DOCSLIB.ORG
  • Sign Up
  • Log In
  • Upload
  • Sign Up
  • Log In
  • Upload
  • Home
  • »  Tags
  • »  Upper Krishna Project

Upper Krishna Project

  • Integrated State Water Plan for Lower Bhima Sub Basin (K-6) of Krishna Basin

    Integrated State Water Plan for Lower Bhima Sub Basin (K-6) of Krishna Basin

  • Karnataka

    Karnataka

  • 6. Water Quality ------61 6.1 Surface Water Quality Observations ------61 6.2 Ground Water Quality Observations ------62 7

    6. Water Quality ------61 6.1 Surface Water Quality Observations ------61 6.2 Ground Water Quality Observations ------62 7

  • Answered On:21.08.2000 Clearance to Projects in Karnataka Rudragouda Patil

    Answered On:21.08.2000 Clearance to Projects in Karnataka Rudragouda Patil

  • PRELIMINARY REPORT for REMODELLING of NARAYANPUR LEFT BANK CANAL and ITS NETWORK Estimated Cost – 3060 Crores May - 2012

    PRELIMINARY REPORT for REMODELLING of NARAYANPUR LEFT BANK CANAL and ITS NETWORK Estimated Cost – 3060 Crores May - 2012

  • Koppal District

    Koppal District

  • D-Dip0000000640

    D-Dip0000000640

  • KRISHNA BHAGYA JALA NIGAM LIMITED (A Government of Karnataka Undertaking)

    KRISHNA BHAGYA JALA NIGAM LIMITED (A Government of Karnataka Undertaking)

  • Chapter 1 Introduction

    Chapter 1 Introduction

  • Krishna Bhagya Jala Nigam Limited 40 Years of Upper Krishna Project

    Krishna Bhagya Jala Nigam Limited 40 Years of Upper Krishna Project

  • 1. Introduction

    1. Introduction

  • ON the WATERFRONT Promotor: Ir

    ON the WATERFRONT Promotor: Ir

  • 0 0 01 Aug 2016 133549197

    0 0 01 Aug 2016 133549197

  • KWDT II Further Report

    KWDT II Further Report

  • The Political Geographies of Interstate Water Disputes in India Srinivas

    The Political Geographies of Interstate Water Disputes in India Srinivas

  • Progress Report of Upper Krishna Project As at 31

    Progress Report of Upper Krishna Project As at 31

  • Operation and Maintenance Manual for Narayanpur Dam of Karnataka State

    Operation and Maintenance Manual for Narayanpur Dam of Karnataka State

  • World Bank Document

    World Bank Document

Top View
  • The Report of the Krishna Water Disputes Tribunal-II
  • Upper Krishna Project in Vijayapura District, Karnataka
  • Strategic Analyses of the National River Linking Project (NRLP) of India Series 2
  • WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon - 122015, Haryana, INDIA Tel
  • Tale of 2 Ias


© 2024 Docslib.org    Feedback