MTRC Contract No. 518 Lantau and Airport Railway Siu Ho Wan Depot, Phase 1 & 1A
Total Page:16
File Type:pdf, Size:1020Kb
MTRC Contract No. 518 Lantau and Airport Railway Siu Ho Wan Depot, Phase 1 & 1a CLIENT MTR Corporation Mr. David Sorton Tel: 2984 2474 Fax: 2984 7204 ENGINEER MTR Corporation CONTRACTOR Build King Group CONTRACT VALUE HK$834 million CONSTRUCTION PERIOD January 1995 to May 1998 MAJOR QUANTITIES : Reinforcement 8,000 tonnes Concrete 65,000 cu.m Sub-ballast 45,000 cu.m Structural Steel 2,600 tonnes Pipework 60,000 m MAJOR WORKS CONSISTED OF: This depot on lantau Island will be the operation and maintenance centre for the new 34 km railway connecting the new airport at Chek Lap Kok and the new town at Tung Chung to Central district on Hong Kong Island. The depot is constructed on reclaimed land with an area of 325,000 sq.m. Major works included : The removal off-site of 277,000 cu.m of surcharge material used for consolidation of reclamation for the Main Deport Building The Main Depot Building, 325m long, 84m wide and 12m high constructed with reinforced concrete pad foundations and columns supporting steel trusses spanning 21m with roof and walls formed of double skin insulated cladding Ancillary Buildings consisting of 20 structures, generally single storey buildings with construction materials and methods similar to the Main Depot The external works included all sub-surface drainage and ducting systems, preparation of all sub-ballast and drainage for the trackwork, overhead line foundations and landscaping works as well as 5 km of road using rigid concrete carriageway construction Three grade separation structures consisting of reinforced concrete box tunnel structures constructed on sub-ballast base material and two bridges crossing the railway HIGHLIGHTS : As there was no land access to the site for this multi-discipline project, careful consideration had to be given to procurement, delivery, and storage of materials. This was one of the projects in the Airport Core Programme therefore timely completion of the works was critical. The main depot building completion was paramount for the success of the project. The completion of the North Lantau Expressway bridge and associated access roads and embankments within a 3 month period emphasized the Joint Venture’s teamwork & determination to complete the works on time. .