I-10-SR210 Initial Design Concept Report Without Appendices

Total Page:16

File Type:pdf, Size:1020Kb

I-10-SR210 Initial Design Concept Report Without Appendices Prepared for: Initial Design Concept Report 205 South 17th Avenue October 2019 Phoenix, Arizona 85007 Interstate 10: Junction Interstate 19 to Kolb Road Tucson – Benson Highway State Route 210: Golf Links Road to I-10 Barraza – Aviation Parkway Prepared by: Federal No.: 010-E(210)S 101 North 1st Avenue, Suite 2600 Project No.: 010 PM 260 H7825 01 L Phoenix, Arizona 85003 Southcentral District – Pima County Initial Design Concept Report Interstate 10: Junction Interstate 19 to Kolb Road Tucson – Benson Highway State Route 210: Golf Links Road to I-10 Barraza – Aviation Parkway Federal No.: 010-E(210)S Project No.: 010 PM 260 H7825 01 L Southcentral District – Pima County Prepared for: 205 South 17th Avenue Phoenix, Arizona 85007 October 2019 Prepared by: 101 North 1st Avenue, Suite 2600 Phoenix, Arizona 85003 I-10; Jct. I-19 to Kolb Road & SR 210; Golf Links Road to I-10 Initial Design Concept Report EXECUTIVE SUMMARY Introduction $4,000,000 using HURF26 funds for design. A programmed between Alvernon Way and Kolb Road. Traffic along I-10 concentrates amount of $2,086,000 in FY 2022 using ASTP funds for Design. at certain TIs where major north-south arterials exist. The Arizona Department of Transportation (ADOT), the Federal • Highway Administration (FHWA), the City of Tucson, and Pima County TIP ID 74.07; A programmed amount of $8,000,000 in FY 2022 Expected future growth in the Tucson area will be to the south and understood that a significant amount of future growth in population using ASTP funds for the design of the Country Club Road TI. southeast of the downtown area. Since I-10 cuts diagonally across this around the Tucson area would take place to the south and southeast of growth area, it is also expected that I-10will be the primary travel corridor Tucson. Interstate 10 (I-10) cuts diagonally across this growth area and I-10 is a full access controlled interstate freeway. for this growth. would be impacted by the future growth. East of the System Interchange The functional classification of SR 210 is Urban Other Freeway. SR 210 East of the System Interchange with I-19, I-10 was constructed in the with I-19, I-10 was constructed in the 1960’s as a rural interstate highway is a divided multi-lane urban highway that parallels I-10 and is located 1960’s as a rural interstate highway with rural design criteria and typically with rural design criteria and typically with just two lanes of traffic in approximately 1.75 miles northeast of I-10. SR 210 begins at Broadway with just two lanes of traffic in each direction. Several of the TIs are each direction. While a third lane in each direction from I-19 to west of Boulevard and ends just past South Palo Verde Road. From Broadway partial cloverleaf type interchanges that have short ramp weave distances Kino Parkway was added around 1990, the remainder of the I-10 corridor Boulevard through the intersection of Country Club Road, SR 210 has that adversely impact traffic operational efficiency, especially as traffic is virtually unchanged. three-lanes in each direction. The roadway then narrows and continues volumes increase over time. Some of the interchanges are spaced closer ADOT and FHWA commissioned the preparation of a two-phased study with two-lanes in each direction to the end of SR 210. However, the together than the recommended minimum of one mile, thus contributing to define and evaluate future safety and capacity improvements to I-10 roadway continues east and connects to Golf Links Road. to reduced operational efficiency. from the Junction with I-19 to the Junction with SR 83. The study also FHWA is serving as the lead federal agency and will provide input and In summary, the small number of north-south arterials, the diagonal included the extension of the Barraza-Aviation Parkway (SR 210) from oversight for the alternative’s identification and evaluation process. alignment of I-10, and the projected growth pattern in Tucson contribute Golf Links Road to a connection with I-10 at a location to be determined. to an increase in local traffic using the Interstate Highway for short local The following agencies were involved in developing the Feasibility trips. The numerous access points on I-10 and the old 1960’s design The first phase of this study was a Feasibility Study (FS) and an Study, the Environmental Overview, the Design Concept Study and the present additional performance issues. These limitations further slow Environmental Overview (EO). In summary, the FS and EO evaluated Environmental Assessment: FHWA, Pima Association of Governments travel on the I-10 mainline and lead to more conflict between local and several alternatives for improving I-10 and for extending SR 210 to I-10. (PAG), Pima County, Pima County Sherriff’s Department, Davis- regional traffic. This is confirmed by the steady increase in crashes. The subsequent Feasibility Study Update Report (February 2015) Monthan Air Force Base (DMAFB), City of Tucson, City of South Conflicting interaction between local and regional/interstate traffic has recommended three alternatives to be evaluated further as a part of the Tucson, US Customs & Border Protection (CBP), Sunnyside Unified led to a reduction in the capacity of I-10 to accommodate through second phase of the study; the development of a Design Concept Study School District, Tucson Airport Authority, Sun Tran, Arizona Game and (regional) travel. Expected growth in both regional and local traffic on I- (DCR) and an Environmental Assessment (EA). Due to future Fish Department (AGFD), Arizona State Land Department (ASLD), the 10 will further reduce the capacity of I-10. construction funding limitations prior to the 2040 design year, the limits Regional Transportation Authority (RTA), the University of Arizona of the DCR were revised to end at Kolb Road, which is designated as a (UofA), and the Union Pacific Railroad (UPRR). SR 210 in the City of Tucson, Arizona, was built as an urban highway future north-south parkway and is a logical point of termini along I-10. subsequent to the construction of I-10. SR 210 is approximately 3.4-miles The number of recommended alternatives to be evaluated further in the Purpose and Need long and is oriented in a northwest to southeast direction, extending second phase of the study was also reduced to two after further review by The Interstate Highway System was intended to relieve congestion, southeast from West Broadway Boulevard at North 1st Avenue, with the stakeholders. improve safety, and enhance the economy by facilitating the movement intersections at Kino Parkway, East 22nd Street, South Country Club The study area is located in the ADOT Southcentral District within the of people and goods throughout the nation. Increasing traffic volumes on Road, East 34th Street, Richie Road, and Dodge Boulevard, before City of Tucson, the City of South Tucson and Pima County. I-10 in the vicinity of Tucson, Arizona have contributed to reduced terminating at Alvernon Way / Golf Links Road. operational effectiveness, particularly the segment of I-10 between I-19 SR 210 is intended to provide motorists with an alternate route into Portions of ADOT Project No. 010 PM 260 H7825 01L; Federal No. 010- and Kolb Road. E(210)S have been programmed in the Pima Association of Governments Tucson’s downtown business district from points east and south of (PAG) Regional Transportation Highway Program for Fiscal Year (FY) The traffic modeling and analysis accomplished for the Feasibility Study downtown. 202042023. The following projects are programmed. demonstrated that north-south traffic demands through the project area The use of SR 210 as a business spur is limited by the fact that motorists are constrained by limitations on north-south arterial corridors. The on westbound I-10 desiring to access downtown Tucson via SR 210 must • TIP ID 39.13; A programmed amount of $1,914,000 in FY 2021 UPRR switching yard located parallel to SR 210, north of I-10 prohibits using ASTP funds for Kino Parkway TI utility relocation and currently use city arterials to get from I-10 to SR 210. The additional trips any north-south arterials between Kino Parkway and Alvernon Way. The on the city arterials tend to exceed the capacity of the local roadway Davis-Monthan Air Force Base (AFB) prohibits any north-south arterials network, which causes motorists to stay on I-10. Commercial and i I-10; Jct. I-19 to Kolb Road & SR 210; Golf Links Road to I-10 Initial Design Concept Report commuter traffic heading into downtown Tucson also use I-10 and add to arterials, traffic interchange intersections, and intersections adjacent to The existing roadway network within the study area was evaluated peak hour congestion, causing increased volume and stress to the the interchange that are directly affected by the interchange operations. using traffic data collected in year 2010. The section of I-10 between operation of the interstate highway. As is, the limited capacity and limited I-19 and Kolb Road is considered urban in character. access for local trips prevents the existing roadway network in the study Traffic Operational Analysis 2. Year 2040: No-Build area from functioning as primarily intended. An Initial Traffic Operational Analysis was conducted as part of the The existing roadway network within the study area was evaluated Feasibility Study and Update. An updated traffic operational analysis was Since I-10 runs parallel to SR 210 approximately 1.75 miles south of SR with the projected year 2040 traffic volumes. Under this scenario there conducted as part of the Design Concept Study.
Recommended publications
  • I-11 Coalition for Sonoran Desert Protection Letter to ADOT, July 2016
    July 8, 2016 Interstate 11 Tier 1 EIS Study Team c/o ADOT Communications 1655 W. Jackson St., MD 126F Phoenix, AZ 85007 RE: Scoping Comments on the Interstate 11 Tier 1 Environmental Impact Statement, Nogales to Wickenburg To Whom It May Concern: The Coalition for Sonoran Desert Protection appreciates the opportunity to provide scoping comments for the Interstate 11 Tier 1 Environmental Impact Statement (EIS), Nogales to Wickenburg. We submit the enclosed comments on behalf of the Coalition for Sonoran Desert Protection, founded in 1998 and comprised of 34 environmental and community groups working in Pima County, Arizona. Our mission is to achieve the long-term conservation of biological diversity and ecological function of the Sonoran Desert through comprehensive land-use planning, with primary emphasis on Pima County’s Sonoran Desert Conservation Plan. We achieve this mission by advocating for: 1) protecting and conserving Pima County’s most biologically rich areas, 2) directing development to appropriate land, and 3) requiring appropriate mitigation for impacts to habitat and wildlife species. In summary, our scoping comments highlight the need for further evaluation of the purpose and need for this project and major environmental impacts that should be considered statewide and particularly in Pima County as this study area is evaluated. Specifically, potential environmental impacts in Pima County include impacts to federal lands such as Saguaro National Park, Ironwood Forest National Monument, and the Bureau of Reclamation’s Central
    [Show full text]
  • Final Report, Volume 1 | I-19: San Xavier Road to Interstate 10 Study
    FINAL DESIGN CONCEPT REPORT (Volume 1 of 2) I-19 San Xavier Road to I-10 Project No. 019 PM 057 H5105 01L Federal Aid Reference Number: 019-A (014) ADOT Contract No. 04-34 August 23, 2012 Prepared For the Arizona Department of Transportation Tucson District – Pima County PREPARED BY: 1860 East River Road, Suite 300 Tucson, Arizona 85718 FINAL DESIGN CONCEPT REPORT I-19 San Xavier Road to I-10 Project No. 019 PM 057 H5105 01L Federal Aid Reference Number: 019-A (014) ADOT Contract No. 04-34 August 23, 2012 Prepared For the Arizona Department of Transportation Tucson District – Pima County Prepared By: 1860 East River Road, Suite 300 Tucson, Arizona 85718 Final Design Concept Report I-19 San Xavier Road to I-10 1.5 Agency and Public Scoping ....................................................................................... 26 Table of Contents 1.5.1 Agency Scoping .................................................................................................. 26 1.5.2 Public Scoping .................................................................................................... 27 Executive Summary ............................................................................................................................. 1 2.0 Traffic And Crash Data .............................................................................................................. 29 Environmental Mitigation Measures.................................................................................................... 8 2.1 2001 Conditions .......................................................................................................
    [Show full text]
  • Route Restriction Information: Table 4
    R17-6-412, Table 4 – Updated April 06, 2021 Table 4. Permanent Highway Restrictions, Requirements, Conditions, and Allowances For “Transport Subject To” requirements see end of document. Route Restriction Location Transport Subject to: Height Length Width Weight (in lbs) (MP = Milepost) Escort requirements: F = front escort, R = rear escort, F/R = front and rear escort, and LE = law enforcement escort Interstate 8 MP 0.00 (California State R17-6-405; R17-6-406; Over 14’ - 16’ = R Line) to MP 21.06 (Dome R17-6-408; R17-6-409 Valley Road TI) Interstate 8 MP 21.06 Westbound (Dome R17-6-405; R17-6-406; 15’ 11” Over 14’ - 16’ = R Valley Road TI Underpass - R17-6-408; R17-6-409 Structure 1325) Interstate 8 MP 21.06 (Dome Valley R17-6-405; R17-6-406; Over 14’ - 16’ = R Road TI) to MP 30.80 R17-6-408; R17-6-409 (Avenue 29E - Wellton TI) Interstate 8 MP 30.80 Westbound R17-6-405; R17-6-406; 15’ 11” Over 14’ - 16’ = R (Avenue 29E - Wellton R17-6-408; R17-6-409 Underpass - Structure 1332) Interstate 8 MP 30.80 (Avenue 29E - R17-6-405; R17-6-406; Over 14’ - 16’ = R Wellton TI) to MP 144.55 R17-6-408; R17-6-409 (Vekol Valley Road TI) Interstate 8 MP 144.55 (Vekol Valley R17-6-405; R17-6-406; 15’ 11” Over 14’ - 16’ = R Road Underpass - Structure R17-6-408; R17-6-409 550) Interstate 8 MP 144.55 (Vekol Valley R17-6-405; R17-6-406; Over 14’ - 16’ = R Road TI) to MP 151.70 R17-6-408; R17-6-409 (Junction SR 84) Interstate 8 MP 151.70 Eastbound R17-6-405; R17-6-406; 15’ 10” Over 14’ - 16’ = R (Junction SR 84 Underpass - R17-6-408; R17-6-409 Structure 1063)
    [Show full text]
  • Senate Concurrent Resolution 1012
    Senate Engrossed State of Arizona Senate Fifty-second Legislature First Regular Session 2015 SENATE CONCURRENT RESOLUTION 1012 A CONCURRENT RESOLUTION SUPPORTING THE ARIZONA DEPARTMENT OF TRANSPORTATION'S COMMENTS TO THE FEDERAL DEPARTMENT OF TRANSPORTATION IN RESPONSE TO THE PROPOSED DESIGNATION OF THE PRIMARY FREIGHT NETWORK. (TEXT OF BILL BEGINS ON NEXT PAGE) - i - S.C.R. 1012 1 Whereas, the Arizona Department of Transportation (ADOT) submitted 2 comments to the federal Department of Transportation (DOT) in response to the 3 proposed designation of the Primary Freight Network (PFN) that highlighted 4 problems with the proposal and provided recommendations for improvement; and 5 Whereas, the federal legislation "Moving Ahead for Progress in the 21st 6 Century Act" (MAP-21) calls for the United States Secretary of Transportation 7 to designate up to 27,000 miles on existing interstate and other roadways, 8 with a possible addition of 3,000 miles in the future, as a PFN to help 9 states strategically direct resources toward improving freight movement; and 10 Whereas, the Federal Register notice identifies more than 41,000 miles 11 of comprehensive, connected roadway that a Federal Highway Administration 12 (FHWA) analysis shows would be necessary to transport goods efficiently on 13 highways throughout the nation to make up the PFN; and 14 Whereas, the PFN proposal is based on the origins and destination of 15 freight movement, shipment tonnage and values, truck traffic volumes and 16 population; and 17 Whereas, under MAP-21, the PFN
    [Show full text]
  • Lesser-Known Areas the National Parks: Lesser-Known Areas
    The National Parks: Lesser-Known Areas The National Parks: Lesser-Known Areas Produced by the Office of Public Affairs and the Division of Publications National Park Service U.S. Department of the Interior Washington, D.C. 1985 National Park Service U. S. Department of the Interior As the nation's principal ment of life through outdoor conservation agency, the recreation. The Department Department of the Interior assesses our energy and has responsibility for most of mineral resources and works our nationally owned public to assure that their develop­ lands and natural resources. ment is in the best interest of This includes fostering the all our people. The Depart­ wisest use of our land and ment also has a major respon- water resources, protecting siblity for American Indian our fish and wildlife, preserv­ reservation communities and ing the environmental and for people who live in island cultural values of our national territories under United parks and historical places, States administration. and providing for the enjoy­ For sale by the Superintendent of Documents U.S. Government Printing Office, Washington, DC 20402 Contents Introduction 4 Maps of the National Park System 6 National Park Service Regional Offices 9 Lesser-Known Areas Listed by State 10 Index 48 Lesser-Known Parks: Doorways to Adventure Few travelers are familiar with most parks described here. Many are located away from principal highways or are relatively new to the National Park Sys­ tem. And most, but not all, are smaller than the more popular parks. Yet these sites contain nationally significant sce­ nic and cultural resources, many of com­ parable quality to the more famous parks.
    [Show full text]
  • 03 Page F-304
    Page F-300 Page F-301 Page F-302 Page Page F-303 Page F-304 Online Survey Responses (Summary) Page F-305 I-11 Survey Monkey Summary of Responses: Summer 2016 Public Scoping Question 1 Please tell us what problems you experience today, or anticipate in the future, related to transportation in the Corridor Study Area that the I-11 project could address. Please rank the following in order of importance to you. (1= highest ranking [most important], 5=lowest ranking [least important]). Relieve local congestion, improve travel time and 134 reliability (reduce how long a trip will take or ensure 67 certainty of travel time) 61 46 173 Relieve regional congestion, improve travel time and 139 reliability (between Southern and Northwestern Arizona) 75 68 41 158 Improve freight travel and reliability, reducing 125 bottlenecks on existing highways 72 72 50 158 Improve local access to communities and resources 73 (parks, recreation, and tourism) 56 98 73 173 Need for a different transportation mode than what 149 exists today 53 49 49 172 Support homeland security and national defense needs 73 34 81 58 226 0 50 100 150 200 250 1 (most important) 2 3 4 5 (least important) Other desirable outcomes (open-ended response): [responses not edited for spelling, grammar, or capitalization] Freeze construction of new homes until the current commuting demands are addressed and solved. Minimal disruption of the desert environment especially in the area of the Arizona Sonoran Desert Museum and the Saguaro National Park.. Protecting what is left of the southern Arizona natural world.
    [Show full text]
  • Arizona Transportation History
    Arizona Transportation History Final Report 660 December 2011 Arizona Department of Transportation Research Center DISCLAIMER The contents of this report reflect the views of the authors who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Arizona Department of Transportation or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Trade or manufacturers' names which may appear herein are cited only because they are considered essential to the objectives of the report. The U.S. Government and the State of Arizona do not endorse products or manufacturers. Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA-AZ-11-660 4. Title and Subtitle 5. Report Date December 2011 ARIZONA TRANSPORTATION HISTORY 6. Performing Organization Code 7. Author 8. Performing Organization Report No. Mark E. Pry, Ph.D. and Fred Andersen 9. Performing Organization Name and Address 10. Work Unit No. History Plus 315 E. Balboa Dr. 11. Contract or Grant No. Tempe, AZ 85282 SPR-PL-1(173)-655 12. Sponsoring Agency Name and Address 13.Type of Report & Period Covered ARIZONA DEPARTMENT OF TRANSPORTATION 206 S. 17TH AVENUE PHOENIX, ARIZONA 85007 14. Sponsoring Agency Code Project Manager: Steven Rost, Ph.D. 15. Supplementary Notes Prepared in cooperation with the U.S. Department of Transportation, Federal Highway Administration 16. Abstract The Arizona transportation history project was conceived in anticipation of Arizona’s centennial, which will be celebrated in 2012. Following approval of the Arizona Centennial Plan in 2007, the Arizona Department of Transportation (ADOT) recognized that the centennial celebration would present an opportunity to inform Arizonans of the crucial role that transportation has played in the growth and development of the state.
    [Show full text]
  • LCSH Section I
    I(f) inhibitors I-215 (Salt Lake City, Utah) Interessengemeinschaft Farbenindustrie USE If inhibitors USE Interstate 215 (Salt Lake City, Utah) Aktiengesellschaft Trial, Nuremberg, I & M Canal National Heritage Corridor (Ill.) I-225 (Colo.) Germany, 1947-1948 USE Illinois and Michigan Canal National Heritage USE Interstate 225 (Colo.) Subsequent proceedings, Nuremberg War Corridor (Ill.) I-244 (Tulsa, Okla.) Crime Trials, case no. 6 I & M Canal State Trail (Ill.) USE Interstate 244 (Tulsa, Okla.) BT Nuremberg War Crime Trials, Nuremberg, USE Illinois and Michigan Canal State Trail (Ill.) I-255 (Ill. and Mo.) Germany, 1946-1949 I-5 USE Interstate 255 (Ill. and Mo.) I-H-3 (Hawaii) USE Interstate 5 I-270 (Ill. and Mo. : Proposed) USE Interstate H-3 (Hawaii) I-8 (Ariz. and Calif.) USE Interstate 255 (Ill. and Mo.) I-hadja (African people) USE Interstate 8 (Ariz. and Calif.) I-270 (Md.) USE Kasanga (African people) I-10 USE Interstate 270 (Md.) I Ho Yüan (Beijing, China) USE Interstate 10 I-278 (N.J. and N.Y.) USE Yihe Yuan (Beijing, China) I-15 USE Interstate 278 (N.J. and N.Y.) I Ho Yüan (Peking, China) USE Interstate 15 I-291 (Conn.) USE Yihe Yuan (Beijing, China) I-15 (Fighter plane) USE Interstate 291 (Conn.) I-hsing ware USE Polikarpov I-15 (Fighter plane) I-394 (Minn.) USE Yixing ware I-16 (Fighter plane) USE Interstate 394 (Minn.) I-K'a-wan Hsi (Taiwan) USE Polikarpov I-16 (Fighter plane) I-395 (Baltimore, Md.) USE Qijiawan River (Taiwan) I-17 USE Interstate 395 (Baltimore, Md.) I-Kiribati (May Subd Geog) USE Interstate 17 I-405 (Wash.) UF Gilbertese I-19 (Ariz.) USE Interstate 405 (Wash.) BT Ethnology—Kiribati USE Interstate 19 (Ariz.) I-470 (Ohio and W.
    [Show full text]
  • Interstate Methodology and Data Everquote Analyzed Interstate
    Interstate Methodology and Data EverQuote analyzed interstate fatalities using raw data from the National Highway Traffic Safety Administration Fatality Analysis Report System from the last six years (2010–2015) and found fatality rates based on the highway lengths. We also compared that to data from EverQuote’s safe-driving app, EverDrive. That data represents over 6 million trips and 80 million miles of driving. Phone use is measured by a driver’s phone motion while driving. While it’s difficult to say for sure what impacts these crashes, there are some commonalities between the most lethal interstates, including high traffic volume, risky driving habits and a lack of distracted driving legislation. Distracted driving fatalities increased 8.8% in 2015 and distraction is believed to be responsible for 10% of all fatal crashes. For the first six months of 2016, traffic fatalities were also up 10.4% compared to the first half of last year. EverDrive data shows that US drivers are distracted by their phones on 31% of all drives: ● 11% of drives have a distraction of one minute or longer while driving in a moving vehicle ● 29% of distractions occur at speeds over 56 mph The average number of times per trip that drivers use their phones nationwide is 1.1. Drivers are, on average, driving .4 miles distracted every 11 miles. You can find that information in our “Confused State of Distracted Driving Report” and Infographic Florida: Three of the most dangerous interstate highways run through the state of Florida (I-4, I-95, I-10). Our EverDrive data found that Florida drivers use their phone on average 1.4 phone uses per trip and the state ranks 2nd worst nationally for phone use while driving.
    [Show full text]
  • Arizona State Freight Plan
    Arizona State Freight Plan This document is Arizona’s five-year State Freight Plan and fulfills the federal requirements for state freight plans embodied in the Fixing America’s Surface Transportation (FAST) Act. This Freight Plan, together with a series of technical working papers that informed development of the Freight Plan, also provides the Arizona Department of Transportation (ADOT) with a base of decision making knowledge and strategies to increase the prominence of freight in ADOT planning and programming. Acknowledgements ADOT thanks an outstanding CPCS (CPCS Transcom Inc.) team for its exemplary efforts in producing this Freight Plan. ADOT also expresses gratitude to the Technical Advisory Committee (TAC) and Freight Advisory Committee (FAC) for valuable advice throughout the development of the plan. Michael Demers, though no longer employed at ADOT, is acknowledged for managing the Plan developed for ADOT, while he served as ADOT Freight Planner. Heidi Yaqub, ADOT’s current Freight Program Manager is also recognized for her efforts in completing the Final Plan document. The Arizona State Freight Plan was prepared under the direction of the Arizona Department of Transportation (ADOT) by: CPCS In association with: HDR Engineering, Inc. American Transportation Research Institute, Inc. Elliott D. Pollack & Company Dr. Chris Caplice (MIT) Plan*ET Communities PLLC (Leslie Dornfeld, FAICP) Gill V. Hicks and Associates, Inc. Contact Questions and comments on this plan can be directed to: Charla Glendening, AICP Assistant Manager of Planning and Programming 602-712-7376 www.azdot.gov FINAL | Arizona State Freight Plan Table of Contents 1 Introduction ............................................................................................................................... 1 Purpose of the Freight Plan ...................................................................................................... 1 The Economic Context for the Arizona State Freight Plan ......................................................
    [Show full text]
  • Nevada Truck Parking Implementation Plan Task 4: Draft Needs Assessment – Truck Parking Supply
    Nevada Truck Parking Implementation Plan Task 4: Draft Needs Assessment – Truck Parking Supply prepared for prepared by Nevada Department Cambridge Systematics, Inc. with of Transportation American Transportation Research Institute Horrocks Engineers Silver State Traffic Data Collection April 15, 2019 www.camsys.com draft report Nevada Truck Parking Implementation Plan Task 4: Draft Needs Assessment – Truck Parking Supply prepared for Nevada Department of Transportation prepared by Cambridge Systematics, Inc. 515 S. Figueroa Street, Suite 1975 Los Angeles, CA 90071 with American Transportation Research Institute Horrocks Engineers Silver State Traffic Data Collection date April 15, 2019 Nevada Truck Parking Implementation Plan Table of Contents 1.0 Introduction ........................................................................................................................................ 1-1 2.0 Parking Attributes .............................................................................................................................. 2-3 2.1 Authorized and Unauthorized .................................................................................................... 2-3 2.2 Paved and Unpaved .................................................................................................................. 2-3 2.3 Marked and Unmarked .............................................................................................................. 2-4 2.4 Private and Public .....................................................................................................................
    [Show full text]
  • Title of [Thesis, Dissertation]
    WEATHER RESPONSIVE VARIABLE SPEED LIMIT SYSTEMS by Levi Austin Ewan A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science in Civil Engineering MONTANA STATE UNIVERSITY Bozeman, Montana April 2013 ©COPYRIGHT by Levi Austin Ewan 2013 All Rights Reserved ii APPROVAL of a thesis submitted by Levi Austin Ewan This thesis has been read by each member of the thesis committee and has been found to be satisfactory regarding content, English usage, format, citation, bibliographic style, and consistency and is ready for submission to The Graduate School. Dr. Patrick McGowen Approved for the Department of Civil Engineering Dr. Jerry Stephens Approved for The Graduate School Dr. Ronald W. Larsen iii STATEMENT OF PERMISSION TO USE In presenting this thesis in partial fulfillment of the requirements for a master’s degree at Montana State University, I agree that the Library shall make it available to borrowers under rules of the Library. If I have indicated my intention to copyright this thesis by including a copyright notice page, copying is allowable only for scholarly purposes, consistent with “fair use” as prescribed in the U.S. Copyright Law. Requests for permission for extended quotation from or reproduction of this thesis in whole or in parts may be granted only by the copyright holder. Levi Austin Ewan April 2013 iv ACKNOWLEDGEMENTS I would like to thank my graduate committee members, Dr. Patrick McGowen, Dr. Ahmed Al-Kaisy and Dr. David Veneziano, for their guidance and assistance offered throughout my entire master’s degree program. I wish to thank the Oregon Department of Transportation (ODOT) and the U.S.
    [Show full text]