Guidelines for Bridge Design.P65

Total Page:16

File Type:pdf, Size:1020Kb

Guidelines for Bridge Design.P65 GUIDELINES FOR BRIDGE DESIGN INDEX FROM THE DESK OF SEDC(BR) ....................................................................... 2 FROM THE AUTHORS ........................................................................................ 3 FOREWORD .......................................................................................................... 4 PREFACE ............................................................................................................... 5 FEW WORDS ........................................................................................................ 6 CONTENTS ............................................................................................................ 7 CHAPTER - 1 : INTRODUCTION .........................................................................11 CHAPTER - 2 : ESTIMATION OF DESIGN DISCHARGE SCOUR DEPTH, LINEAR WATERWAY AND AFFLUX .................................................................... 25 CHAPTER - 3 : COMPONENTS OF BRIDGE STRUCTURE ............................. 45 CHAPTER - 4 : SUBMERSIBLE BRIDGES ....................................................... 101 CHAPTER - 5 : INNOVATIVE STRUCTURES AND BRIDGE ASTHETICS ..... 107 CHAPTER - 6 : PREPARATION OF BRIDGE PROJECT ................................. 121 CHAPTER - 7 : PRESTREESING HIGH PERFORMANCE CONCRETE ANTICORROSIVE TREATMENT ...................................................................... 129 ANNEXURES...................................................................................................... 137 BRIDGE DESIGN 1 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 1FROM234567890123456789012345 THE6 DESK OF SEDC(BR) 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 The Engineers, who join this organisation, have to study various codes and 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 books for considerable time to bring themselves up to a desired level of 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 knowledge, as many of them are not in touch with the requisite literature. They 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 do not get proper references at the required moment. They do not precisely know 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 the practices followed in the State P.W.D. as regards the design of bridges and 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 buildings. It was, therefore, considered necessary to prepare guidelines, which 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 will help the engineers to know our practices and also know some useful 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 references for further study. 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 An effort has been made to discuss almost all aspects relating to the bridge 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 design, which are necessary for preparing ‘Bridge Project’ and further preparing 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 the detailed designs. One practical example is also enclosed as annexure to 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 understand the process better. It may please be remembered that these 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 guidelines are useful for the beginners in Bridge Design. The provisions are only 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 guiding principles and hence the designer should also study Text Books, Codes, 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 and Specifications etc. for preparing the Designs. 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 The first edition of these guidelines was published in the year 1997. The same 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 are now being revised as per revisions in IRC codes and prelevant practices in 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 State P.W.D. 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 Some new chapters on submersible bridges, innovative structures, bridge 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 asthetics, and high performance concrete have been added. Also some 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 additional information on hydraulics including Unit Hydrograph Method.Raft 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 foundations and some informative sketches have been incorporated. Hence, it is 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 felt that the second edition of these guidelines will be useful not only to the new 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 entrants in the Designs Circle but also serves as guidelines to the Field 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 Engineers of the Department. 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 AUGUST 2007 Superintending Engineer 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 Designs Circle(Bridges) 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 Konkan Bhavan, Navi Mumbai 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 2 GUIDELINES FOR 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 12345678901234567890123456 1FROM234567890123456789012345 THE6 AUTHORS 12345678901234567890123456 12345678901234567890123456
Recommended publications
  • Bridge and Tunnel Engineering by Sandeep Jyani Sir
    Bridge and Tunnel Engineering By Sandeep Jyani Sir Civil Engineering by Sandeep Jyani Bridge Engineering • Bridge is a structure which provides a passage over an obstacle like river, channel, valley or a road, without closing the way underneath. • The passage required may be for pedestrians, roads, railway or for a pipeline. Civil Engineering by Sandeep Jyani Types of Bridges • Bridges may be classified on the basis as given below: 1. Purpose: A. Road bridges B. Railway bridges C. Foot bridges D. Aqueduct (for carrying canal water) E. Viaduct (for taking roads across valleys) 2. Alignment: A. Square bridge→ if it is at right angles to obstacle B. Skew bridges → if it is not at right angles to obstacle Civil Engineering by Sandeep Jyani Types of Bridges 3. Life period: A. Permanent B. Temporary→ Temporary bridges are built during military operations, during project execution or in rescue operations. 4. Span: A. Culverts – if less than 6 m B. Minor bridge – if 8 to 30 m C. Major bridge – if 30 to 120 m D. Long span bridges – if more than 120 m. Civil Engineering by Sandeep Jyani Types of Bridges 5. Position of high flood level A. Submersible – flow of water above bridge deck level permitted during heavy rains. B. Non-submersible – all permanent bridges have deck level above the high flood level. Civil Engineering by Sandeep Jyani Types of Bridges 6. Fixed or movable: A. Fixed bridges are built but movable bridges are built across navigational 푆푤푖푛푔 퐵푟푖푑푔푒 channels so as to avoid obstacles to navigation. B. Movable bridges may be further classified as a) Swing bridges b) Lift bridges 퐿푖푓푡 퐵푟푖푑푔푒 c) Bascule bridges→In case of bascule bridges entire superstructure is rotated in vertical plane to 70° to 80° suitable hinges and counterweights are provided for easy operations.
    [Show full text]
  • Chapter 6 Bridges
    Chapter 6 Bridges Many bridges have been built to allow roads and rails to cross the Mejerda River and its tributaries in Zone D2, but it is clear that they need to be improved (replaced, raised) because there are places where the design river channel of this Study will not have sufficient downflow capacity. Thus, as in the Master Plan, this Study includes improvements to existing bridges and the building of new bridges to accompany river improvements. The 11 bridges investigated in the Master Plan will be improved to accommodate changes to the design high-water level and channels. This section covers investigations of the bridge improvement plans required to improve the river, conducted according to the following procedures: 1. Fully understanding the current state of existing bridges and the capabilities they lack with respect to river improvements 2. Investigation of policy for improving existing bridges, selection of places in which to build new bridges 3. Improvement plans for existing bridges 4. Plans to build new bridges Since the bridges in question are used differently for roads, highways and railways, this section also includes information on various design standards. 6-1 6.1 Fully Understanding the Current State of Existing Bridges and the Capabilities They Lack with Respect to River Improvements 6.1.1 Current State of Existing Bridges Basic information about existing bridges was gathered prior to investigating bridge improvement policy. In addition to gathering the basic bridge specifications that serve as basic information, the team also surveyed existing structures and organizations that manage structures and verified the extent of damage at each site.
    [Show full text]
  • Use Style: Paper Title
    AUTOMATED FOOT BRIDGE FOR RAILWAY STATION (SMART WAY OF CROSSING TRACKS) Prof. Harish C. Ringe1, Prof. Anushree B. Chaudhari2, Prof. Chitra E. Ghodke3 1,2,3Civil Engineering Dept.,Csmss College of Polytechnic, Aurangabad ABSTRACT This Paper will explain use of Automated Foot Bridge in Railway station to overcome the problem of passing tracks (from one platform to another) in less time period with less efforts, Automated Foot bridge is designed to overcome the accidental problems occurring on the railway stations during passengers crossing the railway tracks and also it will help to transport the goods from one platform to another. Keywords—Automated Foot Bridge,Railway Station, Accidental Problems I. INTRODUCTION As India is fast growing country we are trying to develop our transportation system to fulfill the need of population and as we knows train is one of the best mode of transportation to travel from one place to another, but when time comes to use this mode of transportation people are being irritated due to the crowd and the systems adopted at railway stations to reach on platforms from one to another. And to avoid the time consumption and efforts many of the people choose to reach the platform by crossing the track directly and due to this many of the time accidents occur and many of the people lose their life. According to http://wonderfulmumbai.com website 10 people die every day in railway accidents in Mumbai. 36,152 people have died and 36,688 injured on Mumbai’s Suburban (Local) Trains, from 2002 to 2012. Of the 36,152 deaths, 15,053 occurred on Mumbai’s Western Railway line and 21,099 occurred on Mumbai’s Central Railway.
    [Show full text]
  • PND Engineers, Inc
    PNDANNIVERSARY Engineers, TIMELINE Inc. 27 1979: The company is founded by Roy Peratrovich, Jr. and Dennis Nottingham, two civil/structural engineers, as Peratrovich & Nottingham, Inc. (P&N). Paul Reynolds, a silent stockholder, helps incorporate the company. Peratrovich and Nottingham met each other in the 1960s while working together at the “We were a Alaska Department of Highways. They designed team together, multiple pioneering bridges across Alaska and and we did were already being published for innovative some wonderful design solutions in Alaska – Peratrovich for things. Most welded steel for friction and torsion dolphins; brilliant man I Nottingham for pressure-treated timber floats k n o w.” standardizing Alaska boat shelters. ~Peratrovich Their prize bridges pre-P&N: on Nottingham Cordova Ferry Transfer Bridge: Peratrovich Gulkana River Bridge: Nottingham designed designed the first modern, all-steel, all-welded the 400-foot tied-arch pipeline bridge using steel orthotropic bridge, replacing timber dolphins piles driven into permafrost, setting a new arctic and setting a new marine engineering standard. engineering standard. Hurricane Gulch Bridge: Nottingham performed all seismic calculations by hand – with boxes of pencils and a slide rule – for this 551-foot-long arch bridge that crosses Hurricane Creek and the Canyon divide, 254 feet aboveground. “I spent many sleepless nights wondering if the Hurricane Gulch Bridge would withstand an earthquake, and I went over those calculations over and over again. Several years after that bridge was built, when I had a computer program to analyze the design of the Sitka Harbor Bridge, I went back and checked all of my calculations on the Hurricane Gulch Bridge and found out they were right.
    [Show full text]
  • A Review on Bridge Construction Technology
    INTERNATIONAL JOURNAL OF INFORMATION AND COMPUTING SCIENCE ISSN NO: 0972-1347 A REVIEW ON BRIDGE CONSTRUCTION TECHNOLOGY *A Bharath Kumar ** S Hemanth Sai *** K. Suresh Kumar * Assistant Professor, Department of Civil Engineering, Jaya Pakash Narayan College of Engineering, Telangana, India ** Assistant Professor, Department of Civil Engineering, Nalla Narasimha Reddy Group of Institutions, Telangana, India *** Assistant Professor, Department of Civil Engineering, Nalla Narasimha Reddy Group of Institutions, Telangana, India ABSTRACT The bridge was necessity since ancient days to cross rivers, valleys, hills etc, the first bridge may be the fallen tree over these obstacles, further with the advancement of civil engineering so many types of bridges came into existence like "Steel and RCC bridges", and now a days it is symbol of development for any country. The necessity and various types of bridges included in this review with history of worldwide and Indian bridges and there classification based on material used for the purpose. Keywords: Bridge, Civil engineering, Construction technology INTRODUCTION TYPES OF BRIDGES AND ITS SUITABILITY A Bridge is a structure providing passage Details of components, classification and over an obstacle without closing the way suitability of different Bridges are as beneath. The required passage may be for a follows: road, a railway, pedestrians, a canal or a Components of Bridge pipeline. The obstacle to be crossed may be The bridge structure comprises of the a river, a road, railway or a valley. In other following parts: words, bridge is a structure for carrying the Superstructure or Decking: This includes road traffic or other moving loads over a slab, girder, truss, etc.
    [Show full text]
  • Different Types of Bridges and Its Suitability: a Paper By
    :DIFFERENT TYPES OF BRIDGES AND ITS SUITABILITY: A PAPER BY Prof. P. C. Vasani, Applied Mechanics Department, L. D. College of Engineering, Ahmedabad – 380015. [email protected] Ph. No. – (079)7486320 Mobile No:9825342208 Bhumika B. Mehta M. E. CIVIL - (CASAD) Sem - III B-2, Kalindi Flats, Opp. Kadwa Patidar Boarding, C. G. Road, Ahmedabad – 380006. Ph. No. – (079)6561093 [email protected] PDF created with FinePrint pdfFactory trial version http://www.fineprint.com :DIFFERENT TYPES OF BRIDGES AND ITS SUITABILITY: v Definition A bridge is a structure providing passage over an obstacle without closing the way beneath. The required passage may be for a road, a railway, pedestrians, a canal or a pipeline. The obstacle to be crossed may be a river, a road, railway or a valley. In other words, bridge is a structure for carrying the road traffic or other moving loads over a depression or obstruction such as channel, road or railway. A bridge is an arrangement made to cross an obstacle in the form of a low ground or a stream or a river without closing the way beneath. v Components of bridge The bridge structure comprises of the following parts. Ø Superstructure or Decking This includes slab, girder, truss, etc. This bears the load passing over it and transmits the forces caused by the same to the substructures. Ø Bearings The bearings transmit the load received from the decking on to the substructure and are provided for distribution of the load evenly over the substructure material which may not have sufficient bearing strength to bear the superstructure load directly.
    [Show full text]
  • “Parametric Study of Plate Girder Bridge”
    IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 14, Issue 6 Ver. I (Nov. - Dec. 2017), PP 01-08 www.iosrjournals.org “Parametric Study of Plate Girder Bridge” Pawan Patidar1, Sunil Harne2 1(Civil Engineering Department, IES IPS Academy Indore, India) 2(Civil Engineering Department, IES IPS Academy Indore, India) Abstract: A bridge is a structure providing passage over an obstacle without closing the way beneath. The required passage may be for pedestrians, a railway, a road, canal or pipelines. The obstacle to be crossed may be a road, rivers, railways or valley. There are many different designs that all serve unique purposes and apply to different conditions. The beam bridge carries vertical loads by flexure. The truss bridge of simple span behaves like a beam because it carries vertical loads by bending. The truss bridge of simple span behaves like a beam because it carries vertical loads by bending. The top chords are in compression and the bottom chords are in tension, while the vertical and diagonal members are either in tension or compression depending on their orientation. Loads are carried primarily in compression by the arch bridge, with the reactions at the supports (springing) being both vertical and horizontal forces. Plate girders became popular in the late 1800's, when they were used in construction of rail road bridges. The plates were joined together using angles and rivets to obtain plate girders of desired size. By old 1950's welded plate girders replaced riveted and bolted plate girders in developed world due to their aesthetics, better quality, and economy.
    [Show full text]
  • 2000 Creek in Chemung County Found New Life with the Installation of a Lightweight Fiber Reinforced Polymer (FRP) Composite Deck
    Prize Bridge Award: Reconstructed New York Route 367 over Bentley Creek Village of Wellsburg, New York There are approximately 19,000 steel truss bridges in the United States, most of which were built over 50 years ago and have not had the benefit of regular, thorough cleaning. It was not until recently that bridge owners gained an awareness and appreciation for a good inspection and maintenance program. Cleaning structures of de-icing salts and other debris was virtually unheard of in the early years of these structures. Critical structural elements were allowed to deteriorate as a “natural” course of events. Even under these harsh conditions, many truss struc- tures have demonstrated the longevi- ty of steel as a building material by surviving and performing satisfactori- ly for the better part of the past cen- tury. With an increased effort placed on inspection and load rating, however, some of these bridges have been identi- fied as being structurally deficient and marked for replacement. Because of their age, it is often accepted that these bridges are at the end of their useful life. The project described in this submission pro- vides credible evidence that this is not necessarily true. Though a steel bridge may be 60 years old, the employment of new technology, such as super-light advanced composite decks, can rejuve- nate and extend the service life of “tired” steel bridges a point the deck replace- ment at Bentley Creek illustrates perfectly. Jurors Comments Project Objective Remove the 14 Ton weight restriction ...brings old iron together with new high tech as quickly as possible to satisfy the pub- lic’s demand for highways without materials (FRP) to extend the service life of a impediments to local commerce.
    [Show full text]
  • Bridge Engineering Intro-Converted
    By Aman Kumar ▪ Introduction ▪ Types of Bridges ▪ Bridge Components Definition :- Bridge is a structure having a total length of above 6 metres between the inner faces of the dirt walls for carrying traffic or other moving loads over a depression or obstruction such as channel, road or railway. Bridge is a structure corresponding to the heaviest responsibility in carrying a free flow of transport and is the most significant component of a transportation system in case of communication over spacings/gaps for whatever reason such as aquatic obstacles, valleys and gorges etc. Minor Bridge Major Bridge Structure having a total length of below 6 metres between the inner faces of the dirt walls is know as Culvert. Minor Bridge:- Total Length of the bridge is 60m Major Bridge:- Total Length of the bridge is above 60m High level bridge Submersible bridge/vented causeway High level bridge:- A high level bridge is a bridge which carries the roadway above the highest flood level of the channel. Submersible bridge:- A submersible bridge/vented causeway is a bridge designed to be overtopped during floods. • Beam Bridge • Arch Bridge • Suspension Bridge • The type of bridge used depends on various features of the obstacle. The main feature that controls the bridge type is the size of the obstacle. How far is it from one side to the other? This is a major factor in determining what type of bridge to use. Beam Bridge:- A beam bridge is basically a rigid horizontal structure that rest on two supports, one located at each end of the bridge as shown in Figure (a).
    [Show full text]
  • (AN AUTONOMOUS INSTITUTION) Dr.Kavitha.OR 16CE
    SNS COLLEGE OF TECHNOLOGY, COIMBATORE-35 (AN AUTONOMOUS INSTITUTION) UNIT IV BRIDGES 16CE 401 – DESIGN OF STRUCTURES PRESENTED BY, O.R.KAVITHA ASSOC PROFESSOR DEPT. OF CIVIL ENGINEERING SNS COLLEGE OF TECHNOLOGY Dr.Kavitha.O.R. 16CE 401/ DRCS/ Bridge 1/34 SNS COLLEGE OF TECHNOLOGY, COIMBATORE-35 (AN AUTONOMOUS INSTITUTION) What is a bridge? A bridge is a structure that spans a divide such as: • A stream/river/ravine/valley • Railroad track/roadway/waterway The traffic that uses a bridge may include: • Pedestrian or cycle traffic • Vehicular or rail traffic • Water/gas pipes • A combination of all the above Dr.Kavitha.O.R. 16CE 401/ DRCS/ Bridge 2/34 SNS COLLEGE OF TECHNOLOGY, COIMBATORE-35 (AN AUTONOMOUS INSTITUTION) Function of A Bridge A bridge has to carry a service (which may be highway or railway traffic, a footpath, public utilities, etc.) over an obstacle (which may be another road or railway, a river, a valley, etc.) and to transfer the loads from the service to the foundations at ground level. Dr.Kavitha.O.R. 16CE 401/ DRCS/ Bridge 3/34 SNS COLLEGE OF TECHNOLOGY, COIMBATORE-35 (AN AUTONOMOUS INSTITUTION) Components of bridge • Super structure • Sub structure • Adjoining structure Dr.Kavitha.O.R. 16CE 401/ DRCS/ Bridge 4/34 SNS COLLEGE OF TECHNOLOGY, COIMBATORE-35 (AN AUTONOMOUS INSTITUTION) Dr.Kavitha.O.R. 16CE 401/ DRCS/ Bridge 5/34 SNS COLLEGE OF TECHNOLOGY, COIMBATORE-35 (AN AUTONOMOUS INSTITUTION) Super structure • Beams, Girders • Arch, Cables • Flooring • Bearing • Parapet wall, Hand Rail Dr.Kavitha.O.R. 16CE 401/ DRCS/ Bridge 6/34 SNS COLLEGE OF TECHNOLOGY, COIMBATORE-35 (AN AUTONOMOUS INSTITUTION) Dr.Kavitha.O.R.
    [Show full text]
  • Bridge Engineering
    BRIDGE ENGINEERING By J. S. Alagia Edition : 8th Revised and Enlarged Edition – 1983 ISBN : 9789380358420 Size : 135 mm x 210 mm Binding : Half - cloth Hard-Bound ` 75.00 BUY Pages : 204 + 18 = 222 About the book CoNTENt This text-book aims at presenting the fundamental principles of Bridge Engineering. PArT I : DESCrIPTION OF BrIDGES It is characterised by the clear, methodical and step-by-step treatment of the subject. 1 : GENErAL INTrODUCTION AND TYPES OF BrIDGES Salient features of this book are: numerous diagrams, photographs, brief description and clear 2 : PErMANENT BIG BrIDGES [SUPErSTrUCTUrES] exposition. Typical questions follow each chapter. 3 : PErMANENT BIG BrIDGES [SUBSTrUCTUrES] Throughout this book the chief aim has been to illustrate the subject matter fully with suitable 4 : PErMANENT SMALL BrIDGES diagrams and by direct treatment of the subject matter. 5 : TEMPOrArY BrIDGES The book is written entirely in metric system of units. [TEMPOrArY FIXED BrIDGES] It is hoped that this revised edition will prove useful to students preparing for degree examina- PArT II : DESIGN, CONSTrUCTION AND MAINTENANCE tions in civil engineering of all the Indian Universities, Diploma Examinations of the various 1 : CHOICE OF TYPE OF A BrIDGE Technical Boards, Certificate Courses, and also Associate Membership Examinations of pro- 2 : GENErAL LAYOUT fessional bodies. It should also prove of interest and of practical value to practising engineers. 3 : PErMANENT BIG BrIDGES [SUPErSTrUCTUrES] 4 : PErMANENT BIG BrIDGES [SUBSTrUCTUrES] 5 : PErMANENT SMALL BrIDGES AND TEMPOrArY BrIDGES 6 : CONSTrUCTION AND MAINTENANCE APPENDIX : BrIDGE ArCHITECTUrE INDEX Checklist Charotar Publishing House Pvt. Ltd. Opposite Amul Dairy, Civil Court Road, Post Box No.
    [Show full text]
  • Automated Movable Bridge Powered by Wind and Solar Energy
    Automated Movable Bridge Powered by Wind and Solar Energy Ms. V.Spandana Mr.J.Chandra Shekhar M-tech Student Assistant Professor Department of Thermal Engineering, Department of Thermal Engineering, Malla Reddy College of Engineering Malla Reddy College of Engineering Maisammaguda, Secunderabad, R.R.Dist, T.S, India Maisammaguda, Secunderabad, R.R.Dist, T.S, India Abstract- something new for a bridge design. The retractable Electrical power has become an essential part of our part of the bridge would be designed through a daily lives and when it is interrupted or not available, mechanism that would support and maintain the then the ability to do our jobs or to be able to balance and position of the retractable part (sliding function in a normal manner will become an mechanism). The bridge structure would require a imposition to our daily routine. The electricity stable and strong structure to maintain its balance and requirement of the world is increasing at an alarming stable during retraction of the bridge. The material rate due to industrial growth, increased and extensive usage must be should not have any vibration effect use of electrical gadgets so we can increase the usage which would be dangerous if the bridge would be of the best alternative source nothing but An easily affected by the vibration of the water and the air. efficiently natural source of energy from sunlight as A movable bridge is a bridge that moves to allow ”solar energy’. This paper presents the automation of passage (usually) for boats or barges. An advantage of movable bridges. Most movable bridges rely on making bridges moveable is the lower cost, due to the electrical power to control and operate the absence of high piers and long approaches.
    [Show full text]