Permit No. ______
RETURN THIS FORM AT PROJECT COMPLETION
CITY OF HERMOSA BEACH CONSTRUCTION AND DEMOLITION WASTE REDUCTION REPORT
NOTICE: A minimum of 65% of construction and demolition debris must be recycled for all newly constructed buildings and demolition in preparation for said new construction, and 50% of construction/demolition debris must be recycled for other projects.
Note: Athens Services is the City’s franchise waster hauler and can assist you with completing this form and recycling your construction debris. Call (888) 336-6100.
Owner Name: ______Date: ______
Property Address: ______
Owner Telephone: ______
Contractor Name: ______
Contractor Contact: ______Contractor Telephone: ______
Description of Project: ______
______
Approximate Dollar Value of Construction / Demolition: ______
Approximate Square Footage of Project: ______
Demolition Schedule: ______
Construction Schedule: ______
Name of Hauler(s): ______Telephone: ______
Please check waste reduction activities that are practiced at this project site:
___ Use of Prefabricated Components ___ Reduced Packaging ___ Reuse of Materials Onsite ___ Other (describe) ______Accurate Material Estimates ______
Permit No. ______
CONSTRUCTION AND DEMOLITION WASTE DISPOSITION SUMMARY
Fill out the tables below. The unit of measurement is “tons”. Use the conversion factors provided below. If a different conversion number is used, please provide. If tonnage information is not available, estimates can be provided in “cubic yards”.
Part I. DEMOLITION MATERIALS (tons or cubic yards) Material Disposed Taken to Other Reduced, How Diverted? Type in Class III Inert Fills Disposal Recycled or (e.g., reused as Landfill (describe) Salvaged aggregate, etc.) Concrete
Asphalt
Dirt
Wood
Metals
Mixed Waste
Other (describe)
Total A= B= C= D= Tons
Diversion Rate: D / (A+B+C+D) =
CONVERSION FACTORS Multiply by Number Below to Material Convert Cubic Yards to Tons Asphalt 1.0 Brick 1.2 Dirt 1.3 Wood 0.2 Gypsum Wallboard 0.2 Cardboard 0.02 Mixed Waste 0.9
Additional Notes / Comments:
2 Permit No. ______
CONSTRUCTION AND DEMOLITION WASTE DISPOSITION SUMMARY (cont.)
Part II. CONSTRUCTION MATERIALS (tons or cubic yards) Material Disposed Taken to Other Reduced, How Diverted? Type in Landfills Inert Fills (describe) Recycled or (e.g., reused as Salvaged aggregate, etc.) Concrete
Asphalt
Dirt
Wood
Metals
Mixed Waste
Other (describe)
Total Tons A= B= C= D= or Cubic Yards
Diversion Rate: D / (A+B+C+D) =
Additional Notes / Comments:
3 Permit No. ______
Disposal Facilities Please name of the facilities (e.g., landfill or inert facility name) materials are taken to:
______Facility Name Total Tons or Cubic Yards
______Facility Name Total Tons or Cubic Yards
______Facility Name Total Tons or Cubic Yards
Recycling Facilities Please name of the recycling facilities or recycler (materials given or sold to):
______Recycler / Recycling Facility Name Total Tons or Cubic Yards
______Recycler / Recycling Facility Name Total Tons or Cubic Yards
______Recycler / Recycling Facility Name Total Tons or Cubic Yards
MANIFESTS MUST BE ATTACHED SHOWING ALL DISPOSAL AT BOTH THE LANDFILL AND THE RECYCLING FACILITY
To the best of my knowledge, the above estimates are an accurate representation of the disposition of the construction and demolition materials generated on-site at the construction job. I understand that the City may audit disposal and recycling documentation related to this survey.
______Print Name Signature
Additional Notes / Comments:
Note: Athens Services is the City’s franchise waster hauler and can assist you with completing this form and recycling your construction debris. Call 888-336-6100.
f:b95/cd/forms-handouts/forms/waste recycling report - revised 1-29-14 4