Appendix H Projects Required for Achieving a State of Good Repair by 2030

Appendix H Projects Required for Achieving a State of Good Repair by 2030

Appendix H Projects Required for Achieving a State of Good Repair by 2030 The following projects, which are currently unfunded, must be completed to achieve and maintain a state of good repair by 2030. This list does not represent the full universe of projects that will be needed to bring the system into a state of good repair. REVENUE VEHICLES • Procurement of 146 New Orange Line #14 Cars (to Replace #12 Cars) • Procurement of 480 New Buses • Bi-Level Coach Procurement (85 Coaches to Replace Pullman Fleet and Support Service Expansion) • Procurement of 74 New Red Line #4 Cars (to Replace #1 Cars) • Bus (CNG, Diesel and Electric) Midlife Overhaul • Midlife Overhaul of 25 GP40-MC Locomotives • Top Deck Overhaul of 37 F40 Locomotives and Upgrade of 25 Engines to Tier 0 Compliance • Midlife Overhaul of 75 Bi-Level Kawasaki Coaches • Coach Reliability and Safety Program (CRASP) • Lease of 20 Passenger Coaches to Support the CRASP and Kawasaki Coach Overhaul Programs • Green Line: #8 Primary Suspension Overhaul - Safety/Reliability/Comfort ACHIEVING A ST A TE OF GOOD REP A I R H-1 • Orange Line Bearing Overhaul Program • Systemwide Tunnel Lighting • Green Line: Type 8 Air Compressor • Yard Switch Replacement and Track Replacement Reconstruction • Red Line: #1 Car A/C Motor and Compressor • Replace Layover Facility - Franklin Overhaul • Subway Facility Enhancement Program • Red Line: #1 Car Inter-Car Cabling and Auto- • Crossover Upgrades (Red Line) at Broadway matic Train Operation (ATO) Modification and South Station • Ferry Overhauls • Clayton Street Curve Rehab (Red Line) • Orange Line: Improve ATO and Speed Sensors • Green Line Frog Replacement Program on Vehicles • Permanent Snow Fencing • Coaches 1607 and 1634 Collision Damage Repair • Layover Capacity Improvements - Bradford • Red Line: #1 Car End Door Threshold Repair • Green Line: Replace Sidings at Blandford Street and Northeastern University • Orange Line: Required Upgrade of Air Compressor • Green Line: Wooden Overhead Trough Removal • Replace Inverters on Air Conditioning Units of 25 GP40 Locomotives • Red Line: Upgrade of Crossovers at Broadway Station, South Station, and Kendall Station NON -REVENUE VEHICLES • Feasibility Study - Crossovers at Aquarium • Non-Revenue Replacement Vehicles and Maverick • Blue Line: Procure New Trailer for Orient • Green Line Crossover Study - Heights Transportation Office Commonwealth Avenue and Beacon Street • Portable Generator Trailer for 350KW Unit • Side Track Study (Green Line) • Red Line: Fork Truck Replacement • Expand Midday Storage Facilities for TR ACK /RIGH T -OF -WAY Commuter Rail • Floating Slabs and Tunnel Leak Repair - SIGNALS Alewife to Harvard • Upgrade signal system in Tower A interlock- • Rehabilitate Grand Junction Secondary ing to allow higher safe train speeds into (connecting north and south side commuter North Station rail systems) between the Worcester Line in • Restore fourth main line track from drawbridge Allston and the Fitchburg Line in Cambridge over Charles River to junction between the • Install improved pumping station at Natick Haverhill and Newburyport/Rockport Lines Station to prevent flooding of tracks • Improve remote control signals and cross- • Ashmont Interlocking Reconstruction overs on the Worcester Line • North Quincy Interlocking Replacement • Wellington Yard Switch and Cable Replacement (Orange Line) • Maintenance-of-way (MOW) - Track Division Annual Initiatives Program (i.e., tie replace- • Park Street Signal Replacement (Green Line) ment, etc.) PR OG ra M FO R Mass Tra N S PO R T A TION H-2 • Government Center Signal Replacement PO W E R (Green Line) • AC Cable/Duct Replacement 039-1, 0-39-2, • Boylston Signal Replacement (Green Line) 0-39-3 • Copley Signal Replacement (Green Line) • AC Cable Duct Bank, Alewife to Porter • Orange Line 14 Signal Upgrade • Trackless Trolley Overhead Replacement • Signals Annual Initiatives Program (third-rail • Orange Line DC Breaker Upgrade heaters, etc.) • Jet Replacement • Upgrade Signal System on the West Route • Red Line 480 Volt AC Cable Replacement Main Line • Suspension Renewal - Commonwealth • Automatic Vehicle Identification on the Avenue Mattapan High Speed Line • Orange Line 480 Volt AC Cable Replacement • Prudential Signal Replacement (Green Line) • Wellington and Cabot DC Breakers • Arlington Signal Replacement (Green Line) • Power Section Modifications • Airport and Government Center Crossover Control • Blue Line DC Feeder Cable Upgrade • Upgrade Signal System from Beverly Junction • Systemwide Unit Substation Upgrades to Gloucester Draw • Replace Unit Substation - Long Wharf • Harvard to Alewife Cable Replacement • Haymarket Orange Line Electrical and Lighting • Hynes Convention Center Signal Replacement System Replacement (Green Line) • Section Insulator Replacement - Green and • Haymarket Signal Replacement (Green Line) Blue Lines • Operations Control Center Technology • North Station Panel Board Circuit Breaker Re-Investment Replacement • Green Line: Next-Generation Signal Study • Cabot Trolley Bug 600 Volt DC Switchgear • Orange Line: Third-Rail Heat for Track 1 be- • Harvard Station Feeders and Panel Board tween Community College and Wellington Replacement • Orange Line: ATO Controller Test Stand for • Davis Station Feeders and Panel Board Safety/Reliability/Productivity (Prototype for Replacement Red) • 500 Arborway HVAC Upgrades • Interoperability Study - Systemwide Radio • Green Line: Chestnut Hill Avenue Catenary Project Pole Relocation, Signalization, and Switch • Green Line Study - Collision Avoidance System Design Study COMMUNICA T IONS • Green Line Track Switch Heaters • Cabot Rapid Transit Unit Substation Circuit • DC Circuit Trip Settings Breaker Replacement • Wellington Transportation AC Replacement • Replace Eight Radio Base Stations • Wellington & Sullivan Transformer Replacement ACHIEVING A ST A TE OF GOOD REP A I R H-3 • Replace 100 Hz Motor Generator Power Engine Terminal (CRMF/BET) Leak Detection Stations & Fuel/Water Line Replacement MAIN T ENANCE FACILITIES • Replace Everett Compressor System • Orange Line: Infrastructure Required for New • Repair Water Main at Southside Service and #14 Trains Inspection Facility (S&I) • South Shore Garages • Charlestown Bus Storm Drain System Repairs • Green Line: Car Washes - Riverside/Reservoir • Everett: Replacement of Six Unreliable and Unsafe Overhead Cranes • Orange Line: Truing Machine Required for New #14 Cars • Everett: Critical Support Equipment Replacement for General Shop Services • Repair Cabot Bus Garage Roof • Reservoir Roof • Wellington Carhouse Roof • Mystic Junction Tank Removal • Mattapan Facility Upgrade • Green Line: Yard Technology Study • Subway: Upgrade of All Carwashes • Modify CRMF Air Brake Room • Systemwide Vehicle Washer Upgrade • Rehabilitation of the Cathodic Protection • Wellington Carhouse Sprinkler/Fire Alarm System at South Side S&I Upgrade • Everett: Sandblast Booth for the Motor Room • Green Line: Riverside, Reservoir, and Lake Street Storage and Work Platform Mezzanine • Orange Line: Procure a Parts Washer • Red Line: Overhead Hoist Equipment Overhaul • Orange Line: Install New Carhouse Security Doors: Study Door Re-Design • Cabot Yard Fire and Domestic Water Main Replacement ST A T IONS • MOW Storage Silo Replacement • New Emergency Smoke Vent Shafts in Downtown Crossing • Orient Heights Car Yard and Maintenance Facility, Phase II • Station Rehabilitation & Enhancement Program • Replace HVAC System - Wellington Carhouse • Orient Heights Station Project • Riverside Carhouse Upgrades • Subway Stations Ventilation Improvements Program • Subway: Install and Update Lighting in All Yard Areas for Safety • Back Bay Vent Fan Upgrade • Everett Shops Improvement • Southwest Corridor Orange Line Station Platform Repairs • Everett: Replacement of Critical Machine Shop Equipment Lacking Required Safety • Kenmore Station Light Rail Accessibility Devices Program and Surface Improvements • Wellington Signal Tower - HVAC Replacement • Blue Line Platform Repairs • Bus Wash Water Recycling • Harvard Square Station Pavement Safety Improvement • Commuter Rail Maintenance Facility/Boston PR OG ra M FO R Mass Tra N S PO R T A TION H-4 • Safety Hazard Mitigation of Systemwide • Replace the Platform Pavement at Melrose Busways Highlands Station • Roxbury Crossing Station Roof • Replace the Platform Pavement at Waverly Station • Jackson Square Station Roof • Alewife Station Lobby Ventilators • Oak Grove Station Pedestrian Walkway • Green Line: Station Ventilation Technology • Massachussets Avenue Roof Replacement Survey • Sullivan Square Station Pavement Safety Improvement FACILITIES • Lighting - Systemwide Parking Lots • Reconstruction of Wollaston Lobby Drains • Systemwide Busway Rehabilitation • Charles/MGH Station Accessibility and Modernization • Storm Drain Replacement • Replace Two Mini–High Platforms at Mansfield • Quincy Center Retaining Wall Repairs Station • Drainage System Repairs - Systemwide • Maverick Square Station and Blue Line Vents • Red Line Sound Wall Repairs • Suffolk Station Footbridge and Ramps • McSweeney Building Roof • Braintree Lobby Floor Drains • Systemwide Restroom Upgrade • JFK Station Footbridge and Ramps • Systemwide Bird Control • Forest Hills Gutter and Roof System • Systemwide Sprinkler Upgrade • Alewife Emergency Ventilation Maintenance • Hingham Commuter Boat Dock Replacement • Systemwide Platform Ventilation Fans • Systemwide Overhead Door Replacement • Improve Air Quality at Back Bay Station: • Emergency Repair Services

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us