow Fencing • Coaches 1607 and 1634 Collision Damage Repair • Layover Capacity Improvements - Bradford • Red Line: #1 Car End Door Threshold Repair • Green Line: Replace Sidings at Blandford Street and Northeastern University • Orange Line: Required Upgrade of Air Compressor • Green Line: Wooden Overhead Trough Removal • Replace Inverters on Air Conditioning Units of 25 GP40 Locomotives • Red Line: Upgrade of Crossovers at Broadway Station, South Station, and Kendall Station NON -REVENUE VEHICLES • Feasibility Study - Crossovers at Aquarium • Non-Revenue Replacement Vehicles and Maverick • Blue Line: Procure New Trailer for Orient • Green Line Crossover Study - Heights Transportation Office Commonwealth Avenue and Beacon Street • Portable Generator Trailer for 350KW Unit • Side Track Study (Green Line) • Red Line: Fork Truck Replacement • Expand Midday Storage Facilities for TR ACK /RIGH T -OF -WAY Commuter Rail • Floating Slabs and Tunnel Leak Repair - SIGNALS Alewife to Harvard • Upgrade signal system in Tower A interlock- • Rehabilitate Grand Junction Secondary ing to allow higher safe train speeds into (connecting north and south side commuter North Station rail systems) between the Worcester Line in • Restore fourth main line track from drawbridge Allston and the Fitchburg Line in Cambridge over Charles River to junction between the • Install improved pumping station at Natick Haverhill and Newburyport/Rockport Lines Station to prevent flooding of tracks • Improve remote control signals and cross- • Ashmont Interlocking Reconstruction overs on the Worcester Line • North Quincy Interlocking Replacement • Wellington Yard Switch and Cable Replacement (Orange Line) • Maintenance-of-way (MOW) - Track Division Annual Initiatives Program (i.e., tie replace- • Park Street Signal Replacement (Green Line) ment, etc.) PR OG ra M FO R Mass Tra N S PO R T A TION H-2 • Government Center Signal Replacement PO W E R (Green Line) • AC Cable/Duct Replacement 039-1, 0-39-2, • Boylston Signal Replacement (Green Line) 0-39-3 • Copley Signal Replacement (Green Line) • AC Cable Duct Bank, Alewife to Porter • Orange Line 14 Signal Upgrade • Trackless Trolley Overhead Replacement • Signals Annual Initiatives Program (third-rail • Orange Line DC Breaker Upgrade heaters, etc.) • Jet Replacement • Upgrade Signal System on the West Route • Red Line 480 Volt AC Cable Replacement Main Line • Suspension Renewal - Commonwealth • Automatic Vehicle Identification on the Avenue Mattapan High Speed Line • Orange Line 480 Volt AC Cable Replacement • Prudential Signal Replacement (Green Line) • Wellington and Cabot DC Breakers • Arlington Signal Replacement (Green Line) • Power Section Modifications • Airport and Government Center Crossover Control • Blue Line DC Feeder Cable Upgrade • Upgrade Signal System from Beverly Junction • Systemwide Unit Substation Upgrades to Gloucester Draw • Replace Unit Substation - Long Wharf • Harvard to Alewife Cable Replacement • Haymarket Orange Line Electrical and Lighting • Hynes Convention Center Signal Replacement System Replacement (Green Line) • Section Insulator Replacement - Green and • Haymarket Signal Replacement (Green Line) Blue Lines • Operations Control Center Technology • North Station Panel Board Circuit Breaker Re-Investment Replacement • Green Line: Next-Generation Signal Study • Cabot Trolley Bug 600 Volt DC Switchgear • Orange Line: Third-Rail Heat for Track 1 be- • Harvard Station Feeders and Panel Board tween Community College and Wellington Replacement • Orange Line: ATO Controller Test Stand for • Davis Station Feeders and Panel Board Safety/Reliability/Productivity (Prototype for Replacement Red) • 500 Arborway HVAC Upgrades • Interoperability Study - Systemwide Radio • Green Line: Chestnut Hill Avenue Catenary Project Pole Relocation, Signalization, and Switch • Green Line Study - Collision Avoidance System Design Study COMMUNICA T IONS • Green Line Track Switch Heaters • Cabot Rapid Transit Unit Substation Circuit • DC Circuit Trip Settings Breaker Replacement • Wellington Transportation AC Replacement • Replace Eight Radio Base Stations • Wellington & Sullivan Transformer Replacement ACHIEVING A ST A TE OF GOOD REP A I R H-3 • Replace 100 Hz Motor Generator Power Engine Terminal (CRMF/BET) Leak Detection Stations & Fuel/Water Line Replacement MAIN T ENANCE FACILITIES • Replace Everett Compressor System • Orange Line: Infrastructure Required for New • Repair Water Main at Southside Service and #14 Trains Inspection Facility (S&I) • South Shore Garages • Charlestown Bus Storm Drain System Repairs • Green Line: Car Washes - Riverside/Reservoir • Everett: Replacement of Six Unreliable and Unsafe Overhead Cranes • Orange Line: Truing Machine Required for New #14 Cars • Everett: Critical Support Equipment Replacement for General Shop Services • Repair Cabot Bus Garage Roof • Reservoir Roof • Wellington Carhouse Roof • Mystic Junction Tank Removal • Mattapan Facility Upgrade • Green Line: Yard Technology Study • Subway: Upgrade of All Carwashes • Modify CRMF Air Brake Room • Systemwide Vehicle Washer Upgrade • Rehabilitation of the Cathodic Protection • Wellington Carhouse Sprinkler/Fire Alarm System at South Side S&I Upgrade • Everett: Sandblast Booth for the Motor Room • Green Line: Riverside, Reservoir, and Lake Street Storage and Work Platform Mezzanine • Orange Line: Procure a Parts Washer • Red Line: Overhead Hoist Equipment Overhaul • Orange Line: Install New Carhouse Security Doors: Study Door Re-Design • Cabot Yard Fire and Domestic Water Main Replacement ST A T IONS • MOW Storage Silo Replacement • New Emergency Smoke Vent Shafts in Downtown Crossing • Orient Heights Car Yard and Maintenance Facility, Phase II • Station Rehabilitation & Enhancement Program • Replace HVAC System - Wellington Carhouse • Orient Heights Station Project • Riverside Carhouse Upgrades • Subway Stations Ventilation Improvements Program • Subway: Install and Update Lighting in All Yard Areas for Safety • Back Bay Vent Fan Upgrade • Everett Shops Improvement • Southwest Corridor Orange Line Station Platform Repairs • Everett: Replacement of Critical Machine Shop Equipment Lacking Required Safety • Kenmore Station Light Rail Accessibility Devices Program and Surface Improvements • Wellington Signal Tower - HVAC Replacement • Blue Line Platform Repairs • Bus Wash Water Recycling • Harvard Square Station Pavement Safety Improvement • Commuter Rail Maintenance Facility/Boston PR OG ra M FO R Mass Tra N S PO R T A TION H-4 • Safety Hazard Mitigation of Systemwide • Replace the Platform Pavement at Melrose Busways Highlands Station • Roxbury Crossing Station Roof • Replace the Platform Pavement at Waverly Station • Jackson Square Station Roof • Alewife Station Lobby Ventilators • Oak Grove Station Pedestrian Walkway • Green Line: Station Ventilation Technology • Massachussets Avenue Roof Replacement Survey • Sullivan Square Station Pavement Safety Improvement FACILITIES • Lighting - Systemwide Parking Lots • Reconstruction of Wollaston Lobby Drains • Systemwide Busway Rehabilitation • Charles/MGH Station Accessibility and Modernization • Storm Drain Replacement • Replace Two Mini–High Platforms at Mansfield • Quincy Center Retaining Wall Repairs Station • Drainage System Repairs - Systemwide • Maverick Square Station and Blue Line Vents • Red Line Sound Wall Repairs • Suffolk Station Footbridge and Ramps • McSweeney Building Roof • Braintree Lobby Floor Drains • Systemwide Restroom Upgrade • JFK Station Footbridge and Ramps • Systemwide Bird Control • Forest Hills Gutter and Roof System • Systemwide Sprinkler Upgrade • Alewife Emergency Ventilation Maintenance • Hingham Commuter Boat Dock Replacement • Systemwide Platform Ventilation Fans • Systemwide Overhead Door Replacement • Improve Air Quality at Back Bay Station: • Emergency Repair Services
Recommended publications
  • Umass Boston Community Guide
    UMass Boston Community Guide _________________________________________________ OFFICE OF STUDENT HOUSING _________________________________________________ 100 Morrissey Boulevard Boston, MA 02125-3393 OFFICE OF STUDENT HOUSING P: 617.287.6011 UNIVERSITY OF MASSACHUSETTS BOSTON F: 617.287.6335 E: [email protected] www.umb.edu/housing CONTENTS Boston Area Communities 3 Dorchester 3 Quincy 4 Mattapan 5 Braintree 6 South Boston 7 Cambridge 8 Somerville 9 East Boston 10 Transportation 11 MBTA 11 Driving 12 Biking 12 Trash Collection & Recycling 13 Being a Good Neighbor 14 Engage in Your Community 16 Volunteer 16 Register to Vote 16 Community Guide | Pg 2 100 Morrissey Boulevard Boston, MA 02125-3393 OFFICE OF STUDENT HOUSING P: 617.287.6011 UNIVERSITY OF MASSACHUSETTS BOSTON F: 617.287.6335 E: [email protected] www.umb.edu/housing BOSTON AREA COMMUNITIES Not sure what neighborhood to live in? This guide will introduce you to neighborhoods along the red line (the ‘T’ line that serves UMass Boston), as well as affordable neighborhoods where students tend to live. Visit these resources for more information on neighborhoods and rental costs in Boston: Jumpshell Neighborhoods City of Boston Neighborhood Guide Rental Cost Map Average Rent in Boston Infographic Dorchester: Andrew – JFK/UMass – Savin Hill – Fields Corner – Shawmut, Ashmont, Ashmont-Mattapan High Speed Line Dorchester is Boston’s largest and oldest neighborhood, and is home to UMass Boston. Dorchester's demographic diversity has been a well-sustained tradition of the neighborhood, and long-time residents blend with more recent immigrants. A number of smaller communities compose the greater neighborhood, including Codman Square, Jones Hill, Meeting House Hill, Pope's Hill, Savin Hill, Harbor Point, and Lower Mills.
    [Show full text]
  • CHAPTER 2 Progress Since the Last PMT
    CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth.
    [Show full text]
  • Amtrak Timetables-Virginia Service
    Effective July 13, 2019 VIRGINIA SERVICE - Southbound serving BOSTON - NEW YORK - WASHINGTON DC - CHARLOTTESVILLE - ROANOKE - RICHMOND - NEWPORT NEWS - NORFOLK and intermediate stations Amtrak.com 1-800-USA-RAIL Northeast Northeast Northeast Silver Northeast Northeast Service/Train Name4 Palmetto Palmetto Cardinal Carolinian Carolinian Regional Regional Regional Star Regional Regional Train Number4 65 67 89 89 51 79 79 95 91 195 125 Normal Days of Operation4 FrSa Su-Th SaSu Mo-Fr SuWeFr SaSu Mo-Fr Mo-Fr Daily SaSu Mo-Fr Will Also Operate4 9/1 9/2 9/2 9/2 Will Not Operate4 9/1 9/2 9/2 9/2 9/2 R B y R B y R B y R B y R B s R B y R B y R B R s y R B R B On Board Service4 Q l å O Q l å O l å O l å O r l å O l å O l å O y Q å l å O y Q å y Q å Symbol 6 R95 BOSTON, MA ∑w- Dp l9 30P l9 30P 6 10A 6 30A 86 10A –South Station Boston, MA–Back Bay Station ∑v- R9 36P R9 36P R6 15A R6 35A 8R6 15A Route 128, MA ∑w- lR9 50P lR9 50P R6 25A R6 46A 8R6 25A Providence, RI ∑w- l10 22P l10 22P 6 50A 7 11A 86 50A Kingston, RI (b(™, i(¶) ∑w- 10 48P 10 48P 7 11A 7 32A 87 11A Westerly, RI >w- 11 05P 11 05P 7 25A 7 47A 87 25A Mystic, CT > 11 17P 11 17P New London, CT (Casino b) ∑v- 11 31P 11 31P 7 45A 8 08A 87 45A Old Saybrook, CT ∑w- 11 53P 11 53P 8 04A 8 27A 88 04A Springfield, MA ∑v- 7 05A 7 25A 7 05A Windsor Locks, CT > 7 24A 7 44A 7 24A Windsor, CT > 7 29A 7 49A 7 29A Train 495 Train 495 Hartford, CT ∑v- 7 39A Train 405 7 59A 7 39A Berlin, CT >v D7 49A 8 10A D7 49A Meriden, CT >v D7 58A 8 19A D7 58A Wallingford, CT > D8 06A 8 27A D8 06A State Street, CT > q 8 19A 8 40A 8 19A New Haven, CT ∑v- Ar q q 8 27A 8 47A 8 27A NEW HAVEN, CT ∑v- Ar 12 30A 12 30A 4 8 41A 4 9 03A 4 88 41A Dp l12 50A l12 50A 8 43A 9 05A 88 43A Bridgeport, CT >w- 9 29A Stamford, CT ∑w- 1 36A 1 36A 9 30A 9 59A 89 30A New Rochelle, NY >w- q 10 21A NEW YORK, NY ∑w- Ar 2 30A 2 30A 10 22A 10 51A 810 22A –Penn Station Dp l3 00A l3 25A l6 02A l5 51A l6 45A l7 17A l7 25A 10 35A l11 02A 11 05A 11 35A Newark, NJ ∑w- 3 20A 3 45A lR6 19A lR6 08A lR7 05A lR7 39A lR7 44A 10 53A lR11 22A 11 23A 11 52A Newark Liberty Intl.
    [Show full text]
  • Suffolk Downs Redevelopment
    SUFFOLK DOWN S REDEVELOPMENT Additional Information Document SEPTEMBER 16, 2019 PREPARED BY SUBMITTED TO IN ASSOCIATION WITH Boston Planning & DLA Piper Development Agency CBT Architects Beals and Thomas, Inc. Stoss Landscape Urbanism PROPONENT ARUP The McClellan Highway AKF Development Company, LLC SourceOne c/o The HYM Investment Group, LLC Vertex Haley & Aldrich Boston, MA 02114 Additional Information Document Suffolk Downs Redevelopment Boston, Massachusetts SUBMITTED TO Boston Redevelopment Authority, d/b/a Boston Planning and Development Agency One City Hall Square, 9th Floor Boston, MA 02201 PROPONENT The McClellan Highway Development Company, LLC c/o The HYM Investment Group, LLC One Congress Street, 11th floor Boston, MA 02114 PREPARED BY VHB 99 High Street, 10th Floor Boston, MA 02110 In association with: DLA Piper ARUP CBT Architects SourceOne Beals and Thomas, Inc. Vertex Stoss Landscape Urbanism Haley & Aldrich AKF September 16, 2019 Suffolk Downs Redevelopment Additional Information Document Table of Contents Additional Information Document 1.1 Summary of BPDA Review Process .............................................................................................................. 1 1.2 Master Plan Project Refinements Since Previous Filings ..................................................................... 2 1.3 PDA Master Plan Document Structure ....................................................................................................... 3 1.3.1 Proposed Development Framework ...............................................................................................
    [Show full text]
  • Massachusetts Bay Transportation Authority
    y NOTE WONOERLAND 7 THERE HOLDERS Of PREPAID PASSES. ON DECEMBER , 1977 WERE 22,404 2903 THIS AMOUNTS TO AN ESTIMATED (44 ,608 ) PASSENGERS PER DAY, NOT INCLUDED IN TOTALS BELOW REVERE BEACH I OAK 8R0VC 1266 1316 MALOEN CENTER BEACHMONT 2549 1569 SUFFOLK DOWNS 1142 ORIENT< NTS 3450 WELLINGTON 5122 WOOO ISLANC PARK 1071 AIRPORT SULLIVAN SQUARE 1397 6668 I MAVERICK LCOMMUNITY college 5062 LECHMERE| 2049 5645 L.NORTH STATION 22,205 6690 HARVARD HAYMARKET 6925 BOWDOIN , AQUARIUM 5288 1896 I 123 KENDALL GOV CTR 1 8882 CENTRAL™ CHARLES^ STATE 12503 9170 4828 park 2 2 766 i WASHINGTON 24629 BOYLSTON SOUTH STATION UNDER 4 559 (ESSEX 8869 ARLINGTON 5034 10339 "COPLEY BOSTON COLLEGE KENMORE 12102 6102 12933 WATER TOWN BEACON ST. 9225' BROADWAY HIGHLAND AUDITORIUM [PRUDENTIAL BRANCH I5I3C 1868 (DOVER 4169 6063 2976 SYMPHONY NORTHEASTERN 1211 HUNTINGTON AVE. 13000 'NORTHAMPTON 3830 duole . 'STREET (ANDREW 6267 3809 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY ricumt inoicati COLUMBIA APFKOIIUATC 4986 ONE WAY TRAFFIC 40KITT10 AT RAPID TRANSIT LINES STATIONS (EGLESTON SAVIN HILL 15 98 AMD AT 3610 SUBWAY ENTRANCES DECEMBER 7,1977 [GREEN 1657 FIELDS CORNER 4032 SHAWMUT 1448 FOREST HILLS ASHMONT NORTH OUINCY I I I 99 8948 3930 WOLLASTON 2761 7935 QUINCY CENTER M b 6433 It ANNUAL REPORT Digitized by the Internet Archive in 2014 https://archive.org/details/annualreportmass1978mass BOARD OF DIRECTORS 1978 ROBERT R. KILEY Chairman and Chief Executive Officer RICHARD D. BUCK GUIDO R. PERERA, JR. "V CLAIRE R. BARRETT THEODORE C. LANDSMARK NEW MEMBERS OF THE BOARD — 1979 ROBERT L. FOSTER PAUL E. MEANS Chairman and Chief Executive Officer March 20, 1979 - January 29.
    [Show full text]
  • Draft TIP Transit Programming MBTA Project
    MBTA Federal Capital Program ‐ FTA Formula Funds FFY 2018‐2023 TIP Project Descriptions ‐ Provided for Informational Purposes For Presentation to the Boston MPO on 3/22/2018 TIP Project Name Project Description 5307 ‐ Revenue Vehicle Program Commuter Rail Locomotive Reliability This program will restore coaches and locomotives, beyond their useful life, to a state of Program good repair to support service and winter resilliency efforts Procurement of 60‐foot Dual Mode Articulated (DMA) buses to replace the existing fleet of DMA Bus Replacement 32 Silver Line Bus Rapid Transit buses and to provide for ridership expansion projected as a result of Silver Line service extension to Chelsea. Green Line Light Rail Fleet Replacement ‐ Development of technical specifications for the procurement of light rail vehicles to replace Design the existing fleet that is approaching the end of its service life. Overhaul of locomotives in operation on commuter rail lines systemwide in order to improve Locomotive Overhaul reliability. Replacement of major systems and refurbishment of seating and other customer facing MBTA Catamaran Overhaul components on two catamarans (Lightning and Flying Cloud). Midlife Overhaul of 25 New Flyer Allison Overhaul of 25 hybrid buses, brought into service in 2009 and 2010, to enable optimal Hybrid 60 ft Articulated Buses reliability through the end of their service life. Overhaul of 32 Neoplan 60' DMA Buses Overhaul of the Neoplan 60' Dual Mode Articulated buses that operate on the MBTA Silver (5307) Line Bus Rapid Transit routes. Overhaul of 33 Kawasaki 900 Series Bi‐Level Overhaul and upgrade of existing systems on commuter rail coaches that were brought into Coaches service in 2005 to enable optimal reliability through the end of their service life.
    [Show full text]
  • Directions to Boston - Local Parking
    Directions to Boston - Local Parking GENERAL INFORMATION Logan Express (Recommended) The Back Bay Logan Express runs from all airport terminals directly to St. James Street in Copley Square in Back Bay diagonally across the street from the hotel. Departures occur at :00, :20, and :40 from 5am to 9pm daily. Fares are $7.50 per passenger – payment is by Visa, MasterCard, American Express and Diners Club (NO CASH). All buses are wheelchair accessible. Subway The closest subway stations are Copley Station (on the Green Line) and Back Bay Station (on the Orange Line). Both stations are within 1 block of the hotel. The MBTA runs daily from 6:00 AM to 1:00 AM. The schedule varies based on line, day of week, and reliability of the service. The cost is $2.75 per ride. Cab Transportation Green transportation is available through Lifestyle Transportation International (LTI) and Boston Cabs. Both transportation companies offer hybrid and Flex-Fuel vehicles in their fleet. Taxi fares from the airport to the hotel range from $40-50. PUBLIC TRANSPORTATION From Airport via Subway From airport terminal take a MassPort shuttle bus to the Airport subway station. Take the inbound Blue Line train to Government Center. Then, transfer to any outbound Green Line train to go to Copley station. Make a right onto Dartmouth Street - the hotel is 300 feet down the block on the same side of the street. The fare is $2.75. OR From airport terminal take any Silver Line bus to South Station. Change to an “Alewife” bound Red Line to Park Street.
    [Show full text]
  • MIT Kendall Square
    Ridership and Service Statistics Thirteenth Edition 2010 Massachusetts Bay Transportation Authority MBTA Service and Infrastructure Profile July 2010 MBTA Service District Cities and Towns 175 Size in Square Miles 3,244 Population (2000 Census) 4,663,565 Typical Weekday Ridership (FY 2010) By Line Unlinked Red Line 241,603 Orange Line 184,961 Blue Line 57,273 Total Heavy Rail 483,837 Total Green Line (Light Rail & Trolley) 236,096 Bus (includes Silver Line) 361,676 Silver Line SL1 & SL2* 14,940 Silver Line SL4 & SL5** 15,086 Trackless Trolley 12,364 Total Bus and Trackless Trolley 374,040 TOTAL MBTA-Provided Urban Service 1,093,973 System Unlinked MBTA - Provided Urban Service 1,093,973 Commuter Rail Boardings (Inbound + Outbound) 132,720 Contracted Bus 2,603 Water Transportation 4,372 THE RIDE Paratransit Trips Delivered 6,773 TOTAL ALL MODES UNLINKED 1,240,441 Notes: Unlinked trips are the number of passengers who board public transportation vehicles. Passengers are counted each time they board vehicles no matter how many vehicles they use to travel from their origin to their destination. * Average weekday ridership taken from 2009 CTPS surveys for Silver Line SL1 & SL2. ** SL4 service began in October 2009. Ridership represents a partial year of operation. File: CH 01 p02-7 - MBTA Service and Infrastructure Profile Jul10 1 Annual Ridership (FY 2010) Unlinked Trips by Mode Heavy Rail - Red Line 74,445,042 Total Heavy Rail - Orange Line 54,596,634 Heavy Rail Heavy Rail - Blue Line 17,876,009 146,917,685 Light Rail (includes Mattapan-Ashmont Trolley) 75,916,005 Bus (includes Silver Line) 108,088,300 Total Rubber Tire Trackless Trolley 3,438,160 111,526,460 TOTAL Subway & Bus/Trackless Trolley 334,360,150 Commuter Rail 36,930,089 THE RIDE Paratransit 2,095,932 Ferry (ex.
    [Show full text]
  • A National Colloquium May 3 -4, 2012, Boston, MA
    Arresting Demand: A National Colloquium May 3 -4, 2012, Boston, MA Frequently Asked Questions 1. What is the location of the colloquium? We are hosting the colloquium at the Westin Copley Place, located at 10 Huntington, Avenue Boston, MA 02116. Please visit their website at www.westin.com/Boston. 2. I have already registered but cannot attend. Can I cancel or transfer my registration? Yes, you may transfer your registration to a colleague in order to take your place at the conference. However, you will be responsible for any fees related to changes made to your travel arrangements. 3. Can I invite a guest to the conference? If you would like to invite a guest or suggest a colleague that should be added to our list please contact Alyssa Ozimek-Maier. 4. When is the registration deadline? Friday, April 6, is the registration deadline for the colloquium. If there is a circumstance that will prevent you from completing your registration by that time please contact Alyssa Ozimek-Maier. 5. What meals will be provided during the conference? All meals (breakfast, lunch, and dinner) will be provided during the two day colloquium. Please be sure to notify us of any dietary preferences, via registration and we will work diligently to make sure that each request is respected. 6. I have questions about my travel arrangements. Who should I contact? Any questions regarding your personal travel arrangements should be directed to Travel Collaborative at [email protected]. 7. Will parking be available? Parking at the hotel will be available through valet service only courtesy of Hunt Alternatives Fund.
    [Show full text]
  • MBTA Red Line Repairs
    Ana Torres November 3, 2011 Assignment 5: Basic queries MBTA Red Line Repairs Starting next Saturday (November 5, 2011) and until March 4, 2012, the MBTA will close the Red Line north of Harvard Square on weekends to complete $80 million in repairs designed to keep trains from derailing due to eroded tracks and power lines caused by leaks in the tunnel. The service will be replaced with shuttle buses. According to an article from the Boston Globe by Eric Moskowitz on October 22, 2011, about 21,200 riders on Saturday and 14,200 on Sunday board the Red Line at Porter, Davis and Alewife stations, meaning over 35,000 commuters will be affected weekly in the five-month shutdown period. The MBTA has come up with its next commuter nightmare. On weekends starting November 5, Red Line trains north of Harvard Square due to tunnel repairs. According to an article from the Boston Globe, the $80 million project will serve to keep trains from derailing These events are a perfect opportunity to reanalyze the profile of the users of the MBTA. Having a clearer idea of the sociodemographic profile and the patterns of use of transportation of the people that will be affected by this project will help to have a better assessment of the true cost of the project, that it, not only the monetary cost of the infrastructure but counting the social cost of the project as well. For this, a map that relates different characteristics of the population and their transportation information will result extremely useful.
    [Show full text]
  • Trinity Financial TRINITY FINANCIAL from the Beginning
    - WHAT’S really IMPORTANT? 32 years Over $3 billion in development work 9,500 units / over 600,000 sf retail + commercial 7,000 units under management 260 employees Properties located in MA, RI, CT & NY Headquarter offices in Boston & Manhattan trinity financial TRINITY FINANCIAL from the beginning ince 1987, Trinity Financial has pursued a distinctive S vision of real estate development based on a few core principles and a collaborative urban spirit. We love the challenge of each new project, but we’re also energized by the broader issues of revitaliz- ing neighborhoods, strengthening cities and fostering opportunity. In every case, we start from a clear understanding of how cities work, how we can help and why our work matters. As the project unfolds, we translate this energy and understanding into struc- tures and relationships that Revitalizing succeed financially, respect neighborhoods every constituency and enhance life for everyone they touch. Strengthening cities Fostering opportunity Our Projects 60 King - Providence, RI Total Development Cost: $22.7 million Units: 60 Completed: 2018 Trinity’s 60 King is an adaptive reuse project which converted a vacant state historic tax credits, soft debt from Rhode Island Housing historic mill building in the Olneyville neighborhood of Providence into and the City of Providence, as well as RIDEM Brownfields 60 units of mixed-income rental housing. Originally constructed in 1923, Remediation grant funding. 60 King was the home of the Rochambeau Worsted Wool manufacturing facility until the 1950s when the complex was acquired by the Imperial 60 King is the second project in the multi-phase redevelopment Knife Company.
    [Show full text]
  • Inner Harbor Connector Ferry
    Inner Harbor Connector Ferry Business Plan for New Water Transportation Service 1 2 Inner Harbor Connector Contents The Inner Harbor Connector 3 Overview 4 Why Ferries 5 Ferries Today 7 Existing Conditions 7 Best Practices 10 Comprehensive Study Process 13 Collecting Ideas 13 Forecasting Ridership 14 Narrowing the Dock List 15 Selecting Routes 16 Dock Locations and Conditions 19 Long Wharf North and Central (Downtown/North End) 21 Lewis Mall (East Boston) 23 Navy Yard Pier 4 (Charlestown) 25 Fan Pier (Seaport) 27 Dock Improvement Recommendations 31 Long Wharf North and Central (Downtown/North End) 33 Lewis Mall (East Boston) 34 Navy Yard Pier 4 (Charlestown) 35 Fan Pier (Seaport) 36 Route Configuration and Schedule 39 Vessel Recommendations 41 Vessel Design and Power 41 Cost Estimates 42 Zero Emissions Alternative 43 Ridership and Fares 45 Multi-modal Sensitivity 47 Finances 51 Overview 51 Pro Forma 52 Assumptions 53 Funding Opportunities 55 Emissions Impact 59 Implementation 63 Appendix 65 1 Proposed route of the Inner Harbor Connector ferry 2 Inner Harbor Connector The Inner Harbor Connector Authority (MBTA) ferry service between Charlestown and Long Wharf, it should be noted that the plans do not specify There is an opportunity to expand the existing or require that the new service be operated by a state entity. ferry service between Charlestown and downtown Massachusetts Department of Transportation (MassDOT) Boston to also serve East Boston and the South and the Massachusetts Port Authority (Massport) were Boston Seaport and connect multiple vibrant both among the funders of this study and hope to work in neighborhoods around Boston Harbor.
    [Show full text]