Building—And Buying—A Campus the Recent Boom—And the Future in Allston by Jonathan Shaw

Total Page:16

File Type:pdf, Size:1020Kb

Building—And Buying—A Campus the Recent Boom—And the Future in Allston by Jonathan Shaw Building—and Buying—a Campus the recent boom—and the future in allston by Jonathan Shaw s Harvard Running Out of Space?” ran a headline existing spaces were begun, it became clear those steps would in this magazine in the spring of 1989. The answer, not be enough. Leaders in the central administration charged the accompanying article explained, was a resound- with planning and real estate had been first to raise the alarm ing “Yes.” The Faculty of Arts and Sciences (FAS) privately. The imminent space crunch was not confined to FAS. “Iwas first to go public with its dilemma, which had become ap- Data they had gathered on growth during the prior 40 years parent as the result of a space analysis provided to Dean Michael showed that Harvard had added more than a million square Spence in 1988. FAS also faced significant deferred maintenance feet of space per decade. problems in the freshman dormitories within Harvard Yard, and “Considerations of flexibility for the long-term future of Har- in its buildings north of the Science Center. A renovation of the vard had not been an issue that was prominent on the radar exterior of Memorial Hall, then used only occasionally for exams screen for the Corporation, and no individual dean had much or special events, prompted thoughts about what to do with the concern for the University’s overall space needs,” recalls Sally grand but underutilized hall within. Planners proposed trans- Zeckhauser, who had headed Harvard Real Estate Inc. since 1979, forming it back into a dining facility for freshmen. The decision and subsequently served (from 1988 to 2009) as Harvard’s vice- to do so eventually freed the Freshman Union to be remade as the president for administration. “But the message coming out of the Barker Center for the Humanities, providing much-needed offices data was clear. To meet Harvard’s mission in the coming decades and a central location for scholars in those fields. would require considerable new physical space.” But almost from the moment renovation and reallocation of Yet it is unlikely that even Zeckhauser could have anticipated 68 September - October 2011 The Cambridge campus as seen from a vantage point above Oxford Street, looking toward the University’s future in Allston Reprinted from Harvard Magazine. For more information, contact Harvard Magazine, Inc. at 617-495-5746 Harvard@ 375 what followed, as Harvard filled out its existing campuses with 15 years between 1994 and 2009, a rate that dwarfed the previous more than 5.5 million square feet of net new space, most of it built pace of growth of the entire University. in a boom during the last decade in which the campus grew at three times its historic rate. FAS and the Harvard School of Pub- Elbow Room Elsewhere— lic Health each grew 30 percent, the Law School grew 21 percent, and the Medical School added 57 percent more space—almost a and on to Allston million new square feet for that one school alone. More than 3 n the Longwood Medical Area, a new research building million square feet were added to the Cambridge campus: a 25 I(later named for the late Warren Alpert, M.B.A. ’47) rose in the percent expansion. Across the campuses in Cambridge, in the Quadrangle in 1992, the first of two (the latter still awaits a name) Medical Area, and in Allston (the Business School and athletic ar- in the past quarter-century. Only at HBS—already in Allston—did eas), the University grew from approximately 15.6 million square growth proceed unconstrained, presaging the University’s future feet to more than 21 million square feet—nearly 35 percent. Capi- even before its land purchases in Allston were made public in 1997. tal spending (more than half of it devoted to new construction Although President Neil L. Rudenstine emphasized interdisci- and acquisitions) rose from less than $225 million annually in the plinary, collaborative academic planning beginning in the 1990s, decade and a half prior to 2000—jumping to more than $600 mil- most of the larger schools (with the exception of FAS) contin- lion in 2001, and eventually peaking in 2009 at $644 million (as ued to make plans independently, with their own budgets. At the University quickly shifted gears to wind down such spending HBS, for example, Dean John McArthur supported the Univer- in the wake of the financial crisis). sity’s Allston land purchases, but wanted no central involvement in his own campus, where Shad Hall, a cutting-edge gymnasium Encountering Constraints in Cambridge that also houses a research computing facility, opened in 1989. The stunning Class of 1959 Chapel (the patina of its green copper ut as Harvard expanded in ever greater concentric rings cladding assured thanks to weathering by goat urine) was built Bwithin Cambridge, Zeckhauser says, it began bumping up in 1992, and renovations to Morgan Hall, the against “mature neighborhoods with sophisticated and politi- principal home of faculty offices, were completed cally active residents often seeking to preserve things just as the same year. In 1999 McArthur­ Hall (a residen- Visit harvardmag. they were.” tial building for executive education) opened, com/campus-375 Academic growth spurts continued at first on the tradition- followed in 2003 by Hawes Hall (a classroom for a compendium of Harvard building al pattern of building around an open green space. Hauser Hall building)—all rising within the school’s existing projects from the (1994), the first new building at the Law School since 1970, rose footprint and prompting no objections. pages of Harvard to complete the Holmes Field quadrangle, in the same way the But back in Cambridge, there was trouble with Magazine from Taubman Building (1990) completed the Kennedy School’s cam- the neighbors, as Zeckhauser anticipated. The 1996 forward. pus. But increasingly, it was tuck, wedge, and squeeze for new 259,000-square-foot Center for Government and International buildings in Cambridge, and renovation for older structures. Studies, for which planning began in 1995, was not completed Towering William James Hall, for example—enormously expen- until 2005; it had to be completely redesigned more than once to sive to renovate—was spared destruction by Spence in the early appease community concerns, more than quadrupling its price to 1990s mainly because the academic spaces the high-rise contained a reported $140 million. A tunnel underneath Cambridge Street couldn’t easily be replaced at the same density. At the same time, linking the two buildings was nixed, echoing earlier thwarted plans were laid to renovate long-mothballed Lowell Lecture Hall. attempts to link the Fogg Art Museum to the Sackler Museum On the site of a faux-Colonial gas station it had acquired in the with an enclosed pedestrian overpass. Similarly, plans to build 1980s, the University built the Inn at Harvard (1991), with the ex- a museum of modern art along the Charles River near Western pectation that it would eventually become faculty offices. Max- Avenue were resisted by vocal Riverside neighbors, some still well Dworkin (1999), with the slimmest of presences on Oxford embittered by the University’s construction of Peabody Terrace Street (it expands from a wedge at the sidewalk entrance into a decades earlier. A park and graduate student housing, mixed substantial building), made new space for information sciences with some affordable housing, went up instead. North of Har- on part of the old Aiken Laboratory site. vard Yard, long-running negotiations with neighbors did allow With little room left on the shelves of campus libraries, books the construction of the 470,000-square-foot Northwest Science began to be shipped to a satellite repository in the suburbs, even- building (2008); its twisting layout mirrors the shape of the par- tually enabling renovation of three major libraries, including cel on which it was built. Langdell at the Law School in beginning in 1996, Widener in 1999, Community concerns thus loomed large in the planning of ev- and Baker at the Business School (HBS) in 2003. Near Quincy ery new building in Cambridge, and space constraints made it House, a parking lot on DeWolfe Street gave way to a substan- clear as well that not many more could be built in any case. Zeck- tial brick apartment building that opened to house students and hauser had realized that Harvard would need a new campus, in junior faculty in 1991. More housing rose later on unbuilt parcels a place with fewer obstacles to its growth, in the late 1980s. In of land near Mather House and in Riverside (2005), along the 1987 or 1988, she put together a proposal and took it to the Har- Charles River near the intersection with Western Avenue. vard Corporation, urging consideration of the long-term physi- Just by renovating and expanding older buildings, and shoe- cal needs of the University, pointing out the difficulty of meeting horning new ones into an increasingly constrained Cambridge them in Cambridge, and identifying Allston as the most promis- campus, FAS alone added a whopping 2 million square feet in the ing place for future expansion. Photographs by Steve Dunwell Harvard Magazine 69 Reprinted from Harvard Magazine. For more information, contact Harvard Magazine, Inc. at 617-495-5746 “The Corporation, with Derek Bok as president, gave the pro- the nature of the dialogue about questions of style and materi- posal careful consideration,” Zeckhauser remembers. “Rod Mac- als. When Harvard—then in a public bidding process for 91 acres Dougall, then Treasurer, was charged with determining how any of Allston land owned by the Massachusetts Turnpike—decid- land assembly in Allston might be undertaken appropriately, giv- ed in 1997 that it was necessary to disclose its aspirations across en the University’s responsibilities, and particularly to assure that the river, that step brought questions of architecture and “brand” Harvard secured properties at fair prices, properties that would to the forefront “in a way that individual projects by individual not be used in the short- or even medium-term.
Recommended publications
  • Harvard Plans Its Sizable Allston Future
    Forging a Connection with immigrants and literacy PAGE6 ~ Community Newspaper Company Ill www.allstonbrightontab.com FRIDAY, OCTOBER 24, 2003 Vol. 8, No. 12 Iii 52 Pages Ill 3 Sections 75¢ New fashions Harvard plans its sizable Allston future By Jill Casey STAFF WRITER "I for one don't want his week Harvard Uni­ versity released its broad Allston to be just T vision for the next phase student housing and of development in Allston. The long-awaited statement did not nothing more. I want offer too many specifics, but did the academic uses and give indication that they hope to transfer many of its integral aca­ bio-tech and medical demic programs across the research. I think the Charles River to Allston. 'This is a critical time in Har­ life sciences are the vard's history, as it is for all high­ future for much of er education .... At such a time, the properties Harvard has acquired Allston Landing." in Allston afford us a historic op­ portunity to innovate, to grow City Councilor and to build our long-term acade­ Jeny McDennott mic strength, while also con­ tributing to the vitality of our im­ With more than 200 acres of portant home communities," said property holdings that they have Harvard University President PHOTO ev ZAAA TZANEV acquired in Allston since the Last week, many people ventured from watchln# the Red Sox at home t o watching the Models from Maggie Inc. show the latest Lawrence Summers in an open fashions at Saks 5th Avenue at Tonic - the Mel L,ounge In Brighton.
    [Show full text]
  • Klarman Hall/ G2 Pavilion at Harvard Business School
    HARVARD | BUSINESS | SCHOOL KLARMAN HALL/ G2 PAVILION AT HARVARD BUSINESS SCHOOL BOSTON CIVIC DESIGN COMMISSION BRIEFING PACKAGE SEPTEMBER 30, 2015 TABLE OF CONTENTS PAGE I. PROJECT INFORMATION 1.1 II. PROJECT TEAM 2.1 III. PROJECT BACKGROUND 3.1 IV. COMMUNITY REVIEW 4.1 V. KLARMAN HALL PROJECT 5.1 A. Project Summary 5.1 B. Project Dimensions 5.2 C. Architectural & Urban Design Goals 5.3 D. Illustrations 5.5 HARVARD | BUSINESS | SCHOOL Klarman Hall/ G2 Pavilion at BOSTON CIVIC DESIGN COMMISSION KLARMAN HALL AND G2 PAVILION Harvard Business School BRIEFING PACKAGE: 09.30.2015 PART I. PROJECT INFORMATION PROJECT NAME: Klarman Hall at Harvard Business School CURRENT PROPERTY OWNER: Harvard University PROJECT PROPONENT: President and Fellows of Harvard College on behalf of the Harvard Business School Holyoke Center, Suite #900 1350 Massachusetts Avenue Cambridge, MA 02138 Drew Faust, President, Harvard University Nitin Nohria, Dean, Harvard Business School Angela Crispi, Associate Dean, Harvard Business School Andy O’Brien, Chief of Operations, Harvard Business School CONTACT: Harvard Business School Shad Hall 70 North Harvard Street Boston, MA 02163 Andy O’Brien Chief of Operations Phone | (617) 496-3534 Fax | (617) 496-7456 HARVARD | BUSINESS | SCHOOL Klarman Hall/ G2 Pavilion at BOSTON CIVIC DESIGN COMMISSION KLARMAN HALL AND G2 PAVILION Harvard Business School BRIEFING PACKAGE: 09.30.2015 1.1 PART II. PROJECT TEAM ARCHITECT SUSTAINABILITY CONSULTANT William Rawn Associates, Architects, Inc., Boston, MA Atelier Ten, New York, NY William
    [Show full text]
  • The Ruth Mulan Chu Chao Center at Harvard Business School
    The Ruth Mulan Chu Chao Center at Harvard Business School BCDC Presentation | November 5, 2013 1. SHIELD LOGO “CENTERED” ABOVE THE NAME LOGO The relative sizes and position should not be changed. Note the shield logo is visually centered between the rules of the name logo (this is not the actual center of name logo); the bottom tip of 1 the shield should point between the “i” and “n” in “Business.” 2. SHIELD LOGO TO THE LEFT OF THE NAME LOGO It is also acceptable for the shield to the left of the name logo. The relative sizes and position should not be changed. 3. SEPARATED In addition, the two logos can be positioned to balance one another on a page (a good rule of thumb for achieving this balance is to position the logos in different quadrants of the page) or appear on separate pages (of a publication). RELATIVE POSITIONS P9 THE RUTH MULAN CHU CHAO CENTER AT HARVARD BUSINESS SCHOOL Project Summary Introduction Existing Site and Context Urban Design The President and Fellows of Harvard College on behalf of the Harvard Business School The site of the Project is in the northeast corner of the HBS campus, to the east of the The Project is located at an important place in the physical geometry of the HBS campus (HBS) propose the construction of the Ruth Mulan Chu Chao Center, a building envi- original HBS campus designed by McKim, Mead and White in the late 1920s. The Project at the end of Harvard Way, and in the social geography of HBS, connecting Executive Edu- sioned as a social center for Executive Education, consisting of approximately 75,000 site is currently occupied by Kresge Hall.
    [Show full text]
  • Explore More Pledges Toward Its $2.5-Billion Goal—Up
    JOHN HARVARD'S JOURNAL gests that shift was driven by changes in Union of Clerical and Technical Workers Partners facilities…is so highly regarded). pension costs and accounting in fiscal year (whose members are not immediately af- It may take all the health-policy and 2003—but there has not been much relief fected by the changes, which are subject -economics expertise at the University’s since. The University’s health coverage, to contract negotiation), a sharp critic of disposal to solve that problem, for Har- in the view of faculty experts at Harvard Harvard’s approach of shifting costs to vard and the wider U.S. healthcare system. Medical School and Harvard School of employees, has not proposed tiered insur- A report on these issues can be found at Public Health, has been very generous— ance plans. The union did release a white harvardmag.com/health-14. and that coverage pays for care in a mar- paper outlining changes in medical servic- ket with very high-quality providers, who es (better use of mail-order prescriptions, charge some of the highest prices in the attempts to reduce emergency-room use Capitalizing country. for urgent care, and so on); it calculated The changes in coinsurance and deduct- savings of $5 million to $6 million annually. The university announced in mid Sep- ibles don’t address those factors. As some Hinting at the large issues still looming, tember that The Harvard Campaign— of the faculty experts point out, high local the union paper noted, “Current research launched publicly a year earlier, with $2.8 costs are associated with academic medi- suggests that the problem of unnecessar- billion of gifts and pledges in hand—had cal centers: the very hospitals affiliated ily high-cost hospital care is particularly realized an additional $1.5 billion of com- with the medical school.
    [Show full text]
  • School of Architecture 2001–2002
    School of Architecture 2001–2002 bulletin of yale university Series 97 Number 3 June 30, 2001 Bulletin of Yale University Postmaster: Send address changes to Bulletin of Yale University, PO Box 208227, New Haven ct 06520-8227 PO Box 208230, New Haven ct 06520-8230 Periodicals postage paid at New Haven, Connecticut Issued sixteen times a year: one time a year in May, October, and November; two times a year in June and September; three times a year in July; six times a year in August Managing Editor: Linda Koch Lorimer Editor: David J. Baker Editorial and Publishing Office: 175 Whitney Avenue, New Haven, Connecticut Publication number (usps 078-500) The closing date for material in this bulletin was June 20, 2001. The University reserves the right to withdraw or modify the courses of instruction or to change the instructors at any time. ©2001 by Yale University. All rights reserved. The material in this bulletin may not be repro- duced, in whole or in part, in any form, whether in print or electronic media, without written permission from Yale University. Open House All interested applicants are invited to attend the School’s Open House: Thursday, November 1, 2001. Inquiries Requests for additional information may be directed to the Registrar, Yale School of Architecture, PO Box 208242, 180 York Street, New Haven ct 06520-8242; telephone, 203.432.2296; fax, 203.432.7175. Web site: www.architecture.yale.edu/ Photo credits: John Jacobson, Sarah Lavery, Michael Marsland, Victoria Partridge, Alec Purves, Ezra Stoller Associates, Yale Office of Public Affairs School of Architecture 2001–2002 bulletin of yale university Series 97 Number 3 June 30, 2001 c yale university ce Pla Lake 102-8 Payne 90-6 Whitney — Gym south Ray York Square Place Tompkins New House Residence rkway er Pa Hall A Tow sh m u n S Central tree Whalley Avenue Ezra Power Stiles t Morse Plant north The Yale Bookstore > Elm Street Hall of Graduate Studies Mory’s Sterling St.
    [Show full text]
  • Calendar of Opening Days for New Students
    Class of 2020 Calendar of Opening Days for New Students Freshman Dean’s Office fdo.fas.harvard.edu Faculty of Arts and Sciences, Harvard University OPENING DAYS CHECKLIST Required Attend Welcome to the Community on Tuesday, 8/23 Attend meetings with your entryway on Tuesday, 8/23, Wednesday, 8/24, and Thursday, 8/25 Learn about the curriculum at Liberal Education: A User’s Guide on Wednesday, 8/24 Join your Academic Adviser for lunch on Wednesday, 8/24 Learn about sexual assault prevention at Speak About It on Wednesday, 8/24 Learn about Harvard’s Honor Code on Thursday, 8/25 Participate in Conversations with Faculty on the Liberal Arts on Thursday, 8/25 Participate in Community Conversations on Tuesday, 8/30 Hear from President Drew Gilpin Faust and the Deans at Freshman Convocation and be in the photo of the Class of 2020 on Tuesday, 8/30 Complete Online Check-in by Tuesday, 8/30 at 11:59 pm Participate in Extended Orientation (check with your Proctor for dates and times) Get a physical examination (for intercollegiate athletes) on Friday, 9/2 Recommended Check online (placement-info.fas.harvard.edu) for placement exam times and locations, and complete any necessary exams Participate in all academic and advising events Take a Crimson Key tour of campus or Harvard Square Check out the schedule of student organization meetings and Late Night @ Harvard event listings Attend the faculty lecture given by Marcyliena Morgan on Thursday, 8/25 Check out Happy. Healthy. Harvard. on Thursday, 8/25 Apply for a Freshman Seminar
    [Show full text]
  • Summer 2021 Testing Schedule 05.13.2021
    May 2021 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 Continue extended hours 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Undergrad Student Begin Summer Hours AM Only Move-out Complete See appendix for last pick-up times 23 24 25 26 27 28 29 No test collection or Commencement AM Only processing 30 31 No test collection or Memorial Day processing No test collection or processing Key: Extended hours (existing) Summer hours Morning testing only University Holiday (no testing) No test collection June 2021 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 Memorial Day AM Only (Observed) No test collection or processing 6 7 8 9 10 11 12 No test collection or AM Only processing 13 14 15 16 17 18 19 No test collection or Juneteenth AM Only processing (Observed) No test collection or processing 20 21 22 23 24 25 26 No test collection or AM Only processing 27 28 29 30 No test collection or processing Key: Extended hours (existing) Summer hours Morning testing only University Holiday (no testing) No test collection July 2021 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4th of July AM Only (Observed) No test collection or processing 4 5 6 7 8 9 10 No test collection or 4th of July AM Only processing (Observed) No test collection or processing 11 12 13 14 15 16 17 No test collection or AM Only processing 18 19 20 21 22 23 24 No test collection or AM Only processing 25 26 27 28 29 30 31 No test collection or AM Only processing Key: Extended hours (existing) Summer hours Morning testing only
    [Show full text]
  • Harvard Univerity 2008 Town Gown Report
    2008 Harvard University’s Town Gown Report for the City of Cambridge Submitted by: University Planning Office Table of Contents I. EXISTING CONDITIONS A. Faculty and Staff ............................................................................................................................... 1 B. Student Body ..................................................................................................................................... 2 C. Student Residences .......................................................................................................................... 3 D. Facilities and Land .......................................................................................................................... 4 E. Real Estate Leased ........................................................................................................................... 7 F. Payments to the City of Cambridge ....................................................................................... 8 II. FUTURE PLANS NARRATIVE A. University Initiatives ...................................................................................................................... 9 B. Capital Projects 1. In Planning ..................................................................................................................................12 2. In Construction ....................................................................................................................... 15 3. Recently Completed ...............................................................................................................18
    [Show full text]
  • Fall 2021 Testing Schedule
    August 2021 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Begin fall weekday Begin fall weekend collection hours (see collection hours (see appendix) appendix) 22 23 24 25 26 27 28 29 30 31 Key: Weekday hours Weekend hours University Holiday (no testing) September 2021 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 Labor Day – No testing 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Key: Weekday hours Weekend hours University Holiday (no testing) Appendix: ‘Last Pickup Not Before’ Schedule ‘Last Pickup Not Before’ times represent the last time that a test can be dropped to guarantee same-day pickup. Any test dropped after last pickup will be retrieved the following morning. Tests retrieved Saturday will be tested on Sunday. Harvard College Last Weekday Pickup Last Weekend Pickup Not Before: Not Before: Adams House 5:30 PM 7:00am Cabot House 5:30 PM 7:00am Currier House 5:30 PM 7:00am Dunster House 5:30 PM 7:00am Eliot House 5:30 PM 7:00am Hurlbut Hall 5:30 PM 7:00am Kirkland House 5:30 PM 7:00am Leverett House 5:30 PM 7:00am Lowell House 5:30 PM 7:00am Mather House 5:30 PM 7:00am Pforzheimer House 5:30 PM 7:00am Quincy House 5:30 PM 7:00am StouGhton Hall 5:30 PM 7:00am Thayer Hall 5:30 PM 7:00am Weld Hall* 5:30 PM 7:00am Winthrop House 5:30 PM 7:00am Other Cambridge/Allston Residential Last Weekday Pickup Last Weekend Pickup Not Before: Not Before: Chao Center 3:00 PM 9:00am Shad Hall 3:00 PM 9:00am SpanGler Center 3:00 PM 9:00am
    [Show full text]
  • Institutional Master Plan Notification Form
    Institutional Master Plan Notification Form HARVARD UNIVERSITY’S CAMPUS IN ALLSTON October 2012 October 17, 2012 Peter Meade Director Boston Redevelopment Authority One City Hall Square 9th Floor Boston, MA 02201 Subject: Institutional Master Plan Notification Form for Harvard University’s Campus in Allston Dear Mr. Meade: I am pleased to submit for your review the Institutional Master Plan Notification Form (“IMPNF”) for Harvard University’s Campus in Allston. This IMPNF is being submitted by Harvard to the BRA pursuant to the provisions of Article 80D-5 of the Boston Zoning Code. This IMPNF filing is intended to start the formal review of the University’s Institutional Master Plan. The information presented in this IMPNF has been discussed with and reviewed by the BRA, the Harvard Allston Task Force, and the community during multiple Task Force meetings and working sessions with the BRA. A meeting of the Harvard Allston Task Force is scheduled for November 7, 2012. In accordance with the requirements of Article 80, a Public Notice of submission of the IMPNF will be published in the Boston Herald on October 19, 2012. We will forward a copy of the notice to your office following publication. Harvard is committed to the economic, intellectual, social and cultural vitality of its neighborhoods and city. In that spirit, together with our Allston neighbors, elected representatives, City and State agencies, and civic leaders, Harvard has created a plan for the future that provides shared opportunity. We look forward to continued planning and discussions with the City, the BRA, the Harvard Allston Task Force and members of the community.
    [Show full text]
  • Mbamission Insider's Guide: Harvard Business School
    mbaMission’s Insider’s Guide Harvard Business School Harvard University Boston, MA 2020–2021 presented by Applying to Business School? mbaMission is your partner in the process! Our team of dedicated, full-time admissions experts has helped thousands of applicants get into their dream MBA programs. These skilled storytellers and MBA graduates will work one-on-one with you to help you discover, select, and articulate your unique stories and stand out from the crowd. Why mbaMission? 15+ years of experience advising Ranked number one firm by GMAT tens of thousands of business Club and Poets&Quants school applicants Exclusively recommended by Extensive, unparalleled library of Services available for all stages of Manhattan Prep since 2009 supplementary content the application process Schedule a free, 30-minute consultation at www.mbamission.com/consult, and start getting answers to all your MBA admissions questions! +1-646-485-8844 [email protected] www.mbamission.com THE ONLY MUST-READ BUSINESS SCHOOL WEBSITE Oering more articles, series and videos on MBA programs and business schools than any other media outlet in the world, Poets&Quants has established a reputation for well-reported and highly-creative stories on the things that matter most to graduate business education prospects, students and alumni. Poets&Quants is a community that stays in touch with its readers. We report on and celebrate their success, share in their lessons and trials. Connect with us to stay informed on B-school admissions, news, internships and careers. Visit www.poetsandquants.com. Poets&Quants | Poets&Quants for Execs | Poets&Quants for Undergrads | Tipping The Scales | We See Genius About mbaMission With our collaborative, full-time team of experienced advisors, mbaMission has elevated and professionalized the world of MBA admissions consulting, earning the exclusive recommendation of the world’s leading GMAT prep firms, Manhattan Prep and Kaplan GMAT, and hundreds more verified five-star reviews on GMAT Club than any other such firm.
    [Show full text]
  • What Gets Built? the Politics of Campus Architecture Certifi Ed Pre-Owned BMW One of Our fi Nest Hours, Revisited
    High-Wire Writing • Lincoln Kirstein • Tropical Forester SEPTEMBER-OCTOBER 2007 • $4.95 What Gets Built? The politics of campus architecture Certifi ed Pre-Owned BMW One of our fi nest hours, revisited. bmwusa.com/cpo The Ultimate 1-800-334-4BMW Driving Machine® After rigorous inspections only the most pristine vehicles are chosen. That’s why we offer a warranty for up to 6 years or 100,000 miles.* In fact, a Certifi ed Pre-Owned BMW looks so good and performs so well it’s hard to believe it’s pre-owned. But it is, we swear. bmwusa.com/cpo Certifi ed by BMW Trained Technicians / BMW Warranty / BMW Leasing and Financing / BMW Roadside Assistance† Pre-Owned. We Swear. *Protection Plan provides coverage for two years or 50,000 miles (whichever comes ¿ rst) from the date of the expiration of the 4-year/50,000-mile BMW New Vehicle Limited Warranty. †Roadside Assistance provides coverage for two years (unlimited miles) from the date of the expiration of the 4-year/unlimited-miles New Vehicle Roadside Assistance Plan. See participating BMW center for details and vehicle availability. For more information, call 1-800-334-4BMW or visit bmwusa.com. ©2007 BMW of North America, LLC. The BMW name and logo are registered trademarks. 125896_2_v1 1 7/20/07 11:46:15 AM SEPTEMBER-OCTOBER 2007 VOLUME 110, NUMBER 1 FEATURES page 11 34 Honorable Forester Peter Ashton’s productive immersion in tropical forests now yields crucial information about biodiversity and threatened ecosystems TOM MOSSER KRIS SNIBBE/HARVARD NEWS OFFICE by Christopher Reed page 59 DEPARTMENTS 40 Writing as Performance A literary scholar deconstructs his own texts 4 Cambridge 02138 to reveal what it costs to “write about the other as Communications from our readers if your life depended on it” 11 Right Now Stephen Greenblatt Calcium channels and male by contraceptives, bad bets and bad apples, the evolution of Vita: Gordon McKay faith, moderating macho 48 Brief life of an inventor with a lasting Harvard 19 Montage legacy: 1821-1903 Screen savant, dance master, Harry R.
    [Show full text]